Loading...
CODE VIOLATION LTR/SITE VISIT CITY OF SALEM, MASSACHUSETTS k BUILDING DEPARTMENT 120 WASHINGTON STREET,3'D FLOOR TEL. (978) 745-9595 F.-�-x(978)740-9846 KIMBERLEY DRISCOLL MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER March 23, 2018 Susan K. Moulton 98 Washington Square East -unit#11 Salem Ma. 01970 Re: site visit Dear Ms Moulton, Thank you for meeting with me last week to attempt to locate the source of popping noises at your building. The area that you pointed out, at the end of your deck,has synthetic decking material(non-wood)which has the tendency to expand and contract based on temperature and exposure to the sun. The boards are fastened perpendicular to the wall in question and some of them appear to be installed too tightly which does not give the material room to expand and contract. I would suggest having a qualified craftsman loosen the fasteners, raise the boards up slightly, and trim off a quarter of an inch of the board and then refasten. This is only a suggestion, but I do believe it should be pretty inexpensive to try and hopefully lead to a solution.The work, as I have proposed, will not need a building permit. If you have any other questions, please let me know. Sincerely, Thomas St.Pierre C47"., 44�� Building Commissioner