Loading...
CONSTRUCTION OBSERVATION #5, SEPT. 2018 PITMAN & WARDLEY" ?I l'hurch tilicci • aIvin \I:\ l'8 !I.X98? CONSTRUCTION OBSERVATION#5 September 7 2018 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: RCG 120 Washington Street Re: Construction Observation Dear Tom, The following observations are based on a periotic site visits by Michel Beheshti,of my staff. Observation: General areas: • The steel stair that was scheduled to be demoed is removed from 4"floor down to ls,floor and the floor infills are in place. • All windows on 3rd,41&2nd floor north are replaced. 2nd floor: • All new roofing on the flat portion is being installed.The walkway link's roof has ice&water shield but new roofing is not done yet. Lobby Area: • Concrete slab at front entry is place,front entry wall has been modified which reflects the design.The glass frameless front doors are installed,the side lights are not installed yet. The soffit below the existing skylight has been removed and aligned with new framed higher ceiling above the transom levels.The framed ceiling is not finished yet.The south Lobby brick wall is exposed. The north mailbox wall is framed&has sheet rock.The new stud wall separating the restaurant area&the Lobby adjacent to the stair is in place but needs sheet rock&the door. 3"floor south: • The corridor walls have sheet rock on the corridor side and getting ready for egress of 3"floor north and the partial occupancy for the 31d floor north. The floor will be grinded&leveled before new flooring installation.The stud walls are up but need sheet rock&insulation. 3rd floor north: • Units 7, 8&9 have all walls&ceilings have G.W.B.and painted.The corridor needs to have ACT. The shower in unit 9 and wall tiles is installed. • Unit 7 entry door is installed. All trims are being completed. • The Unit 6 is being completed next. 4'"floor: • Stud wall framing is 90%done. Duct works are being done. • South stair enclosure is not complete yet. Recommendations or Actions: 1-The Structural Engineer will be submitting independent reports. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectfully Peter F. Pitman,Architect Massachusetts Registration No. 8749 , DAAC I NSR .