SIGNED BLDG PERMIT & CONS. CONTROL DOCS Commonwealth of Massachusetts Citv of Salem 120 Washington St,3rd Floor Salem,MA 01970 978 745-9595 x5641 gto ( ) Return card to Building Division for Certificate of Occupancy 40 Permit No. B-17-548 FEE PAID: $34,376.41 PERMIT TO BUILD DATE ISSUED: 6/22/2017 This certifies that KAK REALTY TRUST KLEIN A A TR CO THERMAL CIRCUITS has permission to erect, alter, or demolish a Wilding Map/Lot: 70078-0 as follows: Other Building Permit MANUFACTURING 8 OFFICE SPACE - FOR PHASE II ,# } Contractor Name: SCOTT W. MULLER DBA: CONNOLLY BROTHERS, INC 4, yw MM Contractor License No: CS-067865 Vy 6/22/2017 '5" eDate V Eli This permit shall be deemed abandoned and invalid u the after issuance.The Building Official may grant one or more extensions not to exceed six �� � � All work authorized by this permit shall conform to the and the approved constru is permit has been granted. All construction,alterations and changes of use of any res shall be in compliance with the nd codes. This permit shall be displayed in a location clearly visI t or road and shall be maintained n for the entire duration of the work until the completion of the same. F �' The Certificate of Occupancy will not be issued until ali res by the Building and Fire Officia rrnit. 1 Y HIC#: P fund"(asset forth In MGL c.1 42A). Restrictions: ' : Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts Citv of Salem 120 Washington St 3rd Floor Salem MA 01970 978 745-9595 x5641 Return card to Building Division for Certlficate of Occupancy Structure CITY OF SALEM BUILDING PERMIT Excavation PERMIT TO BE POSTED IN THE WINDOW �+ Footing INSPECTION RECORD Foundation Framing Mechanical y � n Insulation ., � :_ �-- INSPECTION: �� ��; � ���� ,= .� DATE Chimney/Smoke Chamber ? Final Plumbing/Gas To G ASC 7.v t a, Rough:Plumbing W��S /9 c_1 Rough:GasRIMP'NAly ON E u� 5 . Final e ^� . J-��u� L ` n� � _ '�_ , Electrical , Service Fire DepartmentAl� eel Preliminary Fin�q�/,+ Health Department Ap Y '00A Preliminary Final Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: TechWay Associates Addition Date: March 12,2018 Permit No. Property Address: One Technology Way, Salem, MA 01970 Project: Check(x)one or both as applicable: X New construction X Existing Construction Project description: Phase II of 33,125 square foot one story plus mezzanine manufacturing and office addition to existing 60,013 square foot IIB fully sprinklered building. Phase 1I included finishing the two story business use portion of the project consisting of private and general offices, reception,conference and meeting rooms, two stair towers,and an elevator. I,Richard Griffin,MA Registration Number: 7814 Expiration date: 8-31-2018,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar withthe progress and quality of the work and to determine if the work was performed in a manner consistentwith the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. \�Rokf-l)AR cyi W. G rF Enter in the space to the right a"wet"or electronic signature and seal: 0 No. 7814 SALEM, 1= �p MA Jy y5P r Phone number:978-740-9979 Email: richard@rgriffinarchitects.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 81h edition of the Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Circuits Date:03/15/2018 Permit No. Property Address: 1 Technology Way, Salem MA 01970 Project: Check(x) one or both as applicable: New Construction X Existing Construction Project description: New addition to existing building-Phase 2 I Charles E. Mace MA Registration Number: 46492 Expiration date: 6/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical X Other: Fire Alarm for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Sign off of this affidavit is contigent on the contractor's delivery of the following documents; including but not limited to certification letter stating that the job has been completed and tested in accordance with applicable codes, all testing reports(e.g. HVAC system balancing, sprinkler system,Fire alarm system, life safety egress,plumbing) as required by the specifications and applicable codes. It is also contigent on the contractor's successful completion and proof thereof, of the punchlist items on the attached document. '��NJ`MgS Enter in the space to the right a"wet"or �,��� '94", electronic signature and seal: CHARLES E. G� g MACE -a 00 ELECTRICAL N N0.46492Q Q A90 9FG/S FSSI � Phone number: 603-319-8244 Email: cmace@CSI-Engineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Circuits Date:03/15/2018 Permit No. Property Address: 1 Technology Way, Salem MA 01970 Project: Check(x) one or both as applicable: New Construction X Existing Construction Project description: New addition onto existing building-Phase 2 I Stanley Chamrin, MA Registration Number: 34938 Expiration date: 6/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical X Fire Protection Electrical X Other: Plumbing for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Note 1:The original registered design professional on the project has since left the company. Although I have not been involved from the start,I have reviewed with designers under my charge, all documents,calculations and construction progress. Sign off of this affidavit is contingent on the contractor's delivery of the following documents;including but not limited to certification letter stating that the job has been completed and tested in accordance with applicable codes,all testing reports(e.g.HVAC system balancing, sprinkler system,Fire alarm system, life safety egress,plumbing)as required by the specifications and applicable codes. It is also contingent on the contractor's successful completion and proof thereof,of the punch-list items on the attached document. yZN OF Mgss9 Enter in the space to the right a"wet"or cy electronic signature and seal: C ANL>I c� CD MECRANIc,at. v No.34936 Phone number: 603-319-8244 Email: schamrin@CSI-Engineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013