Loading...
BP FINISH ATTIC 5 4 Commonw�ealtfh of Massachusetts City of Salemlip 120 Washin St,3rd Floor Salem,MA 01970 978 745-9595 x56411" Return card to f dl&V dvbion for Certificate of Occupancy Permit No. B-18-20 `� FEE PAID: $70.00 � ERMIT T BuiD DATE ISSUED: 1/11/2018 This certifies that STREIPS PEER N has permission to erect, alter, or demolish a building 7 MAPLE AYENUMap/Lot: 210215-0 as follows: Other Building Permit -,,A FAMILY PLAYROOM. i Contractor Name: DBA: kt Contractor License No: ;Y s 1/11/2018 � G Date This permit shall be deemed abandoned and fr�alid unlim,the Wt4kI i y W nths after issuance.The Building Official may grant one or more extensions not to exceed six rnon"-eecfr�+pCht+rtldit All work authorized by this permit shall conform to the appro Apron and the approved construction d6ir:1N it NC1A id�4his permit has been granted. All construction,alterations and changes of uso)of any bulftr dlds ores shall be in compliance with the loc evrrl nd codes. This permit shall be displayed in a location clearly visibibilntttwoftt,zet or road and shall be maintained oper� frt for the entire duration of the work until the completion of the same. 4 The Certificate of Occupancy will not be issueld,until alf res by the Building and Fire OfficiaLg, llttt nr,lt. H IC#: PeM4ifK 1ff tlb+ t „ fund'(as set forth in MGL c.142A). Restrictions: Ir t Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. I' Commonwealth of Massachusetts JQ� Citv of Salem 120 Washington3rd Floor Salem AAA 01970 978 745-9595 x56 . St, ( ) Return card to Building Division for Certfficate of Occupa Structure CITY OF SALEM BUILDING PERMIT Excavation PERMIT TO BE POSTED IN THE WINDOW Footing INSPECTION RECORD Foundation Framing ! 09I w ro f' Mechanical k� � �74 a� e � ti•.+ �} k Insulation v PECTION: b s 5 � � DATE �p�` �.s `�7 � °�Ye + E� r� i �1�7 Chimney/Smoke Chamber Final Plumbing/Gas Rough:Plumbing _ �7 , Rough:Gas x s k Final x k� r 't k� a ✓ ? 1 '� inn krts 5.t Electrical Service w ,.ys,:: 7 k Pl� +t, Ire Department " Preliminary Final kh� Heal'S nooartment Preliminary Final