VERSA-LAM ®Boise Cascade Double 1-3/4" x 9-1/2" VERSA-LAM® 2.0 3100 SP Floor Beam\FB01
, E Dry� 1 span � No cantilevers 10/12 slope June 28,2018 10:30:07
BC CALC®Design Report .�;,
Build 6536 File Name: BC CALC Project
Job Name: Description: Designs\FB01
Address: 21 Fairview Rd Specifier:
City, State,Zip:Salem, MA 01970 Designer:
Customer: Company:
Code reports: ESR-1040 Misc: Moynihan Lumber Bev-KH
- — 1
... ...
13-06-00
BO 131
Total Horizontal Product Length=13-06-00
Reaction Summary(Down/Uplift) (lbs)
Bearing Live Dead Snow Wind Roof Live _
BO, 3-1/2" 1,620/0 875/0
B1, 3-1/2" 1,620/0 875/0
Live Dead Snow Wind Roof Live Trib.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
1 Standard Load Unf.Area (Ib/ft^2) L 00-00-00 13-06-00 20 10 12-00-00
Controls Summary Value %Allowable Duration Case Location
Pos. Moment 7,859 ft-lbs 56.3% 100% 1 06-09-00
End Shear 2,095 lbs 33.2% 100% 1 01-01-00
Total Load Defl. L/325(0.481") 73.8% n/a 1 06-09-00
Live Load Defl. L/501 (0.312") 71.9% n/a 2 06-09-00
Max Defl. 0.481" 48.1% n/a 1 06-09-00
Span/Depth 16.5 n/a n/a 0 00-00-00
%Allow %Allow
Bearing Supports Dim.(L x W) Value Support Member Material
BO Post 3-1/2"x 3-1/2" 2,495 lbs n/a 27.2% Unspecified
B1 Post 3-1/2"x 3-1/2" 2,495 lbs n/a 27.2% Unspecified
Notes
Design meets Code minimum (L/240)Total load deflection criteria.
Design meets Code minimum (L/360)Live load deflection criteria.
Design meets arbitrary(1")Maximum Total load deflection criteria.
Calculations assume member is fully braced.
BC CALC®analysis is based on IBC 2009.
Design based on Dry Service Condition.
®Boise Cascade Double 1-3/4" x 9-1/2" VERSA-LAM® 2.0 3100 SP Floor BeamT1301
__ Dry 1 span No cantilevers 10/12 slope June 28, 2018 10:30:07
BC CALC®Design Report
Build 6536 File Name: BC CALC Project
Job Name: Description: Designs\FB01
Address: 21 Fairview Rd Specifier:
City, State,Zip:Salem, MA 01970 Designer:
Customer: Company:
Code reports: ESR-1040 Misc: Moynihan Lumber Bev-KH
Connection Diagram Disclosure
b d Completeness and accuracy of input must
be verified by anyone who would rely on
a output as evidence of suitability for
• • • particular application.Output here based
on building code-accepted design
c properties and analysis methods.
Installation of Boise Cascade engineered
wood products must be in accordance with
• • current Installation Guide and applicable
building codes.To obtain Installation Guide
or ask questions,please call
a minimum=2" c=5-1/2" (800)232-0788 before installation.
b minimum=2-1/2"d =24"
BC CALCO,BC FRAMER@,AJSTM
Bolts are assumed to be Grade A307 or Grade 2 or higher. ALLJOISTO,BC RIM BOARD-,Bcl@.
Member has no side loads. BOISE GLULAMTM,SIMPLE FRAMING
Connectors are: 1/2 in. Staggered Through Bolt SYSTEM@),VERSA-LAM@,VERSA-RIM
PLUS@,VERSA-RIM@,
VERSA-STRAND@,VERSA-STUD@ are
trademarks of Boise Cascade Wood
Products L.L.C.