VALVOLINE, BP, TCO, CO, ETC. Certificate Number: B-17-844 Permit Number: B-17-844
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Gas Sales Building located at
... ...........................................................................................
Building Type
10 PARADISE ROAD.......................................................................... in the .....................................City of Salem...............................................
......................................................................................................-.................
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
VAL VOLINE INSTANT OIL CHANGE(vioc)
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ............................Not Applicable ..................
*......... unless sooner suspended or revoked.
Expiration Date
Issued On: Thursday, May 31, 2018
Certificate Number: B-17444 Permit Number: B-17-844
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Gas Sales Building........................................................... located at
Building Type
...................................................................10 PARADISE ROAD.......................................................................... in the .....................................0 ...of Salem
.................................................
Address Town/City Name
IS HEREBY GRANTED A TEMPORARY CERTIFICATE OF OCCUPANCY
45 Days
VAL VOLINE INSTANT OIL CHANGE(vioc)
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires G U ......./.6.`....oZ O $ ,. unless sooner suspended or revoked.
Expiration Date
Issued On: Thursday, May 31, 2018
Commonwealth of Massachusetts
City of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of occupancy
Permit No. B-17-844 TO BUILD
FEE PAID: $8,260.87PERMIT
DATE ISSUED: 9/13/2017
This certifies that HENLEY SALEM LLC
has permission to erect, alter, or demolish a building 10„PARADISE,;ROAD Map/Lot: 2000040
as follows: Other Building Permit C l$'1'R 1 # f FAGIt ,Y(FULL BASEMENT WITH
CONCERETE FOUNDATi ! �l8F1: TY' +0 AVE AS OIL CHANGE SI
OCCUPANCY-VALVOLINE- TA10ma j 4 x
Contractor Name: '
BOSS CONTRACTORS INCA. . ,
DBA: ,r
Contractor License No: 071195 s`"
9/13/2017
; i1+di1 a Date
This permit shall be deemed abandoned and invalid unisstft,wttrltlstrithr zedby' pet4 � St fat after issuance.The Building Official
may grant one or more extensions not to exceed six mCr4 eaeh i*adn*166it'r
All work authorized by this permit shall conform to the Op rl #.Opolchlllon and the approved construction do6u�fFiY�w s permit has been granted.
All construction,alterations and changes of use of any bap( artti°*Laures shall be in compliance with the loca* tr VYdt nd codes.
This permit shall be displayed in a location clearly visible t!, t street or road and shall be maintained opet#� for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until alb res by the Bwkimg and FK� permit.
'Fersttrlrt a� uFre e�it n1Y "( )•
HIC#: fund as set forth in MGL c.142A
�� 7
Restrictions:
Building plans are to be available on site.
AN Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts ,
City of Salem
Washington ashington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
Excavation PERMIT TO BE POSTED IN THE WINDOW +
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: DATE
Chimney/Smoke Chamber
Final
Plum in /Gas
a
�f�
Rough:Plumbing t
s �
Rough:Gas
r
Final �� y
Electrica
Service ! ��
Rough
Final
�t
i De rt t
law—
;7T
Finalr
s
Health Department -
Preliminary
Final
I irFNo
-- ---- -mr----
--------------
, o _
u
EIONSKW LAY \ 1
O dN� INSTWT 4L dWQ iAO11IY 1
1 C
I � I
d
1
q,, 1
1 ,
1 \1 t
r I
I
I ID � •
S
I
I , G S^
I
x`3{1 1Sr
DIG
` AS—BUILT SITE PLAN
ASSESSOR'S MAP 20 LOT 4
SHEET 1 OF 1 10 PARADISE ROAD
SALEM, MASSACHUSETTS
GRAPHIC SCALE
M2 R/.1011 ..w�F 16 � HENLEY ENTERPRISES, INC.
w•rsr r r t'6,�!' s1.um�wo.nsar.am loa NerroN IemuNas.W
w ,.GA CONSULTANTS, INC." "1�„�
IO SIU(SAQI,KINlIMYIGNI.W 010W Ip.D74-1 _1197
Him] Construction Control Document
t �
:o he >llhtlitll:tl :Il iOIIIIN�Clloli tlf CitlltiiJll.:I1+111 11\ ;1
' -� Kc�istcrccl Ucsiarn 1'rufr..iunal
for\\(irk per the S "lithm t+I ihi
�I.I,�,J:hu.ett Mete [Wil.litl, C t;tli. 78t1 C Nllt. Nccllo:i. I()7
Valvoline Instant Instant Oil Change Facility 17:ui June 6,2018 Pc;lt)it B-17-844
10 Paradise Road, Salem, MA
i'n?ICL t C 1111 uni it; h,,:il 1, aht\lii;lit,i' X X 1 tulinr ( ,al\lruiti,,i:
This project involves the demolition of the existing gas station and conveinience store, and the
new_constrcuction of a 3-bay Valvoline Instant Oil Chnage Faality,_with new entrances&parking.
Note: The demolition of the existing gas pumps and convenience store will be done under a seperate application
by others. ----- - .
I Edward L._Pesce P.E. MA HeLjI,Iration \LIMba: 32001(civil) C\piraiion ti:iti: June 30, 2020_am:1
l!,l,-%.rg'lt pr"J",.i,01,11 :Itld I h:l\C pi'eparctl or d11':cil\ SLII'1:1 MaI 111: p1C1t:11:11io: of all desi.-mi plan?.
:,,11Jptitalloll,and ,pii;;li alit?'ib Colli C271f I;":
I I ill. I'ttut:t::i,•fl ( ; I I„iti,al 1X; oti;ri Civilisite work;foundation&parking layout,
utilities&!drainage installation.
!c�� ,.„; :!11.'11 r;;:n1:,1 Iuuii.t I. .v in•• Jr�i�•nii. i;;ti 1xlloinJ:J the nrir„ar\ pnl(c„iun.11 entii` citta! N.1,prr,ini ei Illy
011154!1;%:11011,ilc oh ,t reg.Jl:u'antf pinodic ha�,i.. Io Ihr 11x•,: „t'nJt 1,Iw%t IC L_.i. tr;oi ml iUnn.and h:Ilet'the %%oi .
(,rtt:iediti in aiiutaat:�i n1a1 Illi riytluiutrnt�of 7St)C�II� .:ud 1111 di>i•�n tla+cumit!t� .Ip{�rutra:!,p;m ttt ih: b,lil.l.lJ_„
11 unit :Intl lil:It I M 111% di>12nie:
I I Litt:rit ii tt iai. lot coni*k,mnanci to 1111.Cod,and Clic de5i_-11 coniipt, S1141p draft Ing,. Ilinlli%jls
h\ 111e C+?J11fai U!r Ill :1C i,�rdalti,' tt 11'1 1111 Iitltllri;lli llt�VI lhi Col UtrJ1it1+,II tloitll'Jellt>
I I ti
pe,lrirm:d the at;tit, Ior 1'.;i,;.:ritl tli�i�1I1 7SII 1'\111
11:,1. 1><rl: pJi>:J11 ,It nninal,ahhrapJiati la1 1111 >i.1_i,�i ton:lructia�ll h�hrtorli_:ins'c,`i1 I:,nlili,u t%uh tlli
p;u�Ii„ a1t.l ytn;litt tit tl.i %tori. and Io doemi:ne ifihi %%,,rk AA i, performed in .I rinnnit IIIc
i,�ll�tr:7ltlt+li d,'„iilnl:',11- .IIID III',code.
In th„d++cunle'lt relic%e,111:it rtraitur obit, li,l><ui.ihililt ri::udinz Ihr plo',1,1011,r,f 7W(AIN 107.
.0 OF
I Illi! u,Ihe'11,1ii It,Th 1'.,111 a :t r EDWARD L.
PUIM
CIVIL ~
NO, 32001
508-333-7630(cell) I „J.ul: epesce@comcast.net
Jt+`r.l.r,� ,11�_r-[ 1,.,n; I•�II;iJ'..„ _. ��i'
NN1%att IIm� aIfl 1ikoII
Architccturc.
1 June 2018
Steven Cummings, Assistant Building Inspector
Salem Building Department
Salem City Hall
93 Washington Street
Salem, MA 01970
Via email: scummings@salem.com
RE: Valvoline Instant Oil Change
10 Paradise Road
Salem, MA 01970
Dear Mr. Cummings,
It is my understanding the main level floor drain 'P trap' installation heights (lower level below
deck) are inadvertently creating a potential safety hazard for the proper access of the catwalks.
We are fully aware of this issue and are currently exploring ways to mitigate this problem. Please
realize that this situation is not 'ideal' and we are working to come up with the best mutually
acceptable remediation within the allowed grace period.
We respectfully request and thank you in advance for issuance of a 'Conditional Certificate of
Occupancy.' Thank you for bringing this issue to our attention so that it may be properly
addressed it in a timely manner without a detrimental affect to our project schedule. We
appreciate your expertise and help on this project.
Sincerely, II
Wyatt H. Nelson, AIA, NCARB�/.'7'
Architect > No 3Y120 _
3 SYRACUSE
NEW YORK
T
`.-,�yf:Si:i..4: f:f?VJ Yk .l,',203 L,�tiL
4 315 u5 .2G72 E: 4v�i�l�,on wyatine�sora r.oa1 wyattriel on Coil.
Commonwealth of Massachusettsl`
Citv of Salem
120 Washington St 3rd Floor Salem.MA 01970 978 745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-95
TO BUILD
FEE PAID: $308.00 .PERMIT
DATE ISSUED: 2/9/20118
This certifies that HENLEY SALEM LLC
has permission to erect, alter, or demolish, ildin Map/Lot: 200004-0
as follows: Sheet Metal AT VAL
INSTALL SPLIT HVAC U
Contractor Name: ROGER J. LYDICK y
DBA: PAPALRA PLUMBING&HE
f
Contractor License No: 1164 ,
2/9/2018
Date
r
This permit shall be deemed abandoned and invalid u the After issuance.The Building Official
may grant one or more extensions not to exceed six
All work authorized by this permit shall conform to the and the approved con Mtn is permit has been granted.
All construction,alterations and changes of use of any res shall be in compliance with the I nd codes.
This permit shall be displayed in a location cliearly visi or road and shall be maintained for the entire duration of the
work until the completion of the same. "
The Certificate of Occupancy will not be issued until al res by the Building and Fire Officie rmit.
HIC#: 'P fund"(as set forth in MGL 042A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts ,
Citv of Salem
f
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupanc
Structure CITY OF SALEM BUILDING PERMIT
Excavation PERMIT TO BE POSTED IN THE WINDOW
Footing INSPECTION RECOR�
Foundation f
i
Framing
Mechanical .:
Insulation INSPECTION: >� DATE
Chimney/Smoke Chamber
Final
Plum in
b Gas
Rough:Plumbing
Rough:Gas
Final "
Electrical "
Service
Rough �3t
C
Final
jj�Flre Department
Preliminary
rrN,
Final k
® Health Department
Preliminary
Final
i