Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
217-221 ESSEX STREET - BUILDING JACKET
217-221 ESSEX STREET IlO No. 153L.2 HASTINGS. MN 'LOS ANGELES-CHICAGO-LOGAN.OH MCGREGOR.TX-LOCUST GROVE.GA - U.S.A. I w CITY OF SALEM PUBLIC PROPERTY DEPARTMENT KI\BERLEY DRISCOLI, MAYOR 120 WASHINGTON XIREET♦SALEM,MASSACHUSETTS 01970 TEL:978-745-9595 FAX:978-740-9846 Ctti�Y December 7, 2006 Ken Carpi Park Towers II, LLC 732 Lynway Lynn, MA 01905 RE: Violations at 217—221 Essex Street Dear Ken; I conducted an Inspection at this Building yesterday with Inspector Holloran of the Salem Fire Department. Work has been done affecting"means of egress corridors" We have no record of Building permits or inspections. This is a violation of the State Building Code 780 CMR, Sections 118.1 through 118.4. Further, and of much more serious a concern is that these changes have impacted the various tenant spaces by removal of a required means of egress, State Building Code 780 C.M.R section 1010.2. Per this section, you have created a"Hazardous Means of Egress"( In any existing building... in which the exits are deemed hazardous or dangerous to life and limb, the Building Official shall declare such building dangerous and unsafe in accordance with 780 CMR 121.0.) Further, per 780 CMR 1004.2.2 "Any person served with any order pursuant to 780 CMR 3400.5 shall have the remedy prescribed in 780 CMR 121."This is a dangerous and hazardous situation that must be immediately remedied; such work must be Permitted and Commence, by a Licensed and Insured Contractor within 24 hours from the receipt of this letter. Any delay or further violation will cause this Department to revoke the Occupancy Certificates for this Building, and Post this Structure as an"Unsafe Structure"per 780 CMR, Section 121.2. Further, I am Ordering that the following conditions be met. First, an Architect must review the structure in the current configuration and check for Code Compliance, inclusive of Architectural Access Board requirements. Any future changes must also be reviewed in this manner. Second, Permits for all work including the Cell Tower installation must be Permitted, performed by a Massachusetts Licensed Construction Supervisor, and Inspected by this Office. Any concealed areas created by this work must be removed to facilitate these inspections. CITY OF SALEM PUBLIC PROPERTY • � . DEPARTMENT KI\BERLEY DRISCOIL MAYOR 120 W ASHINGTON S 1REbr• SALEM,' ASSACHusE r1-s01970 TEL-978-745-9595♦ FAx:978-740-9846 Failure to comply with this Order will result in action being brought against at District Court. If you are aggrieved by any part of this order other than the"hazardous egress"your appeal would be through the Board of Building Regulations and Standards, per 780 CMR, Section 122. In the matter of a"hazardous Means of Egress" there is no appeal. If you have any questions regarding this action please contact this office at (978) 745 —9595, extension 5643. Sincerely, /Joseph E. Barbeau, Jr. Assistant Building Inspector CC: file, Mayor's Office, Health Dept., Fire Prevention, Councilor Corchado r WINTER STREET ARCHITECTS, INC. Pastor Philip Wyman February, 23 2006 The Gathering 217 Essex Street Salem MA 01970 Dear Phil, It was a pleasure to meet with you last week and we wish you and your congregation success at The Gathering's new location. From our earlier conversations, this letter is to address concerns by the Salem Building Department regarding the egress capacities of The Gathering's tenant space at 217 Essex Street in Salem. I understand that the Salem Fire Department has been through the building and is satisfied with the existing and proposed fire alarm, fire and smoke detection and future sprinkler system. Winter Street Architects performed a visual examination of The Gathering's space on Friday, February 17. We did not do an exhaustive investigation of fire rated building materials, assemblies, structural, mechanical and electrical systems or total conformance to accessibility requirements. The intent of this report is to advise on egress deficiencies that may exist within The Gathering's space in violation of CMR 780 Massachusetts State Building Code, 6th Edition. General: The Gathering is a religious organization and the space(Use Group A4, Assembly) contains a sanctuary, offices and some storage space on the first floor and a small room used for storage and limited activities on the basement level. As an existing building it must conform to Chapter 34 of CMR 780 Massachusetts State Building Code, 6th Edition (Repair, Alteration, Addition and Change of Use of Existing Buildings). Which states that any change to or within an Assembly Use Group must conform to the requirements of the code for new construction (780 CMR 3400.3.6). Assuming that the rest of the building is Use group B, Business, Section 3405.0 requires any change in use group to two or more hazard indices to conform with the code for new construction except as provided in 780 CMR 3408 and 3407.0. Separation: According to 780 CMR 313.1 the two use groups must be separated by a one hour(as the building will be equipped with a sprinkler system per 780 CMR 906.2.1) fire resistive assembly per Table 313.1.2. The majority of the tenant space, including the sanctuary, is separated by a masonry bearing wall. This wall has an opening protected by a substantial sliding door, but it appeared to have no closer or positive latching. The other walls appear to be gypsum board or plaster over probably wood frame construction, the floor/ceiling assembly is probably plaster on wood framing. With destructive investigation it could be determined that these assemblies afford the required one hour fireresistive rating. The basement level separation does not appear complete and there are stairs to the second floor that are not fully enclosed and separated. Per Table 1011.4, the corridor fire resistance rating for Use Group A is one hour or zero if the building is equipped with a sprinkler system. 209 64XSIFEET,Sur1E300 WB.4,MASSACHUEEM01970 RiONE978.744.7379 FAX978.741.0240 v .VYSArchitectscom Analysis based on 6th Edition CMR 780 Mass State Building Code Means of Egress: The occupant load for each floor calculated in accordance with 780 CMR Table 1008.1.2 is as follows: Occu ant Load Floor Area Floor Area Per Occupant Floor Area (ftz) Occupant Load (ft2/occupant) Sanctuary 2,100gr/1,100nt 7 net 157 1 Offices/storage 1,070 100 gross 11 Total for Floor= 167 Storage/activity 360 100 gross 4 Basement Total for Floor= 4 Total for tenant space = 171 Based on the occupant loads calculated above, the following minimum number of exits and exit capacity is required from each floor level: Number of Exits 780 CMR Table 1010.2 Floor Occupant Load Required Number Number of of Exits Exits Provided 1 171 2 2 Basement 4 1 (per 1017.2) 1 Exit Capacity 780 CMR Table 1009.2 Exit Floor Occupant Allowance Total Exit Capacity Load (in/person) Provided (persons) Status Door 1/Stair 1 Door 2' 72"Door/0.15=480 36" Door/0.15=240 1 171 0.2(Stair) In 0.15(Door) Compliance. Doors 1 and 2 Total=720 capacity Stair 1 Bsmt 4 0.2(Stair) 36"Stair/0.2= 180 In Compliance. Total= 180 *Door 2 does not swing in the direction of egress 209 `bD(SR T,9.11E 300 SALBA.MAS ACMSEM01970 R-ONE978.744.7379 FAX978.741.0240 w .VrAmhiteciscom It should be noted that Door 2 does not swing in the direction of egress and to reverse the door in its' present opening could create a hazard in the common corridor. Maximum Exit Access Travel Distance: The longest travel distance is from the basement area to the nearest exit(door 2) is approximately 71 feet. This complies with the allowable distance is 250 Feet(780 CMR 1006.5). The travel distance from the basement area to the exit access corridor at the top of the stairs (where there are two separate means of egress) is approximately 38 feet. This complies with the allowable distance of 75 Feet(780 CMR 1017.2). Remoteness of Exits: Where two or more exits are required from a floor or space, they must be separated by a minimum distance equal to '%(with a sprinkler system)of the overall diagonal dimension of the area served (780 CMR 1006.4.1). Doors 1 and 2 are separated by a distance of approximately 28 feet.The overall diagonal dimension of the area served is approximately 102 feet. 102'14=25.5' which is less than 28' therefore the tenant space complies. Other considerations: While the extent of this report is The Gathering tenant space and its' egress requirements, there are existing stairs going through this space that should be addressed. I observed a total of three stairs coming up from the basement level and into The Gathering space. In the event that the Gathering tenant space was unoccupied and secured there appears to be no other way into or out of the basement. I observed one stair which starts at common space at the second floor and ends in a room near the Gathering's women's toilet room. At the top of this stair is a small "Exit"sign which should be removed as there is no guarantee that the door will be unlocked below and creates a hazard. Also, the stair should be enclosed to provide the required one hour use group and tenant separation. From my observation, The Gathering tenant space conforms in general to the building code regarding the required number of exits and means of egress and will benefit greatly by being equipped with a sprinkler system. Please contact us if you need clarification or further assistance. Si er J n Gately Winter Street Architects, Inc. 209®c SIFT 9,.11E 300 SALEM,MASSACRMM01970 - Ri0NE978.744.7379 FAX978.741.0240 w .WSArchitecMcom < .• 1r" splint Consultants Sprint PCS" 400 West Cummings Park,Suite 4050 Woburn,MA 01801 Voice 781932 1313 Fax 781 932 9193 I' City of SalemI Building Department One Salem Green Salem, MA 01970 RE:' Sprint PCS Telecommunications Facility Location: Eastern Bank 217-225 Essex Street 11 Sprint Site ID: BS23XC362a To Whom It May Concern: P The purposed of this letter is to inform you of the Massachusetts Historical Commission's (MHC)requirements pertaining to painting the antennas to be installed on the roof of the Eastern Bank. it Sprint's special permit was' approved with the condition that the antennas be painted to match.the:color.of the building"and existing roof structures (please see the decision attached.) The MHC has requested that the portion of the antennas that project above the line of the roof structures be painted a neutral, non-metallic gray and the portion that is flush with the chimney and penthouse be painted to match those structures. I have also attached a copy of the letter"from the MHC. Please contact me if you have any questions or concerns. Sincerely, T81)Jnnifer McCook 932-1313 . Consultant I cc ,Denise Sullivan, Planriing Department D,ave Hill F-!;- =,;l r, CI i'f CF Sf;LEM, MA CLERK'S OFFICE U.i#u of �5ittljem, Ittssttrl��1 P##s n_,,r „�d999: L -9� 9 13 e�f� ltlY11' `�FIIP2II l�SrPPn r � � ��,� . mains fb �1 Bea. 1.843 PG 41 r 07/30:99 9:36 inst. 175 Ce- -7 �"� Decision For The Petition of Sprint Spectrum L.P. r ' dp 4T1 � Located At 217-225 Essex Street A Public Hearing on this petition was held on July 1, 1999. The following Planning Board members were present: Walter B. Power, III, Chairman; Bill Cullen; Chuck Puleo; Gene Collins; Lee Harrington; Kim Driscoll; David Weiner. Notice of this meeting was sent to abutters and notice of the hearing was properly published in the Salem Evening News. The petitioner is requesting a Wireless Communication Facility Special Permit under Section 5- 3, Special Permit Uses, of the City of Salem Zoning Ordinance,to allow the installation of six panel antennas on the existing building located at 217-225 Essex Street(Eastern Bank). The Planning Board reviewed the application and plans submitted and found that the petitioner addressed the requirements of this section for the issuance of a Special Permit. On July 1, 1999, the Board closed the Public Hearing and then the Planning Board voted by a vote of seven (7) in favor, none opposed, to grant the Wireless Communication Facility Special Permit for the location stated above, in accordance with the applications (dated June 10, 1999), photographs, and site plan dated May 3, 1999 and revised May 11, 1999, titled"Sprint Spectrum LP" and drawn by Coler& Colantonio, Inc.,submitted and now part of the file. The Speciai Pi-eHii was approved with the condition that the applicant paint the antennas to match the color 617-the building and the existing roof structures._In addition,..the_applicant_shall_maintairi the paot on-the antennas. This endorsement shall not take effect until a copy of the decision bearing certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed that it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner's certificate of title. The fee for recording or registering shall be paid by I hereby certify that a copy of this decision is oti file with the city Clerk and that a copy of the decision and`D es is on file with the Planning Board. u UL I `J hereby certify that 20 days have expired ?r4Ur i from the date this instrument was received, Walter B. Power, III and that NO APPEAL has been filed In this Chairman office. t A True Copy ATTEST: CITY CLERK, Salem, Man. +i r IR E i i lj SE' J 1 185 The Commonwealth of Massachusetts William Francis Galvin,Secretary of the Commonwealth Massachusetts Historical Commission September 16, 1999 Sean Carr NEPA Project Manager SAGE Environmental 44 East Avenue Pawtucket,RI 02860 Atm: Heather Stratton,Environmental Scientist RE: Telecommunications Installation,217-221 Essex Street,Salem,MA,MHC#23937;SAGE Reference #BS23XC326A Dear Mr.Carr: Staff of the Massachusetts Historical Commission have reviewed the additional information you submitted,received August 16, 1999,concerning the proposed projects referenced above. The building at 217-221 Essex Street is listed in the State and National Registers of Historic Places as part of the Downtown Salem National Register Historic District and the Old Town Hall National Register Historic District.After a review of materials submitted,the MHC has the following comments. The MHC understands that the proposed project involves installation of two telecommunications antennae on an • existing chimney and penthouse. The MHC further understands that mechanical equipment will be housed in the basement and that the skylight will be minimally modified at its sidewall to accommodate the coaxial cables. The panel antennae will be six feet in height and will project above the roofline 1.5 feet higher than the existing speakers do. �Tha MHC asks vihetheor not'it-is=possible-to-paint°the portion`of the panel antennae which project above the Iine ofl the penthouse and chimney a neutral,non-metalic gray. Where the panel antennae are flush against the penthouse and chimney,the MHC requests whether or-not.they can be painted to match:The-MHC-hopes that this alternative is feasible,as_it_will-help.to_reduce the visibility of the antennae. The MHC looks forward to further consultation. These comments are offered to assist in compliance with M.G.L.Chapter 9,Section 26-27c,as amended by Chapter 254 of the Acts of 1988 (950 CMR 71)and Section 106 of the National Historic Preservation Act of 1966,as amended(36 CFR 800). Please feel free to contact me if you have questions. Sincerely, Ann M.Lattinville XI/ Preservation Planner Massachusetts Historical Commission xc: Lance Kasparian,Salem Historical Commission 220 Morrissey Boulevard,Boston,Massachusetts 02125 • (61—7) 727-8470 Fax:(617) 727-5128 •TDD: 1-800-392-6090 wvwtustate.ma.us/sec/mbc Salem ® Redevelopment Authority February 7, 2006 Mr. Ken Carpi Park Towers II,LLC 732 Lynnway Lynn,MA 01905 RE: The Bank Plaza Building Sign—217 Essex Street, Salem, MA Dear Mr. Carpi: I am writing to inform you that you have erected a sign on your building without receiving the necessary permits from the Salem Redevelopment Authority or the City of Salem and are currently in violation. Your property is located in an Urban Renewal Area. All signs erected in an Urban Renewal Area are required to receive approval from the Design Review Board (DRB) and the Salem Redevelopment Authority (SRA). Following this review process, you are to receive a City of Salem Sign Permit issued by the City Building Inspector prior to erecting your sign. We are requiring that you immediately remove your illegal sign and contact the Salem Redevelopment Authority to find out the steps necessary to apply for a sign permit. Should you have questions or concerns please contact me, in my office, at 978/745-9595 x311. We look forward to helping you come into compliance with the Salem Redevelopment Authority and City of Salem regulations. QSincerely, ]/, aMrtford ` Economics Development Planner cc: nomas St. Pierre, Building Inspector Members of the Salem Redevelopment Authority 120 Washington Street • Salem, Massachusetts 01970 • (978) 745-9595, Ext 311 • Fax (978) 740-0404 . Clay of 52.1^R1 .. Street IUILDiNG Salen, lilasa . 01970 NI��.D OR OFFICE INSPECTION REPORT UNIFORM INSPECTION FORM 508-745-6300 FAR, H 8 1.2 AH "91 BUILDING PERMIT #_2j-21 RECEIVED WIRING PERMIT # CITY OF S;`;LEM,MASS. DATE: /tm e �Z/ / °I1' TIME : INSPECTION SITE NAME INSPECTION SITE ADDRESS_E ;�-/7� DESCRIPTION OF BLDG— °RESIDENTIAL COMMERCTAL�� =i INDUSTRIAL CONTRACTORS NAME Z /�040a L Pi`/ % /e� C?�• //V C� CONTRACTORS ADDRESS 30 7 f MASTERS & 93 _, . JOURNEYMAN# ISO - JOB SOaJOB SITE NUMBER JOURNEYMAN & HELPERS/APPRENTICES - JOURNEYMAN HELPERS APPRENTICES JOB SITE FOREMEN-NAME ADDRESS MASTER# JOURNEYMAN# EXPIRATION DATE EXPIRATION DATE DOES WORK '-= "-` THF MASSACHUSETTS ELECTRICAL CODE REQUIREMENTS YES NO--- VIOLATIONS O_ _VIOLATIONS NOTED: 1 . 2. _ Itl/gIS Z:� ptCa4= CaOC J/4—/h 3• (!700 ,ted RICn P0C. E CODE REFERENCE: 1 . 2. PFI N EL.. Z3 66 R d7 (S 3. P, LICENSEE SIGNATURE INSPECTORS REMARKS INSPECTORS SIGNATURE PAUL M. TUTTLE , CITY ELECTRICIAN cc : William Munroe , Building Inspector LIB:RAIRDRSS/DOC:ELINSPRF � '/�. ��,lli,9-rn /�/u� neo�2 4 ., ,� rR, "sMiTTaL Soep Associates, Inc. eeEzo Mao' 34 LETTER Tel.617 787-2711 AIA DOCUMENT G870 SPACE PLANNERS AND ARCHITECTS PROJECT: ) r;astern Bank i ARCHITECT'S 60,1 (name, address) 217 — 221 Essex St PROTECT Ni%)T'I OF SALEm� �i.Eir,MASS. f Salem, MA — DATE: May 6, 1991 r � TO: Inspector of Buildings If enclosures are not as noted, please One Salem Green inform us immediately. Salem, .MA 01970 If checked below, please: ATTN: Mr. William H. Monroe ( ) Acknowledge receipt of enclosures. L J ( ) Return enclosures to us. WE TRANSMIT: (K)l herewith ( ) under separate cover via ( ) in accordance with your request FOR YOUR: ( ) approval ( ) distribution to parties ( ) information ( ) review & comment ( Yj record ( ) use ( ) THE FOLLOWING: ( ) Drawings ( ) Shop Drawing Prints ( ) Samples ( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature ( ) Change Order ( ) COPIES DATE REV.NO. DESCRIPTION ACTION CODE 1 4-18-91 Architects Field Report 1 5-2-91 Architects Field Report ACTION A. Action indicated on item transmitted D. For signature and forwarding as noted below under REMARKS CODE B. No action required E. See REMARKS below C. For signature and return to this office ' REMARKS COPIES TO: (with enclosures) P. Oliveira ❑ T. Pacitti Cl OBY. Richard T. Perry AIA DOCUMENT 6910 TRANSMITTAL LETTER • APRIL 1970 EDITION • AIAO • COPYRIGHT 0 1970 ONE PAGE THE AMERICAN INSTITUTE OF ARCHITECTS, 17115 MASSACHUSETTS AVENUE,N.W.,WASHINGTON,D.C.20036 ARCHITECT'S OWNER ❑ Soep Associates Inc. 280UncoinStreet ARCHITECT ❑ FIELD REPORT CONSULTANTSPACE PLANNERS AND ARCHITECTS EiOson,tiia.02134 ❑ Tel.61778T-2.711 AIA DOCUMENT C717 FIELD ❑ PROJECT: Eastern Bank FIELD REPORT NO: 03 217 - 221 Essex St. CONTRACT: Salem, MA ARCHITECT'S PROJECT NO: 23601 DATE April 18, 91 TIME 9; OOAM WEATHER TEMP. RANGE EST.% OF COMPLETION 25% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Construction PRESENT AT SITE - OBSERVATIONS 1 . Demolition is completed. 2 . Studding is nearly completed. 3 . Plywood underlayment is installed. 4 . Rough wiring has been inspected and approved. 5 . Revisions to the connecting ramps has been reviewed and approved by J. Santos. 6. Preliminary work on stairway underway. 7 . Framing for fixtures in new toilets is underway. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSI SOEP Associates AIA DOCUMENT 6711 • ARCHITECT'S.FIELD REPORT • OCTOBER 1972 EDITION • AIAO • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE, NW. WASHINGTON,O.C.20006 Page DI Oagm WNER ARCHITECT'S AO CHITECT p Soep Associates Inc. r280 Lincoln Street rIELD REPORT CONSULTANT Cl SPACE PLANNERS ANO ARCHITECTS Boston, Ma.02134 AIA DOCUMENT 0717 FIELD ❑ Tel.617787-2711 PROJECT: Eastern Bank FIELD REPORT NO: 04 CONTRACT: 217 -. 221 Essex St. ARCHITECT'S PROJECT NO: 23601 Salem, MA DATE Map-,2, 1991-TIME 9: 00AM WEATHER TEMP.RANGE EST. % OF COMPLETION CONFORMANCE WITH SCHEDULE WORK IN PROGRESS PRESENT AT SITE OBSERVATIONS 1 . Gypsum wall board installation is complete, including all taping and spackeling, 2 . HVAC ductwork and equipment above the suspended ceiling is nearly complete. 3 . The toilet rooms are ready for tiling. 4 . Gyp. Bd fascia is installed in the stairway. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS REPORTSY: Richard T. Perry CSI SOEP Associates AIA DOCUMENT G71T • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIA® • 0 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON,D.C.20006 page of pages L. • • ate/li)L. 7 i—t# P E A L S Soep rvI 16 9 , 6 '9l Associates, Inc. FECF.0�=0 280 Lincoln Street CITY OFs,;:.H,�Ms. Boston , MA 02134 Tel . 617 787-2711 April 12 , 1991 Mr. William H. Monroe Inspector of Buildings Building Department One Salem Green Salem, MA 01970 Re: Eastern Bank 217-221 Essex Street Dear Mr. Monroe: Enclosed for your records, in accordance with Section 127 of the Massachusetts State Building Code are the bi-weekly field reports for the above named project. Should you have any questions regarding these reports, please do not hesitate to contact this office. sincerely, Q4 Richard T. Perry` C Director of Planning RTP/res c: P. Oliveira c: T. Pacitti SPACE PLANNERS AND ARCHITECTS "ARCHITECT'S OWNER ❑ SoepAssociatesInc. 280Uncolnstreet FIELD REPORT ARCHITECT ❑ O CONSULTANT ❑ SPACE PLANNERS AND ARCHITECTS B=Dn,IVIS.02134 AIA DOCU.VIENT C771 FIELD ❑ Tel.617 787-2711 PROJECT: Eastern Bank FIELD REPORT NO: 01 CONTRACT: 217 - 221 Essex Street ARCHITECT'S PROJECT NO: A, Salem, A 23601 DATE March 21, i1TIME 9: OOAM WEATHER - TEMP.RANGE EST.% OF COMPLETION S% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Demolition PRESENT AT SITE OBSERVATIONS 1. Temporary partitions erected to control dust and secure area from employee traffic . 2 . Removal of suspended ceiling and non-bearing partitons started. 3 . Partition running the lengthof the building being opened to allow for structural evaluation prior to further demolition. 4 . Debris removal underway. ITEMS TO VERIFY Status and adequacy of 4th floor framing before removal of all or portions of center partitions . INFORMATION OR..ACTION REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSI SOEP Associates. AIA DOCUMENT GTT • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIAO • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS.1735 NEW YORK AVE., NW. WASHINGTON,D.0 20006 page 01 pages ARCHITECT'S OWNER ❑ SoepAssociates Inc. 280UncclnStre=t FIELD REPORT ARCHITECT ❑ SPACE PLANNERS AND ARCHITECT$ r E=cn, Ma-O 34 covsuLrnvr ❑ Te1.617787--2'111 AIA DOCUMENT 0717 FIELD ❑ PROJECT: Eastern Ban', FIELD REPORT NO: 02 217 - 221 Essex Street CONTRACT: Salem, MA ARCHITECT'S PROJECT NO: 23601 DATE April 3, 91 TIME 8 : 00AM WEATHER TEMP. RANGE EST. % OF COMPLETION 15% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Demo & Framing. PRESENT AT SITE OBSERVATIONS 1. Demolition 80% complete. 2 . Structural evaluation has been made by the engineer. 3 . Perimeter e:all studding underway. 4 . Electrical materials being delivered to the site . 5 . Removal of wiring and plumbing- underway. 6 . Have mei= with the Wiring Inspector (P. Tuttle) regarding Electrical room requirements. ITEMS TO VERIFY INFORMATION OR A(7,-TON REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSi SOEP Associates AIA OOCUMENT 6711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIAe • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE, NW. WASHINGTON, D.C.20006 page 01 pages M �- 3.s' �asl Plans must be filed and approved by the Inspector before a permit will be granted. No. City of Salem Ward_/ IS PROPERTY LOCATED IN THE HISTORIC DISTRICT? Yes No_ s IF SIDING, HAS ELECTRICAL 1/Home Phone # 509 77'f 9773 PERMIT BEEN OBTAINED? Yes No APPLICATION tfus. Phone #50th 717 Som FOR PERMIT TO ROOF, REROOF OR INSTALL SIDING — W O n`I` 's Salem,Mass., TO THE INSPECTOR OF BUILDINGS: The undersigned herebv applies fora permit to build according to the following specifications: Ownei s name and address 4�}E�h 9. � alga Univ Syr_�e L nV\ M Architect's name IiFtechanic's name and address vtS v SIC �j0.0 G✓1 VK M(} Kocation of building,No.�2 Se 2 A IM t What is the purpose of building?/� ✓r ���- _ Material of building? ASbestos? If a dwelling,for how many families?_ Will the building onfonn to the requirements of the law? iEstima�edcost DO . ContorsLic.No. 4CW, -41411f 5 nb�Daf'� t/Signature of applicant Y �t Cat zSTS� a S EMARK SIGNED UNDER THE �NALTY OF PERJURY. v No, / 9 7 Ward / APPLICATION FOR PERMIT TO ROOF REROOF OR INSTALL SIDING Location4/ PERMIT GRANTED // Af _/1 19941 9 9 7 Approved lld /ns c © IFLECgTQ STREET PERMIT No °:91 �,�nnnrc�R (i➢ilire of 31miputur of 33WINugss gFWp�uF.Wa� /� City Hal1, �AJ � A Permission is hereby given to to occupy for �o�ro'g J purposes min front of eslate 'sw—. 3 ai Wd. CJ of sidewalk, of street. his permit is limited to191&, subject to the provisions of the ordinances and statutes in relation to Streets and the Inspection and Construction of Buildi t t e City of Sa Director of Public Services Inspector of Buil 'ngs Signature of Applicant PC24 2C 2.29.96 =.=ro• Soep Associates Inc. SPACE PLANNERS AND ARCHITECTS July 19, 1991 Mr. William H. Monroe Inspector of Buildings p ° one Salem Green n Salem, MA 01970 rn� rn Re: Eastern Bank fl z 217-221 Essex Street Salem, MA N Dear Mr. Monroe: in accordance with the requirements of the Commonwealth of Massachusetts State Building Code (780 CMR) we hereby certify the work performed at the above named facility is substantially complete. The work performed by Deiulis Brothers Construction Company, Inc. and the related sub-contractors has been completed as indicated on the Contract Documents. Should you have any questions please do not hesitate to call this office. sincerely, Richard Perry, CS Director of Planning c: P. Oliveira T. Pacitti y" 290 LINCOLN STREET BOSTON MASSACHUSETTS 02134.1319 TEL 917 787.2711 FAX 817 7872713 u aCITY OF SALEM PUBLIC PROPERTY DEPARTMENT KIWERLE,Y DRISCOLL MAYOR 120 W[\SFIING'IY)N$'IREB'f * S.VJ4ni,i\IAtiidCl ICSI(fl'S 01970 Ti-L:978-745-9597 ♦ FAx 9787-10-9846 REQUIRED INSPECTION PROPERTY LOCATION 384 Essex Street March 19, 2007 The DRR Real Estate Trust, R. Barnard, Trustee 249 Green Street Marblehead, MA 01945 Dear Mr. Barnard; The above referenced property has come to the attention of this department for the following reason(s): 780 CMR, State Building Code, Section 106; requires that these premises be inspected every five (5)years for Code Compliance/Life Safety Compliance. This property has never been inspected per this Code, and this must be done forthwith. Under the provisions of 780 CMR, Section 115.6, State Building Code, access to this property must be granted for the purposes of inspection. Please call this office upon receipt of this letter to schedule this required inspection. If this property has rental units, these tenants must be notified in advance of this inspection, so that access to these spaces may also be accomplished. This inspection must be completed on or before April 19'h, 2007; failure to respond to this notification will be construed as non-compliance, and as such an Administrative Search Wan ant will be sought, so as to allow the lawful inspection of this property. If you have any further questions regarding this letter; please call this office at (978) 745-9595, extension 5640. Sincerely, Thomas J. St. Pierre Building Commissioner/Zoning Enforcement Officer CC: file, Health Dept., Electrical Dept., Fire Prevention, Mayor's Office, Councilor Pelletier Certificate No: 611-10 Building Permit No.: 611-10 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Pemuts This is to Certify that the BUSINESS located at ----------------------------------------------------- Dwelling Type - 217 ESSEX STREET in the CITY OF SALEM ---------------------------------------------------------------------------- ------------------------------------------------------------------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY PERMANENT OCCUPANCY FOR (MUD PUDDLE TOYS)jbh This permit is granted in conformity with the Statutes and ordinances relating thereto,and expires unless sooner suspended or revoked. Expiration Date Issued On:Thu May 13,2010 - - - - - GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. -----'---------------------------------------'----------'---------------------- O N YSpYE •C 1 CITY OF SALEM BUILDING PERMIT 217 ESSEX STREET 611-10 GIs# r x sag, _;_. COMMONWEALTH OF MASSACHUSETTS ` Map " .�I I 35 .�«+�' s x-. �:! Block ,.';,= CITY OF SALEM CategoryTENANT FIT-OUT PernDt# ��. 611-10� BUILDING PERMIT Project# JS-2010-000956 �';� Est. Cost: $20,000.00 Fee Charged:'"'`, $225.00 1i PI�a a Balance b ei; $.00 PERMISSION IS HEREBY GRANTED TO: Const. Ctass _,. Contractor: License: Expires Use Group:-- UW° "' � P PRE-CON CONSTRUCTION CONSTRUCTIO SUPERVISOR- 101475 Lot Size(sq.`ft) 73350684 !,I : mg r,., BS PARK TOWERS V, L.L.C. Zon ,. weer: Units Gained: ",i( ,Applicant: PRE-CON CONSTRUCTION Units Lost: 217 ESSEX STREET Dig Safe#..;... ISSUED ON: 19-Mar-2010 AMENDED ON: EXPIRES ON: 19-Sep-2010 TO PERFORM THE FOLLOWING WORK: STORE FRONT IMPROVEMENTS AND INTERIOR ALTERATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: Footings: Rough: Rough: Rough: Foundation: Final:. -3 Final: Final: Rough Frame: , Fireplace/Chimney: D.P.W. Fire Health // Insulation: Meter: Oil: l'tl `J [ y Final://yA Q W Y House# Smoke: V� /Water: Alarm: A Assessor Treasury: Sewer: Sprinklers: �///y Final: TIIIS RULES ANDIT MAY BE REGULATIONSOKED BY THE CITY OF SALEM UPON VI ANY OF ITS / ,! ' Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2010-001110 19-Mar-10 189 - $225.00 Call'for Permit ao OCCW �rl'I ON-7 — GcoTMS®2010 Des Lauriers Municipal Solutions,Inc. Now 4' V5QVE AO -c CITY OF SALEM BUILDING PERMIT • a CITY OF SALEM PUBLIC PROPERTY DEPARTMENT KIMNGRLF_Y DRISCOIJ. MAYOR 120WASHING"ION STRLL-r♦ SALETI,MASSACHGSEIT.S 01970 TEL:978-745-9595 0 FAR;978-740-9846 December 7, 2006 Ken Carpi Park Towers II, LLC 732 Lynway Lynn, MA 01905 RE: Violations at 217—221 Essex Street Dear Ken; An Inspection was conducted at this Building yesterday by both myself and Inspector Holloran of the Salem Fire Department. There is evidence of many changes ) within this structure since my last inspection, W2 /10 19erm,h5 Permit. I^•w*re--4��this is a Violation of 780 CMR, the State Building Code, ©-q QOc-41 Section 118.1, and under Section 118.4 is punishable by a fine of$1000 per day, with each day being a separate offense. Further, and of much more serious a concern is that these changes have impacted the various tenant spaces with violations such as removal of a required means of egress. Sir, this is a dangerous and unacceptable situation that must be remedied immediately, such work must be Permitted and Commence within 48 hours from the receipt of this letter. Any delay or further violation will cause this Department to revoke the Occupancy Certificates for this entire Building. Further, I am requiring the following conditions be met. First, an Architect must review the structure in the current configuration and check for Code Compliance, any future changes must also be reviewed in this manner. Second, Permits for all work including the Cell Tower installation must be Permitted and Inspected aF'"'�inft. If, any concealed areas created by this work have not been inspected then this work must be removed to facilitate these inspections. Third, copies of all contracts from work done in 2005 and 2006 must be produced so that-aa-a bu in . This is required so that it can be determined if the value of this work would cause further Code Compliance requirements, such Architectural Access, and/or Sprinkler installation. DATE OF PERMIT PERMIT No. OWNER LOCATION �{- acs ' 04 4 ! I 1135-0251 I drrr: 3/ 12/ 1954 52 Naumkeag Trust Co. 217 Essex Street B-5 STRUCTURE MATERIAL DIMENSIONS No.OFSTORIES No.OFFAMILIES WARD COST BANK & OFFICE brick,wood 2'X101 ' 5 I 1 $ 100,000. steel BUILDER Hydman "3/ 1/88 COPIED ALL INFO FROM ORIGINAL CARD" 10/8/ 1958 11309 Remodel 3rd. floor for general offices. $25,000. 9/ 10/71 11325 Remodel fifth floor arear to provide office space $4,000. 11/ 11/71 11397 Remove existing ballustrades, rails including buttresses from flat roof replace with same design, paint $8,000. 11/27/72 11382 Repair existing fire escape (Contractor - Earle Hydman) 7/9/74 11189 Renovating existing interior with new flooring(carpets) new ceiling, new wall paneling, bathroom conference room, certain amount of n echanicals (Connelly Constr) 2/ 10/75 1120 Renovate office on 4th floor new paneling, ei g pet' (Walsh Const . ) 11/3/75 11335 Install sign cast aluminum letters 10/ 13/76 11454 renovate 3rd. floor, paper, moving and n e t ca oar 7/28/77 11327 Expose base of steel columns at building n are r 8/ 12/77 11341 Erect projecting sign 5'X6' 1/29/81 1124 Alterations to mahogany paneling hang suspended acoustial ceiling. 2/ 13/81 1140 Renovate existing classroom to office and conference room. "OVER" � DATE OF PERMIT PERMIT No. OWNER 1135-0251 LOCATION "'�P, ", �.e A ,aa� drrrd 3/ 12/ 1954 52 Naumkeag Trust Co. I 217 Essex Street B-5 STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No.OF FAMILIES WARD COST BANK & OFFICE brick,wood 2'X101 ' 5 I I I $ 100,000. steel BUILDER Hydman "3/1/88 COPIED ALL INFO FROM ORIGINAL CARD" 10/8/ 1958 #309 Remodel 3rd. floor for general offices. $25,000. 9/ 10/71 #325 Remodel fifth floor arear to provide office space $4,000. 11/11/71 #397 Remove existing ballustrades, rails including buttresses from flat roof replace with same design, paint $8,000. 11/27/72 #382 Repair existing fire escape (Contractor - Earle Hydman) 7/9/74 # 189 Renovating existing interior with new flooring(carpets) new ceiling, new wall paneling, bathroom conference room, certain amount of nechanicals (Connelly Constr) 2/ 10/75 #20 Renovate office on 4th floor new paneling, ei gRrf�l pet' (Walsh Const . ) 11/3/75 #335 Install sign cast aluminum letters AV la 10/ 13/76 #454 renovate 3rd. floor, paper, moving and n e tar 7/28/77 #327 Expose base of steel columns at building n 8/ 12/77 #341 Erect projecting sign 5'X6' 1/29/81 #24 Alterations to mahogany paneling hang suspended acoustial ceiling. 2/ 13/81 #40 Renovate existing classroom to office and conference room. "OVER" 6/5/84 $239 Interior renovastions, no structural, ceiling, walls,etc. 7/30/85 #501 REnovate (Owner - Eastern Bank, Lynn,MA) 1/21/86 #501 CERTIFICATE OF OCCUPANCY ISSUED 7/8/86 #554 Renovation interior, $75,000. fee $455.00 12/9/87 # 1292 Erect sign, est . cost $7,500. fee $50. (Salem Sign Co. ) Eastern Bank 12/7/88 #735-88 Repair gutter and roof, cost $3,000. fee $20.00 5/9/89 #201-89 Renovate handrails & doors for handicap (HANDICAPPED BATH WAITING FOR AMENDED DRAWINGS SHOWING @ BATHROOMS) cost $66,000.fee $401 .00 7/ 10/89 #201-89 CERTIFICATE OF OCCUPANCY ISSUED 3/6/91 #73-91 Interior completion of 2nd. , 3rd. & 5th floors of building for Eastern Bank as per plans submitted, cost $230,000. fee $] ,385.00 J.S. CERTIFICATE OF OCCUPANCY ISSUED: 8/8/91 on permit #73-91 D.Harris, Inspector 3/9/94 #58-94 Replicate existing sash/ Remove existing and install new ( llunits) Est. 4,500 Fee 32.00 J.J.J. 10/7/99 #700-99 INSTALL WIRELESS COMMUNICATION ANTENNAS PER PLANS SUBMITTED. PLANNING BOARD APPROVAL. est. 62,000.00 fee 620.00 T.J.S. PROJECT NAME: 2.5 EQUIPMENT DEPLOYMENT Sprint' VISIONMARKET NAME: BOSTON 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH, NJ 07495 BS23XC362 (201) 694.4000 ■ EASTERN BANK TRM r i n 6 CHESTNUT STREET, SUE 220 217 ESSEX STREET FO%BOROUGH, MA 02035 (774) 215-5421 TM SALEM, MA 01970 wwwlrmcom.com ® �CHAPPELL VISION ESSEX COUNTY ENGINEERING ® �ASSOCIATES, LLC SITE TYPE: ROOFTOP GAv)+'S1rDc11,n11.)-a1Tc,S,FYeYr1,, R.K. EXECUTIVE CENTRE 201 BOSTON POST ROAD WEST, SUITE 101 MARLBOROUGH, MA 01752 (508) 481-7400 SITE INFORMATION: VICINITY MAP APPROVALS www.chOppellengineering.com LAND]-OWER OWNER: PARKTOWERS N,LLC SCALE; T"=1000' ATTN:PETER BOHLIN LANDLORDJTOWER OWNER: n 100 WASHINGTON STREET,SUITE it ,r] '- � CONSTRUCTION MANAGER: SALEM,MA 01970 %"+ y f' RF ENGINEER: APPLICANT: SPRINT - 1 INTERNATIONAL BLVD,SUITE 800 SITE ACQUISITIONAEASING AGENT: +� DAVI MAHWAH,NJ 07495 •. � • '., �•: K> w7• SPRINT: SITE ADDRESS: 217 ESSEX STREET • •Af .r H SALEM,MA 01970 '-• - SHEET INDEX OG COUNTY: ESSEX LATITUDE: N4231'i6.Tr DWG. DESCRIPTION REV. GJSjEF �4 LONGITUDE: W]0 W41.1' S` *��^ ' `�ONALENG� GROUND ELEVATION: 22.0±AMSl - ^<^•- v 'Q� T-0 TIRE SHEET 1 SITE TYPE: ROOFTOP - SITE K,. �. GNt GENERAL NOTES 1 1 x <' tdl STRUCTURE HEIGHT: 68.0±AGL A. x U GN-2 GENERAL NOTES Ir: ENGINEER/LAND SURVEYOR DATE ANTENNA RAD CENTER85.2±AGL dx.+ A-1 ROOF PLAN wAA It 6 n VOLXMN OF w FOR Nn f<xsox, : A-2 ELEVATION 1 uNU55 ILC NTE 4M uxOm 1xc oix[rnox TAX ID PARCEL NUMBER: MAP 35 LOT 251 _ -� � of n uc[xsm frtof¢aoNu[waw ZONING JURISDICTION: CITYOFSALEM .. .., A3 ANTENNA PLANS&DETAILS `1 To.LLTTx THS L'CCL M, EQUIPMENT PWT,DETAILS&HYBRID CABLE SPECIRCKnONS 1 ZONING DISTRICT: B5(CENTRAL DEVELOPMENT) e:: 'A " REVISIONS MATERIALS DATA SHEET 801LL OF MATEAS 1 ARCHITECT/ENGINEER: CI-L201 FIPEILL BOSTON POST RINGROAD ASSOCIATES,LLC AB WIRING DIAGRAMS 1 201 BOSTON POSTROADWEST,SUITE 101 may. AMRLBOROUGH,MA 01752 �� F}� � FJ�G •r - - ��. r+ L Si STRUCNRALDEfAILS 1 POWER COMPANY: NATIONAL GRID ' .� Sr i 170MEDFORDSTREET §r , 4" r •..* `. • g Et ONE4INE DWGRAAI&PRO DETAILS 1 E 148 ,•)_ J ih 2 GROUNDING DETAILS&NOTES (BOD V�405 1 FIBERCOMPANY: COMCAST,INC. 4 PROJECT DESCRIPTION SIAM85 EAST BELCHER STREET f .6 �'?{ 1 01/29/1SIAMFOR CdI51RIILTDH FOXBOROUGH,MA 02035 p . K 1 4'. "{ ��Bi ¢ - %•I SPRINT EQUIPMENT MODIFICATIONS REQUIRED TO SUPPORT MODERNIZATION OF AN EXISTING 0 01/27/14 MED FOR REAM (500) -oo22 I °"' � "T' � ?� r WIRELESS COMMUNICATIONS FACILITY AND UTILIZATION OF FCC BROADBAND SPECTRUM SPRINT MARKET MANAGER: RONALD HIBBARO b 1 5 I `'eemsY�N! / REV. DATE DESCRIPTION ,'"'tF�«� /�? LICENSE FOR 2.SGHZ FREQUENCY.INCLUDING INSTALLATION OF: B (]!4)269-8812 mnWd.hibbertlpsprintcom JL xl - 4 ` 1„^j .b.uu' GROUND-LEVEL RAN EQUIPMENT,CONSISTING OF: 12 � RETROFIT EXISTING WARTS CABINET WITH 2.5 RADIO ACCESS NETWORK(RAN) 1218.019 'Bc O0 AS SHOWN EQUIPMENT SUPPLIER ALCATEL-LUCENT EQUIPMENT 600 MOUNTAIN AVENUE DIRECTIONS (2)ADDITIONAL BATTERY STRINGS INSIDE EXISTING BATTERY BACKUP(BBU)CABINET xm¢T rud4vJnx MURRAY HILL,NJ O774 (9O8)508-8080 TOWER-TOP EQUIPMENT,INCLUDING INSTALLATION OF: TAKE I-287N TOWARD I-87. KEEP RIGHT AT FORK AND MERGE ONTO I-287 E11-67 S. CONTINUE TO FOLLOW I-287 E. TAKE (3)PANEL ANTENNAS BS23XC362 EXIT9N-9SFORHUTCHINSONPARKWAYTOWARDWHITESTONEBRIDGEIMERRITTPARKWAY. MERGE ONTO • (3)REMOTE RADIO GENERAL NOTES EASTERN BANK AVENUE TAKE THE HUTCHINSON PARKWAY N RAMP TO MERRITT PARKWAY. MERGE ONTO HUTCHINSON RIVER PARKWAY (1)HYBRID CABLE ASSOCIATED FIBER.DC POWER,COAXIAL CABLE JUMPERS AND N. CONTINUE ONTO CT-15 N. TAKE EXIT 68 N-ETO MERGE ONTO 1-91 NTOWARD CT416 E/HARTFORD/MIDOLETOWN. TAKE ANTENNA REMOTE ELECTRICAL-TILT(RET)CABLE THIS IS AN UNMANNED AND RESTRICTED ACCESS TELECOMMUNICATIONS FACILITY,AND IS EXIT 29 FOR CT-15N/US-S N TOWARD 1-84 EIE HARTFORD/BOSTON. CONTINUE ONTO CT-15 N. MERGE ONTO 154 E. TAKE NOT FOR HUMAN HABITATION.IT WILL BE USED FOR THE TRANSMISSION OF RADIO SIGNAL EXIT ONTO I-90 ETOWARD NH-MAINE/BOSTON. TAKE EXIT 14 FOR 1-95 N TOWARD NH-MAINE CONTINUE ONTO MA-128 N. SPECIAL ZONING NOTE: 217 ESSEX STREET FOR THE PURPOSE OF PROVIDING PUBUC CELLULAR SERVICE. TAKE EXIT 25A FOR MA-114 EJANDOVER STREET TOWARD SALEM. TURN LEFT ONTO ENDICOTT STREET. CONTINUE ONTO BASEDONINFORMATION PROVIDED BY SPRINT REGULATORY COMPLIANCE PROFESSIONALS SALEM,MA 01970 • ADA COMPLIANCE IS NOT REQUIRED PULASKI STREET. TURN RIGHT ONTO GARDNER STREET. TURN RIGHT ONTO MARGIN STREET. CONTINUE ONTO NORTH AND LEGAL COUNSEL THIS TELECOMMUNICATIONS EQUIPMENT DEPLOYMENT IS • POTABLE WATER OR SANITARY SERVICE IS NOT REQUIRED STREET. TURN LEFT ONTO ESSEX STREET. SITE IS LOCATED ON THE RIGHT HAND SIDE. CONSIDERED AN ELIGIBLE FACILITY UNDER THE TAX RELIEF ACT OF 2012,47 USC 1455(A).AND p•V•G AIRF • NO OUTDOOR STORAGE OR ANY SCUD WASTE RECEPTACLES ARE REQUIRED IS SUBJECT TO AN EXPEDITED ELIGIBLE FACNTIES REQUEST/REVIEW AND ZONING PRE-EMPRON FOR LOCAL DISCRETIONARY PERMITS(VARIANCE,SPECIAL PERMIT,SITE PLAN TITLE SHEET SPRINT MAINTENANCE CREW(TYPICALLY ONE PERSON)WILL MAKE AN AVERAGE OF ONE TRIP flEVIEW,ADMINISTRATIVE RENEW). PER MONTH ATONE HOUR PER VISIT. 8 AT LEAST 72 HOURS PRIOR TO DO NOT SCALE DRAWINGS DRAWINGS AND NEW CONSTRUCTION SHALL CONFORM TO ALL LESS S BLE STAND RD CIVIL DIGGING,THE CONTRACTORS oxr>vf14 x'4� INTEGRATED CONSTRUCTION STANDARDS FOR COMBINED WIRELESS SMS,STANDARD CML DETAILS AND GENERAL DESIGN GUIDUNES,CODES AND ORDINANCES REQUIRED TO CALL DIG SAFE AT 811 CONTRACTOR SHALLVERIFY ALL PLANS AND EXISTING DIMENSIONS AND CONDITIONS ON THE �_� Di afe JOB SITE AND SHALL IMMEDIATELY NOTIFY THE PROJECT OWNERS REPRESENTATIVE IN WRITING OF DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS, DESCRIBE THE WORK(RET) BE PERFORMED BY THE CONTRACTOR. SECTION 01 100 - SCOPE OF WORK 5. LOAD PHOTOS TO SIIERW PROJECT LIBRARY 15.IN 6 CREATE NEW CATEGORY;2.5 OEPWMN,F,AND SECTOR; ROOM ELECTRICAL TILT (RET) CABLES;PERMANENT CONEMURION.IABEL WIT PHOTOS H SITE CAVIEW SCADE AND BERING OMCIEO.GYERAS USED TO TAKE Sprint' ME W RK tPHOTOCIAPHS OR .FIEOY A.CM ER LTDRP LOq MAT WECM ARY NEW RNNAM ANTEHHA NATE ING-L W ME PHOTO MMA-FILE �. �p� SHALL COMPLY WIN MPIKABIE NATIONAL CODES AND STPNDAROS,-TEST EDITION,AND PORTIONS THEREOF. WSe SPIMIERS,COMBINERS.FILTERS PER W DATA SER, FURNISHED BY SPRIT. VISION PRECFOENR: CONMISSIONINC: ANTENNA NSTALAMIA SHOULD CONFL=OCCUR BETWEEN THE WANGRD CONSTRUCTION SPECIFKATNMS FOR WIRELESS SITES INCLUDING ME PERFORM NL COMMISSIONING AN REWIRED BY MPUCABLE MOPS ME CONTFOLTOR GHALL A EENIBLE Nl ANTENNAS ONEI E M ADCORUANCE WITH THE UNMUCHONS SUPPLIED BY THE 1 INTERNATIONAL BLVD, SURE 800 STANDARD CONST DONT DUNLS FOR WIRELESS$IES AND ME CON FFL CTION DHAIWNGS, INFOPoMnON ON MEMON INTEGRATION UFACIURER.ANTENNA HE%HT,AZIMUTH.AND FEED OMEMATKKSULL I INFORMATION BE A DESIGNATED ON ME CONSTRUCTION DRAWINGS%IAL TAKE PRECEDENCE. ' CoN,HACBON DRAWINGS MAHWAH, NJ 07495 PERFORM NL INTEGRATION ACIAMES A5 REWIRED BY AFPI.IGBLE MOPS (201) 684-4000 SITE EAMWADH A THE RINIPILTOR SWJL POSITION THE MREHW W TOWER PIPE MOUNTS 50 TWT ME BOTTOM STRUT 6 LLVFI.. CONTRACTOR SHALL BE RESEEDING TOR FAMRNCTIINC wMSEIF MIM PLL CONTACT DOCUMENTS,HELD fXANOff0N5 AND SECTION 07 500 - ROOF CUTTING, PATCHING & REPAIR THE PPE MOUNTS SRNL RA PLUMB TO WITHIN OINENSIONS PRIOR i0 PROCEEDING WEH CONSMULTION. 1 DECREE. TRM ON-°�UPEIMION' THIS SECTION snonm CUTTING AND PATCHING EKIEING ROOFING SKTEMS%HERE CONCUR OR CABLES EXR ME BUIIDINC B. AORTA MOUNTING REWBSMENTS: PROVIDE ANTENNA MIMING HNIMARE AS INDICTED ON ME OWWINGS THE OS.TCTW SHALL OUERASE AND DIRECT ME WORK AVD SHALL M RESE CXNTE FOR CONSIRII3. MEANS, ONTO ME ROOF B BUILDING-MOUNTEDROCROSHAIANTENNAS.LAID AN REWIRED FOR H LANDLORD. .ANY INCE ROOFTOP ENTRY MEIHOW,TECHXIWFS, SEQUENCES.AND PROCWURES W ACCORDANCE WITH ME CONTRACT DOCUMENTS. OPENINGS 15 MEMBRANE ROOFTOPS SFLAEL BE CONSHUCIED TO COMPLY GOTH VWDLORO,AN/E6nNG WARRANTY,PAD HYBRID CARIES INSTALLATION: LOLL JIlR6DK'i101U1 STANGROS THE COKTRUCTON CONMMCTW SINAL MARIAN A TILL SET OF ME CONSTRUCTION DRAWINGS AT ME JOBSIIE FROM 1.4 SUBMMTAIS: A ME CONIRACTW SHNL ROUTE,LEST,Aldi INSTALL P11 CABLES AN INDICATED ON ME CONSWUCI%N DRAWINGS 16 CHESTNUT STREET, SUITE 220 MWIUZXMON MROUGX CONSIRULTON COMPLETION. AND IN ACCORDANCE WITH ME MANUFACTURER'S RECOMMENGnONS. FOXBOROUGH, W 02035 A PRE-CONSIFROP Raaf T A MIN WLPIETE T RANG INSPECTION PRIOR 10 THE INENUnON W SPRINT WUIPYEM B. THE INSTNUD RADIUS OF ME CASTES SHAUL HOT BE LES THAN ME MANUFACTURER'S SPECIFlGTIONS FOR (774) 215-5421 A OTNLS ARE INTENDED TD SHOW DESIGN INTElB.PROVIDE ALL REWIRED AND T JOB AN REWIRED TO PROTIDE A ON NIU ROOFTOP BUILD.ATA MINIMUM INSPECT AND PHOTOGRAPH BENDING RADII. www.RrmCOm.c.. COMPLETE AND NNCIIONING STSTELI.MWIFlGnWS WY BE REWIRED TO SUR JOB EMENSIWS OR CWDHONS.AND (MINIMUM 3 E)LD1 AREAS IMPACTED BY ME PDOEW OF ME WPoM EQUIPMENT. SIKH MODIFICATIONS SHALL BE INCLUDED M PART OF THE WORK C. ETREME GRE SHNL BE TAKEN TO AVOID ONAAGE TO ME CABLES WRLVG HANOUNG AND 1N6TNlAnW. B. PROVIDESYAAR PHOTOGRAPHS SHON'INC RDOG CONDITIONS LATER CONSTRUCTION(YWMUu 3 E) B. CONTRA"KLA EN SILL M SPRINT CONSIRM SURF Mum N ANY THIOR WS PRIOR AT Pft MAY BE WITH TIRE 1. 4'S OG WH MYB�CABLES: TN CABLES SHALL BE PERMANENTLY FISTENW TO ME L(NII UDDER AT wORKDIMENSONs SHOWN ARE TO FISH SURFACES UM65 NOTED OMFRNTSE NWIFKAl1W5 MAY BE REWIRED TO C. ROOF INSPECTION PHOTOGRAPHS SHOULD BE ARCADED W!H CLOSEOUT P9TOGRAPHS. - CHAPPELL SUI JOB DIMENSIONS OR CWD10N5,AND SUCH IMDIf1GINlNS SHALL BE INCLUDED AN PMf OF THE WOPo(. 4'-0'W USING NON-MADNETIC STNNIE65 SEER LL1Pi O MARK THE FEW SET OF CRAWNCS 1N RED.DOCUMENTING ANY CHANGES FROM ME CONSTRIILIDN DOCUMENTS. SECTION 07 SOO - ROOF CUTTING, PATCHING & REPAIR 2. RAMMING MD ODUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE(MEDUSA).OHM THE MMM ENGINEERING SUMMARE. CABINET AND ANY INTERMEDIATE DISTRIBUTOR MX '. ASSOCIATES, LLC CENTRAS R PROCEDURE RW FOR WNSIRULIIW: THIS SECTOR SPECIFIED CUTTING LAID PATCHING EXISTING RWW FlNC MIENS WHERE COUI OR CABLES COT ME BUINWG CCONTRACTORSRML PERFORM wORK AS DESCRIBED IN ME FOLLOWING INSfMLIAIION AND CONNSSONING M03 ONTO ME ROOF OR WELDING-MOUNTED ANTENNAS,AND AS REWIRED FOR WAIFRTGIR PERFCR A E-ROOFTOP ENTRY °� FIBER BE W. FIBER WATERS USING M'VELCRO SEARS Of LE RAW MED LENGTH O 18'OO STUMPS Ci'✓iT $truGlcVrdl f_dNT:i$IIN('yIT'i WENINGS IN MEMBRANE RORUM SINAL BE CWSMWTED TO COMPLY 10TH LWDLDRO,ANY E%STING WARRANTY,ARO SNAIL BE W.OIL AND WATER RESISTANT AND BURABLE FOR INWSIPoAL MS(MUATONS 0.5 WNUFPLNRAD A TOP HAT LOON.MRWICTONAL STANGRDS. BY 1ETOL W APPROVED EQUAL R.K. EXECUTIVE CENTRE B. OWN'TO B INSTNIT A NEW GIDNR 201 BOSTON POST ROAD WEST, SURE 101 C. BASE GLAD UNIT a Ix F%S5 UNI 1 4 SUBMITTALS; B. BBLACKSUPPORTMON O WUNEEK GOTH ZIP TIES W ME M 19 M LENGTH.ZIP BES TO BE RO SCID OR D. INSTAULCHON OF HYBRID EC EQUMNYLON,WiM TENSILE STRENGTH AT 12.000 P51 AN MANUFPCNRW NT TELCO PRODUCTS OR MARLBOROUGH, 7 01752 E. INSTALLABON OF HYBRID CABLE EQLLN. (SOB) 481-7400 F. CMUNG W FIRMS A PRE-CY ROOFTOP E ROOF T AT2S�COMPLETE T ROOF INSPECTION PRIOR TO ME INSTAIATON OF SPRINT EQUIPMENT www.chappeliengineering.com G. GELVG W ANY ROOFTOP ALL AT I MINIMUM INSPECT IIID PHOTOGRAPH O FASTENING JUMPERS: SE EL JUMPERS TO ME SDE ATN$OR HEM FRAYE5 USING STNNL£55 STEEL TIE H. T5-0200 REV 4-ANTENNA UNE ACCEPTANCE STANOARCS (MINIMUM J E)NL MEAS IMPACTED M THE IDDmW W ME SPRINT EOOPYEM. WRAPS W STAWIE55 SIEFL BUTTERFLY CUPS. 1. SIMM CELL SHE ENGINEERING NOTICE-EN 2012-001,REV 1. J. IXNMLSSIONING MOPS W. PROVIDE SYILW PHOPOCRANS SHOWING ROOF WNDIIIONS ITER WNSIRJLIION(MINIMUM 3 FA) 4. CPBLF INGfI11A110N: SECTION 01 200 - COMPANY FURNISHED MATERIAL AND EQUIPMENT C. ROW INSPECTION PHOTOGRAPHS SHOULD BE UPLOADED ON CUMEOUT PIWTWRAPHS. o. INSPECT WILE PRIOR N USE FOR 5HIPPING GRACE.NOTIFY THE CONGTUCTION MIN M. COMPANY FURNISHED MKIMI .AND EQUIPMENT 6 IDENTIFIED ON ME RF DATA SHEET IN ME CONSTRUCTION DRAWINGS SECTION 09 900 - PAINTING N. CAERE E RRNG:CABLE IxIL 5TOLATION SL BE PUNNED TO ENSURE THAT ME UNES WILL BE PROPERLY -AL`�OF ROUTED IN ME CABLE ENVEOP AS INDICATED ON THE DRAWINGS.AMD TWISTING AND CROSShERS. 5(J� •1I W�OR 60 SPoSML RE FRPROVIDED MATERIAL AND EDUIPMEM S ED AN TO ENSURE IT PROIECID HANDLED DUAIM ASSURANCE t HOW CABLE MW PROPER HOSTING GRIPS.GO NOT C(CEF)MANUFACTURES RECOMMENDED W%MUM � DAVI ROPEC�TSPRINT A COMPLY WITH CONERNING CANES AND RECUGBONS.PROTIDE PROOUCIS OF ACCEPTABLE MANUFACTURERS WHICH HAVE BEND RADIUS CONTF CTM RESPON518IE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL ERE OR CONIRACTOM LOCATION. BEEN IN SAMFACRYTY U5E IN SIMIVM SERVILE FOR THREE YEWS,USE EWERIENCED WSTA(iFAS. DELIVER,HANDLE AND 5. GROUNDING OF MAMMIMON LING:Al TRANSMISSION UNES SHALL BE GROUNDED AS INDICATED ON CONTRACTOR TO COMPLRE MIPPNG AND RECEIPT DOCUMENTATION IN ACCOROPHCE GOTH COMPANY PRACTICE SPORE MATERw6 IN ACCORDANCE WOR MANUFACTURER'S(NMUCTIOR6. mwNGS. I SECTION 01 300 - CELL SITE CONSTRUCTION B COMPLY WITH ALL ENWRONMEMAL REGUGBONS FOR VOLATILE ORGAWC COMPOUNDS. 6. NOBRD CABLE COLOR CODING:ALL COLOR CLUNG SILL BE M REWIRED IN R 02M REV 4. 06 C6 Nona TO PROCEFU MATERIAM 7. HYBRID CABLE-BERING:INDNIDOIL HYBRID AND X BUND.E5 SILL BE-BELE➢NPM-NUMERICALLY G�R NO WORK SHNL COLIMENCE PRIOR TO COMPANY'S WRITTEN NOTICE M PROCEED AND ME 69MNCE OF WOPo(ORDER ACCORDING M SPRINT CELL SME ENONEMNC NOTICE- ON 2012-001,REV 1 A MANMIUM GRACE. REBENJNIIN uODRE.ICI DEVCE CGTPPG,, SHFAWIN WILLVNS DR APPR(MD EQUAL.PROVIDEtryO SITE R• < L FAN,TESS R . PREMIUM GRADEROFE55UNN P -OwuT PROcrs DuFOR cGnNc srsrzus. WEAIHERPROOFlNG E7(IQDOft CONNECTORS AND HYBRID CARTER 1i2g1ND KRIS: NAI ME MIR. SRNL KEEP THE SNE FREE FROM E 5MEAR WASTE WIEAML,CEDES.AND HUSH.AT ME CONIES.AN OF ME WORK, CONIRACfOR SILL REMOVE FROM ME SME Al1 REMAINING RUBESH,IMREYEMS,TEMPORARY FACILITIES.AND PRIM SCHEDULE: A ALL FIBER k CAO%CONNECTORS LAND GROUND KMS SW11 RA W-MERPRCOFFD. SURPLUS MATERIALS ENGINEER (AND SURVEYOR DATE A ANTENNA ANTENNAE AND ANTEHA YMM D CONT E: ONE COAT OF PRIMER AND TWO FINISH f%AN PAM FOR B. WITH THE ANUF USING ONE OF ME FAMOR15 G INDU . B I PRACTIIONG MUST BE GONE M ACCgtDWCE SECTION Ot 400 - SUBMITTALS & TESTS REQUIRED STALL 1K NOEMVICE O ANTED AND N AD4N NO BUILDING PARTICLES. PROVIDE Xi COORS AND PATTERNS AS WITH 111E MANUFACTURER'S RECOMMENG110N5 AND MWSIRf BEST PRAWLES. M N A Y`XA.OF LVN MR ANY PERSON. REQUIRED A MASK MPF.ARAHCE R'VIMENTIN ON AONLEVE BUILDING SURFACES LAID 0.5 MCEIBAAE TD TIER OWNER. REFER i0 AIITRINA LAWIIFACNRER'S NNSTRUCTIWS WHENEVER POSSIBLE. 1. COLD SHRINK:E EXTMU5 CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE CORM OF ux11OF . Art APRO UxnAl THE gRECIKW AT ME COMPARYS REQUEST,ANY NIERNATNES M ME WIERMIG OR METHODS SPECIFIED SINAL BE SUBMITTD M SPRINTS ELECTRICAL TAPE EXIENDNG T BEYOND TUBING.PROVIDE SM COD SNR NN CXS SERIES OR EOUA. Of A IIV,NL IxbfES9GV1 ANaME9P. B. ROOF TOP CONOR OMR TOUCH H -PING OC SURFACES t0 EF REPAIRED. FOLLOW INDUSTRY STANDARDS AND to N1EX T6 0aG\ANRNT. RBALMPCONSTRUCTOR WINGER FOR MPROAN. SPRIT WBL RENEW AND APPROVE ONLY MDSE Fd0UF5T5 RUDE IN WRITING. NO REQUIREMENTS OF OWNER TO MATCH EXISTING CGTNG AND FMISH. L SRIF'-ALALCAWTING TAPE:CLEAN SURFACES.APPLY-MAT A OOIIEE CORM OF SELFE DIREC MING TME O BEYOND VERBAL APPRONNS WILL BE CONSDEIRED, CONNECTOR.APPLY A SECOND W14P W GEIF-M4AlfAMATNG TAPE IN OPPOSME DIRECTION.I➢WT COUBLL TESTS AND INSPECTIONS: PAINTING APPUCATION: WRAP OF T WIDE ELECTRICAL TAPE EILIENDNG 2'BEYOND ME SEIP-AMLOJIABNG TAPE REVISIONS A INSPECT SURFACES,REPORT UNSATISFACTORY CONDITIONS W WRITING;BEGINNING WORK MEANG ACCEPTANCE OF 3. 3M%M LOCK CLOSURE 716:SUBSTITUTIONS MILL NOT BE AILOWID. A ME CONTACTOR SHALL BE RESPONSIBIf FOR NL CONSIRUCIKKN 1E515,MSPECI%NS RAID PROJECT COWNEMATXN. SUBSIUIE 1. OPEN BANE ON JOB SRE IS NOT ACCEPTABLE B. CONIWCTOR SHNL ACCOYPUSH TEG W INCWONG BUT NOT UIMED TO ME FOLIOMNG: B. COMPLY WTM MANUFACTURER'S MSTRUCTIONS AND RECOMMENDX p FOR PRMARKTON,PRIMING AND CGTING NOOK 1 COAX SWEEPS AND FIBER TESTS PER TS-0200 REV 4 ANTENNA LRNE ACCEPTANCE STANLWV05 =MINATE IWM WORN OF OTHER SECTORS. SECTION 11 800 - INSTALLATION OF MULTIMODAL BASE TRANSCIEVER STATIONS 2. OCL AZIMUTH AND"CLT PROVIDE AN AUTOMATED REPORT UPLOADED TO SMERRA USING A COMMERCIAL MADE-FOR C. MATCH APPROVED LOCK-UPC FOR COLOR,TE%TURE AND PARIERM. RE-CGT OR REMOVE LAID REPLACE WORK WH%H (MMBTS) AND RELATED EQUIPMENT GOES NOT MATCH OR SHOWS LOSS OF AOMCMI. SUMMARY: ME ORM IM ELECTRONIC RXJIOANTENNA MLGNMEM TOOL(MT).INSTNIID AZINMI, CENTEPoINE AND WWNIILi MUSE CONFORM WIH RF CONFlGURATIW GTA D. CLEAN UP.TRACH UP AND PROLER WOflK 1 01/29/14 ISSUED FOR CWSIRIICIDN 3. COMPACTOR SHNL BE RESWNSIEE FOR ANY AND Al.CORRECTIONS M ANY NOW IDENTIFIED AS IAiACCEPTABLE MA THIS SECTOR SPECIFIES MMBIS CABINETS,PgWR CABINETS,AND INMMAL EQUIPMENT INCLUDNG BY NOT UNITED ACTNMEG SBE INSPECTIONAND/OR AS A RMULT OF 1FSTNG. TOUCHUP PAINTING: M RECIVIRM POWER DISRRIBU%N UNTTS,GSE BAND UNITS,SURGE ARRESTORS, GTTERIM AND SMILAR 0 01/27/14 SLUED FOR RENEW EQUINEM FU6M BY THE COMPANY FOR INSTNLATIW BY THE CONTRACTOR(OFCJ). 4. ALL IESTNG REWIRED BY APPLICABLE INSTNIATON MOPS. A GNVMIZING ONAGER AND ALL BOLTS AND NNS SCOL BE TRACHED UP MER POWER ERECTION WITH'CNVAROX;*DRY REV. IIDATE DESCRIPTION CAV.'W'ZINC-R.' B. CONTACTOR SULL PROVIDE AND NG CAJ.ABINET ALL MISCELLANEOUS WIERWS AND PROVIDE PLL-RJR REWIRED TOR ME APPUON EQUIPMENT INN MOM.CABINUI OR NEW GBWR AN SHOWN W gUWNGS AND A5 REWIRE BY IO N li0. OE9LIpD of JMI sru[ G REWIRED CIDSEOM DOCUMENTAI%N INCLUDES.BUT 6 NOT UNITED TO THE FWLONTNC; B. FIELD TOUCHUP PNM SCOL RA DONE IN ACCORDANCE WIRY THE WNUFACTUREflS NRMrtPN INSIRUm1WS. TIE APPIGBIE INSTPUAnON MOPS. 1. AZIMUTH, TIOWNTILT,ACL FROM SINSICM INSTRUMENTS- ANTENNA AICNMEM TOOL M 1238.019 .BV: M AS SHOWN (AAT) C. NL MRA COMPONENTS SIALL BE NANOID WITH CARE TO PREVENT GOUGE TO ME COMPONENTS.THEIR PRESWJATNE C. COMPLY MifH MAUYUFACIURElRS INSPMUAiYN AND STINT-UP fEOUWEMEMS oE. IW. JM 2. SWEEP AND OWER TESTS TREATMENT. OR THEIR PRMECRNE CGRNGS rmxq SUPPORTING DEVICES: 3. MNNA LE EWCOOE PHOTOGRAPHS OF TOWER TOP ANO INACCESSIBLE SERMUZED EQUIPMENT SECTION 11 700 - ANTENNA ASSEMBLY, REMOTE RADIO HEADS AND CABLE INSTALLATION A WNUFACTURW SIRUCIURN SUPPORT MATERMLS:SUBJECT TO ODMPLWICE AMR REWIROENTS,PROVIDE 4. ALL AVNIABLE JURISDICTIONAL INFOR,WTOM SVMMAM: PRo000M BY THE MLLO'NING: BS23XC362 5. PDG SCAN OF REWIRES PRODUCED M FEWTSECTION SPECIFIES HSN-ATION OF AMEN . RRH'S,AND CABLE EWIPMEM.WSTAVATON,AND JESTING OF COUK L AHED TUBE AND CONWR EASTERN BANK 6. A PG SCAN OF REOINE MNK-UPS SUTAEE POR USE IN ELECTRON%M-BULT DRAWING PRODUCnW NTENEW AND RRH'S 2. B-UNE SYSTEM 7 UEN WAVERS ME NUMBER AND TYPE OF ANTENNAS AND RRH'S TO BE INSTALLED 6 ORATED ON ME COMMIC110N DRAINING£ 3. UNSTUT DARManED mOuRn 217 ESSEX STREET 8. FINN.PAYMENT MPIICADM HYBRID CABLE: 4. THOMAS&BETTS SALEM,MA 01970 HYBRID CABLE WILL BE DC/FIBER ARID FURNISHED FOR INSTNUT%N AT EACH SIE. CABLE SLAC BE INSTU D PER THE S. REWIRED RNA-CONsTMuc ION PROTOS CONSHUCII(ON DRAWINGS AND ME APPICMIl MANUFACTURER'S RAOUTREVENTS. B. FASTENERS:TYPES, MATERMLS,ANO CON5RRUCHON FEATURES AS FOLLDWS: oPANNN nnC 10. CONSTRUCBON AND COMMIMONING CHECIOIST COMPLETE WMH NO CEMENT ITEMS J MPFRS AND CONNFCTOM L IXPANS%N ANCHORS:CARBON STEEL%RME W SLEEVE TYPE FURNM AND INSTNl 1/T C000(JUMPER CMUR BETWEEN ME RIM'S AND PMEMA5.JUMPERS SW BE TYPE TDF 4.FILETHREADED NOTES 1 11. Al. ST NTP TASKS INCLUDING DOCUMENT UFLGDS PW COMPLETED STERRA(SPRITS DOCUMENT REPOSITORY OF 12-50,CR W.OR ML 5TH. SUPER-FID(CABLES AAE NOT OCCEPIApE RS WIRER ME RRH'S AND ANFNWS 2 POWER-DRIER TREADED STUDS: NET-TE1W STEL, DESIGNED SPdF1G11T FOR 11E INTENDED SERVICE. FI RECORD). OR TOWER TW AMPUNERS SHALL CONEY T OF 1/2 WW TOW OIEWCMIO,OUTDOOR RATEO CGU(ML CABLE W IDT USE }, G/SIEN BY MEANS OF WOOD SCREWS W WOOD. SUPER LEX OUTDOORS. JUMPERS%LAJL BE FACTORY FABRICATED IN IN APPROPRIATE LENGTHS WITH A MAMMUM OF 4 FEET 00.wmE wulm 12. CLCOMJF PHOTOGRAPHS: EJ(CEA PER JUMPER AND HAVE CONNECTORS AT EACH END, WNUFACNRED BY WPPUER. IF JUMPERS PRE READ 4. TOGGLE BOLTS ON HOLLOWASOMS MNRY UN FABRICATED.FOLLOW MANUFACTURER'S REOWRENENTS FOR IHS MCN OF WHNECfO6 /'� j a. PROVOS PHOTOGRAPHS OF FINAL PROJECT PER ME FOLLOWING UST.ADOTIOWL PHOTWRAPHS MAY BE REQUIRED 1 A TO SUPPORT ACCEPTANCE PROCESSES CORTIN- SHEET -2 ' Y . G THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS, DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. SECTION 01 100 - SCOPE OF WORK CONDUIT AND CONDUCTOR INSTALLATION: 5. CONCRETE INSERTS OR EXPANSION BOLTS ON CONCRETE OR SLD MASONRY. A CONOUTIS SHAM BE FASTENED SECURELY IN PUCE WITH APPROVED NON-PFRORAIFD STRAPS AND HANGERS. FXPLOSNE Sprint ONCE&MR ATTACHING HANGERS TO STRUCTURE WILL NOT BE PERMITTED,CLOMY MUM THE UNES OF THE VISION 6. MACHINE SCREWS.WELDED THRMDS.DS.OR SPRING-TENSION CLIPS W STEEL SIR11C1URF,MARIAN CLOSE PROGWTY TO THE STRUCTURE AND KEEP CONDUITS IN TIGHT ENVMPES.CHANGES IN DIRECTION TO ROUTE AROUND OBSAOES SLL DE WE WITH CMDUT OUOET BODES CONDUIT SIAL BE INSTALLED T. EXPLOSIVE DEVICES FOR ATTACHING HANGERS TO STRUCTURE SIAL NOT BE PERMITTED. IN A NEAT AND WORKMANUKE MANNER, PAMWEL AND PERPEMOMAR TO STRUCTURE WAE AND COUNG UNES.Al 1 INTERNATIONAL BLVD, SUITE 800 CONDUIT SHAM BE FSNFD TO CLEAR OBSTRUCTLONS, ENDS OF COMMIS SMALL BE TEMPORARILY GIPPED TO PREVENT MAHWAH, NJ 07495 B. DO NOT WEM CONDUIT,PIPE STRAPS,OR ITEMS OTHER HAI THREADED STUDS TO SRR MVSMRFS. CONCRETE. PASTER OR DIRT TOM ENTERING.CONDUNS 51411 BE RUDLY CLUMPED TO BOXES BY GV.VAMgD MAJEMCE IRON BUSHING ON INSME AND GYVANIZED MAIFABUE IRON LOCKNUT ON ASIDE AND)WINE (201) 684-4000 9. IN PARTITIONS OF UGHT STEEL CONSTRUCTION,USE SHEET META SCREWS, B. CONDUCTORS OVAL DE PULLED IN ACCORDANCE WITH ACCEPTED CDOD PIUCTCE UP SPORTING DEVIPROJECT INFORMATION CES: TR A INSTAL G EVIICI DEVICES TO FASTEN EIFCTPoCA COMPONENTSSECURRT AND PERWNENRY w ACCORDANCE WN - "-t NEC. SPECIAL CONSTRUCTION NDE B. COORDINATE WITH THE MIMING SLRUCTUM SYSTEM AND WITH OTHER TRADES. SPRINT TAXER MP WORK 5 CONTINGENT ON THE FOLLOWING C. UMESS OMERWSE INDICATED ON THE DRAMNGS, FASTEN EIECIRCAI ITEMS AND THEIR SUPPORING H RDWARE16 CHESTNUT STREET, SUITE 220 SEWRU.Y TU THE STRUCTURE IN ACCORDANCE WITH THE FOLLOWING: A. COMPLETION OF A GLOBN-SIRUCNRA 90M ANALYSIS(FRONDED BY TOWER OWNER) FOXBOROUGH, MA 02035 D. ENSURE THAT INE MND APPUED BY ANY FASTENER DOES HOT U(CEED 25 PERCENT OF THE PROOF TEST LDA. B. COMPLEI)ON OF M ANTMNA/RRH MOUNT STRUCIURA ASSESSMENT(PROWTED BY A&E VENDOR) (774) 215-5421 ww.A mcom.c0m E USE NBRATON AND SHOCK-RESISIFNT FASTENERS FOR ATTACHMENTS TO CONCRETE SUBS. G GENERA CONTRACTOR SIAL FURNISH,DISTAL AND COMPLETE ALL REWIRED STRUCTURAL MWB1CAlIONs AS INDICATED IN BEFORE-MENTIONED AMLYSS AND ASSESSMENT ELECTRICAL IDENTIFICATION: 0. UNDWM/TOWER OWNER SILL PROADE WRT EN ACCEI'TMLE/APPRFNA FOR THE COMPLETION OF AL CrAm CHAPPELL A UPDATE MOMD MINE TYPED ORCUIT BRFANER SCHEDULES M THE MOUNTING BROOKE.[MERGE DOORS OF k PANE. TONWIMUNGTION STRUMM MODIFICATIONS.INCLUDING(AS NECESSARY)CONTROLLED CONSLRUC ION INSPECTIONS,BOLDS WITH ANY CHANGES MME TO THE AC SYSTEM. SHOP-ORAMG APPROVALS, MTERLAIS TEST RESULTS ARD MR&ENGINEERS AFIRM T ENGINEERING B BRANCH ORCURS FEEDING AN4TON OBSTRUCTION CGHI NG EQUIPMENT SHALLBE CLEARLY IDFMIFIED AS SUCH AT ME SPECIAL PROJECT NOTES: ASSOCIATES, LLC BRANCH CROUTE PANOJB D. A OMMNCS AND NEW CONSTRUCTION SHVL CONFORM TO ALL APPUGBCE SPRRI/NEI(fEL INTEGR11U1 CONSIRL'C110N C'iVl7 :i21lJC_ILN£87 4-dYIC1.S"liJti2J+llJf) DC CIRCUIT BREWER LABELING: STANDARDS FOR COMBINED WIRELESS SITES,STANDARD CML DETALS AND GENUAL DESIGN GUDEUNM CODES AND AN ORDINCES. R.N. EXECUTIVE CENTRE A UIRL GOUT BREWERS ACCORDING TO SPRINT CM SIE ENONOE UNG NOTICE- UN 2012-001, REV 1. 201 BOSTON POST ROAD WEST, SUITE 101 B. OWNER AND TENANT MAY, FROM TIME M TIME AT TENANTS OPTION, REPLACE THIS EODM WON AN EWIM SETTING MARLBOROUGH, MA 01752 FORM THE REGAL DESCRIPTION OF THE SITE,OR WITH ENGINEERED OR AS-MILT DRAWING DEPICTING THE SITE OR (508) 481-7400 SECTION 26 200 - ELECTRICAL MATERIALS AND EQUIPMENT ILLUSTRATING SMUMRAL MODFICURMS OR CONSTFUCIKIN PEWS OF THE SITE ANY VSVAL OR ME www.choppeliengineering.com REPRESENTATION OF THE EWIPMENT MCAIEL WITHIN THE SE CONIANED IN THESE OTHER DOCUMFNS IS RIUSTRATVE CONDUIT: ONLY,AND DOES HOT UMIT TIE RICKS OF SPRINT AS PROVIDED FOR IN THE AGREENEM.THE LOCATIONS OF ANY ACCESS AND MHUR Y EASEMENTS ARE RUUMMATNE ONLY.ACTUAL LOCATIONS MY R DETERMINED BY TEN4NT AND/OR A MOD GALVANIZED STEEL(PGS)CONDUIT SWUM BE USED FDR EXTERIOR WCATONS ABOVE GROUND AND M UNFINISHED THE SERMONS UTIUP COMPANY IN MWPU NCE WITH UCAL WAS AND REWUTIONS. . INTERIOR LOCATIONS AND FOR ENCASED RUNS IN CONCRETE MOD WNWIT AND FITTINGS SHAT BE STEEL.CCATED WITH➢M EXTERIOR AND INTERIOR BY THE HOT DIP GAVANBJM PROCESS.CONDUIT WALL BE PRODUCED TO ANS SPEC6IOAIIONS CMI,FEDEM SPECIFlGTAEL ON WN-C-581 AND SHBE LISTED WITH THE UNDERMj MERS' j"OF IAORATOMES. FITTINGS SMALL BE THREADED- SET SCREW OR COMPRESSION FITTINGS WILL NOT 9E ACCEPM&E. RGS CONDORS SHAM BE WNUFACIUFED BY ALUM. REPUBUC OR WHEATWND. DAVI B. UNDERGROUND CONDUT IN CONCRETE SHAL BE PoLMNYLOIWPoOE(ING)SURABIE TOR DIRECT BVRM AS APPIJCABLE O JOINS 51411 BE BELLED.AND RUSH SOLVENT WMED IN ACCORDANCE WITH WNUFNMRER'S INSTRUCTIONS.COHDOT SMALL BE CARLON ELECTRICAL PRODUCTS OR APPROMD MUA. E�4 ti C. TRANSITIONS BETWEEN PVL AND RICO (PGS)SHLLL BE AVDE WAIN PJC COALED MEALC LONG SWEEP FAOUS ELBOWS. M � D. ENT OR ROOD GAIVAIBED STEEL COMMIT MY BE USED IN FlN5HED SPACES CONGEALED IN WALLS AND MUNGS.ENT WW A� SIAL BE MILT STEEL,MCMICALLY WELDED,ELECTRO-GALVANIZED OR HOT-UPPED GLLVAN=AND PRODUCED M ANSI �I SPEOFIGATG)CBO.3, FEDERAL SPEOFICARON WW-C-563,AND SA11 BE UL USTED. EMT 5411 BE MANUFACTURED BY C�',REPUTE UIC OR W AT EMMPPROVED EOWL FITTINGS SHALL BE MLTAIIO COMPRESSION. SET SCREW Al. E. UOUD TIGHT FLEABU METALC COMMIT SMALL BE USED FOR FINAL CONNECTION TO EOUIPMENT. FITTINGS SIAL BE MEAIJC qAM TYPE COMPRESSION FIRINGS, MAINTAINING THE DI ERITY a CONDUIT SYSTEM. SET SCREW CONNECTIONS SHALL NOT BE ACCEPTABLE MpNUM LENGTH OF REABUE CONDUIT SAL NOT EXCEED 5-FEET.UAIC SAL BE ENGINEER/LAND SURVEYOR DATE PROTECTED AND SUPPORTED AS REWIRE BY NEC. MNUFACIURERS OF FLEXIBLE CONDUITS SMAC BE CMOI,AACONM META HOSE OR UNMRSA META HOSE.OR APPROVED EOUAL 9 IS A WOUTNHN OF LMW FDR ANY PFR6CN, UNLESS THEY ARE ILTNG UNDER ME DRECTI F. MINIMUM MAZE CONDOR SHAM BE 3/4 INCH(21MM). O A LICENSED PROFmpNu ENGIN®i. HUBS AND BOXES: TO&TEN DR W WM. A AT ENTRANCES M CABINETS OR OTHER EQUIPMENT NOT MMNG MEGRAL THREADED HUBS PROVIDE YEALC THREADED REVISIONS MBS OF THE SIZE AND CONFIGURATION REg1RED. HUB SHAM MCWDE WGINW AND NEOPRENE 0-RING SEAL PRJMDE IMPACT RESISTANT 105 DEGREE C PIASMC BUSHINGS TO PROTECT CABLE INSUUNON. B. CABLE TERMINATION FIRINGS FOR CONDUIT 1. CABLE TERMINATORS FOR RS WNDUIIS MALL BE TYPE GO BY 0-Z/GEDNEY OR EQUAL 2. CABIN TERMINATORS FOR UNC SMA.BE ECO- =75;OR MADE FOR ME PURPOSE PRODUCTS BY M TEC. C. EX1TRgR PRL BOXES AND PULL BOXES IN INTERIOR INDUSTRIAL MEAS STALL BE PULED GST ALM,HEAW DUTY, WFATHERPMOf,OST PROOF.WITH GASKET.PLATED IRON ALLOY COVER AND STAINLESS STEL CORER SCRENS, CROUSE-HINDS WM SERIES OR FOWL 1 01/29/14 ISSUED FOR CONSFRUCTK) D. GERI OU11ET BODIES SAL BE RATED GST ALLGY WIN SMIUR GASKEIED COVERS.OUTLET BODES SHALL BE OF 0 01/27/14 ISSUED FOR REVIEW/ THE CONFIGURATION AND WE SUITABLE FOR THE APPUCATON.PROVIDE CROUSE-HINDS FORM B OR EOWL REV. B DATE DESCRIPTION E. MANUFACTURER FOR BOXES AND COMERS SHAM BE HOFTMAN.SOUAR b',CROUSE-MINDS,COOPER,AOALE,APPU7ON, 0-Z FECNEY.RACO.OR APPROVED EOAL RRLLRL!w. mMoMm R m SWF SUPPLELIEMAL (ROUNDING SYSTEM 1]]8.(119 DROWN IR. D¢ WHowx DwCD Orr. m A FURNISH AND INSTAL.A SUPPLEMENTAL GROUNDING SYSTEM M INDICATED ON ME DRAWINGS.MPPORT SYSTEM WITH NNUO,T MN-MAGNETIC STANCES$MEL CIPS WITH RUBBER GROMMETS GRWNONG CONNECTORS SHALL BE TINNED COPPER WIRE,SIZES AS)DIUTED ON THE DRAWINGS.PROVIDE STRANDED OR SOLD BARE OR INSUUTED CONDUCTORS M NDICATBO. B. WM`EMENTA GROUNDING SYSTEM AL CONNECTIONS TO BE ALOE MATH CSD ADDS,EXCEPT AT EOUPMENT USE LUGS BS23XC362 OR OTHER AVAM E GROUNDING MEWS AS REWIRED BY MANUFACTURER:AT GROUND BAS USE MI HOLE SPADES EASTERN BANK WTM RO OX C. STOLEN GROUND-BARS:IN ME EVENT OF STOLEN GROUND BARS, CDNI E SPRINT CM FOR REPLACEMENT INSTRUCTION 217 ESSEX STREET MIND THRFMKIT m ROD S. EXISTING STRUCTURE SALEM,MA 01970 A EXISTING EXPOSED MRIRO AND ALL EXPOSED OURETS, RECEPTACLES, SWITCHES.DEVICES, BOXES.AND OTHER EQUIPMENT THAT ARE NOT TO BE UITU EI IN ME COMPLETED PROJECT SAL BE REMO,ED OR DE-FNEROZED AND CAPPED IN ME WAL CUL)G,OR FLUOR SO THAT THEY ARE WNCEUED AND SAE WALL,COLING.OR FLOOR SHAM BE PATCHED TO GENEAALNOTES2 MATCH ME MJ AD UT CONSTRUCTION. DRAlEC IIRRFA GN-2_j Sprint' VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH. NJ 07495 Fx (201) 684-4000 0 0 j p ( //(XTRM SI. gYEF FooE 16 CHESTNUT STREET, SUITE 220 ` EXIST SPFINT Faun MTNW / FOXBOROUGH, M4 02035 (I FER 5ECMIT TOT&Of J) (774) 215-5421 MWNIED TO EXIST PENTHOUSE WWw,((mCOm.COm EXIST. SPRMT BOOIINr RRHS(I PSI?SECTOR, roTTO OF J),)I9CO"MHI NES(I PER SECTOR, EXIST WAC h WITS M CHAPPELL TOTAL OJ)J)B COw&NERS(I PER SECIO. 'T fire[Of J MOUNTED TO EXIST FENTTIITIE ENGINEERING EOSE SPEVIEFs ®ASSOCIATES,LLC ED CrvL'-StILGIuraT 4 Z1110 SIITveyiny R.K- EXECUTIVE CEN 201 BOSTON POST ROAD WEST, SURE 101 Fol ------1 MARLBOROUGH, MA 01752 F_--- (508) 481-7400 awwww .chappellengineenng.com ---7 i jNOF PROP. SPWNT 2500M14 NTIENNAS 1 (I PER SECTOR,TOTAL OF 2) 3 1 I i ��� DAVE MOUNTED TO EXIST. PENTHOUSE A-3 S-1 ON PROP.ANTENNA MOUNTS 1 I ml PROP. SPRINT 2500104PoM'S y (1 PER SECTOR. TOTAL,OF 2) 4 1 COST W✓ 06 MOUNTED TO EXIST. StAIDING A-1 S-1 UNlis 1 "1 BELOW PROP. PANEL ANTENNAS 1 i I C�,...rpL I ulCr� SPROfT TO UTILIZE I no AL EMST.ACCESS AREA 1 FROM PUBLIC R.O.W. fx6t I - I - sXriIGHT I - INSMLL(2)STRINGS PROP.SPRINT(1) 2500104 RRH 4 2 - 1 _ I A-4 gRJTRT BATTERIES IN ENGINEER/LAND SURVEYOR DAMOUNTED TE B PROP.PANEL ANTENNA A-3 S-I I EXIST CHIMNEY r�I I a 6 A NOU1gN Of TAW fOR IN!FER50.4. _ 25TALLBB RECTIFIER k LIE uxuF IM ORE Arnxc uxocz TxE a6Ecrwx ExrsT I I I I 2.5 BBU TETROTI W DOST. or A ucwsFn FROf69pW1 eaNxmA PROP. SPRINT(1) 2500MNX ANTENNA 3 2 1 cwuwrcr 'J - A-4 SPRINT MMBIS CABINET TO.urex rN6 oauMOrt. MOLWIED TO ETOST.CHIMNEY ON - PROP.ANTENNA MOUNTS A-3 S-1 - ---- --' REVISIONS I I EXIST a6V?nRC PANEL ANTENNAS(I PER I SECTOR, MOIL OE J)R 95`0M'TCNMS I I EXIST.SPFINT EOUIPM£N)RWM (TOTAL Of JI NOUNIFD 7p LXIST BUILDING IN fXlSI.BUttOINO 645EMENI ST t_ H9ICHCN 1 01/29/14 6511E0 FOR CONSIRUCipN 0 01/27/14 ISSUED FOR RE\1ON ❑ A-4 ADJACENT TO EXIST. W4tt REV. If DATE DESCRIPTION EXIST sPFINr ccs,wrzNNA MOUNTED r0 EXIST SXYLICJrT —i �' -.—��ROnf6- M Sev£ 1339.019 be[ I' 5' EXIST a¢a'R eh m NerveIT1 � 4 ' xINO.x es6ewnx L £xsE mPw O BS23XC362 EXIST.WAC EASTERN BANK T NII O 217 ESSEX STREET SALEM,MA 01970 6wxw nl�c ROOF PLAN ROOF PLAN wNNR I SCALE:1- - 0-0- ' A_1 2A-1 0 2'-6' 5' 10• 15' Sprintw )00 VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH, NJ 07495 (201) 684-4000 CXAST C[rARWIRE PANEL gNTENN45(l PEx PROP. SPRINT 25TOTAL ANTENNAS TRM SECFo.. IOTA w J)s DISH AMENN/S A33 S-1 (i PER SECTOR TOTAL OF 3) (MTN of 3)NODNIED TO EXIST. S TTv MOUNTED to EXIST. BUILDING ON PROP.ANTENNA MOUNTS EMT SPRINT RAAEL A AMMS (I PER SECTOR, Tofu t#3) 16 CHESTNUT STREET, SUITE 220 MINMIEO TD EXIST &Zlt O PROP SPRINT 2500MFR RRH'S FOXBOROUGH, MA 02035 4 - (i PER SECTOR TOTAL OF 3) (774) 215-5421 EXIST S TTTT 8 Hl RRHS(I PER SECTOR, A-3 5-I MOUNIm TO EXIST. BUILDING ..A. com.mm TOTAL Of 3), 19DDNHr RRH'S(I P£R SECO4, BROW PROP.ANTENNAS Toru of J)d XYWIRS(I PER S117tW. PROP. SPRINT 3 PANEL_ANTENNAS.. Toru a"J) winTO To EXIST.8wztIw EL- 10824 AMA(86.2'!;01.-) , _ CHAPPELL F EXSr SFMNT 3 PANft M9ENNA2S TEE- 10..2$ANS( (B62 '` ENGINEERING TOP LY EXIST PfN!/pUSf 1&9T9s MISt 829,AIX , _ASSOCIATES,LLC I Civil SIT,IJCILII'al-Land Sumeying 0 R.N. EXECUTIVE CENTRE I 201 BOSTON POST ROAM A 017, SURE 101 L 1 MARLBOROUGH. 752 (508) 481-7474 0100 rww.chappellengineering.com TDP AW rust ' GLO EL.=sooto,oust ceol A �SNOF 044 IAAI/�ENT TO EXIST.KyBFUD CCOAXABLE _ O�'� QAVI s ONALEN�\� e �� ENGINEER/LAND SURVEYOR DATE �� ILI rt 6 A NCV.TM of Uw MR 1W PW WN. uNuss INEY ARE rcnrx urlom INE ouRc,nx or A ucwsm RRef65NAY1 firaND:x. ro ura,ws occwENr. �O- � nu _P 0000 M�IE T 00 REVISIONS -aa � as oo as as a as a o0 as IBM ��0� 0� �� 1 01/29/1+ MuEo TDR causmucrroN 0 01/27/14REV. B DATE DESCRIPTION -- EL=I2of AP5L(0.0 ALLJ 123&019 PR 1/9,- ,' I I arcav en wrt r� INSTILL RECIIFIER 8 UT. EXIST,SMITE 1500F.Eff 2.5 BBURETROFIT IN DIST.- Iry EXIST B [pry84SENNT SPRINT MMUTS GBINEA4 PSI NI ^1pN I I 1 _u__---3 BS23XC362 OF BATT'�ERis ) 4 D - EASTERN BANK SPRINT BSU CABINET A-4 217 ESSE)(STREET SALEM,MA 01970 orv.Nam,nu: ELEVATION ELEVATION www wN�R _ A-2 0 4' 8' I6' 24' fX5! SPRINT m. NOT or 3) / 3'\qIQ ` EXIST(1R S, PANEL ANIENNLC / Q$T q�Q (l PER SECTOR, /PEN KA J pV `S (I TO TO EXIT /U]K IO J NWN](D]0 EXIST PEN/HOUSE SCP ° MWN]EO/O EXIST PENTHOUSE W EAST,AMENN9 WMIS M EXIST AN/ENNA S p ri ntW EATST SPRINT BOOMHz RFH'S(I PERSEC]OP. EXIST.SIMM 8"HI~5(I PER SECTOR, VISION TOTAL CF J). l900MHZ R.FH S(I MR SECTOR, /OIA(W J). 19WMHZ RRN'S(I PER SECTOR, ♦ SION /OT& Of 3)h LOLBINERS(I PER SECXVT. IOli MW OC J)J CONBINERS(I PER SECTOR, WTAL UE J)M(XINIEO BELOW EXIST PANEL ANTENW OF J)NIN/N/N STOW£XIS/.PANEL WENN451 INTERNATIONAL BLVD. SURE 800 VIA EXIST Eusi MAHWAH. NJ 07495 HVAC NAVrs � � , � HVAC Lwi]5 �����/�/( (201) 684-4000 I�III��IOLLLRRR�"( IILIIVV T AV EXIST V Ex/ST � ll.15PEAY£FRMS/ � �AS�EARERS/ � I��I�///(((////// EXIST SPRINT CABLE IMY EXIST 6MINJ CABLE/FAY L EXISTLam` S UN Lam`XIST 16 CHESTNUT STREET, SUITE 220 TIME UN/T$ HAS UNnS EDXB774) 21' Alp 02035 21 PROP. TED T LDUST. ANTENNAS - ( ) (I PER SECTOR,TOTAL OF 2)::::::t 774 215-5421 MOUNTED TO DUST. PFNIIIOUSE W www.Umcom.c0m ON PROP. ANTENNA MOUNTSPENMWff7Wsf� I `®CHAPPELL {/ //// ENGINEERING PROP. SPIw 2SDOMHz RRM.S ASSOCIATES, LLC (1 PER SECTOR TOTAL OP 2) Crvil SO ucks,L!-Lar Lc(Surveying / MOUNTED TO EXIST. PENTHOUSE / L D M PROP.AI^aU L R.N. EXECUTIVE CENTRE EnsE 201 BOSTON POST ROAD WEST, SURE 101 Z1.1 r. LBNFa Ropf7 LOWR RWf MARLBOROUGH, AIA 01752 ;� www.c(508)1481 -7400Og.com EXIST0 EXISTrrn/wr W Ix srnm/T wars SMOF EXrsI. EEXISTot+� DAVI xvnc Lwrrs Nvac EXIST ER SECTOR, PANEL AY/ENAVS EXIST cI sr IRE PANEL AM£NN46 y (I ik MIDIVI, Tout W J)W (l PER sEc/oa /oFAL W 3)a PROP. SPRINT 25004Hz RRH'S EXSE LVSN ANIENM45(TOTAL W J) EAIs/ TAX,ANTENNAS(Tom of 3) a 2 (1 PER SECTOR TOTAL OF 3) UPPER axr7 EAST. WPER Roa- EXIST. A-3 S-1 MOUNTED TO EXIST. CHIMNEY (�C/Ag'{'EP� <(. / zz CINNNfY SAWNEY BELOW PROP.ANTENNAS SIONAL 3 2 PROP. SPRINT(1) 25ODMHz EAST £xrsT �L 3 S-1 asr. CHMEY ON PROP. ENGINEER/LAND SURVEYOR DATE •'Tw ANTENNA MOUNTED TO SYnRiI/ SNnILN] • A- ANTENIN MOUNTS IT 6 n NOUiKK1 Cf uw TOR AxE xwm xLnd uNtEss THEY A .rnNc CNLWW 1H RE EXIST. ANTENNA PLAN PROP. ANTENNA PLAN e ° "ro" sGru: l'-Y-LE A-3 scuc I•-Y-o" A-s REVISIONS 6.7' IB.6' (SWM SWELL)IN DEE) SHIFID INCLUDED) CALIBRATION CONNECTOR o 1 01/29/11 MED FOR CONSIRUCiWN RF CONNECTORS Q 0 8 D 01/27/14 MEO FOR RE41EW o � ASG IN - REV. / DATE DESCRIPTION RF CONNECTORS M---Mmmm o e G-L ASG OUT o PINIELT w. oEWu®ms m W:uT 0o g 1230.019 m AS SHOWN Y3 ocab PLAN VIEW BS23XC362 �j EASTERN BANK RES AP%M14-c-120 PANEL ANTENNA DIMENSIW£ 66.3'.ILfi'x6.3' ID VIEW FRONT VIEW 217 ESSEX STREET WDGHT: 66 EBS W/HARDWARE ALARM iREWENCY RANGE: 2190-2690 YHZ SALEM,FAA DT970 NSG POWER lD-RNH9vJ0-]5 RFIAOIE RAgO HEAD DP1D O Nt.MN mIE 6.3 12.6• DIYFN90Nk 26.1'.1&6'rtX CAUBPATION WEIGHT: 70 LBS W/HARDWARE ANTENNA ANTENNA ANTENNA PLANS R DETAILS SIDE VIEW FRONT VIEW PLAN VIEW 2500MHz ANTENNA DETAILS 3 250OMHz RRH DETAILS N.T.S M3 N.T.6. @17i A-3 V 0217[5.50] -12 CHANNEL FIBER DIST. .mr LExn a SIN noon er ON.: 3 MANUF: RFS G Sprint' 0.319[8.10] y 12G (M MILT YARRS 115E NN jxlof? X 5 B' 4 AWG PAC OC WERE :/" /`�J (•j HIBRBlIX .200 BANE HYBaiFLEX 225-3)0 6 AWB 1-I { OTY.: 6 \ y���ij' - % qW 3zs-ns 4 Axt 1-t/a• VISION 1 INTERNATIONAL BLVD, SURE 800 MAHWAH, NJ 07495 �/�j (201) 684-4000 OAR TAPE `wElt CORE RFS HYBRIREX RISER CABLE SCHEDULE x-. TRM MR:H O INSTALL(2)STRINGS INSTALL RECTIFIER @ LTE 4 AWG -MN:HBOS&Mt2owF Soft 3 2 IN multi-mode fibo pairs,Top:WHoar protested mnnectan,Bottom:LC OF Br1T1ERIF5 O FIST. 2S BBU RETROFIT IN EXIST. �. -_S- O Cnnneaors,58cable 50h SPRINT BBU CABINET A-4 A-4 SPRINT MMBIS CARNET 1.217[5.50] g MN:H&X&Ml2-075F 75t 16 CHESTNUT STREET, SUITE 220 WNEIR 1CORE -12 CFNVINEL FIBER DIS.391 FOXB774) 21, MA 202035 1 MNFR CORE `. OTT.: 3 `N MN:HBOSBMI2-1COF 3W h RFD_-. �,, �2D: Fl 239] a c MN:HBOWW2-MF 125h (774) 215-5427 MACK_ , 4 www.Umcom.com MN:HB058-M32-150F 15o ft EES! EaxSI. /�� �K MN:H8050-M32-31ST 175 ft 41 fXIS/. Ert/. $FEIN! L(fARx7RE `C/� EOfiVOW CN! EOUIFIAfNI RED -- \'r CHAPPELL SPPoN/6BU NMN EQUfpMENI {i .-E® MN:HBOSB-MI2-IDLY 210E L4BlNfr fi,BlNf7 �'` �' rw_PoN_n 01.110[2.6.19]_, ✓J%1,`�/ x bHeotle Y A ENGINEERING OVER TAPE /12G 51217 MN:HB1I10AI3M32-0SaF \i 3rBAWLpowerpalrs,I2xmuIH-meds fiber palm,WMOorntetlmnpeRors&LC Soft h _ASSOCIATES, LLC �'w♦ BLACK . �•- � \\_11.1.y2B.D9] � �3�MN:H011A8G13M12-075F 251t Ch''Sfl"JC/tlf8!-L3f]Ll ul.INPJIIIILJ CX5! fXT. 0. 640 (710 GORE U' MN:HBll4OW3M12-100F 100E [N7i (xrs/ SPReVf f1RfR 1 6 AWG PVC OAC WIRE R.K. EXECUTIVE CENTRE (X57 b67 /XS/RIBUF70.4 CA9/NE! L of (") MN:HB11408L13M12-125F 115E 201 BOSTON POST ROAD WEST, SUITE 101 SFR/N/ SPPoM I 01Y.: 6 se MN:11811400U3M12-150F 150ft MARLBOROUGH, MA 01752 a0`4 TFL' E B AWG & 6 AWG MN:HB1110RJWl2-125F 175 it (508) 481-7400 MN:HB114-0&13M12-200F 200ft www.chappellengineering.com 12 CHANNEL FIBER DIST. xytrM cable MN:HB1I41W3M12-225F 225ft INSTALL(1) HYBRID CABIE� - 8 3sbAWG powersA al2x molt made fiber palm,Outdoor mtedmnnec[ors&lC PDUCENT ro FXLST.CDA% A-4 I �� u �I q 1� ?� MN:H8114-1W3M12-250F 275ft -`•�"VF 61 FS !�I'�I�% b MR:HBI1C13U3M124T5F 275 ft IVP FYI {� MN:HB314"13U3MI236F Too It wv�� yAYI EQUIPMENT PLAN �1 0.117[2.971_,, �l il:i MNN61F21113M12325F ft EQUIPMENT A_{ ]MU�SEPOW \ROD � p. 3,=powerpal r.lL mUlU-mode Flberpalrs,OUMoornbc1 mnncctars&IC 350ft 0 1-6• ]• b 9• - MN:HB11421U3M12-3XF FIBER ONLY - O IMN:1,12314"21U3M12325F t ALEN RFS HYBRin-Ex JUMPER CABLE SCHEDULE ENGINEER/LAND SURVEYOR DATE •. ( u'4 ��qa5� �IIWJ{ =�':51'j' HYb:H Ml2-MobM R O A NgAMKi OF Wt NR ME pERBON. MN.NBF012 M3 SF3 5 h UNLESS MEY NS!LIIIW IMOER TOE ffiEVl.WN [ F P S 3x mulh m3-l0Pl er Pairs.Outdoor&lC mnntttors3 2 able Or A UOt]r30 mfi.DoCNK FYtlNEFIt yyy555yyMryrya ti �� O MN HBGOf2 M3 10F1 10 it la ALTFA TN5 aCCUYLNr, J._ MN H3F012-M3.I5Fl 15k 2 MN HBF012 M3 20F1 20 it REVISIONS MN.HBF012"M3-25F1 25 ft 1 1. pp {i MW IMM12-M3-30F3 30ft r �.. a I'3raai ,t Ribirl MN;1, Nm11-08Mast e SHELFHEY/RECTIFIER I 3335 MN.Is 8AW-0power SFl 5 k SHELF@(3) Sft,rsBAWGpower palg3x multi-modellber pairs,Outdoor&LC Connectors, I RECTIFIERS 25GIh 5 Bcable MN.HBF058"O8U3M3d0% IDh 1 INSTALL NEW LIFE a MN:HBF058-O8U11013-15F3 l5ft 1 01/29/14 ISSUED FOR CONSTRUCTION y c BBU 25 GHZMN:H9F058-08U1M3-20Fl 20 it f (�lUii: ���"-•y`� � � + MN.NBF058-0eU1 M3-E5TI 25 k 0 01/27/14 ISSUED FOR RFNEW -0 • MN.HBFa58BMk U13-30F1 30 � tir REV. B DATE DESCRIPTION OSTALL(1) NEW BATTER xrbrld wm per table SIRING IN EXIST. BBU IN Mx HRF05913U1M3 5F1 JW .."' 1 EMPTY MIDDLE MY 5lt,la 6AWG power pair,3x multi-mode0ber palri,Outdoor&LCConnectors, 5h 1238.019 DRus"Ba Ola AS SHOWN e 5/8 table artab BI M 0 MN:1BF058-I3U1M3-10F3 loft ppPEQ a60iW3M1 a MN:H8FO58-13U1M3-15F3 25 It MN,HBFO58-l3UtM3-20F1 20 ft _ MN HBFO5B13UIM3-25F1 25k B523XC362 MR:H3F058-13U1M3-3DF3 30 it EASTERN BANK y xYbna romper cable N:48F078231j1M35F1 5h 217 ESSE(STREEE e 5q 1s 4 AWG power pair,3x multi mode Fber paus,Outdoor&LC Connectors, _ p 7/8 cable SALEM,MA 01870 E INSTALL(1) NEW BATTERY 3 MN Hero7e-23UIM3 lOF1 30 k STRING IN EXIST. BBU IN Q laWHBF078.2301,13-15F1 15 it Dubai TELE t yMN:H3078-21U1M3-20F1 20k DIP1Y•FRDNT BAY MN:1ff M78-11UIM3-25F1 25h EQUIPMENT PLAN,DETAILS& MN:48FD7833U1M3-30Fl 1 30R HYBRID CABLE SPECIFICATIONS • NOTE: SPRINT CM TO CONFIRM HYBRID RISER GALE AND HYBRID JUMPER GABLE MODEL NUMBERS BEFORE PREPARING BOM. EXIST. MMBTS CABINET xuw s N EXIST. BBU CABINET 3 250OMHz HYBRID CABLE X-SECTION & DATA NTS NTS N SA-4 ONENnA-{ SCI,LE: Yr-{ TC A-4 Sprint')! VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH. W 07495 (201) 684-4000 TRM 16 CHESTNUT STREET, SUITE 220 FOXBOROUGH, MA 02035 (774) 215-5421 www.trmcOm.cOm X ENGINE R ENGINEERING 'c'm �ASSOCIATES,LLC Civil-Structural Land Someying R.N. EXECUTIVE CENTRE 201 BOSTON POST ROAD WEST, SURE 101 250OMHz GROUND EQUIPMENT MAR BOROUGH, 74Onsz (50RO GH. MA 00 www.choppellengineeringxom ITEM QUANTITY MODEL DIMENSIONS .& WEIGHT BBU KIT 1 ALU 11.8"x19.0"x3.5" OF GROWTH CABINET 0 TOP HAT 0 - _ ��� DAVI m BATTERIES 8 ALU 10.1"x6.9"x17.6" - 105 LBS y RECTIFIER SHELF 1 ALU - 06 RECTIFIER 3 ALU 11.5"x5.5"x2.5" - 5.5 LBS AL 250OMHz TOWER EQUIPMENT ENGINEER/LAND SURVEYOR DATE ITEM QUANTITY MODEL DIMENSIONS & WEIGHT IT s n wouTroN a uw FOR M IxRSOx, uxus tun rNE rmxc uuwn n¢ouxcnox ANTENNAS 3 RFS APXVFMI4-C-120 56.3"x126"x6.3" - 56 LBS OT A 1C°'�p PROi�'°""L D1A1EP' TO&M T16 L INT.. RRH'S 3 TD-RRH8x20-25 26.1"x18.6"x6.7" - 70 LBS REVISIONS FIBER 1 - ALL HYBRID 01.625"0101 - 1.6 LBS/FT JUMPERS 27 - 00.5x8'L AISG RET CABLE 3 COMMSCOPE ATCB-BOl-006 00.315x8'L - 1.3 LBS 1 01/29/14 ISSUED FOR CON61RU=N 0 01/27/14 BALED FOR REVIEW REV. B I GATE DESCRIPTION wmen x0. omam ee m x 12M.D19 DPAMX ec 06 AS SRm owv'o er m wou+awowwux BS23XC362 EASTERN BANK 217 ESSEX STREET SALEM,MA 01970 LPMN TIME RF DATA SHEET 8 BILL OF MATERIALS ce+.WC NwaEn A-5 Sprint* VISION 1 INTERNATIONAL BLVD. SUITE 800 MAHWAH. NJ 07495 g, :g '. (201) 684-4000 TRM 16 CHESTNUT STREET, SUITE 220 FOXBOROUGH, MA 02035 (774) 215-5421 www.lrmmm.com •www www• •www www• wwwwwwww r , ° Per HYBRIFLEX Jumpers ®- CHAPPELL 1' !' Sector 0 pr MM Fiber ENGINEERING Ti 1 pr Power .10 r ` ASSOCIATES,LLC ! ; w Civil,Stluctura= Luna Survcyrnq Y RX EXECUTIVE CENTRE r e `31 : Medusa with Outdoor rated. 201 BOSTON POSE ROAD WEST, SUITE 107 v"' terminations MANI(0B)481-4000,752 www.choPFeliengineering.com Per Site HYBRIFLEX Riser y 18 pr MM Fiber ('p`YSHpF V 3 pr .Power � DAV► H ALU 250OMHz ALU SCENARIO 1 RFS 25OOMHz ALU SCENARIO 1 N.TS A-8 N.TA �ONALEN ENGINEER/LAND SURVEYOR DATE rt a A wuArax a wx rax un vmscx. ux�rss TNEv.la w.mxo carom THE UREC -..• _. -. or A ucr FRaiS510W1 ExdNEER. ew�snNW' axurii" ` a�r�uiliN" s�M� x ffiLRdUNH• esomRHe ;- - N KiER M6 COCUYEM. ". REVISIONS -+*iW-•3,-+.nx^^•`�wn -F 3 , �s+-�d+ve.a+, � A°✓'' I --zti�^eu-n»...y � 4 T 01/19/14 I V)TOR CONS CIMN o 01/17/14 Issuco roR REvrtw N REV. / DATE DESCRIPTION 5� �� VAtER M r�xF. ,M SfNE 1111.019 SHOWN R,�� aIEOlD 6t: art ,d3 £ rRJh[r EsawwYMl �l. azo r C RRN n a d n ° BS23XC362 # M ;w r k� y EASTERN BANK 4.,: �•Y1- Wn w9bN'da p5 ^� 5 .; ` 5-" y 'p ' i ,iwgltE?I' 3 '1`° � 'Si$+r r,ltTd` ,y.. T4'r`st "` r ..z+ - 217 ESSIXSTAEEr 4 u.3 I,X SALEM,MA 01970 WIRING DWGRAMS Note:,The iflLI* god atigve m fora 3 sector view.Please Scale 9rTeatlY f0r2-sectorlwd single sector views: . .. owmc xxmx RAN WIRING DIAGRAM: ALU EQUIPMENT J A_6 N.T.S A e INST IAS I. CONTRACTOR TO ENSURE THAT RRH MOUNTING DOES NOT INTERFERE WON CLIMBING IAMM CAME CLIMB. OR COAX PORTS V p ri nt* )00 2. CONTRACTOR TO VERIFY IN FIELD SIZE OF EXISTING MOUNTING RPE TO BE 2%'STD(2.88 O.D.) PIPE VISION MAST (12'-6'LONG). (R AVAILABLE) 3.VERIFY EXACT RRH AND ANTENNA MODEL 6 AZIMUTHS WRH RF ENGINEER PRIOR TO INSTALLATION. INTERNATIONAL BLVD, SURE 800ON. MAHWAH. NJ 07495 4. ROTATE EXISTING ANTENNA FRAME AS NEEDED TO ACCOMMODATE INSTALL ANTENNAS. (201) 684-4000 S. RRH PLACEMENT FOR REFERENCE ONLY. CONTRACTOR SWILL RACE RRH IN CORRECT ORDER MATCHING INSTALL THE PLACEMENT THE AND ENSURE THAT THERE S ENOIGH CLEARANCE FOR RRHS T� TO BE PLACED LL THE INAI�ON THE AND ENA FRUIE/RPE 6. INSTALL EOUIRAENT TO BE MOUNTED PER MANUFACTURERS SPECIFICATIONS 16 CHESTNUT STREET, SURE 220 FOXBOROUGH, MA 02035 (774) 215-5421 f f w"A mcom.com PROP. L3'x3'x$ I CHAPPELL - EXST P[NNO wnuJIM 8'LONGENGINEERING PROP.OOWNTLT ANTENNA PROP.DOMNTILT ANTENNA �_ -m ASSOCIATES,LLC MOUNTING BRACKET MOUNTING BRACKET PROP, 431.ywCivil-StrucU.Tral Land Surveying I8 LONGPROP. 2157/SCH.40 P10P.SPRINT PRO'. SPRINT STEEL PIPE MAST. R.K. EXECUTIVE CENTRE 250011112 PANEL 2SOOAHz PANEL LENGTH AS REWD 201 BOSTON POST ROAD WEST, SURE 101 ANTENNA ANTENNAMARLBOROUGH, MA D1752 (508) 481-7400 www.chappelienginm ing.com PROP. ANTENNA PROP. ANTENNAMOUNTING BRACKET MOUNTING BRACKETPROP.1$'I U-BOS(TM.1 PFR CONNECTION)PROP. GT ,SEED OF ROD,LENGTH N RIO) PROP.9COHER nBEU Bars(TW. 2 PER CONNECTION) w/wawms a LDOCNUTs �� DAVI (TTP. 2 PER CONNECTION) O PROP. L3'x3'.W �1 8'LONG y PROP. PIPE SCS.b PROP. PIPE SOI. 40 0` LENGTH AS STEEL PIPE MAST. LENGTH AS REOD CONNECTION DETAIL ��``� Ni.i 5 1At PROP. L}'xYxW 8'LONG PROP. L}'xr.W 8'LONG ENGINEER/LAND SURVEYOR DATE PROP.RRH n 5 A wourox w wx Pae Axr vErzS'ON, MOUNTING BRACKET uNl 1NAr.wc rcnxc UxDUI mA MKz PROP. RRH CIT A ucOa40 vNovvsmNu zxavuzn, MOUNTING BRACKET To K1IX mrs ooavuvm. FXST.PENT SE wu2 e REVISIONS PROP. SPRINT a PROP.SPRINT 250011Hz RRH a 250OAHz RRH PROP. L3'x3'xW e EXISTcruun2r IB'LONG = 1 01/29/14 MUD FOR OMSTIMETON PROP• G}1}'x){' D 01/27/14 ISSUED FOR RENEN I } B'LONG REV. Y DATE DESCRIPTION I s-1 \\ q rxo2T MO . ar: m xuz S-I PROP. 2IP'0 SOL 1 40 1218.019 D""""°n °w AS SNOwx I STEEL PIPE MAST, ONOYo ar: .ert PROP. L}'.r.W / LENGTH AS REOb WE mora mrwwmx 18'LONG a/m/ Exrst&wcxcr (TV) BS23XC362 PROP.AE U-BOLT EASTERN BANK EXIST. a4wEr (TYP.I PER CONNECTION) 217 ESSEX STREET SALEM,MA 01970 PROP. 'HPE UNTIL Bars Tns/.BPACxCI(!YP) W/WASHERS h TF >nO (TMP.2 PER CONNECTION) STRUCTURAL ALPHA & GAMMA SECTORS BETA SECTOR DETAILS TYPICAL 250OMHz ANTENNA MOUNTING DETAIL TYPICAL 2500MHz ANTENNA MOUNTING DETAIL 2 CONNECTION DETAIL N.F.£ 5-1 Ni.£ N.T.S. S-1 S_1 NOTES TO CONTRACTOR: I& FROJDECORE a%wNL AS NELESSIRY FOR PE]S TONS OR RLSF]S MRDIXM SmMN 16110-RY WAn.BOM THD RMIGs 'KELECTRICAL LEGEND DOG.DO NOT PENETRATE mcrufm MEYRERS WIMDU[CONSTRUCTION TIYNYGF% APFRWAL REEVES IND/OR PQEIRArgM IN TWE RATED CONSTRUCTION L BE A ovaTO MITN ,COIMECI016 NID mUR11YS EYr COL1iW%AND LWWECIm 1. CgirRN:lpt SNVl C6ECr ME EXETRI:ODOROUS%WI m STORMNG 910.ANY POLNED'MM FIRE RATm UATEI WHICH 6 MAINTAIN ME FIRE WNW Of 1K EDNm SrffFL CR W1L[A&£ARU!CMY. •taICRETE nGxF CR 1 tt ANO OUMFORS Atl4Nf.".ME 90 PERIOD IN REGARDS m THE tlAORICIORS FIIXCMNS. NIll OR STRUCNFE NL FOR FL0.Yf PFNErIGMN$Stall PAYSNr PASW£M OXER nE GANO Nq RI6L CWPA65pN TYPE OR S1NM[SS SIEU.YULTIR£ ME SCOPE W PGM,OR ANY O 6511E RR M m 116 RM a 9 BE WA1ER,SYCNF.TIRE NA NYES NL WIFIELL SIW1 BE UL ApPMA'ED EOR MS IGIM LOLNWG IYi£LCN,CCIIX6 m WYE 1161AA1ED MSWIS EYr iI1nHGS USGIG SYMBOLS PA 9RMYIr W DLdWG ME BO FUND RITE TSE MIXER RR QUUN ARGN.NOT AFTER NRFTSE SET SCIRDS OR INDENTAUM AS A UEw OF AITMIYpi ARE NOT PERMITTED. ABBREVIATIONS print ME OORMAI M 9F£N AWANOD MOTE D NORIGL WIMS 4N NT EAND UGIT T1W AW UEIING R 70 9E mm B. R ARMS:ME CON TWE F ME C NO T GROUNDING DING 5N Li'RR OD 513 0 NIyJrt 1MIHHG UP ICG MRFILW f/91£NNi ASAYBLr VISION z AS MAY K TOR F 9E fQSMYSIHE FOR AND RA G I1L PERMITS M9 PAY Al FES OF 004 DIM D ISEAlOWNERS FQPPESFMATDL AND EOIRPIENI OHNE TE�To ;TO ME WARMS MC RT RO DY a THE COIIWT fAWNOnF SYSIEIL FOR R,-0' slm AS UR M UxAl.FOR OFCMIOAL MORIc.wo FCR soQowrp a ILL NYECBOn ss HA LW IME .Wows AE N SIFT USTAL_RNS BE HE OESO CONNECTED TRISE ACWRov E m ED mxDUrt,IMC A1"ROD ONDUTw mrmu E _• mMUR iGRAWc ooxx AGO COPPER IMENW maven Bw 1 INTERNATIONAL BLVD. SURE 800 IEauWm MTM LOVL NITIYNd'IY. UPONHANOR ES Mu RNdImEO T MF T ME ONE OF[SCR Ci MESE PW4 ARE MSFO L, Cq'6UR wsMUM AS EE. MA l LONG,LED ON RY.'O AND OD DIRECT WF MEIMlN WRE GWGE X(201) 4 07495 uPoX BEST AVNI$E NOT TIE JNxl AT As ONE OF R MD NA NNI E.uxwnc X,ED AGREE.IW411 NFCN£D V OR NM[YT w As M M UNSU, AS P35gE ]. ERCT YDS SAND ARE PRONCID,THE ELECIIOL POINTS ROUTING SD mORM1U1[ OUT11 N8OXE%ET ARE & TME As DIVAN OXT RRDIIECT).L BE CL OF ME EYPosm RXTD ARGUE OND PN DII m M AT RIGMµfE,S ro TIE LITS Cp10Un R1W W6fP4RpwO BCN BARE CUSER"S (201) 684-4000 EVLT TE1r}N RI N9 RECANT DED CgWECIKN PoNIS,RWIING NW ASSOCNIm CONFERS mM6•ET& IM ME TYFE OF CgIwMRCDON(RCCA GI m1. sINLL BE NR E N SAIN AYM AxCI£ CREN w EWYD CONWR N9 Ew PoIN6 SEN 8 GASE TRNILE9CV1 snTEY PEQFEIIENIS MIM Lq'IL UI611Y LCYPNIIS k SPw1T @VSIMICINY LLNVIAi. Lg61Alm WON TE mMEA'6 IEAdIDITA1M1E PRJR lO RCFX-w. 1VFE ROM STNOIYIO FtBVl15.SCREW XNIm KWWRT mTIN3 OR WwUR ffM mISUR FJN OID`'E 1.Ti0UTL 91S KL AL NIDERNOUND COMMIT ROI 9WL PE 60PmY.TED IN FEW BETWEEN TO RI W FESS MAN REUSE OF STNNVN ELT:N& 4. 1M DONTRACRIQ STALL PONCE TEMPORARY POINR AXD LOTTING a RETAINED RW THE WaRlt PRINT WE.ONOTACTS.NO RSffCINE UIRFIT tlX1PAV¢. � IIEIm�ITTw/��MIT CRI LOAM EMAIFD CBOUm BN EFIEiWI (VTRM a DONDurt soRIOMs:RxA10E 9Pvoms FTR IIW201NW mxnlllrs LA0 Eur - vMc wcunm 5. LCG1pN OF AND S. MWr Am 'ON MID N ME WMR F 20. ALL ROO GA RMNm 9Rpl OM 9WL rR.WLIIOx m ROD WLYNIYm F1BLY5 NOT MORE MAN&FEET APART MIM NOT FEES MW TMO SYWJFI6 FOR FN.N 10 2J. DO f1ECIPoCK MTI TARN; -,d 5/6•,1D'-0•COPPER CUD M%N%IWIE NY SWl1 PE CNPCWhO MIM REW N6RMNS MR m A0.g1-GL wN RGq GLYWIIID STEEL,WNpM TATE LPIDE COOT SIPNLIR LFNCM N1p ONE YFPME MAR FIA1 FLEW OR BSD IK1llpWG 9iJLWp @.O^ OEM GENERATOR 6. MF Lain Rom AS 9MYYN ON ME RN6 ARE APPCOpWTE FLLT UX:w I N!0 21.CG.TUCKR SKILL RONDE AL DIRECT COPIED OONCT 5 WIN 6'YAE 6 MIL M[M RUTS AANE 919`MCED 00.140 AND MIMN I FSE OF AU_µCRON COMES 6MTC'FS.N11M6.EIC NSTNL ME XOIE RPE STRWS W WINAR I PICA W Ramrc 9w1 s RR Exe-nls FmB camina¢ AIAFwIZm ws1N MED FOR ruc mp.Nrmc mxlExlz rrE wvs sw1 ff M+ANa ExaNFRUTWE E xlox GPS MORAL wvlpwlc smw 76 CHESTNUT STREET, SUITE 220 FOR TEIIDMM sWLFP NSDLL IICMWML RPE IWII,9E FON LYNAMS W6FA TINN I Axa. ■ FNO RED COR fLECIRG O`F,P SST FASIRIFRS MIx NWGW Pops WY IISfO W DM ICG1MI15 61 Lou 9( 6ACATx FO%BOROUGH, MA 202035 1 ]. RWACE Ru BJ%FS ND.NNCIICN mZS MIEIE 9WNN tlf TQLNRFD GI ML a PPE s1PA3 az EIII'IPYIL Cax1PALTOR 991L PMA4E A mrox a sv1T1s WIDw NR TETCO • wMPR®oF1 tME cnWmmox �maN,D ROTC 09Ln) (774) 215-5427 fl NL LYWMIS SWL ff NS NIIH PoNOS WDE W I<GY61W[E WIM ML U&£N6-10. OON E7nO m ME R6WRY RNp fABOET. 6CIp'WlE pKr CCRECTNN YLIpI MIND-CONTI ...trmcom.COm M Poplr Npl£OENLE O1Nm niW SCW WM C[NDM 9BLW5'MIH 12'YIXW W TNT MTM LURM. -G-G- GMNWD wN' II2 AMC EqD URB LWm ANTENNA COPPER GROUND GOR WRXE SWTID6 Epi Al CONT IS 2'OR UNDER. A "PES AND VRFTS(YO WTSY CWY IT MFA TOMEO EWE RRME RIUBIE M.AND OBRA CU M.FIECTWUL LGRWLILP 9WL NNAIDE A SECRINI OF YALn1F CIXINp FOR PLMLR LONNECRON YINW"S FOR M U4 WEEN IFO. BE tlfPIX ONIETW6 NOR CO]L m CMpNTaR v NiPY MOST INE W9 YAS1IX STYMIED GROUND&R 9. ALL DORM TERIOvMWS 9WL BE NNNZED MIM RASIF MIDAT F TIRG m 11E R"W2f 0.Wp UHwi. ME mMR/CTO]9WL RFACf AN NYWFMNUL E-0•LCl OF WSMATION UMESS OMERMSF WEO OR NOTED ON ME DRAI USE SIAA`OM M9 N'OFF CONCRETE wMFON GROMNOID 8TRI CS WNDIATI FOR ND.B W W&FA MERE EL4"ERE EPEaRm OR Iplm OIIERMSF FS PfIEOWI CpMWGIILR SnIFY WFO AT IN END CE ME IL DIRE W TE COgMTML, EMR:T prµyYNUY.=FOR ,vel NOT CT RSI ural MUATtN Pil Rlwm RxnEnMl CIS ENGIN E R 1a HL WUE sxul eE 1WE MWx.swa uwF.Mm LcwfP IR ro 92E/10 AMD(law 2A w0urm w Acwlm W/1urL CODE s s1EET E-z 9MLL PE TY1E MIW/Tlml.]5'C,FOR NL CONwATaE.usFLFs onwbsE 9'Ernm ENGINEERING URGER 9w1 9[mN.YMRc smwGm)75 OEcrE[C 0&/DEGREES if.B6[ OR NOTED ON RITE OW"NN5 pX FEfPEESDfl6 0K NUMBER IRC ProY"'WDp GBMT CrAm �ASSOCIATES, LLC wrmFXTmrc,MM"N/1z 11. NL ROES SNI MCMC AT Ill RAL BOYS J-90pS.EwIMM BOXES AND M. PRJA[E(2)r VLVA1:mD ADD PEEL IYMp1AT REEK WON I/N'NnAN tl1I4 UIE wtlllWlC & OOR CCdXG RNSE TENNI AND GACIIp LpWCIOl6 LYILW-CNm pOF ~�•GAINING muBm ROT ROOD. G4WNQFD STEL DEMOS WM A PRIED R.6TN TMs.Anal DRAT,GRAM,OR APwD.ED EQ W. By GBO swm Al RXF pP m 20'-0•Wc.) YNRE m PIXE Pm Inure muwm w acaRavEE wlN xTc cWwn NL mxNXTow rc ME saE mWR ro R OA Emm. RDLNrc crtFm"'umnr COYPAIY ME DANT RMSE GorpuLTOR rnDR wDNc 9w1 BO mACW,p0.m1E, RAT wtmAr Civil-S'irucli nal Lanv Sur eying It AL rmM WTEINL 9Mu WVE A uL LaEL WROTE(IM/me)OR"OWN mNNc[,COLD,.DOW(2n/Aw)MORLON 13.CCNr RWPI-N SN41 BE COORDINATED WM IFM IT ME NEGRI DOT AMX) _ELECTRICAL SPECIFICATIONS FOR Al`ROUND Ri S cmxx pW GOAL DR "` WREXECUTIVE CENTRE Y96Y CONTORTION OONFUCIL M 1E ONDCONTORTION ND DOI m RFWdED. 201 BOSTON POST ROAD WEST, SUITE 101 SSU sFRl1fT SFFGIRW L60ND PN(119191P .K. c WNNECIOFE IND pus:FOR COPPER OOMDMCORS Na 6 ART EMAILR 3N 14.Al PNEL DI ECIp0¢SIAL BE TOMNOM NOT Kw WRITTEN SECTOR RON-FF19LMCON W ML PROM)NI6 sLN- T s 8 STA-YON XARBREMIGN OR WOFM m WNNOW ROIYI9 IlP1ER ANImIN COPPER(i1OMp BW MARLBOROUGH, MA 01752 Nvrm1W YPNwm wswnnxG OAP& NR HIPPER roxDGCTDI6 LvcEn Mw COST. EI6TBO (508) 481-7400 A IEOIAREYmIS FIIPNL91 NL LNW,WIERLLL SmA3.FgAFLmT.ND H0.6 y TARED O IIW RR NIX NJEW w!,0.i 119E%L411.ff WMffI,'IMS, 1& WSTNL Ax EGIPYIXT GPoIUNmIG cormunon W WL caxwlrs Pm ME mEllRurDrE IPPBAvcm RECFXRm m cOLPILTE ME wsrwumll v M[croPFFIE PRaPEar TIPFO a NMMTm. PRONSEo www.c8appellengineering.rom NID NEC 1xE EW ARD AlDISCO G VMpULTpE Sw4l BE BOXED I NL.WNLMIN pp;RMX1 6ri1EY w.Ntl"YYF"M ME SPELRMATCM M9 COMPACT (P) eo%R PLumrS,ARD L DlsaxlEcr rWnoEs.9AVNr¢.uD EDuwENr c9NErs. DRAY4XS. 1&TRE cONTWCIOR 94ll PRETY E AS-B14T ORAWN .DO'N T MT NO Al mw fl RmIIWDE1115 fR IIEfAM1p1Y N:pIC6.WD SWIIWpS: INSrN1.A1pA W1D6V. 0. SRCfS(4m 1GI5 NIO LOpfRk:LWWKTaR FLNG116 S1PIL BE WNIIXOI$iRdl - W E E CO OEDON NIO CHVYA MIGIE CCOwI£TIBO ME CpIIR'CT.mBYR FL ECA%IEM ND'NJRYYV84P STAT CCNigN m TM AALLW£FRMS OF 1TRYMIATIUX ro 1WIYNlEN N1M411r SRpES UNLE59 ARANID BY 11E RAW<. 918STIM91 CWRE1pX. N9EE701t ONE W1pWl ELECMMN COLE(ROC)-.WRMIBIE SFA1E F1FnRC LGIEL ME W1pW1 FLFCIRGAL 6NFIY CODE xESC.ANO ME lmw IND THE 9211011 I62M-CWO1R BEANSSH OF n.ILL Dscnxwcr sWnaEs Am a1MR corlrRawp OEws 91NL BO PRC.mm"M COxWTpxs a ME NmpralEs WWp FANTLL wR®IGTDx wNWpxc ro ME Nmmm IAMIOm NRROO. s oms RED Nm(NO.R mT Mwm.BRu+QI cRnms ., �. Wl YomIOAnws REGAVm ar HESE LBOES R.Aq II6rILID bE NV PN6 WuiKKE Fm IPOA1(NO EMCF➢IYA6) REGLUTMM,.tap IL1W"116 AV1L EE Y.WE Br 11E 011RY.,Tgi"1MpJT w PRvaIDE 1YXIXD G¢,B%T{N.1MAWL WfNETIC iPoP.!MUL MO W MREE N u ADm1DX4 ODDS m ME vANER P NE RAANCN f.WCLW BMIYf16 m sH ON uu"xGS M w P eflUYERS ... A'== "" O� DAY{I I stall&FARE U4,E AT j OT IPP.A RAnHG ro WTW FX6Mp OR As C TOR OBOES VR CO.RTI TO T:Al WTER9LGARDwsAPPLIANCES ORYFNI.OR RECITED FOR wALA$E F.WLr bIRRENS. y W mens 991L Wp0.R1ro ME AWLItlP1E nANWx6 OF uxomWnnFRs uBaunXEPs,Ix&ME LaE1 aE W 1SING Br.IA,E REpRREO. � � INCOAX ) )A i W STALL E .fi,z ry ,... JUMPERS. TYP. k 'Y F IT �IJIGI�- INSTALL RET CABLES -0 } �ONALENG\� NV 2.5 NV 2. 1 ANTENNA RRH INSTALL FIBER R INSTALL FIBER E DC JUMPER, TIP. f ENGINEER/LAND SURVEYOR DATE a JUMPER, 1. - TO ADDITN4 RIS A xOuiXlx 0<I.A.FOR NN PER6gA SECTORS HYBRID CABLE MPo MEDUSA uNFFSS MESE ARE H:TINO UNDER iH[MROLTLN OF A Lp9rsm PROFESS.61GMDER To&TER MRS UOCUIREN, INSTALL CABLE GROUNDING KN (TYP. AT 3 LOCAPONS. TOP, BOTTOM, AND AT EQUIPMENT) INSTALL /2 GROUND, EA INSTALL (1) 1 1/4' HYBRID CABLE REVISIONS SLRANDED, INSULATED COPPER I I I CAINST RO O F`7 IKIM PND IMPORTANT, VELCRO STRAPS /6 INSULATED ONLY MAY BE USED ON FIBER. EXIST. 2001 WITH 2 HOLE LUG CABLE TIES OR TIE WRAP MAN BREAKER (MCB) MUST NOT BE USED ON FIBER INSTALL CABLE EXIST_ TOOA-2P BREAKER IN GROUNDING KN `X2 SOLID TINNED BCW COPPER E%IST. PPC, VERIFY BREAKER MISTING ANTENNA �6-//-/J REQUIREMENTS W/EQUIPMENT GROUND BAR (AGB) EXIST. FIBER MANUFACTURER AND SPRINT DISTRIBUTION PANEL EXIST. EQUIPMENT 1 01/29/14 ISSUED FOR CONSTRUCTIONEXIST. ELECTRICAL PANEL GROUND BAR IF B) EXIST. 0 01/27/14 hSUEO FOR RENEW EXIST. 20OA-2P MAIN EXIST. GROUND FIBER NRNISH AND INSIAII (2) 1.5' LIQUID MTE EXIST. IOM-2P MMBTS CIRCUIT BREAKER (MCB CONDUCTOR TO EXIST. ISR. BO CONDUIT FOR FIBER JUMPERS AND/OR W _ CIRCUIT BREAKER REV. B DATE DESCRIPTION TOWER GROUND RING CONDUCTORS. SUPPORT CONDUrt AT 29' O.C. AND AT VERTICAL-TO-HORIZONTAL BENDS. m&E n x& oL9DIEo ICO. Rrt OJE EXIST. SPRINT METER INSTALL LIE BBU IN EXIST. METER BANK INTERCONNECT CONDUITAC��aOWEMS AS 510"1 FROM POWER LOAD EXISTING SOURCE CENTER _EXIPSTING AC EOU PEMENT EXISTING I PREM CABINET EMU FROM TELCO EXISTING CABINET BS23XC362 J- DEMARCATION TELCO PANEL INSTALL RECTIFIER ret SOLID TINNED EASTERN BANK COPPER TO E%IST. dCOPPER EXIST- GROUNDRIGROUND RING NG E%IST. MASTER 217 ESSEX STASES GROUND BAR (MGB) SALEM,MA019M EXIST. GROUNDING CONNECTION Mglry THF e I ONHINE DIAGRAM& EXIST- BURIED PPC DETAILS GROUND RING TYPICAL POWER & GROUNDING ONE-LINE @ EXIST. PPC BREAKER PANEL E-1 SCALE:NTS E-1 Stec F.NTS E-1 PROTECTIVE GROUNDING SYSTEMS GENERAL NOTES: • 1. GROUNDING SHALL BE IN ACCORDANCE WITH NEC ARTICLE 13.EXOTHERMIC WELDING IS RECOMMENDED WHFOR GROUNDING `/print' 250-GROUNDING AND BONDING. CONNECTION ERE PRACTICAL OTHERWISE. THE CONNECTION C SHALL BE MADE USING COMPRESSION TYPE-2 HOLES. LONG VISION 2. GROUNDING SHALL BE IN ACCORDANCE WITH SPRINT SSED BARREL LUGS OR DOUBLE CRIMP 'C' CLAMP. THE COPPER DOCUMENTS 3.010.02.004 BONDING, GROUNDING AND TRANSIENT CABLES SHALL BE COATED WITH AN MTD-OXIDANT (THOMAS BETTS 1 INTERNATIONAL BLVD, SUITE 600 PROTECTION FOR CELL SITES'AND 3.018.10.002 'SITE KOPR-SHILD) BEFORE MAKING THE CRIMP CONNECTIONS THE RESISTANCE TO EARTH TESTING. CONTRACTOR SHALL FOLLOW MANUFACTURER'S RECOMMENDED MAHWAH. NJ 0749$ 3. PROTIDE GROUND CONNECTIONS FOR ALL METALLIC STRUCTURES, TORQUES ON THE BOLT ASSEMBLY TO SECURE CONNECTIONS. (201) 684-4000 ENCLOSURES, RACEWAYS AND OTHER CONDUCTNE ITEMS 14.AT ALL TERMINATIONS AT EQUIPMENT ENCLOSURES, PANEL, AND ASSOCIATED WITH THE INSTALLATION OF CARRIER'S EQUIPMENT. FRAMES OF EQUIPMENT AND WHERE EXPOSED FOR GROUNDING. CONDUCTOR TERMINATION SHALL IO PERFORMED UTILIZING TWO UNLESS NOTED OTHERWISE, RLL TRM 4. GROUND CONNECTIONS: CLEAN SURFACES THOROUGHLY BEFORE HCLE BOLTED TONGUE COMPRESSION ME LUGS WITH STAINLESS BONDING CONDUCTORS ARE 28 REPLYING GROUND LUGS OR CLAMPS. IF SURFACE IS COATED, STEEL SELF-TAPPING SCREWS. REMOVE THE COATING, APPLY A NON-CORROSIVEINETLU APPROVED SOLID TINNED BCW. COMPOUND TO CLEAN SURFACE AND M META LUGS HA CAPE 15.THE MASCO GROUND BAR (OOR) SHALL BE MAGE OF BNtE WHERE GOR TOUCH IS REMOVED FROM METAL R SHALL BE TINNED COPPER (FOR LARGE ER APPLICATIONS R SHALL BE PAINTED OR TOUCHED UP WITH 'CMVANO% OR EQUAL. TINNED COPPER) AND LARGE ENDUGH TO ACCOMMODATE THE EXISTING GROUND CONNECTION 16 CHESTNUT GREET, SUITE 220 5. ALL GROUNDING WIRES SHALL PROVIDE A STRAIGHT. DOWNWARD RECURRED NUMBER OF GROUND CONNECTIONS. THE HARDWARE FOXB774) 21, MA 02035 21 PATH TO GROUND WITH GRADUAL BENDS AS REQUIRED. GROUND SECURING THE MGB SHAH ELECTRICAL INSULATE THE MGB FROM EXISTING MASTER GROUND BAR (MOB) (774) 215-5421 WIRES SHALL NOT BE LOOPED OR SHARPLY BEM. ANY STRUCTURE TO WHICH R R FASTENED. WWW.UmCOm.Oom 6. P11 CLAMPS AND SUPPORTS USED TO SUPPORT THE GROUNDING 16.ALL BOLTS, WASHERS, AND NUTS USED ON GROUNDING EXISTING EQUIPMENT GROUND BAR (EGB) SYSTEM CONDUCTORS AND PJC CONCURS SHALL BE PVC TYPE CONNECTIONS SHALL BE STAINLESS STEEL. BBU EXPANSION (REFER TO RMI (NON CONDUCTIVE). DO NOT USE METAL BRACKETS OR SUPPORTS 17.ALL GROUNDING CONNECTIONS SHALL BE COATED WITH A COPPER EQUIPMENT REDS) 7 CHAPPELL WHICH WOULD FORM A COMPLETE RING AROUND PLAY GROUNDING SHIELD ANTI-CORROSIVE AGENT SUCH AS T&B KORB SHIELD. ISTING b2 STRANDED, CONDUCTOR. VERIFY PRODUCT WITH SPRINT CONSTRUCTION MANAGER. INSULATECOPPER NEED. ENGINEERING 7. ALL GROUND WIRES SHAUL BE A2 SOLID TINNED BCW UNLESS 18.TOR NEW OR REPAIRED GROUNDING EQUIPMENT. REFER MI ® ASSOCIATES,LLC NOTED OTHERWISE. SPRINT GROUNDING STANDARDS AND FOLLOWING (SUPPLEMENTS): -AND-THEFT UPDATE TO SPRINT GROUNDING DATED 08-24-12 (itVil Sftuclur8!,L81TC!SUrv'ByiRCf & PROVIDE DEDICATED B2 AWG COPPER GROUND WIRE FROM EACH -SPRINT ENGINEERING LETTER EL-0504 DATED 04-20-12 INSD11 INTERNAL GROUND KIT AND ANTENNA MOUNTING PIPE TO ASSOCIATED CIGBE. /6 INSULATED WITH 2-HOLE LUG 1 R.K. OST ROAD CENTRE 9. GROUND ANTENNA BASES, FRAMES. CABLE TACKS, AND OTHER EXISTING 201 BOSTON POG ROAD WEST, SURE 101 INSTALL HYBRIFLIX AND MARLBOROUGH, 044 01752 COPPER COMPONENTS WITH g2 INSULATED TINNED STRANDED CABLE GROUNDING KIT BBU EXISTING EQUIPMENT COPPER GROUNDING CONDUCTORS AND CONNECT TO INSULATED _ - dEEH GROUNDING BATE (ECB) (508) 481-7400 SURFACE MOUNTED RER'SGROUND BARS. CONNECTION DETAILS SHALL wwW.ChOpp61160gi0eeriny.tOm FOLLOW MANUFACTURER'S SPECIFICATIONS FOR GROUNDING. 1 INSTALL INTERNM GROUND KR AND EXISTING FIBER DISTRIBUTION 80X 10.EACH EQUIPMENT CABINET SHALL BE CONNECTED TO THE MASTER /6 INSULATED WITH 2-HOLE LUG ISOLATION GROUND BAR (NOB) WITH /2 SOLID TINNED BCW FURNISH AND INSTALL (2) 1.5' INSTALL HYBRIFLEX (FIBER ONLY) EQUIPMENT CABINETS WALL HAVE (2) CONNECTIONS. UOUID YTE CONDUIT FOR FIBER - AND CABLE GROUNDING KIT * JUMPERS AND DC CONDUCTORS, \�OF 11.GROUND HYBRIREX SHIELD AT TOP, BOTTOM AND AT TRANSITION SUPPORT CONDUR AT 24' O.L. AND _ _ TO HTBRIFLIX JUMPER CARIES AT EQUIPMENT CABINET ENTRANCE AT VERTICAL-TO-HORIZONTAL BENDS RM DA,I� USING MANUFACTURER'S GUIDELINES. WHEN HYBRIFLEX CABLE EXCEEDS 200'. GROUND AT INTERVALS NOT EXCEEDING 100'. 12.ME CONTRACTOR SHALL VERIFY THAT THE EXISTING GROUND FURNISH AND INSTALL (1) 1.5" UOUID BARS HAVE ENOUGH SPACE/HOLES FOR ADDITIONAL TWO HOLE WE CONDUIT FOR FIBER JUMPERS. --1 LUGS. SUPPORT CONDUIT AT 24' O.C.AND Go AT VERTICAL-TO-HORIZONTAL BENDS. 06 EXISTING BURIED GROUND RING ' OP HAT OR cRo uSION �G��`( (REFER TO RPN EQUIPMENT REDS) AL NOTE: HYBRIFLEX (FIBER & POWER) AMD ENGINEER/LAND SURVEYOR DATE HYBRIFLER (FIBER-ONLY SHOWN. REFER TO RAN EQUIPMENT REDS FOR SRS-SPECIFIC SLENPRIO. R ISA M TKH a AW FGR Axr RNTtEOH. UNMIS THEY MS ACING UZ.BE 61ELTION M A LIQD PROi®WVL p TIER, To IlWR THS omnwl. REVISIONS 2.5 RAN EQUIPMENT GROUNDING SCHEMATIC SCALE N.T.S. E-2 IIS AM FROM ANTENNAk 5 GROUND KIT LL 4 2 1 01/29/14 ISSUES FOR CONSTRUCTION ° 01/27/14 ISSUED FOR FDABN 3/4' 0 GROUND BM REV. B DATE DESCRIPTION 7/16' 0 0 ON WNL OR AR 2 0 ° 0 0 ON SMOKE HEAT SHRINK PER FRu1 xu [fN'®RY: M YUE 0 0 0 0 0 0 STS SPRINT SPECIFICATIONS 121&019 AS SHOWN 0 0 0 0 °(0 0 ° � auaro Nn m 3 00 �-0 PRaMtT gTmwlv1 0 ° O oQ o O oQ o 0 0 0 o O Qo BS23XC362 LEGEND O O EASTERN BANK 1- TINNED COPPER GRDUND BAR, 49!44'%20, NEWTON INSTRUMENT L0.GT. NO. 217 ESSEX STREET B-6142. HOLE CENTERS TO MATCH NEMA DOUBLE WG CONFIGURATION SALEM,MA 01970 2- WSUWTORS, NEWTON INSTRUMENT GT. LA0.3061-4 TWO HOLE LUG,TO BE USED WITH 3- 5/8'LOCKWASHERS,NEWTON INSTRUMENT CO.GT. W.3015-8 12 AWG BCM TO Ntuec nnF 1- WALL MOUNTING BRACKET, NEWTON INSTRUMENT CO.GAT LA0.A-6056 eUILDING OR RING GROUND GROUNDING DETAILS 5- 5/8-11 X 1"H.H.C.S.BOLTS,NEWTON WSIRIIMENT W.GT NO. 3012-1 $NOTES GROUND BAR 2 INSTALLATION OF GROUND WIRE TO GROUND BAR rT'� MMWW NABS' SCALE:N.T.S. E-2 SOLE NTS E-2 E-" 217-221 ESSEX STREET IlO No. 153L.2 HASTINGS. MN 'LOS ANGELES-CHICAGO-LOGAN.OH MCGREGOR.TX-LOCUST GROVE.GA - U.S.A. I w CITY OF SALEM PUBLIC PROPERTY DEPARTMENT KI\BERLEY DRISCOLI, MAYOR 120 WASHINGTON XIREET♦SALEM,MASSACHUSETTS 01970 TEL:978-745-9595 FAX:978-740-9846 Ctti�Y December 7, 2006 Ken Carpi Park Towers II, LLC 732 Lynway Lynn, MA 01905 RE: Violations at 217—221 Essex Street Dear Ken; I conducted an Inspection at this Building yesterday with Inspector Holloran of the Salem Fire Department. Work has been done affecting"means of egress corridors" We have no record of Building permits or inspections. This is a violation of the State Building Code 780 CMR, Sections 118.1 through 118.4. Further, and of much more serious a concern is that these changes have impacted the various tenant spaces by removal of a required means of egress, State Building Code 780 C.M.R section 1010.2. Per this section, you have created a"Hazardous Means of Egress"( In any existing building... in which the exits are deemed hazardous or dangerous to life and limb, the Building Official shall declare such building dangerous and unsafe in accordance with 780 CMR 121.0.) Further, per 780 CMR 1004.2.2 "Any person served with any order pursuant to 780 CMR 3400.5 shall have the remedy prescribed in 780 CMR 121."This is a dangerous and hazardous situation that must be immediately remedied; such work must be Permitted and Commence, by a Licensed and Insured Contractor within 24 hours from the receipt of this letter. Any delay or further violation will cause this Department to revoke the Occupancy Certificates for this Building, and Post this Structure as an"Unsafe Structure"per 780 CMR, Section 121.2. Further, I am Ordering that the following conditions be met. First, an Architect must review the structure in the current configuration and check for Code Compliance, inclusive of Architectural Access Board requirements. Any future changes must also be reviewed in this manner. Second, Permits for all work including the Cell Tower installation must be Permitted, performed by a Massachusetts Licensed Construction Supervisor, and Inspected by this Office. Any concealed areas created by this work must be removed to facilitate these inspections. CITY OF SALEM PUBLIC PROPERTY • � . DEPARTMENT KI\BERLEY DRISCOIL MAYOR 120 W ASHINGTON S 1REbr• SALEM,' ASSACHusE r1-s01970 TEL-978-745-9595♦ FAx:978-740-9846 Failure to comply with this Order will result in action being brought against at District Court. If you are aggrieved by any part of this order other than the"hazardous egress"your appeal would be through the Board of Building Regulations and Standards, per 780 CMR, Section 122. In the matter of a"hazardous Means of Egress" there is no appeal. If you have any questions regarding this action please contact this office at (978) 745 —9595, extension 5643. Sincerely, /Joseph E. Barbeau, Jr. Assistant Building Inspector CC: file, Mayor's Office, Health Dept., Fire Prevention, Councilor Corchado r WINTER STREET ARCHITECTS, INC. Pastor Philip Wyman February, 23 2006 The Gathering 217 Essex Street Salem MA 01970 Dear Phil, It was a pleasure to meet with you last week and we wish you and your congregation success at The Gathering's new location. From our earlier conversations, this letter is to address concerns by the Salem Building Department regarding the egress capacities of The Gathering's tenant space at 217 Essex Street in Salem. I understand that the Salem Fire Department has been through the building and is satisfied with the existing and proposed fire alarm, fire and smoke detection and future sprinkler system. Winter Street Architects performed a visual examination of The Gathering's space on Friday, February 17. We did not do an exhaustive investigation of fire rated building materials, assemblies, structural, mechanical and electrical systems or total conformance to accessibility requirements. The intent of this report is to advise on egress deficiencies that may exist within The Gathering's space in violation of CMR 780 Massachusetts State Building Code, 6th Edition. General: The Gathering is a religious organization and the space(Use Group A4, Assembly) contains a sanctuary, offices and some storage space on the first floor and a small room used for storage and limited activities on the basement level. As an existing building it must conform to Chapter 34 of CMR 780 Massachusetts State Building Code, 6th Edition (Repair, Alteration, Addition and Change of Use of Existing Buildings). Which states that any change to or within an Assembly Use Group must conform to the requirements of the code for new construction (780 CMR 3400.3.6). Assuming that the rest of the building is Use group B, Business, Section 3405.0 requires any change in use group to two or more hazard indices to conform with the code for new construction except as provided in 780 CMR 3408 and 3407.0. Separation: According to 780 CMR 313.1 the two use groups must be separated by a one hour(as the building will be equipped with a sprinkler system per 780 CMR 906.2.1) fire resistive assembly per Table 313.1.2. The majority of the tenant space, including the sanctuary, is separated by a masonry bearing wall. This wall has an opening protected by a substantial sliding door, but it appeared to have no closer or positive latching. The other walls appear to be gypsum board or plaster over probably wood frame construction, the floor/ceiling assembly is probably plaster on wood framing. With destructive investigation it could be determined that these assemblies afford the required one hour fireresistive rating. The basement level separation does not appear complete and there are stairs to the second floor that are not fully enclosed and separated. Per Table 1011.4, the corridor fire resistance rating for Use Group A is one hour or zero if the building is equipped with a sprinkler system. 209 64XSIFEET,Sur1E300 WB.4,MASSACHUEEM01970 RiONE978.744.7379 FAX978.741.0240 v .VYSArchitectscom Analysis based on 6th Edition CMR 780 Mass State Building Code Means of Egress: The occupant load for each floor calculated in accordance with 780 CMR Table 1008.1.2 is as follows: Occu ant Load Floor Area Floor Area Per Occupant Floor Area (ftz) Occupant Load (ft2/occupant) Sanctuary 2,100gr/1,100nt 7 net 157 1 Offices/storage 1,070 100 gross 11 Total for Floor= 167 Storage/activity 360 100 gross 4 Basement Total for Floor= 4 Total for tenant space = 171 Based on the occupant loads calculated above, the following minimum number of exits and exit capacity is required from each floor level: Number of Exits 780 CMR Table 1010.2 Floor Occupant Load Required Number Number of of Exits Exits Provided 1 171 2 2 Basement 4 1 (per 1017.2) 1 Exit Capacity 780 CMR Table 1009.2 Exit Floor Occupant Allowance Total Exit Capacity Load (in/person) Provided (persons) Status Door 1/Stair 1 Door 2' 72"Door/0.15=480 36" Door/0.15=240 1 171 0.2(Stair) In 0.15(Door) Compliance. Doors 1 and 2 Total=720 capacity Stair 1 Bsmt 4 0.2(Stair) 36"Stair/0.2= 180 In Compliance. Total= 180 *Door 2 does not swing in the direction of egress 209 `bD(SR T,9.11E 300 SALBA.MAS ACMSEM01970 R-ONE978.744.7379 FAX978.741.0240 w .VrAmhiteciscom It should be noted that Door 2 does not swing in the direction of egress and to reverse the door in its' present opening could create a hazard in the common corridor. Maximum Exit Access Travel Distance: The longest travel distance is from the basement area to the nearest exit(door 2) is approximately 71 feet. This complies with the allowable distance is 250 Feet(780 CMR 1006.5). The travel distance from the basement area to the exit access corridor at the top of the stairs (where there are two separate means of egress) is approximately 38 feet. This complies with the allowable distance of 75 Feet(780 CMR 1017.2). Remoteness of Exits: Where two or more exits are required from a floor or space, they must be separated by a minimum distance equal to '%(with a sprinkler system)of the overall diagonal dimension of the area served (780 CMR 1006.4.1). Doors 1 and 2 are separated by a distance of approximately 28 feet.The overall diagonal dimension of the area served is approximately 102 feet. 102'14=25.5' which is less than 28' therefore the tenant space complies. Other considerations: While the extent of this report is The Gathering tenant space and its' egress requirements, there are existing stairs going through this space that should be addressed. I observed a total of three stairs coming up from the basement level and into The Gathering space. In the event that the Gathering tenant space was unoccupied and secured there appears to be no other way into or out of the basement. I observed one stair which starts at common space at the second floor and ends in a room near the Gathering's women's toilet room. At the top of this stair is a small "Exit"sign which should be removed as there is no guarantee that the door will be unlocked below and creates a hazard. Also, the stair should be enclosed to provide the required one hour use group and tenant separation. From my observation, The Gathering tenant space conforms in general to the building code regarding the required number of exits and means of egress and will benefit greatly by being equipped with a sprinkler system. Please contact us if you need clarification or further assistance. Si er J n Gately Winter Street Architects, Inc. 209®c SIFT 9,.11E 300 SALEM,MASSACRMM01970 - Ri0NE978.744.7379 FAX978.741.0240 w .WSArchitecMcom < .• 1r" splint Consultants Sprint PCS" 400 West Cummings Park,Suite 4050 Woburn,MA 01801 Voice 781932 1313 Fax 781 932 9193 I' City of SalemI Building Department One Salem Green Salem, MA 01970 RE:' Sprint PCS Telecommunications Facility Location: Eastern Bank 217-225 Essex Street 11 Sprint Site ID: BS23XC362a To Whom It May Concern: P The purposed of this letter is to inform you of the Massachusetts Historical Commission's (MHC)requirements pertaining to painting the antennas to be installed on the roof of the Eastern Bank. it Sprint's special permit was' approved with the condition that the antennas be painted to match.the:color.of the building"and existing roof structures (please see the decision attached.) The MHC has requested that the portion of the antennas that project above the line of the roof structures be painted a neutral, non-metallic gray and the portion that is flush with the chimney and penthouse be painted to match those structures. I have also attached a copy of the letter"from the MHC. Please contact me if you have any questions or concerns. Sincerely, T81)Jnnifer McCook 932-1313 . Consultant I cc ,Denise Sullivan, Planriing Department D,ave Hill F-!;- =,;l r, CI i'f CF Sf;LEM, MA CLERK'S OFFICE U.i#u of �5ittljem, Ittssttrl��1 P##s n_,,r „�d999: L -9� 9 13 e�f� ltlY11' `�FIIP2II l�SrPPn r � � ��,� . mains fb �1 Bea. 1.843 PG 41 r 07/30:99 9:36 inst. 175 Ce- -7 �"� Decision For The Petition of Sprint Spectrum L.P. r ' dp 4T1 � Located At 217-225 Essex Street A Public Hearing on this petition was held on July 1, 1999. The following Planning Board members were present: Walter B. Power, III, Chairman; Bill Cullen; Chuck Puleo; Gene Collins; Lee Harrington; Kim Driscoll; David Weiner. Notice of this meeting was sent to abutters and notice of the hearing was properly published in the Salem Evening News. The petitioner is requesting a Wireless Communication Facility Special Permit under Section 5- 3, Special Permit Uses, of the City of Salem Zoning Ordinance,to allow the installation of six panel antennas on the existing building located at 217-225 Essex Street(Eastern Bank). The Planning Board reviewed the application and plans submitted and found that the petitioner addressed the requirements of this section for the issuance of a Special Permit. On July 1, 1999, the Board closed the Public Hearing and then the Planning Board voted by a vote of seven (7) in favor, none opposed, to grant the Wireless Communication Facility Special Permit for the location stated above, in accordance with the applications (dated June 10, 1999), photographs, and site plan dated May 3, 1999 and revised May 11, 1999, titled"Sprint Spectrum LP" and drawn by Coler& Colantonio, Inc.,submitted and now part of the file. The Speciai Pi-eHii was approved with the condition that the applicant paint the antennas to match the color 617-the building and the existing roof structures._In addition,..the_applicant_shall_maintairi the paot on-the antennas. This endorsement shall not take effect until a copy of the decision bearing certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed that it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner's certificate of title. The fee for recording or registering shall be paid by I hereby certify that a copy of this decision is oti file with the city Clerk and that a copy of the decision and`D es is on file with the Planning Board. u UL I `J hereby certify that 20 days have expired ?r4Ur i from the date this instrument was received, Walter B. Power, III and that NO APPEAL has been filed In this Chairman office. t A True Copy ATTEST: CITY CLERK, Salem, Man. +i r IR E i i lj SE' J 1 185 The Commonwealth of Massachusetts William Francis Galvin,Secretary of the Commonwealth Massachusetts Historical Commission September 16, 1999 Sean Carr NEPA Project Manager SAGE Environmental 44 East Avenue Pawtucket,RI 02860 Atm: Heather Stratton,Environmental Scientist RE: Telecommunications Installation,217-221 Essex Street,Salem,MA,MHC#23937;SAGE Reference #BS23XC326A Dear Mr.Carr: Staff of the Massachusetts Historical Commission have reviewed the additional information you submitted,received August 16, 1999,concerning the proposed projects referenced above. The building at 217-221 Essex Street is listed in the State and National Registers of Historic Places as part of the Downtown Salem National Register Historic District and the Old Town Hall National Register Historic District.After a review of materials submitted,the MHC has the following comments. The MHC understands that the proposed project involves installation of two telecommunications antennae on an • existing chimney and penthouse. The MHC further understands that mechanical equipment will be housed in the basement and that the skylight will be minimally modified at its sidewall to accommodate the coaxial cables. The panel antennae will be six feet in height and will project above the roofline 1.5 feet higher than the existing speakers do. �Tha MHC asks vihetheor not'it-is=possible-to-paint°the portion`of the panel antennae which project above the Iine ofl the penthouse and chimney a neutral,non-metalic gray. Where the panel antennae are flush against the penthouse and chimney,the MHC requests whether or-not.they can be painted to match:The-MHC-hopes that this alternative is feasible,as_it_will-help.to_reduce the visibility of the antennae. The MHC looks forward to further consultation. These comments are offered to assist in compliance with M.G.L.Chapter 9,Section 26-27c,as amended by Chapter 254 of the Acts of 1988 (950 CMR 71)and Section 106 of the National Historic Preservation Act of 1966,as amended(36 CFR 800). Please feel free to contact me if you have questions. Sincerely, Ann M.Lattinville XI/ Preservation Planner Massachusetts Historical Commission xc: Lance Kasparian,Salem Historical Commission 220 Morrissey Boulevard,Boston,Massachusetts 02125 • (61—7) 727-8470 Fax:(617) 727-5128 •TDD: 1-800-392-6090 wvwtustate.ma.us/sec/mbc Salem ® Redevelopment Authority February 7, 2006 Mr. Ken Carpi Park Towers II,LLC 732 Lynnway Lynn,MA 01905 RE: The Bank Plaza Building Sign—217 Essex Street, Salem, MA Dear Mr. Carpi: I am writing to inform you that you have erected a sign on your building without receiving the necessary permits from the Salem Redevelopment Authority or the City of Salem and are currently in violation. Your property is located in an Urban Renewal Area. All signs erected in an Urban Renewal Area are required to receive approval from the Design Review Board (DRB) and the Salem Redevelopment Authority (SRA). Following this review process, you are to receive a City of Salem Sign Permit issued by the City Building Inspector prior to erecting your sign. We are requiring that you immediately remove your illegal sign and contact the Salem Redevelopment Authority to find out the steps necessary to apply for a sign permit. Should you have questions or concerns please contact me, in my office, at 978/745-9595 x311. We look forward to helping you come into compliance with the Salem Redevelopment Authority and City of Salem regulations. QSincerely, ]/, aMrtford ` Economics Development Planner cc: nomas St. Pierre, Building Inspector Members of the Salem Redevelopment Authority 120 Washington Street • Salem, Massachusetts 01970 • (978) 745-9595, Ext 311 • Fax (978) 740-0404 . Clay of 52.1^R1 .. Street IUILDiNG Salen, lilasa . 01970 NI��.D OR OFFICE INSPECTION REPORT UNIFORM INSPECTION FORM 508-745-6300 FAR, H 8 1.2 AH "91 BUILDING PERMIT #_2j-21 RECEIVED WIRING PERMIT # CITY OF S;`;LEM,MASS. DATE: /tm e �Z/ / °I1' TIME : INSPECTION SITE NAME INSPECTION SITE ADDRESS_E ;�-/7� DESCRIPTION OF BLDG— °RESIDENTIAL COMMERCTAL�� =i INDUSTRIAL CONTRACTORS NAME Z /�040a L Pi`/ % /e� C?�• //V C� CONTRACTORS ADDRESS 30 7 f MASTERS & 93 _, . JOURNEYMAN# ISO - JOB SOaJOB SITE NUMBER JOURNEYMAN & HELPERS/APPRENTICES - JOURNEYMAN HELPERS APPRENTICES JOB SITE FOREMEN-NAME ADDRESS MASTER# JOURNEYMAN# EXPIRATION DATE EXPIRATION DATE DOES WORK '-= "-` THF MASSACHUSETTS ELECTRICAL CODE REQUIREMENTS YES NO--- VIOLATIONS O_ _VIOLATIONS NOTED: 1 . 2. _ Itl/gIS Z:� ptCa4= CaOC J/4—/h 3• (!700 ,ted RICn P0C. E CODE REFERENCE: 1 . 2. PFI N EL.. Z3 66 R d7 (S 3. P, LICENSEE SIGNATURE INSPECTORS REMARKS INSPECTORS SIGNATURE PAUL M. TUTTLE , CITY ELECTRICIAN cc : William Munroe , Building Inspector LIB:RAIRDRSS/DOC:ELINSPRF � '/�. ��,lli,9-rn /�/u� neo�2 4 ., ,� rR, "sMiTTaL Soep Associates, Inc. eeEzo Mao' 34 LETTER Tel.617 787-2711 AIA DOCUMENT G870 SPACE PLANNERS AND ARCHITECTS PROJECT: ) r;astern Bank i ARCHITECT'S 60,1 (name, address) 217 — 221 Essex St PROTECT Ni%)T'I OF SALEm� �i.Eir,MASS. f Salem, MA — DATE: May 6, 1991 r � TO: Inspector of Buildings If enclosures are not as noted, please One Salem Green inform us immediately. Salem, .MA 01970 If checked below, please: ATTN: Mr. William H. Monroe ( ) Acknowledge receipt of enclosures. L J ( ) Return enclosures to us. WE TRANSMIT: (K)l herewith ( ) under separate cover via ( ) in accordance with your request FOR YOUR: ( ) approval ( ) distribution to parties ( ) information ( ) review & comment ( Yj record ( ) use ( ) THE FOLLOWING: ( ) Drawings ( ) Shop Drawing Prints ( ) Samples ( ) Specifications ( ) Shop Drawing Reproducibles ( ) Product Literature ( ) Change Order ( ) COPIES DATE REV.NO. DESCRIPTION ACTION CODE 1 4-18-91 Architects Field Report 1 5-2-91 Architects Field Report ACTION A. Action indicated on item transmitted D. For signature and forwarding as noted below under REMARKS CODE B. No action required E. See REMARKS below C. For signature and return to this office ' REMARKS COPIES TO: (with enclosures) P. Oliveira ❑ T. Pacitti Cl OBY. Richard T. Perry AIA DOCUMENT 6910 TRANSMITTAL LETTER • APRIL 1970 EDITION • AIAO • COPYRIGHT 0 1970 ONE PAGE THE AMERICAN INSTITUTE OF ARCHITECTS, 17115 MASSACHUSETTS AVENUE,N.W.,WASHINGTON,D.C.20036 ARCHITECT'S OWNER ❑ Soep Associates Inc. 280UncoinStreet ARCHITECT ❑ FIELD REPORT CONSULTANTSPACE PLANNERS AND ARCHITECTS EiOson,tiia.02134 ❑ Tel.61778T-2.711 AIA DOCUMENT C717 FIELD ❑ PROJECT: Eastern Bank FIELD REPORT NO: 03 217 - 221 Essex St. CONTRACT: Salem, MA ARCHITECT'S PROJECT NO: 23601 DATE April 18, 91 TIME 9; OOAM WEATHER TEMP. RANGE EST.% OF COMPLETION 25% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Construction PRESENT AT SITE - OBSERVATIONS 1 . Demolition is completed. 2 . Studding is nearly completed. 3 . Plywood underlayment is installed. 4 . Rough wiring has been inspected and approved. 5 . Revisions to the connecting ramps has been reviewed and approved by J. Santos. 6. Preliminary work on stairway underway. 7 . Framing for fixtures in new toilets is underway. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSI SOEP Associates AIA DOCUMENT 6711 • ARCHITECT'S.FIELD REPORT • OCTOBER 1972 EDITION • AIAO • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE, NW. WASHINGTON,O.C.20006 Page DI Oagm WNER ARCHITECT'S AO CHITECT p Soep Associates Inc. r280 Lincoln Street rIELD REPORT CONSULTANT Cl SPACE PLANNERS ANO ARCHITECTS Boston, Ma.02134 AIA DOCUMENT 0717 FIELD ❑ Tel.617787-2711 PROJECT: Eastern Bank FIELD REPORT NO: 04 CONTRACT: 217 -. 221 Essex St. ARCHITECT'S PROJECT NO: 23601 Salem, MA DATE Map-,2, 1991-TIME 9: 00AM WEATHER TEMP.RANGE EST. % OF COMPLETION CONFORMANCE WITH SCHEDULE WORK IN PROGRESS PRESENT AT SITE OBSERVATIONS 1 . Gypsum wall board installation is complete, including all taping and spackeling, 2 . HVAC ductwork and equipment above the suspended ceiling is nearly complete. 3 . The toilet rooms are ready for tiling. 4 . Gyp. Bd fascia is installed in the stairway. ITEMS TO VERIFY INFORMATION OR ACTION REQUIRED ATTACHMENTS REPORTSY: Richard T. Perry CSI SOEP Associates AIA DOCUMENT G71T • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIA® • 0 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NW, WASHINGTON,D.C.20006 page of pages L. • • ate/li)L. 7 i—t# P E A L S Soep rvI 16 9 , 6 '9l Associates, Inc. FECF.0�=0 280 Lincoln Street CITY OFs,;:.H,�Ms. Boston , MA 02134 Tel . 617 787-2711 April 12 , 1991 Mr. William H. Monroe Inspector of Buildings Building Department One Salem Green Salem, MA 01970 Re: Eastern Bank 217-221 Essex Street Dear Mr. Monroe: Enclosed for your records, in accordance with Section 127 of the Massachusetts State Building Code are the bi-weekly field reports for the above named project. Should you have any questions regarding these reports, please do not hesitate to contact this office. sincerely, Q4 Richard T. Perry` C Director of Planning RTP/res c: P. Oliveira c: T. Pacitti SPACE PLANNERS AND ARCHITECTS "ARCHITECT'S OWNER ❑ SoepAssociatesInc. 280Uncolnstreet FIELD REPORT ARCHITECT ❑ O CONSULTANT ❑ SPACE PLANNERS AND ARCHITECTS B=Dn,IVIS.02134 AIA DOCU.VIENT C771 FIELD ❑ Tel.617 787-2711 PROJECT: Eastern Bank FIELD REPORT NO: 01 CONTRACT: 217 - 221 Essex Street ARCHITECT'S PROJECT NO: A, Salem, A 23601 DATE March 21, i1TIME 9: OOAM WEATHER - TEMP.RANGE EST.% OF COMPLETION S% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Demolition PRESENT AT SITE OBSERVATIONS 1. Temporary partitions erected to control dust and secure area from employee traffic . 2 . Removal of suspended ceiling and non-bearing partitons started. 3 . Partition running the lengthof the building being opened to allow for structural evaluation prior to further demolition. 4 . Debris removal underway. ITEMS TO VERIFY Status and adequacy of 4th floor framing before removal of all or portions of center partitions . INFORMATION OR..ACTION REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSI SOEP Associates. AIA DOCUMENT GTT • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIAO • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS.1735 NEW YORK AVE., NW. WASHINGTON,D.0 20006 page 01 pages ARCHITECT'S OWNER ❑ SoepAssociates Inc. 280UncclnStre=t FIELD REPORT ARCHITECT ❑ SPACE PLANNERS AND ARCHITECT$ r E=cn, Ma-O 34 covsuLrnvr ❑ Te1.617787--2'111 AIA DOCUMENT 0717 FIELD ❑ PROJECT: Eastern Ban', FIELD REPORT NO: 02 217 - 221 Essex Street CONTRACT: Salem, MA ARCHITECT'S PROJECT NO: 23601 DATE April 3, 91 TIME 8 : 00AM WEATHER TEMP. RANGE EST. % OF COMPLETION 15% CONFORMANCE WITH SCHEDULE WORK IN PROGRESS Demo & Framing. PRESENT AT SITE OBSERVATIONS 1. Demolition 80% complete. 2 . Structural evaluation has been made by the engineer. 3 . Perimeter e:all studding underway. 4 . Electrical materials being delivered to the site . 5 . Removal of wiring and plumbing- underway. 6 . Have mei= with the Wiring Inspector (P. Tuttle) regarding Electrical room requirements. ITEMS TO VERIFY INFORMATION OR A(7,-TON REQUIRED ATTACHMENTS REPORT BY: Richard T. Perry CSi SOEP Associates AIA OOCUMENT 6711 • ARCHITECT'S FIELD REPORT • OCTOBER 1972 EDITION • AIAe • m 1972 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE, NW. WASHINGTON, D.C.20006 page 01 pages M �- 3.s' �asl Plans must be filed and approved by the Inspector before a permit will be granted. No. City of Salem Ward_/ IS PROPERTY LOCATED IN THE HISTORIC DISTRICT? Yes No_ s IF SIDING, HAS ELECTRICAL 1/Home Phone # 509 77'f 9773 PERMIT BEEN OBTAINED? Yes No APPLICATION tfus. Phone #50th 717 Som FOR PERMIT TO ROOF, REROOF OR INSTALL SIDING — W O n`I` 's Salem,Mass., TO THE INSPECTOR OF BUILDINGS: The undersigned herebv applies fora permit to build according to the following specifications: Ownei s name and address 4�}E�h 9. � alga Univ Syr_�e L nV\ M Architect's name IiFtechanic's name and address vtS v SIC �j0.0 G✓1 VK M(} Kocation of building,No.�2 Se 2 A IM t What is the purpose of building?/� ✓r ���- _ Material of building? ASbestos? If a dwelling,for how many families?_ Will the building onfonn to the requirements of the law? iEstima�edcost DO . ContorsLic.No. 4CW, -41411f 5 nb�Daf'� t/Signature of applicant Y �t Cat zSTS� a S EMARK SIGNED UNDER THE �NALTY OF PERJURY. v No, / 9 7 Ward / APPLICATION FOR PERMIT TO ROOF REROOF OR INSTALL SIDING Location4/ PERMIT GRANTED // Af _/1 19941 9 9 7 Approved lld /ns c © IFLECgTQ STREET PERMIT No °:91 �,�nnnrc�R (i➢ilire of 31miputur of 33WINugss gFWp�uF.Wa� /� City Hal1, �AJ � A Permission is hereby given to to occupy for �o�ro'g J purposes min front of eslate 'sw—. 3 ai Wd. CJ of sidewalk, of street. his permit is limited to191&, subject to the provisions of the ordinances and statutes in relation to Streets and the Inspection and Construction of Buildi t t e City of Sa Director of Public Services Inspector of Buil 'ngs Signature of Applicant PC24 2C 2.29.96 =.=ro• Soep Associates Inc. SPACE PLANNERS AND ARCHITECTS July 19, 1991 Mr. William H. Monroe Inspector of Buildings p ° one Salem Green n Salem, MA 01970 rn� rn Re: Eastern Bank fl z 217-221 Essex Street Salem, MA N Dear Mr. Monroe: in accordance with the requirements of the Commonwealth of Massachusetts State Building Code (780 CMR) we hereby certify the work performed at the above named facility is substantially complete. The work performed by Deiulis Brothers Construction Company, Inc. and the related sub-contractors has been completed as indicated on the Contract Documents. Should you have any questions please do not hesitate to call this office. sincerely, Richard Perry, CS Director of Planning c: P. Oliveira T. Pacitti y" 290 LINCOLN STREET BOSTON MASSACHUSETTS 02134.1319 TEL 917 787.2711 FAX 817 7872713 u aCITY OF SALEM PUBLIC PROPERTY DEPARTMENT KIWERLE,Y DRISCOLL MAYOR 120 W[\SFIING'IY)N$'IREB'f * S.VJ4ni,i\IAtiidCl ICSI(fl'S 01970 Ti-L:978-745-9597 ♦ FAx 9787-10-9846 REQUIRED INSPECTION PROPERTY LOCATION 384 Essex Street March 19, 2007 The DRR Real Estate Trust, R. Barnard, Trustee 249 Green Street Marblehead, MA 01945 Dear Mr. Barnard; The above referenced property has come to the attention of this department for the following reason(s): 780 CMR, State Building Code, Section 106; requires that these premises be inspected every five (5)years for Code Compliance/Life Safety Compliance. This property has never been inspected per this Code, and this must be done forthwith. Under the provisions of 780 CMR, Section 115.6, State Building Code, access to this property must be granted for the purposes of inspection. Please call this office upon receipt of this letter to schedule this required inspection. If this property has rental units, these tenants must be notified in advance of this inspection, so that access to these spaces may also be accomplished. This inspection must be completed on or before April 19'h, 2007; failure to respond to this notification will be construed as non-compliance, and as such an Administrative Search Wan ant will be sought, so as to allow the lawful inspection of this property. If you have any further questions regarding this letter; please call this office at (978) 745-9595, extension 5640. Sincerely, Thomas J. St. Pierre Building Commissioner/Zoning Enforcement Officer CC: file, Health Dept., Electrical Dept., Fire Prevention, Mayor's Office, Councilor Pelletier Certificate No: 611-10 Building Permit No.: 611-10 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Pemuts This is to Certify that the BUSINESS located at ----------------------------------------------------- Dwelling Type - 217 ESSEX STREET in the CITY OF SALEM ---------------------------------------------------------------------------- ------------------------------------------------------------------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY PERMANENT OCCUPANCY FOR (MUD PUDDLE TOYS)jbh This permit is granted in conformity with the Statutes and ordinances relating thereto,and expires unless sooner suspended or revoked. Expiration Date Issued On:Thu May 13,2010 - - - - - GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. -----'---------------------------------------'----------'---------------------- O N YSpYE •C 1 CITY OF SALEM BUILDING PERMIT 217 ESSEX STREET 611-10 GIs# r x sag, _;_. COMMONWEALTH OF MASSACHUSETTS ` Map " .�I I 35 .�«+�' s x-. �:! Block ,.';,= CITY OF SALEM CategoryTENANT FIT-OUT PernDt# ��. 611-10� BUILDING PERMIT Project# JS-2010-000956 �';� Est. Cost: $20,000.00 Fee Charged:'"'`, $225.00 1i PI�a a Balance b ei; $.00 PERMISSION IS HEREBY GRANTED TO: Const. Ctass _,. Contractor: License: Expires Use Group:-- UW° "' � P PRE-CON CONSTRUCTION CONSTRUCTIO SUPERVISOR- 101475 Lot Size(sq.`ft) 73350684 !,I : mg r,., BS PARK TOWERS V, L.L.C. Zon ,. weer: Units Gained: ",i( ,Applicant: PRE-CON CONSTRUCTION Units Lost: 217 ESSEX STREET Dig Safe#..;... ISSUED ON: 19-Mar-2010 AMENDED ON: EXPIRES ON: 19-Sep-2010 TO PERFORM THE FOLLOWING WORK: STORE FRONT IMPROVEMENTS AND INTERIOR ALTERATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: Footings: Rough: Rough: Rough: Foundation: Final:. -3 Final: Final: Rough Frame: , Fireplace/Chimney: D.P.W. Fire Health // Insulation: Meter: Oil: l'tl `J [ y Final://yA Q W Y House# Smoke: V� /Water: Alarm: A Assessor Treasury: Sewer: Sprinklers: �///y Final: TIIIS RULES ANDIT MAY BE REGULATIONSOKED BY THE CITY OF SALEM UPON VI ANY OF ITS / ,! ' Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2010-001110 19-Mar-10 189 - $225.00 Call'for Permit ao OCCW �rl'I ON-7 — GcoTMS®2010 Des Lauriers Municipal Solutions,Inc. Now 4' V5QVE AO -c CITY OF SALEM BUILDING PERMIT • a CITY OF SALEM PUBLIC PROPERTY DEPARTMENT KIMNGRLF_Y DRISCOIJ. MAYOR 120WASHING"ION STRLL-r♦ SALETI,MASSACHGSEIT.S 01970 TEL:978-745-9595 0 FAR;978-740-9846 December 7, 2006 Ken Carpi Park Towers II, LLC 732 Lynway Lynn, MA 01905 RE: Violations at 217—221 Essex Street Dear Ken; An Inspection was conducted at this Building yesterday by both myself and Inspector Holloran of the Salem Fire Department. There is evidence of many changes ) within this structure since my last inspection, W2 /10 19erm,h5 Permit. I^•w*re--4��this is a Violation of 780 CMR, the State Building Code, ©-q QOc-41 Section 118.1, and under Section 118.4 is punishable by a fine of$1000 per day, with each day being a separate offense. Further, and of much more serious a concern is that these changes have impacted the various tenant spaces with violations such as removal of a required means of egress. Sir, this is a dangerous and unacceptable situation that must be remedied immediately, such work must be Permitted and Commence within 48 hours from the receipt of this letter. Any delay or further violation will cause this Department to revoke the Occupancy Certificates for this entire Building. Further, I am requiring the following conditions be met. First, an Architect must review the structure in the current configuration and check for Code Compliance, any future changes must also be reviewed in this manner. Second, Permits for all work including the Cell Tower installation must be Permitted and Inspected aF'"'�inft. If, any concealed areas created by this work have not been inspected then this work must be removed to facilitate these inspections. Third, copies of all contracts from work done in 2005 and 2006 must be produced so that-aa-a bu in . This is required so that it can be determined if the value of this work would cause further Code Compliance requirements, such Architectural Access, and/or Sprinkler installation. DATE OF PERMIT PERMIT No. OWNER LOCATION �{- acs ' 04 4 ! I 1135-0251 I drrr: 3/ 12/ 1954 52 Naumkeag Trust Co. 217 Essex Street B-5 STRUCTURE MATERIAL DIMENSIONS No.OFSTORIES No.OFFAMILIES WARD COST BANK & OFFICE brick,wood 2'X101 ' 5 I 1 $ 100,000. steel BUILDER Hydman "3/ 1/88 COPIED ALL INFO FROM ORIGINAL CARD" 10/8/ 1958 11309 Remodel 3rd. floor for general offices. $25,000. 9/ 10/71 11325 Remodel fifth floor arear to provide office space $4,000. 11/ 11/71 11397 Remove existing ballustrades, rails including buttresses from flat roof replace with same design, paint $8,000. 11/27/72 11382 Repair existing fire escape (Contractor - Earle Hydman) 7/9/74 11189 Renovating existing interior with new flooring(carpets) new ceiling, new wall paneling, bathroom conference room, certain amount of n echanicals (Connelly Constr) 2/ 10/75 1120 Renovate office on 4th floor new paneling, ei g pet' (Walsh Const . ) 11/3/75 11335 Install sign cast aluminum letters 10/ 13/76 11454 renovate 3rd. floor, paper, moving and n e t ca oar 7/28/77 11327 Expose base of steel columns at building n are r 8/ 12/77 11341 Erect projecting sign 5'X6' 1/29/81 1124 Alterations to mahogany paneling hang suspended acoustial ceiling. 2/ 13/81 1140 Renovate existing classroom to office and conference room. "OVER" � DATE OF PERMIT PERMIT No. OWNER 1135-0251 LOCATION "'�P, ", �.e A ,aa� drrrd 3/ 12/ 1954 52 Naumkeag Trust Co. I 217 Essex Street B-5 STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No.OF FAMILIES WARD COST BANK & OFFICE brick,wood 2'X101 ' 5 I I I $ 100,000. steel BUILDER Hydman "3/1/88 COPIED ALL INFO FROM ORIGINAL CARD" 10/8/ 1958 #309 Remodel 3rd. floor for general offices. $25,000. 9/ 10/71 #325 Remodel fifth floor arear to provide office space $4,000. 11/11/71 #397 Remove existing ballustrades, rails including buttresses from flat roof replace with same design, paint $8,000. 11/27/72 #382 Repair existing fire escape (Contractor - Earle Hydman) 7/9/74 # 189 Renovating existing interior with new flooring(carpets) new ceiling, new wall paneling, bathroom conference room, certain amount of nechanicals (Connelly Constr) 2/ 10/75 #20 Renovate office on 4th floor new paneling, ei gRrf�l pet' (Walsh Const . ) 11/3/75 #335 Install sign cast aluminum letters AV la 10/ 13/76 #454 renovate 3rd. floor, paper, moving and n e tar 7/28/77 #327 Expose base of steel columns at building n 8/ 12/77 #341 Erect projecting sign 5'X6' 1/29/81 #24 Alterations to mahogany paneling hang suspended acoustial ceiling. 2/ 13/81 #40 Renovate existing classroom to office and conference room. "OVER" 6/5/84 $239 Interior renovastions, no structural, ceiling, walls,etc. 7/30/85 #501 REnovate (Owner - Eastern Bank, Lynn,MA) 1/21/86 #501 CERTIFICATE OF OCCUPANCY ISSUED 7/8/86 #554 Renovation interior, $75,000. fee $455.00 12/9/87 # 1292 Erect sign, est . cost $7,500. fee $50. (Salem Sign Co. ) Eastern Bank 12/7/88 #735-88 Repair gutter and roof, cost $3,000. fee $20.00 5/9/89 #201-89 Renovate handrails & doors for handicap (HANDICAPPED BATH WAITING FOR AMENDED DRAWINGS SHOWING @ BATHROOMS) cost $66,000.fee $401 .00 7/ 10/89 #201-89 CERTIFICATE OF OCCUPANCY ISSUED 3/6/91 #73-91 Interior completion of 2nd. , 3rd. & 5th floors of building for Eastern Bank as per plans submitted, cost $230,000. fee $] ,385.00 J.S. CERTIFICATE OF OCCUPANCY ISSUED: 8/8/91 on permit #73-91 D.Harris, Inspector 3/9/94 #58-94 Replicate existing sash/ Remove existing and install new ( llunits) Est. 4,500 Fee 32.00 J.J.J. 10/7/99 #700-99 INSTALL WIRELESS COMMUNICATION ANTENNAS PER PLANS SUBMITTED. PLANNING BOARD APPROVAL. est. 62,000.00 fee 620.00 T.J.S. PROJECT NAME: 2.5 EQUIPMENT DEPLOYMENT Sprint' VISIONMARKET NAME: BOSTON 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH, NJ 07495 BS23XC362 (201) 694.4000 ■ EASTERN BANK TRM r i n 6 CHESTNUT STREET, SUE 220 217 ESSEX STREET FO%BOROUGH, MA 02035 (774) 215-5421 TM SALEM, MA 01970 wwwlrmcom.com ® �CHAPPELL VISION ESSEX COUNTY ENGINEERING ® �ASSOCIATES, LLC SITE TYPE: ROOFTOP GAv)+'S1rDc11,n11.)-a1Tc,S,FYeYr1,, R.K. EXECUTIVE CENTRE 201 BOSTON POST ROAD WEST, SUITE 101 MARLBOROUGH, MA 01752 (508) 481-7400 SITE INFORMATION: VICINITY MAP APPROVALS www.chOppellengineering.com LAND]-OWER OWNER: PARKTOWERS N,LLC SCALE; T"=1000' ATTN:PETER BOHLIN LANDLORDJTOWER OWNER: n 100 WASHINGTON STREET,SUITE it ,r] '- � CONSTRUCTION MANAGER: SALEM,MA 01970 %"+ y f' RF ENGINEER: APPLICANT: SPRINT - 1 INTERNATIONAL BLVD,SUITE 800 SITE ACQUISITIONAEASING AGENT: +� DAVI MAHWAH,NJ 07495 •. � • '., �•: K> w7• SPRINT: SITE ADDRESS: 217 ESSEX STREET • •Af .r H SALEM,MA 01970 '-• - SHEET INDEX OG COUNTY: ESSEX LATITUDE: N4231'i6.Tr DWG. DESCRIPTION REV. GJSjEF �4 LONGITUDE: W]0 W41.1' S` *��^ ' `�ONALENG� GROUND ELEVATION: 22.0±AMSl - ^<^•- v 'Q� T-0 TIRE SHEET 1 SITE TYPE: ROOFTOP - SITE K,. �. GNt GENERAL NOTES 1 1 x <' tdl STRUCTURE HEIGHT: 68.0±AGL A. x U GN-2 GENERAL NOTES Ir: ENGINEER/LAND SURVEYOR DATE ANTENNA RAD CENTER85.2±AGL dx.+ A-1 ROOF PLAN wAA It 6 n VOLXMN OF w FOR Nn f<xsox, : A-2 ELEVATION 1 uNU55 ILC NTE 4M uxOm 1xc oix[rnox TAX ID PARCEL NUMBER: MAP 35 LOT 251 _ -� � of n uc[xsm frtof¢aoNu[waw ZONING JURISDICTION: CITYOFSALEM .. .., A3 ANTENNA PLANS&DETAILS `1 To.LLTTx THS L'CCL M, EQUIPMENT PWT,DETAILS&HYBRID CABLE SPECIRCKnONS 1 ZONING DISTRICT: B5(CENTRAL DEVELOPMENT) e:: 'A " REVISIONS MATERIALS DATA SHEET 801LL OF MATEAS 1 ARCHITECT/ENGINEER: CI-L201 FIPEILL BOSTON POST RINGROAD ASSOCIATES,LLC AB WIRING DIAGRAMS 1 201 BOSTON POSTROADWEST,SUITE 101 may. AMRLBOROUGH,MA 01752 �� F}� � FJ�G •r - - ��. r+ L Si STRUCNRALDEfAILS 1 POWER COMPANY: NATIONAL GRID ' .� Sr i 170MEDFORDSTREET §r , 4" r •..* `. • g Et ONE4INE DWGRAAI&PRO DETAILS 1 E 148 ,•)_ J ih 2 GROUNDING DETAILS&NOTES (BOD V�405 1 FIBERCOMPANY: COMCAST,INC. 4 PROJECT DESCRIPTION SIAM85 EAST BELCHER STREET f .6 �'?{ 1 01/29/1SIAMFOR CdI51RIILTDH FOXBOROUGH,MA 02035 p . K 1 4'. "{ ��Bi ¢ - %•I SPRINT EQUIPMENT MODIFICATIONS REQUIRED TO SUPPORT MODERNIZATION OF AN EXISTING 0 01/27/14 MED FOR REAM (500) -oo22 I °"' � "T' � ?� r WIRELESS COMMUNICATIONS FACILITY AND UTILIZATION OF FCC BROADBAND SPECTRUM SPRINT MARKET MANAGER: RONALD HIBBARO b 1 5 I `'eemsY�N! / REV. DATE DESCRIPTION ,'"'tF�«� /�? LICENSE FOR 2.SGHZ FREQUENCY.INCLUDING INSTALLATION OF: B (]!4)269-8812 mnWd.hibbertlpsprintcom JL xl - 4 ` 1„^j .b.uu' GROUND-LEVEL RAN EQUIPMENT,CONSISTING OF: 12 � RETROFIT EXISTING WARTS CABINET WITH 2.5 RADIO ACCESS NETWORK(RAN) 1218.019 'Bc O0 AS SHOWN EQUIPMENT SUPPLIER ALCATEL-LUCENT EQUIPMENT 600 MOUNTAIN AVENUE DIRECTIONS (2)ADDITIONAL BATTERY STRINGS INSIDE EXISTING BATTERY BACKUP(BBU)CABINET xm¢T rud4vJnx MURRAY HILL,NJ O774 (9O8)508-8080 TOWER-TOP EQUIPMENT,INCLUDING INSTALLATION OF: TAKE I-287N TOWARD I-87. KEEP RIGHT AT FORK AND MERGE ONTO I-287 E11-67 S. CONTINUE TO FOLLOW I-287 E. TAKE (3)PANEL ANTENNAS BS23XC362 EXIT9N-9SFORHUTCHINSONPARKWAYTOWARDWHITESTONEBRIDGEIMERRITTPARKWAY. MERGE ONTO • (3)REMOTE RADIO GENERAL NOTES EASTERN BANK AVENUE TAKE THE HUTCHINSON PARKWAY N RAMP TO MERRITT PARKWAY. MERGE ONTO HUTCHINSON RIVER PARKWAY (1)HYBRID CABLE ASSOCIATED FIBER.DC POWER,COAXIAL CABLE JUMPERS AND N. CONTINUE ONTO CT-15 N. TAKE EXIT 68 N-ETO MERGE ONTO 1-91 NTOWARD CT416 E/HARTFORD/MIDOLETOWN. TAKE ANTENNA REMOTE ELECTRICAL-TILT(RET)CABLE THIS IS AN UNMANNED AND RESTRICTED ACCESS TELECOMMUNICATIONS FACILITY,AND IS EXIT 29 FOR CT-15N/US-S N TOWARD 1-84 EIE HARTFORD/BOSTON. CONTINUE ONTO CT-15 N. MERGE ONTO 154 E. TAKE NOT FOR HUMAN HABITATION.IT WILL BE USED FOR THE TRANSMISSION OF RADIO SIGNAL EXIT ONTO I-90 ETOWARD NH-MAINE/BOSTON. TAKE EXIT 14 FOR 1-95 N TOWARD NH-MAINE CONTINUE ONTO MA-128 N. SPECIAL ZONING NOTE: 217 ESSEX STREET FOR THE PURPOSE OF PROVIDING PUBUC CELLULAR SERVICE. TAKE EXIT 25A FOR MA-114 EJANDOVER STREET TOWARD SALEM. TURN LEFT ONTO ENDICOTT STREET. CONTINUE ONTO BASEDONINFORMATION PROVIDED BY SPRINT REGULATORY COMPLIANCE PROFESSIONALS SALEM,MA 01970 • ADA COMPLIANCE IS NOT REQUIRED PULASKI STREET. TURN RIGHT ONTO GARDNER STREET. TURN RIGHT ONTO MARGIN STREET. CONTINUE ONTO NORTH AND LEGAL COUNSEL THIS TELECOMMUNICATIONS EQUIPMENT DEPLOYMENT IS • POTABLE WATER OR SANITARY SERVICE IS NOT REQUIRED STREET. TURN LEFT ONTO ESSEX STREET. SITE IS LOCATED ON THE RIGHT HAND SIDE. CONSIDERED AN ELIGIBLE FACILITY UNDER THE TAX RELIEF ACT OF 2012,47 USC 1455(A).AND p•V•G AIRF • NO OUTDOOR STORAGE OR ANY SCUD WASTE RECEPTACLES ARE REQUIRED IS SUBJECT TO AN EXPEDITED ELIGIBLE FACNTIES REQUEST/REVIEW AND ZONING PRE-EMPRON FOR LOCAL DISCRETIONARY PERMITS(VARIANCE,SPECIAL PERMIT,SITE PLAN TITLE SHEET SPRINT MAINTENANCE CREW(TYPICALLY ONE PERSON)WILL MAKE AN AVERAGE OF ONE TRIP flEVIEW,ADMINISTRATIVE RENEW). PER MONTH ATONE HOUR PER VISIT. 8 AT LEAST 72 HOURS PRIOR TO DO NOT SCALE DRAWINGS DRAWINGS AND NEW CONSTRUCTION SHALL CONFORM TO ALL LESS S BLE STAND RD CIVIL DIGGING,THE CONTRACTORS oxr>vf14 x'4� INTEGRATED CONSTRUCTION STANDARDS FOR COMBINED WIRELESS SMS,STANDARD CML DETAILS AND GENERAL DESIGN GUIDUNES,CODES AND ORDINANCES REQUIRED TO CALL DIG SAFE AT 811 CONTRACTOR SHALLVERIFY ALL PLANS AND EXISTING DIMENSIONS AND CONDITIONS ON THE �_� Di afe JOB SITE AND SHALL IMMEDIATELY NOTIFY THE PROJECT OWNERS REPRESENTATIVE IN WRITING OF DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS, DESCRIBE THE WORK(RET) BE PERFORMED BY THE CONTRACTOR. SECTION 01 100 - SCOPE OF WORK 5. LOAD PHOTOS TO SIIERW PROJECT LIBRARY 15.IN 6 CREATE NEW CATEGORY;2.5 OEPWMN,F,AND SECTOR; ROOM ELECTRICAL TILT (RET) CABLES;PERMANENT CONEMURION.IABEL WIT PHOTOS H SITE CAVIEW SCADE AND BERING OMCIEO.GYERAS USED TO TAKE Sprint' ME W RK tPHOTOCIAPHS OR .FIEOY A.CM ER LTDRP LOq MAT WECM ARY NEW RNNAM ANTEHHA NATE ING-L W ME PHOTO MMA-FILE �. �p� SHALL COMPLY WIN MPIKABIE NATIONAL CODES AND STPNDAROS,-TEST EDITION,AND PORTIONS THEREOF. WSe SPIMIERS,COMBINERS.FILTERS PER W DATA SER, FURNISHED BY SPRIT. VISION PRECFOENR: CONMISSIONINC: ANTENNA NSTALAMIA SHOULD CONFL=OCCUR BETWEEN THE WANGRD CONSTRUCTION SPECIFKATNMS FOR WIRELESS SITES INCLUDING ME PERFORM NL COMMISSIONING AN REWIRED BY MPUCABLE MOPS ME CONTFOLTOR GHALL A EENIBLE Nl ANTENNAS ONEI E M ADCORUANCE WITH THE UNMUCHONS SUPPLIED BY THE 1 INTERNATIONAL BLVD, SURE 800 STANDARD CONST DONT DUNLS FOR WIRELESS$IES AND ME CON FFL CTION DHAIWNGS, INFOPoMnON ON MEMON INTEGRATION UFACIURER.ANTENNA HE%HT,AZIMUTH.AND FEED OMEMATKKSULL I INFORMATION BE A DESIGNATED ON ME CONSTRUCTION DRAWINGS%IAL TAKE PRECEDENCE. ' CoN,HACBON DRAWINGS MAHWAH, NJ 07495 PERFORM NL INTEGRATION ACIAMES A5 REWIRED BY AFPI.IGBLE MOPS (201) 684-4000 SITE EAMWADH A THE RINIPILTOR SWJL POSITION THE MREHW W TOWER PIPE MOUNTS 50 TWT ME BOTTOM STRUT 6 LLVFI.. CONTRACTOR SHALL BE RESEEDING TOR FAMRNCTIINC wMSEIF MIM PLL CONTACT DOCUMENTS,HELD fXANOff0N5 AND SECTION 07 500 - ROOF CUTTING, PATCHING & REPAIR THE PPE MOUNTS SRNL RA PLUMB TO WITHIN OINENSIONS PRIOR i0 PROCEEDING WEH CONSMULTION. 1 DECREE. TRM ON-°�UPEIMION' THIS SECTION snonm CUTTING AND PATCHING EKIEING ROOFING SKTEMS%HERE CONCUR OR CABLES EXR ME BUIIDINC B. AORTA MOUNTING REWBSMENTS: PROVIDE ANTENNA MIMING HNIMARE AS INDICTED ON ME OWWINGS THE OS.TCTW SHALL OUERASE AND DIRECT ME WORK AVD SHALL M RESE CXNTE FOR CONSIRII3. MEANS, ONTO ME ROOF B BUILDING-MOUNTEDROCROSHAIANTENNAS.LAID AN REWIRED FOR H LANDLORD. .ANY INCE ROOFTOP ENTRY MEIHOW,TECHXIWFS, SEQUENCES.AND PROCWURES W ACCORDANCE WITH ME CONTRACT DOCUMENTS. OPENINGS 15 MEMBRANE ROOFTOPS SFLAEL BE CONSHUCIED TO COMPLY GOTH VWDLORO,AN/E6nNG WARRANTY,PAD HYBRID CARIES INSTALLATION: LOLL JIlR6DK'i101U1 STANGROS THE COKTRUCTON CONMMCTW SINAL MARIAN A TILL SET OF ME CONSTRUCTION DRAWINGS AT ME JOBSIIE FROM 1.4 SUBMMTAIS: A ME CONIRACTW SHNL ROUTE,LEST,Aldi INSTALL P11 CABLES AN INDICATED ON ME CONSWUCI%N DRAWINGS 16 CHESTNUT STREET, SUITE 220 MWIUZXMON MROUGX CONSIRULTON COMPLETION. AND IN ACCORDANCE WITH ME MANUFACTURER'S RECOMMENGnONS. FOXBOROUGH, W 02035 A PRE-CONSIFROP Raaf T A MIN WLPIETE T RANG INSPECTION PRIOR 10 THE INENUnON W SPRINT WUIPYEM B. THE INSTNUD RADIUS OF ME CASTES SHAUL HOT BE LES THAN ME MANUFACTURER'S SPECIFlGTIONS FOR (774) 215-5421 A OTNLS ARE INTENDED TD SHOW DESIGN INTElB.PROVIDE ALL REWIRED AND T JOB AN REWIRED TO PROTIDE A ON NIU ROOFTOP BUILD.ATA MINIMUM INSPECT AND PHOTOGRAPH BENDING RADII. www.RrmCOm.c.. COMPLETE AND NNCIIONING STSTELI.MWIFlGnWS WY BE REWIRED TO SUR JOB EMENSIWS OR CWDHONS.AND (MINIMUM 3 E)LD1 AREAS IMPACTED BY ME PDOEW OF ME WPoM EQUIPMENT. SIKH MODIFICATIONS SHALL BE INCLUDED M PART OF THE WORK C. ETREME GRE SHNL BE TAKEN TO AVOID ONAAGE TO ME CABLES WRLVG HANOUNG AND 1N6TNlAnW. B. PROVIDESYAAR PHOTOGRAPHS SHON'INC RDOG CONDITIONS LATER CONSTRUCTION(YWMUu 3 E) B. CONTRA"KLA EN SILL M SPRINT CONSIRM SURF Mum N ANY THIOR WS PRIOR AT Pft MAY BE WITH TIRE 1. 4'S OG WH MYB�CABLES: TN CABLES SHALL BE PERMANENTLY FISTENW TO ME L(NII UDDER AT wORKDIMENSONs SHOWN ARE TO FISH SURFACES UM65 NOTED OMFRNTSE NWIFKAl1W5 MAY BE REWIRED TO C. ROOF INSPECTION PHOTOGRAPHS SHOULD BE ARCADED W!H CLOSEOUT P9TOGRAPHS. - CHAPPELL SUI JOB DIMENSIONS OR CWD10N5,AND SUCH IMDIf1GINlNS SHALL BE INCLUDED AN PMf OF THE WOPo(. 4'-0'W USING NON-MADNETIC STNNIE65 SEER LL1Pi O MARK THE FEW SET OF CRAWNCS 1N RED.DOCUMENTING ANY CHANGES FROM ME CONSTRIILIDN DOCUMENTS. SECTION 07 SOO - ROOF CUTTING, PATCHING & REPAIR 2. RAMMING MD ODUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE(MEDUSA).OHM THE MMM ENGINEERING SUMMARE. CABINET AND ANY INTERMEDIATE DISTRIBUTOR MX '. ASSOCIATES, LLC CENTRAS R PROCEDURE RW FOR WNSIRULIIW: THIS SECTOR SPECIFIED CUTTING LAID PATCHING EXISTING RWW FlNC MIENS WHERE COUI OR CABLES COT ME BUINWG CCONTRACTORSRML PERFORM wORK AS DESCRIBED IN ME FOLLOWING INSfMLIAIION AND CONNSSONING M03 ONTO ME ROOF OR WELDING-MOUNTED ANTENNAS,AND AS REWIRED FOR WAIFRTGIR PERFCR A E-ROOFTOP ENTRY °� FIBER BE W. FIBER WATERS USING M'VELCRO SEARS Of LE RAW MED LENGTH O 18'OO STUMPS Ci'✓iT $truGlcVrdl f_dNT:i$IIN('yIT'i WENINGS IN MEMBRANE RORUM SINAL BE CWSMWTED TO COMPLY 10TH LWDLDRO,ANY E%STING WARRANTY,ARO SNAIL BE W.OIL AND WATER RESISTANT AND BURABLE FOR INWSIPoAL MS(MUATONS 0.5 WNUFPLNRAD A TOP HAT LOON.MRWICTONAL STANGRDS. BY 1ETOL W APPROVED EQUAL R.K. EXECUTIVE CENTRE B. OWN'TO B INSTNIT A NEW GIDNR 201 BOSTON POST ROAD WEST, SURE 101 C. BASE GLAD UNIT a Ix F%S5 UNI 1 4 SUBMITTALS; B. BBLACKSUPPORTMON O WUNEEK GOTH ZIP TIES W ME M 19 M LENGTH.ZIP BES TO BE RO SCID OR D. INSTAULCHON OF HYBRID EC EQUMNYLON,WiM TENSILE STRENGTH AT 12.000 P51 AN MANUFPCNRW NT TELCO PRODUCTS OR MARLBOROUGH, 7 01752 E. INSTALLABON OF HYBRID CABLE EQLLN. (SOB) 481-7400 F. CMUNG W FIRMS A PRE-CY ROOFTOP E ROOF T AT2S�COMPLETE T ROOF INSPECTION PRIOR TO ME INSTAIATON OF SPRINT EQUIPMENT www.chappeliengineering.com G. GELVG W ANY ROOFTOP ALL AT I MINIMUM INSPECT IIID PHOTOGRAPH O FASTENING JUMPERS: SE EL JUMPERS TO ME SDE ATN$OR HEM FRAYE5 USING STNNL£55 STEEL TIE H. T5-0200 REV 4-ANTENNA UNE ACCEPTANCE STANOARCS (MINIMUM J E)NL MEAS IMPACTED M THE IDDmW W ME SPRINT EOOPYEM. WRAPS W STAWIE55 SIEFL BUTTERFLY CUPS. 1. SIMM CELL SHE ENGINEERING NOTICE-EN 2012-001,REV 1. J. IXNMLSSIONING MOPS W. PROVIDE SYILW PHOPOCRANS SHOWING ROOF WNDIIIONS ITER WNSIRJLIION(MINIMUM 3 FA) 4. CPBLF INGfI11A110N: SECTION 01 200 - COMPANY FURNISHED MATERIAL AND EQUIPMENT C. ROW INSPECTION PHOTOGRAPHS SHOULD BE UPLOADED ON CUMEOUT PIWTWRAPHS. o. INSPECT WILE PRIOR N USE FOR 5HIPPING GRACE.NOTIFY THE CONGTUCTION MIN M. COMPANY FURNISHED MKIMI .AND EQUIPMENT 6 IDENTIFIED ON ME RF DATA SHEET IN ME CONSTRUCTION DRAWINGS SECTION 09 900 - PAINTING N. CAERE E RRNG:CABLE IxIL 5TOLATION SL BE PUNNED TO ENSURE THAT ME UNES WILL BE PROPERLY -AL`�OF ROUTED IN ME CABLE ENVEOP AS INDICATED ON THE DRAWINGS.AMD TWISTING AND CROSShERS. 5(J� •1I W�OR 60 SPoSML RE FRPROVIDED MATERIAL AND EDUIPMEM S ED AN TO ENSURE IT PROIECID HANDLED DUAIM ASSURANCE t HOW CABLE MW PROPER HOSTING GRIPS.GO NOT C(CEF)MANUFACTURES RECOMMENDED W%MUM � DAVI ROPEC�TSPRINT A COMPLY WITH CONERNING CANES AND RECUGBONS.PROTIDE PROOUCIS OF ACCEPTABLE MANUFACTURERS WHICH HAVE BEND RADIUS CONTF CTM RESPON518IE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL ERE OR CONIRACTOM LOCATION. BEEN IN SAMFACRYTY U5E IN SIMIVM SERVILE FOR THREE YEWS,USE EWERIENCED WSTA(iFAS. DELIVER,HANDLE AND 5. GROUNDING OF MAMMIMON LING:Al TRANSMISSION UNES SHALL BE GROUNDED AS INDICATED ON CONTRACTOR TO COMPLRE MIPPNG AND RECEIPT DOCUMENTATION IN ACCOROPHCE GOTH COMPANY PRACTICE SPORE MATERw6 IN ACCORDANCE WOR MANUFACTURER'S(NMUCTIOR6. mwNGS. I SECTION 01 300 - CELL SITE CONSTRUCTION B COMPLY WITH ALL ENWRONMEMAL REGUGBONS FOR VOLATILE ORGAWC COMPOUNDS. 6. NOBRD CABLE COLOR CODING:ALL COLOR CLUNG SILL BE M REWIRED IN R 02M REV 4. 06 C6 Nona TO PROCEFU MATERIAM 7. HYBRID CABLE-BERING:INDNIDOIL HYBRID AND X BUND.E5 SILL BE-BELE➢NPM-NUMERICALLY G�R NO WORK SHNL COLIMENCE PRIOR TO COMPANY'S WRITTEN NOTICE M PROCEED AND ME 69MNCE OF WOPo(ORDER ACCORDING M SPRINT CELL SME ENONEMNC NOTICE- ON 2012-001,REV 1 A MANMIUM GRACE. REBENJNIIN uODRE.ICI DEVCE CGTPPG,, SHFAWIN WILLVNS DR APPR(MD EQUAL.PROVIDEtryO SITE R• < L FAN,TESS R . PREMIUM GRADEROFE55UNN P -OwuT PROcrs DuFOR cGnNc srsrzus. WEAIHERPROOFlNG E7(IQDOft CONNECTORS AND HYBRID CARTER 1i2g1ND KRIS: NAI ME MIR. SRNL KEEP THE SNE FREE FROM E 5MEAR WASTE WIEAML,CEDES.AND HUSH.AT ME CONIES.AN OF ME WORK, CONIRACfOR SILL REMOVE FROM ME SME Al1 REMAINING RUBESH,IMREYEMS,TEMPORARY FACILITIES.AND PRIM SCHEDULE: A ALL FIBER k CAO%CONNECTORS LAND GROUND KMS SW11 RA W-MERPRCOFFD. SURPLUS MATERIALS ENGINEER (AND SURVEYOR DATE A ANTENNA ANTENNAE AND ANTEHA YMM D CONT E: ONE COAT OF PRIMER AND TWO FINISH f%AN PAM FOR B. WITH THE ANUF USING ONE OF ME FAMOR15 G INDU . B I PRACTIIONG MUST BE GONE M ACCgtDWCE SECTION Ot 400 - SUBMITTALS & TESTS REQUIRED STALL 1K NOEMVICE O ANTED AND N AD4N NO BUILDING PARTICLES. PROVIDE Xi COORS AND PATTERNS AS WITH 111E MANUFACTURER'S RECOMMENG110N5 AND MWSIRf BEST PRAWLES. M N A Y`XA.OF LVN MR ANY PERSON. REQUIRED A MASK MPF.ARAHCE R'VIMENTIN ON AONLEVE BUILDING SURFACES LAID 0.5 MCEIBAAE TD TIER OWNER. REFER i0 AIITRINA LAWIIFACNRER'S NNSTRUCTIWS WHENEVER POSSIBLE. 1. COLD SHRINK:E EXTMU5 CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE CORM OF ux11OF . Art APRO UxnAl THE gRECIKW AT ME COMPARYS REQUEST,ANY NIERNATNES M ME WIERMIG OR METHODS SPECIFIED SINAL BE SUBMITTD M SPRINTS ELECTRICAL TAPE EXIENDNG T BEYOND TUBING.PROVIDE SM COD SNR NN CXS SERIES OR EOUA. Of A IIV,NL IxbfES9GV1 ANaME9P. B. ROOF TOP CONOR OMR TOUCH H -PING OC SURFACES t0 EF REPAIRED. FOLLOW INDUSTRY STANDARDS AND to N1EX T6 0aG\ANRNT. RBALMPCONSTRUCTOR WINGER FOR MPROAN. SPRIT WBL RENEW AND APPROVE ONLY MDSE Fd0UF5T5 RUDE IN WRITING. NO REQUIREMENTS OF OWNER TO MATCH EXISTING CGTNG AND FMISH. L SRIF'-ALALCAWTING TAPE:CLEAN SURFACES.APPLY-MAT A OOIIEE CORM OF SELFE DIREC MING TME O BEYOND VERBAL APPRONNS WILL BE CONSDEIRED, CONNECTOR.APPLY A SECOND W14P W GEIF-M4AlfAMATNG TAPE IN OPPOSME DIRECTION.I➢WT COUBLL TESTS AND INSPECTIONS: PAINTING APPUCATION: WRAP OF T WIDE ELECTRICAL TAPE EILIENDNG 2'BEYOND ME SEIP-AMLOJIABNG TAPE REVISIONS A INSPECT SURFACES,REPORT UNSATISFACTORY CONDITIONS W WRITING;BEGINNING WORK MEANG ACCEPTANCE OF 3. 3M%M LOCK CLOSURE 716:SUBSTITUTIONS MILL NOT BE AILOWID. A ME CONTACTOR SHALL BE RESPONSIBIf FOR NL CONSIRUCIKKN 1E515,MSPECI%NS RAID PROJECT COWNEMATXN. SUBSIUIE 1. OPEN BANE ON JOB SRE IS NOT ACCEPTABLE B. CONIWCTOR SHNL ACCOYPUSH TEG W INCWONG BUT NOT UIMED TO ME FOLIOMNG: B. COMPLY WTM MANUFACTURER'S MSTRUCTIONS AND RECOMMENDX p FOR PRMARKTON,PRIMING AND CGTING NOOK 1 COAX SWEEPS AND FIBER TESTS PER TS-0200 REV 4 ANTENNA LRNE ACCEPTANCE STANLWV05 =MINATE IWM WORN OF OTHER SECTORS. SECTION 11 800 - INSTALLATION OF MULTIMODAL BASE TRANSCIEVER STATIONS 2. OCL AZIMUTH AND"CLT PROVIDE AN AUTOMATED REPORT UPLOADED TO SMERRA USING A COMMERCIAL MADE-FOR C. MATCH APPROVED LOCK-UPC FOR COLOR,TE%TURE AND PARIERM. RE-CGT OR REMOVE LAID REPLACE WORK WH%H (MMBTS) AND RELATED EQUIPMENT GOES NOT MATCH OR SHOWS LOSS OF AOMCMI. SUMMARY: ME ORM IM ELECTRONIC RXJIOANTENNA MLGNMEM TOOL(MT).INSTNIID AZINMI, CENTEPoINE AND WWNIILi MUSE CONFORM WIH RF CONFlGURATIW GTA D. CLEAN UP.TRACH UP AND PROLER WOflK 1 01/29/14 ISSUED FOR CWSIRIICIDN 3. COMPACTOR SHNL BE RESWNSIEE FOR ANY AND Al.CORRECTIONS M ANY NOW IDENTIFIED AS IAiACCEPTABLE MA THIS SECTOR SPECIFIES MMBIS CABINETS,PgWR CABINETS,AND INMMAL EQUIPMENT INCLUDNG BY NOT UNITED ACTNMEG SBE INSPECTIONAND/OR AS A RMULT OF 1FSTNG. TOUCHUP PAINTING: M RECIVIRM POWER DISRRIBU%N UNTTS,GSE BAND UNITS,SURGE ARRESTORS, GTTERIM AND SMILAR 0 01/27/14 SLUED FOR RENEW EQUINEM FU6M BY THE COMPANY FOR INSTNLATIW BY THE CONTRACTOR(OFCJ). 4. ALL IESTNG REWIRED BY APPLICABLE INSTNIATON MOPS. A GNVMIZING ONAGER AND ALL BOLTS AND NNS SCOL BE TRACHED UP MER POWER ERECTION WITH'CNVAROX;*DRY REV. IIDATE DESCRIPTION CAV.'W'ZINC-R.' B. CONTACTOR SULL PROVIDE AND NG CAJ.ABINET ALL MISCELLANEOUS WIERWS AND PROVIDE PLL-RJR REWIRED TOR ME APPUON EQUIPMENT INN MOM.CABINUI OR NEW GBWR AN SHOWN W gUWNGS AND A5 REWIRE BY IO N li0. OE9LIpD of JMI sru[ G REWIRED CIDSEOM DOCUMENTAI%N INCLUDES.BUT 6 NOT UNITED TO THE FWLONTNC; B. FIELD TOUCHUP PNM SCOL RA DONE IN ACCORDANCE WIRY THE WNUFACTUREflS NRMrtPN INSIRUm1WS. TIE APPIGBIE INSTPUAnON MOPS. 1. AZIMUTH, TIOWNTILT,ACL FROM SINSICM INSTRUMENTS- ANTENNA AICNMEM TOOL M 1238.019 .BV: M AS SHOWN (AAT) C. NL MRA COMPONENTS SIALL BE NANOID WITH CARE TO PREVENT GOUGE TO ME COMPONENTS.THEIR PRESWJATNE C. COMPLY MifH MAUYUFACIURElRS INSPMUAiYN AND STINT-UP fEOUWEMEMS oE. IW. JM 2. SWEEP AND OWER TESTS TREATMENT. OR THEIR PRMECRNE CGRNGS rmxq SUPPORTING DEVICES: 3. MNNA LE EWCOOE PHOTOGRAPHS OF TOWER TOP ANO INACCESSIBLE SERMUZED EQUIPMENT SECTION 11 700 - ANTENNA ASSEMBLY, REMOTE RADIO HEADS AND CABLE INSTALLATION A WNUFACTURW SIRUCIURN SUPPORT MATERMLS:SUBJECT TO ODMPLWICE AMR REWIROENTS,PROVIDE 4. ALL AVNIABLE JURISDICTIONAL INFOR,WTOM SVMMAM: PRo000M BY THE MLLO'NING: BS23XC362 5. PDG SCAN OF REWIRES PRODUCED M FEWTSECTION SPECIFIES HSN-ATION OF AMEN . RRH'S,AND CABLE EWIPMEM.WSTAVATON,AND JESTING OF COUK L AHED TUBE AND CONWR EASTERN BANK 6. A PG SCAN OF REOINE MNK-UPS SUTAEE POR USE IN ELECTRON%M-BULT DRAWING PRODUCnW NTENEW AND RRH'S 2. B-UNE SYSTEM 7 UEN WAVERS ME NUMBER AND TYPE OF ANTENNAS AND RRH'S TO BE INSTALLED 6 ORATED ON ME COMMIC110N DRAINING£ 3. UNSTUT DARManED mOuRn 217 ESSEX STREET 8. FINN.PAYMENT MPIICADM HYBRID CABLE: 4. THOMAS&BETTS SALEM,MA 01970 HYBRID CABLE WILL BE DC/FIBER ARID FURNISHED FOR INSTNUT%N AT EACH SIE. CABLE SLAC BE INSTU D PER THE S. REWIRED RNA-CONsTMuc ION PROTOS CONSHUCII(ON DRAWINGS AND ME APPICMIl MANUFACTURER'S RAOUTREVENTS. B. FASTENERS:TYPES, MATERMLS,ANO CON5RRUCHON FEATURES AS FOLLDWS: oPANNN nnC 10. CONSTRUCBON AND COMMIMONING CHECIOIST COMPLETE WMH NO CEMENT ITEMS J MPFRS AND CONNFCTOM L IXPANS%N ANCHORS:CARBON STEEL%RME W SLEEVE TYPE FURNM AND INSTNl 1/T C000(JUMPER CMUR BETWEEN ME RIM'S AND PMEMA5.JUMPERS SW BE TYPE TDF 4.FILETHREADED NOTES 1 11. Al. ST NTP TASKS INCLUDING DOCUMENT UFLGDS PW COMPLETED STERRA(SPRITS DOCUMENT REPOSITORY OF 12-50,CR W.OR ML 5TH. SUPER-FID(CABLES AAE NOT OCCEPIApE RS WIRER ME RRH'S AND ANFNWS 2 POWER-DRIER TREADED STUDS: NET-TE1W STEL, DESIGNED SPdF1G11T FOR 11E INTENDED SERVICE. FI RECORD). OR TOWER TW AMPUNERS SHALL CONEY T OF 1/2 WW TOW OIEWCMIO,OUTDOOR RATEO CGU(ML CABLE W IDT USE }, G/SIEN BY MEANS OF WOOD SCREWS W WOOD. SUPER LEX OUTDOORS. JUMPERS%LAJL BE FACTORY FABRICATED IN IN APPROPRIATE LENGTHS WITH A MAMMUM OF 4 FEET 00.wmE wulm 12. CLCOMJF PHOTOGRAPHS: EJ(CEA PER JUMPER AND HAVE CONNECTORS AT EACH END, WNUFACNRED BY WPPUER. IF JUMPERS PRE READ 4. TOGGLE BOLTS ON HOLLOWASOMS MNRY UN FABRICATED.FOLLOW MANUFACTURER'S REOWRENENTS FOR IHS MCN OF WHNECfO6 /'� j a. PROVOS PHOTOGRAPHS OF FINAL PROJECT PER ME FOLLOWING UST.ADOTIOWL PHOTWRAPHS MAY BE REQUIRED 1 A TO SUPPORT ACCEPTANCE PROCESSES CORTIN- SHEET -2 ' Y . G THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS, DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. SECTION 01 100 - SCOPE OF WORK CONDUIT AND CONDUCTOR INSTALLATION: 5. CONCRETE INSERTS OR EXPANSION BOLTS ON CONCRETE OR SLD MASONRY. A CONOUTIS SHAM BE FASTENED SECURELY IN PUCE WITH APPROVED NON-PFRORAIFD STRAPS AND HANGERS. FXPLOSNE Sprint ONCE&MR ATTACHING HANGERS TO STRUCTURE WILL NOT BE PERMITTED,CLOMY MUM THE UNES OF THE VISION 6. MACHINE SCREWS.WELDED THRMDS.DS.OR SPRING-TENSION CLIPS W STEEL SIR11C1URF,MARIAN CLOSE PROGWTY TO THE STRUCTURE AND KEEP CONDUITS IN TIGHT ENVMPES.CHANGES IN DIRECTION TO ROUTE AROUND OBSAOES SLL DE WE WITH CMDUT OUOET BODES CONDUIT SIAL BE INSTALLED T. EXPLOSIVE DEVICES FOR ATTACHING HANGERS TO STRUCTURE SIAL NOT BE PERMITTED. IN A NEAT AND WORKMANUKE MANNER, PAMWEL AND PERPEMOMAR TO STRUCTURE WAE AND COUNG UNES.Al 1 INTERNATIONAL BLVD, SUITE 800 CONDUIT SHAM BE FSNFD TO CLEAR OBSTRUCTLONS, ENDS OF COMMIS SMALL BE TEMPORARILY GIPPED TO PREVENT MAHWAH, NJ 07495 B. DO NOT WEM CONDUIT,PIPE STRAPS,OR ITEMS OTHER HAI THREADED STUDS TO SRR MVSMRFS. CONCRETE. PASTER OR DIRT TOM ENTERING.CONDUNS 51411 BE RUDLY CLUMPED TO BOXES BY GV.VAMgD MAJEMCE IRON BUSHING ON INSME AND GYVANIZED MAIFABUE IRON LOCKNUT ON ASIDE AND)WINE (201) 684-4000 9. IN PARTITIONS OF UGHT STEEL CONSTRUCTION,USE SHEET META SCREWS, B. CONDUCTORS OVAL DE PULLED IN ACCORDANCE WITH ACCEPTED CDOD PIUCTCE UP SPORTING DEVIPROJECT INFORMATION CES: TR A INSTAL G EVIICI DEVICES TO FASTEN EIFCTPoCA COMPONENTSSECURRT AND PERWNENRY w ACCORDANCE WN - "-t NEC. SPECIAL CONSTRUCTION NDE B. COORDINATE WITH THE MIMING SLRUCTUM SYSTEM AND WITH OTHER TRADES. SPRINT TAXER MP WORK 5 CONTINGENT ON THE FOLLOWING C. UMESS OMERWSE INDICATED ON THE DRAMNGS, FASTEN EIECIRCAI ITEMS AND THEIR SUPPORING H RDWARE16 CHESTNUT STREET, SUITE 220 SEWRU.Y TU THE STRUCTURE IN ACCORDANCE WITH THE FOLLOWING: A. COMPLETION OF A GLOBN-SIRUCNRA 90M ANALYSIS(FRONDED BY TOWER OWNER) FOXBOROUGH, MA 02035 D. ENSURE THAT INE MND APPUED BY ANY FASTENER DOES HOT U(CEED 25 PERCENT OF THE PROOF TEST LDA. B. COMPLEI)ON OF M ANTMNA/RRH MOUNT STRUCIURA ASSESSMENT(PROWTED BY A&E VENDOR) (774) 215-5421 ww.A mcom.c0m E USE NBRATON AND SHOCK-RESISIFNT FASTENERS FOR ATTACHMENTS TO CONCRETE SUBS. G GENERA CONTRACTOR SIAL FURNISH,DISTAL AND COMPLETE ALL REWIRED STRUCTURAL MWB1CAlIONs AS INDICATED IN BEFORE-MENTIONED AMLYSS AND ASSESSMENT ELECTRICAL IDENTIFICATION: 0. UNDWM/TOWER OWNER SILL PROADE WRT EN ACCEI'TMLE/APPRFNA FOR THE COMPLETION OF AL CrAm CHAPPELL A UPDATE MOMD MINE TYPED ORCUIT BRFANER SCHEDULES M THE MOUNTING BROOKE.[MERGE DOORS OF k PANE. TONWIMUNGTION STRUMM MODIFICATIONS.INCLUDING(AS NECESSARY)CONTROLLED CONSLRUC ION INSPECTIONS,BOLDS WITH ANY CHANGES MME TO THE AC SYSTEM. SHOP-ORAMG APPROVALS, MTERLAIS TEST RESULTS ARD MR&ENGINEERS AFIRM T ENGINEERING B BRANCH ORCURS FEEDING AN4TON OBSTRUCTION CGHI NG EQUIPMENT SHALLBE CLEARLY IDFMIFIED AS SUCH AT ME SPECIAL PROJECT NOTES: ASSOCIATES, LLC BRANCH CROUTE PANOJB D. A OMMNCS AND NEW CONSTRUCTION SHVL CONFORM TO ALL APPUGBCE SPRRI/NEI(fEL INTEGR11U1 CONSIRL'C110N C'iVl7 :i21lJC_ILN£87 4-dYIC1.S"liJti2J+llJf) DC CIRCUIT BREWER LABELING: STANDARDS FOR COMBINED WIRELESS SITES,STANDARD CML DETALS AND GENUAL DESIGN GUDEUNM CODES AND AN ORDINCES. R.N. EXECUTIVE CENTRE A UIRL GOUT BREWERS ACCORDING TO SPRINT CM SIE ENONOE UNG NOTICE- UN 2012-001, REV 1. 201 BOSTON POST ROAD WEST, SUITE 101 B. OWNER AND TENANT MAY, FROM TIME M TIME AT TENANTS OPTION, REPLACE THIS EODM WON AN EWIM SETTING MARLBOROUGH, MA 01752 FORM THE REGAL DESCRIPTION OF THE SITE,OR WITH ENGINEERED OR AS-MILT DRAWING DEPICTING THE SITE OR (508) 481-7400 SECTION 26 200 - ELECTRICAL MATERIALS AND EQUIPMENT ILLUSTRATING SMUMRAL MODFICURMS OR CONSTFUCIKIN PEWS OF THE SITE ANY VSVAL OR ME www.choppeliengineering.com REPRESENTATION OF THE EWIPMENT MCAIEL WITHIN THE SE CONIANED IN THESE OTHER DOCUMFNS IS RIUSTRATVE CONDUIT: ONLY,AND DOES HOT UMIT TIE RICKS OF SPRINT AS PROVIDED FOR IN THE AGREENEM.THE LOCATIONS OF ANY ACCESS AND MHUR Y EASEMENTS ARE RUUMMATNE ONLY.ACTUAL LOCATIONS MY R DETERMINED BY TEN4NT AND/OR A MOD GALVANIZED STEEL(PGS)CONDUIT SWUM BE USED FDR EXTERIOR WCATONS ABOVE GROUND AND M UNFINISHED THE SERMONS UTIUP COMPANY IN MWPU NCE WITH UCAL WAS AND REWUTIONS. . INTERIOR LOCATIONS AND FOR ENCASED RUNS IN CONCRETE MOD WNWIT AND FITTINGS SHAT BE STEEL.CCATED WITH➢M EXTERIOR AND INTERIOR BY THE HOT DIP GAVANBJM PROCESS.CONDUIT WALL BE PRODUCED TO ANS SPEC6IOAIIONS CMI,FEDEM SPECIFlGTAEL ON WN-C-581 AND SHBE LISTED WITH THE UNDERMj MERS' j"OF IAORATOMES. FITTINGS SMALL BE THREADED- SET SCREW OR COMPRESSION FITTINGS WILL NOT 9E ACCEPM&E. RGS CONDORS SHAM BE WNUFACIUFED BY ALUM. REPUBUC OR WHEATWND. DAVI B. UNDERGROUND CONDUT IN CONCRETE SHAL BE PoLMNYLOIWPoOE(ING)SURABIE TOR DIRECT BVRM AS APPIJCABLE O JOINS 51411 BE BELLED.AND RUSH SOLVENT WMED IN ACCORDANCE WITH WNUFNMRER'S INSTRUCTIONS.COHDOT SMALL BE CARLON ELECTRICAL PRODUCTS OR APPROMD MUA. E�4 ti C. TRANSITIONS BETWEEN PVL AND RICO (PGS)SHLLL BE AVDE WAIN PJC COALED MEALC LONG SWEEP FAOUS ELBOWS. M � D. ENT OR ROOD GAIVAIBED STEEL COMMIT MY BE USED IN FlN5HED SPACES CONGEALED IN WALLS AND MUNGS.ENT WW A� SIAL BE MILT STEEL,MCMICALLY WELDED,ELECTRO-GALVANIZED OR HOT-UPPED GLLVAN=AND PRODUCED M ANSI �I SPEOFIGATG)CBO.3, FEDERAL SPEOFICARON WW-C-563,AND SA11 BE UL USTED. EMT 5411 BE MANUFACTURED BY C�',REPUTE UIC OR W AT EMMPPROVED EOWL FITTINGS SHALL BE MLTAIIO COMPRESSION. SET SCREW Al. E. UOUD TIGHT FLEABU METALC COMMIT SMALL BE USED FOR FINAL CONNECTION TO EOUIPMENT. FITTINGS SIAL BE MEAIJC qAM TYPE COMPRESSION FIRINGS, MAINTAINING THE DI ERITY a CONDUIT SYSTEM. SET SCREW CONNECTIONS SHALL NOT BE ACCEPTABLE MpNUM LENGTH OF REABUE CONDUIT SAL NOT EXCEED 5-FEET.UAIC SAL BE ENGINEER/LAND SURVEYOR DATE PROTECTED AND SUPPORTED AS REWIRE BY NEC. MNUFACIURERS OF FLEXIBLE CONDUITS SMAC BE CMOI,AACONM META HOSE OR UNMRSA META HOSE.OR APPROVED EOUAL 9 IS A WOUTNHN OF LMW FDR ANY PFR6CN, UNLESS THEY ARE ILTNG UNDER ME DRECTI F. MINIMUM MAZE CONDOR SHAM BE 3/4 INCH(21MM). O A LICENSED PROFmpNu ENGIN®i. HUBS AND BOXES: TO&TEN DR W WM. A AT ENTRANCES M CABINETS OR OTHER EQUIPMENT NOT MMNG MEGRAL THREADED HUBS PROVIDE YEALC THREADED REVISIONS MBS OF THE SIZE AND CONFIGURATION REg1RED. HUB SHAM MCWDE WGINW AND NEOPRENE 0-RING SEAL PRJMDE IMPACT RESISTANT 105 DEGREE C PIASMC BUSHINGS TO PROTECT CABLE INSUUNON. B. CABLE TERMINATION FIRINGS FOR CONDUIT 1. CABLE TERMINATORS FOR RS WNDUIIS MALL BE TYPE GO BY 0-Z/GEDNEY OR EQUAL 2. CABIN TERMINATORS FOR UNC SMA.BE ECO- =75;OR MADE FOR ME PURPOSE PRODUCTS BY M TEC. C. EX1TRgR PRL BOXES AND PULL BOXES IN INTERIOR INDUSTRIAL MEAS STALL BE PULED GST ALM,HEAW DUTY, WFATHERPMOf,OST PROOF.WITH GASKET.PLATED IRON ALLOY COVER AND STAINLESS STEL CORER SCRENS, CROUSE-HINDS WM SERIES OR FOWL 1 01/29/14 ISSUED FOR CONSFRUCTK) D. GERI OU11ET BODIES SAL BE RATED GST ALLGY WIN SMIUR GASKEIED COVERS.OUTLET BODES SHALL BE OF 0 01/27/14 ISSUED FOR REVIEW/ THE CONFIGURATION AND WE SUITABLE FOR THE APPUCATON.PROVIDE CROUSE-HINDS FORM B OR EOWL REV. B DATE DESCRIPTION E. MANUFACTURER FOR BOXES AND COMERS SHAM BE HOFTMAN.SOUAR b',CROUSE-MINDS,COOPER,AOALE,APPU7ON, 0-Z FECNEY.RACO.OR APPROVED EOAL RRLLRL!w. mMoMm R m SWF SUPPLELIEMAL (ROUNDING SYSTEM 1]]8.(119 DROWN IR. D¢ WHowx DwCD Orr. m A FURNISH AND INSTAL.A SUPPLEMENTAL GROUNDING SYSTEM M INDICATED ON ME DRAWINGS.MPPORT SYSTEM WITH NNUO,T MN-MAGNETIC STANCES$MEL CIPS WITH RUBBER GROMMETS GRWNONG CONNECTORS SHALL BE TINNED COPPER WIRE,SIZES AS)DIUTED ON THE DRAWINGS.PROVIDE STRANDED OR SOLD BARE OR INSUUTED CONDUCTORS M NDICATBO. B. WM`EMENTA GROUNDING SYSTEM AL CONNECTIONS TO BE ALOE MATH CSD ADDS,EXCEPT AT EOUPMENT USE LUGS BS23XC362 OR OTHER AVAM E GROUNDING MEWS AS REWIRED BY MANUFACTURER:AT GROUND BAS USE MI HOLE SPADES EASTERN BANK WTM RO OX C. STOLEN GROUND-BARS:IN ME EVENT OF STOLEN GROUND BARS, CDNI E SPRINT CM FOR REPLACEMENT INSTRUCTION 217 ESSEX STREET MIND THRFMKIT m ROD S. EXISTING STRUCTURE SALEM,MA 01970 A EXISTING EXPOSED MRIRO AND ALL EXPOSED OURETS, RECEPTACLES, SWITCHES.DEVICES, BOXES.AND OTHER EQUIPMENT THAT ARE NOT TO BE UITU EI IN ME COMPLETED PROJECT SAL BE REMO,ED OR DE-FNEROZED AND CAPPED IN ME WAL CUL)G,OR FLUOR SO THAT THEY ARE WNCEUED AND SAE WALL,COLING.OR FLOOR SHAM BE PATCHED TO GENEAALNOTES2 MATCH ME MJ AD UT CONSTRUCTION. DRAlEC IIRRFA GN-2_j Sprint' VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH. NJ 07495 Fx (201) 684-4000 0 0 j p ( //(XTRM SI. gYEF FooE 16 CHESTNUT STREET, SUITE 220 ` EXIST SPFINT Faun MTNW / FOXBOROUGH, M4 02035 (I FER 5ECMIT TOT&Of J) (774) 215-5421 MWNIED TO EXIST PENTHOUSE WWw,((mCOm.COm EXIST. SPRMT BOOIINr RRHS(I PSI?SECTOR, roTTO OF J),)I9CO"MHI NES(I PER SECTOR, EXIST WAC h WITS M CHAPPELL TOTAL OJ)J)B COw&NERS(I PER SECIO. 'T fire[Of J MOUNTED TO EXIST FENTTIITIE ENGINEERING EOSE SPEVIEFs ®ASSOCIATES,LLC ED CrvL'-StILGIuraT 4 Z1110 SIITveyiny R.K- EXECUTIVE CEN 201 BOSTON POST ROAD WEST, SURE 101 Fol ------1 MARLBOROUGH, MA 01752 F_--- (508) 481-7400 awwww .chappellengineenng.com ---7 i jNOF PROP. SPWNT 2500M14 NTIENNAS 1 (I PER SECTOR,TOTAL OF 2) 3 1 I i ��� DAVE MOUNTED TO EXIST. PENTHOUSE A-3 S-1 ON PROP.ANTENNA MOUNTS 1 I ml PROP. SPRINT 2500104PoM'S y (1 PER SECTOR. TOTAL,OF 2) 4 1 COST W✓ 06 MOUNTED TO EXIST. StAIDING A-1 S-1 UNlis 1 "1 BELOW PROP. PANEL ANTENNAS 1 i I C�,...rpL I ulCr� SPROfT TO UTILIZE I no AL EMST.ACCESS AREA 1 FROM PUBLIC R.O.W. fx6t I - I - sXriIGHT I - INSMLL(2)STRINGS PROP.SPRINT(1) 2500104 RRH 4 2 - 1 _ I A-4 gRJTRT BATTERIES IN ENGINEER/LAND SURVEYOR DAMOUNTED TE B PROP.PANEL ANTENNA A-3 S-I I EXIST CHIMNEY r�I I a 6 A NOU1gN Of TAW fOR IN!FER50.4. _ 25TALLBB RECTIFIER k LIE uxuF IM ORE Arnxc uxocz TxE a6Ecrwx ExrsT I I I I 2.5 BBU TETROTI W DOST. or A ucwsFn FROf69pW1 eaNxmA PROP. SPRINT(1) 2500MNX ANTENNA 3 2 1 cwuwrcr 'J - A-4 SPRINT MMBIS CABINET TO.urex rN6 oauMOrt. MOLWIED TO ETOST.CHIMNEY ON - PROP.ANTENNA MOUNTS A-3 S-1 - ---- --' REVISIONS I I EXIST a6V?nRC PANEL ANTENNAS(I PER I SECTOR, MOIL OE J)R 95`0M'TCNMS I I EXIST.SPFINT EOUIPM£N)RWM (TOTAL Of JI NOUNIFD 7p LXIST BUILDING IN fXlSI.BUttOINO 645EMENI ST t_ H9ICHCN 1 01/29/14 6511E0 FOR CONSIRUCipN 0 01/27/14 ISSUED FOR RE\1ON ❑ A-4 ADJACENT TO EXIST. W4tt REV. If DATE DESCRIPTION EXIST sPFINr ccs,wrzNNA MOUNTED r0 EXIST SXYLICJrT —i �' -.—��ROnf6- M Sev£ 1339.019 be[ I' 5' EXIST a¢a'R eh m NerveIT1 � 4 ' xINO.x es6ewnx L £xsE mPw O BS23XC362 EXIST.WAC EASTERN BANK T NII O 217 ESSEX STREET SALEM,MA 01970 6wxw nl�c ROOF PLAN ROOF PLAN wNNR I SCALE:1- - 0-0- ' A_1 2A-1 0 2'-6' 5' 10• 15' Sprintw )00 VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH, NJ 07495 (201) 684-4000 CXAST C[rARWIRE PANEL gNTENN45(l PEx PROP. SPRINT 25TOTAL ANTENNAS TRM SECFo.. IOTA w J)s DISH AMENN/S A33 S-1 (i PER SECTOR TOTAL OF 3) (MTN of 3)NODNIED TO EXIST. S TTv MOUNTED to EXIST. BUILDING ON PROP.ANTENNA MOUNTS EMT SPRINT RAAEL A AMMS (I PER SECTOR, Tofu t#3) 16 CHESTNUT STREET, SUITE 220 MINMIEO TD EXIST &Zlt O PROP SPRINT 2500MFR RRH'S FOXBOROUGH, MA 02035 4 - (i PER SECTOR TOTAL OF 3) (774) 215-5421 EXIST S TTTT 8 Hl RRHS(I PER SECTOR, A-3 5-I MOUNIm TO EXIST. BUILDING ..A. com.mm TOTAL Of 3), 19DDNHr RRH'S(I P£R SECO4, BROW PROP.ANTENNAS Toru of J)d XYWIRS(I PER S117tW. PROP. SPRINT 3 PANEL_ANTENNAS.. Toru a"J) winTO To EXIST.8wztIw EL- 10824 AMA(86.2'!;01.-) , _ CHAPPELL F EXSr SFMNT 3 PANft M9ENNA2S TEE- 10..2$ANS( (B62 '` ENGINEERING TOP LY EXIST PfN!/pUSf 1&9T9s MISt 829,AIX , _ASSOCIATES,LLC I Civil SIT,IJCILII'al-Land Sumeying 0 R.N. EXECUTIVE CENTRE I 201 BOSTON POST ROAM A 017, SURE 101 L 1 MARLBOROUGH. 752 (508) 481-7474 0100 rww.chappellengineering.com TDP AW rust ' GLO EL.=sooto,oust ceol A �SNOF 044 IAAI/�ENT TO EXIST.KyBFUD CCOAXABLE _ O�'� QAVI s ONALEN�\� e �� ENGINEER/LAND SURVEYOR DATE �� ILI rt 6 A NCV.TM of Uw MR 1W PW WN. uNuss INEY ARE rcnrx urlom INE ouRc,nx or A ucwsm RRef65NAY1 firaND:x. ro ura,ws occwENr. �O- � nu _P 0000 M�IE T 00 REVISIONS -aa � as oo as as a as a o0 as IBM ��0� 0� �� 1 01/29/1+ MuEo TDR causmucrroN 0 01/27/14REV. B DATE DESCRIPTION -- EL=I2of AP5L(0.0 ALLJ 123&019 PR 1/9,- ,' I I arcav en wrt r� INSTILL RECIIFIER 8 UT. EXIST,SMITE 1500F.Eff 2.5 BBURETROFIT IN DIST.- Iry EXIST B [pry84SENNT SPRINT MMUTS GBINEA4 PSI NI ^1pN I I 1 _u__---3 BS23XC362 OF BATT'�ERis ) 4 D - EASTERN BANK SPRINT BSU CABINET A-4 217 ESSE)(STREET SALEM,MA 01970 orv.Nam,nu: ELEVATION ELEVATION www wN�R _ A-2 0 4' 8' I6' 24' fX5! SPRINT m. NOT or 3) / 3'\qIQ ` EXIST(1R S, PANEL ANIENNLC / Q$T q�Q (l PER SECTOR, /PEN KA J pV `S (I TO TO EXIT /U]K IO J NWN](D]0 EXIST PEN/HOUSE SCP ° MWN]EO/O EXIST PENTHOUSE W EAST,AMENN9 WMIS M EXIST AN/ENNA S p ri ntW EATST SPRINT BOOMHz RFH'S(I PERSEC]OP. EXIST.SIMM 8"HI~5(I PER SECTOR, VISION TOTAL CF J). l900MHZ R.FH S(I MR SECTOR, /OIA(W J). 19WMHZ RRN'S(I PER SECTOR, ♦ SION /OT& Of 3)h LOLBINERS(I PER SECXVT. IOli MW OC J)J CONBINERS(I PER SECTOR, WTAL UE J)M(XINIEO BELOW EXIST PANEL ANTENW OF J)NIN/N/N STOW£XIS/.PANEL WENN451 INTERNATIONAL BLVD. SURE 800 VIA EXIST Eusi MAHWAH. NJ 07495 HVAC NAVrs � � , � HVAC Lwi]5 �����/�/( (201) 684-4000 I�III��IOLLLRRR�"( IILIIVV T AV EXIST V Ex/ST � ll.15PEAY£FRMS/ � �AS�EARERS/ � I��I�///(((////// EXIST SPRINT CABLE IMY EXIST 6MINJ CABLE/FAY L EXISTLam` S UN Lam`XIST 16 CHESTNUT STREET, SUITE 220 TIME UN/T$ HAS UNnS EDXB774) 21' Alp 02035 21 PROP. TED T LDUST. ANTENNAS - ( ) (I PER SECTOR,TOTAL OF 2)::::::t 774 215-5421 MOUNTED TO DUST. PFNIIIOUSE W www.Umcom.c0m ON PROP. ANTENNA MOUNTSPENMWff7Wsf� I `®CHAPPELL {/ //// ENGINEERING PROP. SPIw 2SDOMHz RRM.S ASSOCIATES, LLC (1 PER SECTOR TOTAL OP 2) Crvil SO ucks,L!-Lar Lc(Surveying / MOUNTED TO EXIST. PENTHOUSE / L D M PROP.AI^aU L R.N. EXECUTIVE CENTRE EnsE 201 BOSTON POST ROAD WEST, SURE 101 Z1.1 r. LBNFa Ropf7 LOWR RWf MARLBOROUGH, AIA 01752 ;� www.c(508)1481 -7400Og.com EXIST0 EXISTrrn/wr W Ix srnm/T wars SMOF EXrsI. EEXISTot+� DAVI xvnc Lwrrs Nvac EXIST ER SECTOR, PANEL AY/ENAVS EXIST cI sr IRE PANEL AM£NN46 y (I ik MIDIVI, Tout W J)W (l PER sEc/oa /oFAL W 3)a PROP. SPRINT 25004Hz RRH'S EXSE LVSN ANIENM45(TOTAL W J) EAIs/ TAX,ANTENNAS(Tom of 3) a 2 (1 PER SECTOR TOTAL OF 3) UPPER axr7 EAST. WPER Roa- EXIST. A-3 S-1 MOUNTED TO EXIST. CHIMNEY (�C/Ag'{'EP� <(. / zz CINNNfY SAWNEY BELOW PROP.ANTENNAS SIONAL 3 2 PROP. SPRINT(1) 25ODMHz EAST £xrsT �L 3 S-1 asr. CHMEY ON PROP. ENGINEER/LAND SURVEYOR DATE •'Tw ANTENNA MOUNTED TO SYnRiI/ SNnILN] • A- ANTENIN MOUNTS IT 6 n NOUiKK1 Cf uw TOR AxE xwm xLnd uNtEss THEY A .rnNc CNLWW 1H RE EXIST. ANTENNA PLAN PROP. ANTENNA PLAN e ° "ro" sGru: l'-Y-LE A-3 scuc I•-Y-o" A-s REVISIONS 6.7' IB.6' (SWM SWELL)IN DEE) SHIFID INCLUDED) CALIBRATION CONNECTOR o 1 01/29/11 MED FOR CONSIRUCiWN RF CONNECTORS Q 0 8 D 01/27/14 MEO FOR RE41EW o � ASG IN - REV. / DATE DESCRIPTION RF CONNECTORS M---Mmmm o e G-L ASG OUT o PINIELT w. oEWu®ms m W:uT 0o g 1230.019 m AS SHOWN Y3 ocab PLAN VIEW BS23XC362 �j EASTERN BANK RES AP%M14-c-120 PANEL ANTENNA DIMENSIW£ 66.3'.ILfi'x6.3' ID VIEW FRONT VIEW 217 ESSEX STREET WDGHT: 66 EBS W/HARDWARE ALARM iREWENCY RANGE: 2190-2690 YHZ SALEM,FAA DT970 NSG POWER lD-RNH9vJ0-]5 RFIAOIE RAgO HEAD DP1D O Nt.MN mIE 6.3 12.6• DIYFN90Nk 26.1'.1&6'rtX CAUBPATION WEIGHT: 70 LBS W/HARDWARE ANTENNA ANTENNA ANTENNA PLANS R DETAILS SIDE VIEW FRONT VIEW PLAN VIEW 2500MHz ANTENNA DETAILS 3 250OMHz RRH DETAILS N.T.S M3 N.T.6. @17i A-3 V 0217[5.50] -12 CHANNEL FIBER DIST. .mr LExn a SIN noon er ON.: 3 MANUF: RFS G Sprint' 0.319[8.10] y 12G (M MILT YARRS 115E NN jxlof? X 5 B' 4 AWG PAC OC WERE :/" /`�J (•j HIBRBlIX .200 BANE HYBaiFLEX 225-3)0 6 AWB 1-I { OTY.: 6 \ y���ij' - % qW 3zs-ns 4 Axt 1-t/a• VISION 1 INTERNATIONAL BLVD, SURE 800 MAHWAH, NJ 07495 �/�j (201) 684-4000 OAR TAPE `wElt CORE RFS HYBRIREX RISER CABLE SCHEDULE x-. TRM MR:H O INSTALL(2)STRINGS INSTALL RECTIFIER @ LTE 4 AWG -MN:HBOS&Mt2owF Soft 3 2 IN multi-mode fibo pairs,Top:WHoar protested mnnectan,Bottom:LC OF Br1T1ERIF5 O FIST. 2S BBU RETROFIT IN EXIST. �. -_S- O Cnnneaors,58cable 50h SPRINT BBU CABINET A-4 A-4 SPRINT MMBIS CARNET 1.217[5.50] g MN:H&X&Ml2-075F 75t 16 CHESTNUT STREET, SUITE 220 WNEIR 1CORE -12 CFNVINEL FIBER DIS.391 FOXB774) 21, MA 202035 1 MNFR CORE `. OTT.: 3 `N MN:HBOSBMI2-1COF 3W h RFD_-. �,, �2D: Fl 239] a c MN:HBOWW2-MF 125h (774) 215-5427 MACK_ , 4 www.Umcom.com MN:HB058-M32-150F 15o ft EES! EaxSI. /�� �K MN:H8050-M32-31ST 175 ft 41 fXIS/. Ert/. $FEIN! L(fARx7RE `C/� EOfiVOW CN! EOUIFIAfNI RED -- \'r CHAPPELL SPPoN/6BU NMN EQUfpMENI {i .-E® MN:HBOSB-MI2-IDLY 210E L4BlNfr fi,BlNf7 �'` �' rw_PoN_n 01.110[2.6.19]_, ✓J%1,`�/ x bHeotle Y A ENGINEERING OVER TAPE /12G 51217 MN:HB1I10AI3M32-0SaF \i 3rBAWLpowerpalrs,I2xmuIH-meds fiber palm,WMOorntetlmnpeRors&LC Soft h _ASSOCIATES, LLC �'w♦ BLACK . �•- � \\_11.1.y2B.D9] � �3�MN:H011A8G13M12-075F 251t Ch''Sfl"JC/tlf8!-L3f]Ll ul.INPJIIIILJ CX5! fXT. 0. 640 (710 GORE U' MN:HBll4OW3M12-100F 100E [N7i (xrs/ SPReVf f1RfR 1 6 AWG PVC OAC WIRE R.K. EXECUTIVE CENTRE (X57 b67 /XS/RIBUF70.4 CA9/NE! L of (") MN:HB11408L13M12-125F 115E 201 BOSTON POST ROAD WEST, SUITE 101 SFR/N/ SPPoM I 01Y.: 6 se MN:11811400U3M12-150F 150ft MARLBOROUGH, MA 01752 a0`4 TFL' E B AWG & 6 AWG MN:HB1110RJWl2-125F 175 it (508) 481-7400 MN:HB114-0&13M12-200F 200ft www.chappellengineering.com 12 CHANNEL FIBER DIST. xytrM cable MN:HB1I41W3M12-225F 225ft INSTALL(1) HYBRID CABIE� - 8 3sbAWG powersA al2x molt made fiber palm,Outdoor mtedmnnec[ors&lC PDUCENT ro FXLST.CDA% A-4 I �� u �I q 1� ?� MN:H8114-1W3M12-250F 275ft -`•�"VF 61 FS !�I'�I�% b MR:HBI1C13U3M124T5F 275 ft IVP FYI {� MN:HB314"13U3MI236F Too It wv�� yAYI EQUIPMENT PLAN �1 0.117[2.971_,, �l il:i MNN61F21113M12325F ft EQUIPMENT A_{ ]MU�SEPOW \ROD � p. 3,=powerpal r.lL mUlU-mode Flberpalrs,OUMoornbc1 mnncctars&IC 350ft 0 1-6• ]• b 9• - MN:HB11421U3M12-3XF FIBER ONLY - O IMN:1,12314"21U3M12325F t ALEN RFS HYBRin-Ex JUMPER CABLE SCHEDULE ENGINEER/LAND SURVEYOR DATE •. ( u'4 ��qa5� �IIWJ{ =�':51'j' HYb:H Ml2-MobM R O A NgAMKi OF Wt NR ME pERBON. MN.NBF012 M3 SF3 5 h UNLESS MEY NS!LIIIW IMOER TOE ffiEVl.WN [ F P S 3x mulh m3-l0Pl er Pairs.Outdoor&lC mnntttors3 2 able Or A UOt]r30 mfi.DoCNK FYtlNEFIt yyy555yyMryrya ti �� O MN HBGOf2 M3 10F1 10 it la ALTFA TN5 aCCUYLNr, J._ MN H3F012-M3.I5Fl 15k 2 MN HBF012 M3 20F1 20 it REVISIONS MN.HBF012"M3-25F1 25 ft 1 1. pp {i MW IMM12-M3-30F3 30ft r �.. a I'3raai ,t Ribirl MN;1, Nm11-08Mast e SHELFHEY/RECTIFIER I 3335 MN.Is 8AW-0power SFl 5 k SHELF@(3) Sft,rsBAWGpower palg3x multi-modellber pairs,Outdoor&LC Connectors, I RECTIFIERS 25GIh 5 Bcable MN.HBF058"O8U3M3d0% IDh 1 INSTALL NEW LIFE a MN:HBF058-O8U11013-15F3 l5ft 1 01/29/14 ISSUED FOR CONSTRUCTION y c BBU 25 GHZMN:H9F058-08U1M3-20Fl 20 it f (�lUii: ���"-•y`� � � + MN.NBF058-0eU1 M3-E5TI 25 k 0 01/27/14 ISSUED FOR RFNEW -0 • MN.HBFa58BMk U13-30F1 30 � tir REV. B DATE DESCRIPTION OSTALL(1) NEW BATTER xrbrld wm per table SIRING IN EXIST. BBU IN Mx HRF05913U1M3 5F1 JW .."' 1 EMPTY MIDDLE MY 5lt,la 6AWG power pair,3x multi-mode0ber palri,Outdoor&LCConnectors, 5h 1238.019 DRus"Ba Ola AS SHOWN e 5/8 table artab BI M 0 MN:1BF058-I3U1M3-10F3 loft ppPEQ a60iW3M1 a MN:H8FO58-13U1M3-15F3 25 It MN,HBFO58-l3UtM3-20F1 20 ft _ MN HBFO5B13UIM3-25F1 25k B523XC362 MR:H3F058-13U1M3-3DF3 30 it EASTERN BANK y xYbna romper cable N:48F078231j1M35F1 5h 217 ESSE(STREEE e 5q 1s 4 AWG power pair,3x multi mode Fber paus,Outdoor&LC Connectors, _ p 7/8 cable SALEM,MA 01870 E INSTALL(1) NEW BATTERY 3 MN Hero7e-23UIM3 lOF1 30 k STRING IN EXIST. BBU IN Q laWHBF078.2301,13-15F1 15 it Dubai TELE t yMN:H3078-21U1M3-20F1 20k DIP1Y•FRDNT BAY MN:1ff M78-11UIM3-25F1 25h EQUIPMENT PLAN,DETAILS& MN:48FD7833U1M3-30Fl 1 30R HYBRID CABLE SPECIFICATIONS • NOTE: SPRINT CM TO CONFIRM HYBRID RISER GALE AND HYBRID JUMPER GABLE MODEL NUMBERS BEFORE PREPARING BOM. EXIST. MMBTS CABINET xuw s N EXIST. BBU CABINET 3 250OMHz HYBRID CABLE X-SECTION & DATA NTS NTS N SA-4 ONENnA-{ SCI,LE: Yr-{ TC A-4 Sprint')! VISION 1 INTERNATIONAL BLVD, SUITE 800 MAHWAH. W 07495 (201) 684-4000 TRM 16 CHESTNUT STREET, SUITE 220 FOXBOROUGH, MA 02035 (774) 215-5421 www.trmcOm.cOm X ENGINE R ENGINEERING 'c'm �ASSOCIATES,LLC Civil-Structural Land Someying R.N. EXECUTIVE CENTRE 201 BOSTON POST ROAD WEST, SURE 101 250OMHz GROUND EQUIPMENT MAR BOROUGH, 74Onsz (50RO GH. MA 00 www.choppellengineeringxom ITEM QUANTITY MODEL DIMENSIONS .& WEIGHT BBU KIT 1 ALU 11.8"x19.0"x3.5" OF GROWTH CABINET 0 TOP HAT 0 - _ ��� DAVI m BATTERIES 8 ALU 10.1"x6.9"x17.6" - 105 LBS y RECTIFIER SHELF 1 ALU - 06 RECTIFIER 3 ALU 11.5"x5.5"x2.5" - 5.5 LBS AL 250OMHz TOWER EQUIPMENT ENGINEER/LAND SURVEYOR DATE ITEM QUANTITY MODEL DIMENSIONS & WEIGHT IT s n wouTroN a uw FOR M IxRSOx, uxus tun rNE rmxc uuwn n¢ouxcnox ANTENNAS 3 RFS APXVFMI4-C-120 56.3"x126"x6.3" - 56 LBS OT A 1C°'�p PROi�'°""L D1A1EP' TO&M T16 L INT.. RRH'S 3 TD-RRH8x20-25 26.1"x18.6"x6.7" - 70 LBS REVISIONS FIBER 1 - ALL HYBRID 01.625"0101 - 1.6 LBS/FT JUMPERS 27 - 00.5x8'L AISG RET CABLE 3 COMMSCOPE ATCB-BOl-006 00.315x8'L - 1.3 LBS 1 01/29/14 ISSUED FOR CON61RU=N 0 01/27/14 BALED FOR REVIEW REV. B I GATE DESCRIPTION wmen x0. omam ee m x 12M.D19 DPAMX ec 06 AS SRm owv'o er m wou+awowwux BS23XC362 EASTERN BANK 217 ESSEX STREET SALEM,MA 01970 LPMN TIME RF DATA SHEET 8 BILL OF MATERIALS ce+.WC NwaEn A-5 Sprint* VISION 1 INTERNATIONAL BLVD. SUITE 800 MAHWAH. NJ 07495 g, :g '. (201) 684-4000 TRM 16 CHESTNUT STREET, SUITE 220 FOXBOROUGH, MA 02035 (774) 215-5421 www.lrmmm.com •www www• •www www• wwwwwwww r , ° Per HYBRIFLEX Jumpers ®- CHAPPELL 1' !' Sector 0 pr MM Fiber ENGINEERING Ti 1 pr Power .10 r ` ASSOCIATES,LLC ! ; w Civil,Stluctura= Luna Survcyrnq Y RX EXECUTIVE CENTRE r e `31 : Medusa with Outdoor rated. 201 BOSTON POSE ROAD WEST, SUITE 107 v"' terminations MANI(0B)481-4000,752 www.choPFeliengineering.com Per Site HYBRIFLEX Riser y 18 pr MM Fiber ('p`YSHpF V 3 pr .Power � DAV► H ALU 250OMHz ALU SCENARIO 1 RFS 25OOMHz ALU SCENARIO 1 N.TS A-8 N.TA �ONALEN ENGINEER/LAND SURVEYOR DATE rt a A wuArax a wx rax un vmscx. ux�rss TNEv.la w.mxo carom THE UREC -..• _. -. or A ucr FRaiS510W1 ExdNEER. ew�snNW' axurii" ` a�r�uiliN" s�M� x ffiLRdUNH• esomRHe ;- - N KiER M6 COCUYEM. ". REVISIONS -+*iW-•3,-+.nx^^•`�wn -F 3 , �s+-�d+ve.a+, � A°✓'' I --zti�^eu-n»...y � 4 T 01/19/14 I V)TOR CONS CIMN o 01/17/14 Issuco roR REvrtw N REV. / DATE DESCRIPTION 5� �� VAtER M r�xF. ,M SfNE 1111.019 SHOWN R,�� aIEOlD 6t: art ,d3 £ rRJh[r EsawwYMl �l. azo r C RRN n a d n ° BS23XC362 # M ;w r k� y EASTERN BANK 4.,: �•Y1- Wn w9bN'da p5 ^� 5 .; ` 5-" y 'p ' i ,iwgltE?I' 3 '1`° � 'Si$+r r,ltTd` ,y.. T4'r`st "` r ..z+ - 217 ESSIXSTAEEr 4 u.3 I,X SALEM,MA 01970 WIRING DWGRAMS Note:,The iflLI* god atigve m fora 3 sector view.Please Scale 9rTeatlY f0r2-sectorlwd single sector views: . .. owmc xxmx RAN WIRING DIAGRAM: ALU EQUIPMENT J A_6 N.T.S A e INST IAS I. CONTRACTOR TO ENSURE THAT RRH MOUNTING DOES NOT INTERFERE WON CLIMBING IAMM CAME CLIMB. OR COAX PORTS V p ri nt* )00 2. CONTRACTOR TO VERIFY IN FIELD SIZE OF EXISTING MOUNTING RPE TO BE 2%'STD(2.88 O.D.) PIPE VISION MAST (12'-6'LONG). (R AVAILABLE) 3.VERIFY EXACT RRH AND ANTENNA MODEL 6 AZIMUTHS WRH RF ENGINEER PRIOR TO INSTALLATION. INTERNATIONAL BLVD, SURE 800ON. MAHWAH. NJ 07495 4. ROTATE EXISTING ANTENNA FRAME AS NEEDED TO ACCOMMODATE INSTALL ANTENNAS. (201) 684-4000 S. RRH PLACEMENT FOR REFERENCE ONLY. CONTRACTOR SWILL RACE RRH IN CORRECT ORDER MATCHING INSTALL THE PLACEMENT THE AND ENSURE THAT THERE S ENOIGH CLEARANCE FOR RRHS T� TO BE PLACED LL THE INAI�ON THE AND ENA FRUIE/RPE 6. INSTALL EOUIRAENT TO BE MOUNTED PER MANUFACTURERS SPECIFICATIONS 16 CHESTNUT STREET, SURE 220 FOXBOROUGH, MA 02035 (774) 215-5421 f f w"A mcom.com PROP. L3'x3'x$ I CHAPPELL - EXST P[NNO wnuJIM 8'LONGENGINEERING PROP.OOWNTLT ANTENNA PROP.DOMNTILT ANTENNA �_ -m ASSOCIATES,LLC MOUNTING BRACKET MOUNTING BRACKET PROP, 431.ywCivil-StrucU.Tral Land Surveying I8 LONGPROP. 2157/SCH.40 P10P.SPRINT PRO'. SPRINT STEEL PIPE MAST. R.K. EXECUTIVE CENTRE 250011112 PANEL 2SOOAHz PANEL LENGTH AS REWD 201 BOSTON POST ROAD WEST, SURE 101 ANTENNA ANTENNAMARLBOROUGH, MA D1752 (508) 481-7400 www.chappelienginm ing.com PROP. ANTENNA PROP. ANTENNAMOUNTING BRACKET MOUNTING BRACKETPROP.1$'I U-BOS(TM.1 PFR CONNECTION)PROP. GT ,SEED OF ROD,LENGTH N RIO) PROP.9COHER nBEU Bars(TW. 2 PER CONNECTION) w/wawms a LDOCNUTs �� DAVI (TTP. 2 PER CONNECTION) O PROP. L3'x3'.W �1 8'LONG y PROP. PIPE SCS.b PROP. PIPE SOI. 40 0` LENGTH AS STEEL PIPE MAST. LENGTH AS REOD CONNECTION DETAIL ��``� Ni.i 5 1At PROP. L}'xYxW 8'LONG PROP. L}'xr.W 8'LONG ENGINEER/LAND SURVEYOR DATE PROP.RRH n 5 A wourox w wx Pae Axr vErzS'ON, MOUNTING BRACKET uNl 1NAr.wc rcnxc UxDUI mA MKz PROP. RRH CIT A ucOa40 vNovvsmNu zxavuzn, MOUNTING BRACKET To K1IX mrs ooavuvm. FXST.PENT SE wu2 e REVISIONS PROP. SPRINT a PROP.SPRINT 250011Hz RRH a 250OAHz RRH PROP. L3'x3'xW e EXISTcruun2r IB'LONG = 1 01/29/14 MUD FOR OMSTIMETON PROP• G}1}'x){' D 01/27/14 ISSUED FOR RENEN I } B'LONG REV. Y DATE DESCRIPTION I s-1 \\ q rxo2T MO . ar: m xuz S-I PROP. 2IP'0 SOL 1 40 1218.019 D""""°n °w AS SNOwx I STEEL PIPE MAST, ONOYo ar: .ert PROP. L}'.r.W / LENGTH AS REOb WE mora mrwwmx 18'LONG a/m/ Exrst&wcxcr (TV) BS23XC362 PROP.AE U-BOLT EASTERN BANK EXIST. a4wEr (TYP.I PER CONNECTION) 217 ESSEX STREET SALEM,MA 01970 PROP. 'HPE UNTIL Bars Tns/.BPACxCI(!YP) W/WASHERS h TF >nO (TMP.2 PER CONNECTION) STRUCTURAL ALPHA & GAMMA SECTORS BETA SECTOR DETAILS TYPICAL 250OMHz ANTENNA MOUNTING DETAIL TYPICAL 2500MHz ANTENNA MOUNTING DETAIL 2 CONNECTION DETAIL N.F.£ 5-1 Ni.£ N.T.S. S-1 S_1 NOTES TO CONTRACTOR: I& FROJDECORE a%wNL AS NELESSIRY FOR PE]S TONS OR RLSF]S MRDIXM SmMN 16110-RY WAn.BOM THD RMIGs 'KELECTRICAL LEGEND DOG.DO NOT PENETRATE mcrufm MEYRERS WIMDU[CONSTRUCTION TIYNYGF% APFRWAL REEVES IND/OR PQEIRArgM IN TWE RATED CONSTRUCTION L BE A ovaTO MITN ,COIMECI016 NID mUR11YS EYr COL1iW%AND LWWECIm 1. CgirRN:lpt SNVl C6ECr ME EXETRI:ODOROUS%WI m STORMNG 910.ANY POLNED'MM FIRE RATm UATEI WHICH 6 MAINTAIN ME FIRE WNW Of 1K EDNm SrffFL CR W1L[A&£ARU!CMY. •taICRETE nGxF CR 1 tt ANO OUMFORS Atl4Nf.".ME 90 PERIOD IN REGARDS m THE tlAORICIORS FIIXCMNS. NIll OR STRUCNFE NL FOR FL0.Yf PFNErIGMN$Stall PAYSNr PASW£M OXER nE GANO Nq RI6L CWPA65pN TYPE OR S1NM[SS SIEU.YULTIR£ ME SCOPE W PGM,OR ANY O 6511E RR M m 116 RM a 9 BE WA1ER,SYCNF.TIRE NA NYES NL WIFIELL SIW1 BE UL ApPMA'ED EOR MS IGIM LOLNWG IYi£LCN,CCIIX6 m WYE 1161AA1ED MSWIS EYr iI1nHGS USGIG SYMBOLS PA 9RMYIr W DLdWG ME BO FUND RITE TSE MIXER RR QUUN ARGN.NOT AFTER NRFTSE SET SCIRDS OR INDENTAUM AS A UEw OF AITMIYpi ARE NOT PERMITTED. ABBREVIATIONS print ME OORMAI M 9F£N AWANOD MOTE D NORIGL WIMS 4N NT EAND UGIT T1W AW UEIING R 70 9E mm B. R ARMS:ME CON TWE F ME C NO T GROUNDING DING 5N Li'RR OD 513 0 NIyJrt 1MIHHG UP ICG MRFILW f/91£NNi ASAYBLr VISION z AS MAY K TOR F 9E fQSMYSIHE FOR AND RA G I1L PERMITS M9 PAY Al FES OF 004 DIM D ISEAlOWNERS FQPPESFMATDL AND EOIRPIENI OHNE TE�To ;TO ME WARMS MC RT RO DY a THE COIIWT fAWNOnF SYSIEIL FOR R,-0' slm AS UR M UxAl.FOR OFCMIOAL MORIc.wo FCR soQowrp a ILL NYECBOn ss HA LW IME .Wows AE N SIFT USTAL_RNS BE HE OESO CONNECTED TRISE ACWRov E m ED mxDUrt,IMC A1"ROD ONDUTw mrmu E _• mMUR iGRAWc ooxx AGO COPPER IMENW maven Bw 1 INTERNATIONAL BLVD. SURE 800 IEauWm MTM LOVL NITIYNd'IY. UPONHANOR ES Mu RNdImEO T MF T ME ONE OF[SCR Ci MESE PW4 ARE MSFO L, Cq'6UR wsMUM AS EE. MA l LONG,LED ON RY.'O AND OD DIRECT WF MEIMlN WRE GWGE X(201) 4 07495 uPoX BEST AVNI$E NOT TIE JNxl AT As ONE OF R MD NA NNI E.uxwnc X,ED AGREE.IW411 NFCN£D V OR NM[YT w As M M UNSU, AS P35gE ]. ERCT YDS SAND ARE PRONCID,THE ELECIIOL POINTS ROUTING SD mORM1U1[ OUT11 N8OXE%ET ARE & TME As DIVAN OXT RRDIIECT).L BE CL OF ME EYPosm RXTD ARGUE OND PN DII m M AT RIGMµfE,S ro TIE LITS Cp10Un R1W W6fP4RpwO BCN BARE CUSER"S (201) 684-4000 EVLT TE1r}N RI N9 RECANT DED CgWECIKN PoNIS,RWIING NW ASSOCNIm CONFERS mM6•ET& IM ME TYFE OF CgIwMRCDON(RCCA GI m1. sINLL BE NR E N SAIN AYM AxCI£ CREN w EWYD CONWR N9 Ew PoIN6 SEN 8 GASE TRNILE9CV1 snTEY PEQFEIIENIS MIM Lq'IL UI611Y LCYPNIIS k SPw1T @VSIMICINY LLNVIAi. Lg61Alm WON TE mMEA'6 IEAdIDITA1M1E PRJR lO RCFX-w. 1VFE ROM STNOIYIO FtBVl15.SCREW XNIm KWWRT mTIN3 OR WwUR ffM mISUR FJN OID`'E 1.Ti0UTL 91S KL AL NIDERNOUND COMMIT ROI 9WL PE 60PmY.TED IN FEW BETWEEN TO RI W FESS MAN REUSE OF STNNVN ELT:N& 4. 1M DONTRACRIQ STALL PONCE TEMPORARY POINR AXD LOTTING a RETAINED RW THE WaRlt PRINT WE.ONOTACTS.NO RSffCINE UIRFIT tlX1PAV¢. � IIEIm�ITTw/��MIT CRI LOAM EMAIFD CBOUm BN EFIEiWI (VTRM a DONDurt soRIOMs:RxA10E 9Pvoms FTR IIW201NW mxnlllrs LA0 Eur - vMc wcunm 5. LCG1pN OF AND S. MWr Am 'ON MID N ME WMR F 20. ALL ROO GA RMNm 9Rpl OM 9WL rR.WLIIOx m ROD WLYNIYm F1BLY5 NOT MORE MAN&FEET APART MIM NOT FEES MW TMO SYWJFI6 FOR FN.N 10 2J. DO f1ECIPoCK MTI TARN; -,d 5/6•,1D'-0•COPPER CUD M%N%IWIE NY SWl1 PE CNPCWhO MIM REW N6RMNS MR m A0.g1-GL wN RGq GLYWIIID STEEL,WNpM TATE LPIDE COOT SIPNLIR LFNCM N1p ONE YFPME MAR FIA1 FLEW OR BSD IK1llpWG 9iJLWp @.O^ OEM GENERATOR 6. MF Lain Rom AS 9MYYN ON ME RN6 ARE APPCOpWTE FLLT UX:w I N!0 21.CG.TUCKR SKILL RONDE AL DIRECT COPIED OONCT 5 WIN 6'YAE 6 MIL M[M RUTS AANE 919`MCED 00.140 AND MIMN I FSE OF AU_µCRON COMES 6MTC'FS.N11M6.EIC NSTNL ME XOIE RPE STRWS W WINAR I PICA W Ramrc 9w1 s RR Exe-nls FmB camina¢ AIAFwIZm ws1N MED FOR ruc mp.Nrmc mxlExlz rrE wvs sw1 ff M+ANa ExaNFRUTWE E xlox GPS MORAL wvlpwlc smw 76 CHESTNUT STREET, SUITE 220 FOR TEIIDMM sWLFP NSDLL IICMWML RPE IWII,9E FON LYNAMS W6FA TINN I Axa. ■ FNO RED COR fLECIRG O`F,P SST FASIRIFRS MIx NWGW Pops WY IISfO W DM ICG1MI15 61 Lou 9( 6ACATx FO%BOROUGH, MA 202035 1 ]. RWACE Ru BJ%FS ND.NNCIICN mZS MIEIE 9WNN tlf TQLNRFD GI ML a PPE s1PA3 az EIII'IPYIL Cax1PALTOR 991L PMA4E A mrox a sv1T1s WIDw NR TETCO • wMPR®oF1 tME cnWmmox �maN,D ROTC 09Ln) (774) 215-5427 fl NL LYWMIS SWL ff NS NIIH PoNOS WDE W I<GY61W[E WIM ML U&£N6-10. OON E7nO m ME R6WRY RNp fABOET. 6CIp'WlE pKr CCRECTNN YLIpI MIND-CONTI ...trmcom.COm M Poplr Npl£OENLE O1Nm niW SCW WM C[NDM 9BLW5'MIH 12'YIXW W TNT MTM LURM. -G-G- GMNWD wN' II2 AMC EqD URB LWm ANTENNA COPPER GROUND GOR WRXE SWTID6 Epi Al CONT IS 2'OR UNDER. A "PES AND VRFTS(YO WTSY CWY IT MFA TOMEO EWE RRME RIUBIE M.AND OBRA CU M.FIECTWUL LGRWLILP 9WL NNAIDE A SECRINI OF YALn1F CIXINp FOR PLMLR LONNECRON YINW"S FOR M U4 WEEN IFO. BE tlfPIX ONIETW6 NOR CO]L m CMpNTaR v NiPY MOST INE W9 YAS1IX STYMIED GROUND&R 9. ALL DORM TERIOvMWS 9WL BE NNNZED MIM RASIF MIDAT F TIRG m 11E R"W2f 0.Wp UHwi. ME mMR/CTO]9WL RFACf AN NYWFMNUL E-0•LCl OF WSMATION UMESS OMERMSF WEO OR NOTED ON ME DRAI USE SIAA`OM M9 N'OFF CONCRETE wMFON GROMNOID 8TRI CS WNDIATI FOR ND.B W W&FA MERE EL4"ERE EPEaRm OR Iplm OIIERMSF FS PfIEOWI CpMWGIILR SnIFY WFO AT IN END CE ME IL DIRE W TE COgMTML, EMR:T prµyYNUY.=FOR ,vel NOT CT RSI ural MUATtN Pil Rlwm RxnEnMl CIS ENGIN E R 1a HL WUE sxul eE 1WE MWx.swa uwF.Mm LcwfP IR ro 92E/10 AMD(law 2A w0urm w Acwlm W/1urL CODE s s1EET E-z 9MLL PE TY1E MIW/Tlml.]5'C,FOR NL CONwATaE.usFLFs onwbsE 9'Ernm ENGINEERING URGER 9w1 9[mN.YMRc smwGm)75 OEcrE[C 0&/DEGREES if.B6[ OR NOTED ON RITE OW"NN5 pX FEfPEESDfl6 0K NUMBER IRC ProY"'WDp GBMT CrAm �ASSOCIATES, LLC wrmFXTmrc,MM"N/1z 11. NL ROES SNI MCMC AT Ill RAL BOYS J-90pS.EwIMM BOXES AND M. PRJA[E(2)r VLVA1:mD ADD PEEL IYMp1AT REEK WON I/N'NnAN tl1I4 UIE wtlllWlC & OOR CCdXG RNSE TENNI AND GACIIp LpWCIOl6 LYILW-CNm pOF ~�•GAINING muBm ROT ROOD. G4WNQFD STEL DEMOS WM A PRIED R.6TN TMs.Anal DRAT,GRAM,OR APwD.ED EQ W. By GBO swm Al RXF pP m 20'-0•Wc.) YNRE m PIXE Pm Inure muwm w acaRavEE wlN xTc cWwn NL mxNXTow rc ME saE mWR ro R OA Emm. RDLNrc crtFm"'umnr COYPAIY ME DANT RMSE GorpuLTOR rnDR wDNc 9w1 BO mACW,p0.m1E, RAT wtmAr Civil-S'irucli nal Lanv Sur eying It AL rmM WTEINL 9Mu WVE A uL LaEL WROTE(IM/me)OR"OWN mNNc[,COLD,.DOW(2n/Aw)MORLON 13.CCNr RWPI-N SN41 BE COORDINATED WM IFM IT ME NEGRI DOT AMX) _ELECTRICAL SPECIFICATIONS FOR Al`ROUND Ri S cmxx pW GOAL DR "` WREXECUTIVE CENTRE Y96Y CONTORTION OONFUCIL M 1E ONDCONTORTION ND DOI m RFWdED. 201 BOSTON POST ROAD WEST, SUITE 101 SSU sFRl1fT SFFGIRW L60ND PN(119191P .K. c WNNECIOFE IND pus:FOR COPPER OOMDMCORS Na 6 ART EMAILR 3N 14.Al PNEL DI ECIp0¢SIAL BE TOMNOM NOT Kw WRITTEN SECTOR RON-FF19LMCON W ML PROM)NI6 sLN- T s 8 STA-YON XARBREMIGN OR WOFM m WNNOW ROIYI9 IlP1ER ANImIN COPPER(i1OMp BW MARLBOROUGH, MA 01752 Nvrm1W YPNwm wswnnxG OAP& NR HIPPER roxDGCTDI6 LvcEn Mw COST. EI6TBO (508) 481-7400 A IEOIAREYmIS FIIPNL91 NL LNW,WIERLLL SmA3.FgAFLmT.ND H0.6 y TARED O IIW RR NIX NJEW w!,0.i 119E%L411.ff WMffI,'IMS, 1& WSTNL Ax EGIPYIXT GPoIUNmIG cormunon W WL caxwlrs Pm ME mEllRurDrE IPPBAvcm RECFXRm m cOLPILTE ME wsrwumll v M[croPFFIE PRaPEar TIPFO a NMMTm. PRONSEo www.c8appellengineering.rom NID NEC 1xE EW ARD AlDISCO G VMpULTpE Sw4l BE BOXED I NL.WNLMIN pp;RMX1 6ri1EY w.Ntl"YYF"M ME SPELRMATCM M9 COMPACT (P) eo%R PLumrS,ARD L DlsaxlEcr rWnoEs.9AVNr¢.uD EDuwENr c9NErs. DRAY4XS. 1&TRE cONTWCIOR 94ll PRETY E AS-B14T ORAWN .DO'N T MT NO Al mw fl RmIIWDE1115 fR IIEfAM1p1Y N:pIC6.WD SWIIWpS: INSrN1.A1pA W1D6V. 0. SRCfS(4m 1GI5 NIO LOpfRk:LWWKTaR FLNG116 S1PIL BE WNIIXOI$iRdl - W E E CO OEDON NIO CHVYA MIGIE CCOwI£TIBO ME CpIIR'CT.mBYR FL ECA%IEM ND'NJRYYV84P STAT CCNigN m TM AALLW£FRMS OF 1TRYMIATIUX ro 1WIYNlEN N1M411r SRpES UNLE59 ARANID BY 11E RAW<. 918STIM91 CWRE1pX. N9EE701t ONE W1pWl ELECMMN COLE(ROC)-.WRMIBIE SFA1E F1FnRC LGIEL ME W1pW1 FLFCIRGAL 6NFIY CODE xESC.ANO ME lmw IND THE 9211011 I62M-CWO1R BEANSSH OF n.ILL Dscnxwcr sWnaEs Am a1MR corlrRawp OEws 91NL BO PRC.mm"M COxWTpxs a ME NmpralEs WWp FANTLL wR®IGTDx wNWpxc ro ME Nmmm IAMIOm NRROO. s oms RED Nm(NO.R mT Mwm.BRu+QI cRnms ., �. Wl YomIOAnws REGAVm ar HESE LBOES R.Aq II6rILID bE NV PN6 WuiKKE Fm IPOA1(NO EMCF➢IYA6) REGLUTMM,.tap IL1W"116 AV1L EE Y.WE Br 11E 011RY.,Tgi"1MpJT w PRvaIDE 1YXIXD G¢,B%T{N.1MAWL WfNETIC iPoP.!MUL MO W MREE N u ADm1DX4 ODDS m ME vANER P NE RAANCN f.WCLW BMIYf16 m sH ON uu"xGS M w P eflUYERS ... A'== "" O� DAY{I I stall&FARE U4,E AT j OT IPP.A RAnHG ro WTW FX6Mp OR As C TOR OBOES VR CO.RTI TO T:Al WTER9LGARDwsAPPLIANCES ORYFNI.OR RECITED FOR wALA$E F.WLr bIRRENS. y W mens 991L Wp0.R1ro ME AWLItlP1E nANWx6 OF uxomWnnFRs uBaunXEPs,Ix&ME LaE1 aE W 1SING Br.IA,E REpRREO. � � INCOAX ) )A i W STALL E .fi,z ry ,... JUMPERS. TYP. k 'Y F IT �IJIGI�- INSTALL RET CABLES -0 } �ONALENG\� NV 2.5 NV 2. 1 ANTENNA RRH INSTALL FIBER R INSTALL FIBER E DC JUMPER, TIP. f ENGINEER/LAND SURVEYOR DATE a JUMPER, 1. - TO ADDITN4 RIS A xOuiXlx 0<I.A.FOR NN PER6gA SECTORS HYBRID CABLE MPo MEDUSA uNFFSS MESE ARE H:TINO UNDER iH[MROLTLN OF A Lp9rsm PROFESS.61GMDER To&TER MRS UOCUIREN, INSTALL CABLE GROUNDING KN (TYP. AT 3 LOCAPONS. TOP, BOTTOM, AND AT EQUIPMENT) INSTALL /2 GROUND, EA INSTALL (1) 1 1/4' HYBRID CABLE REVISIONS SLRANDED, INSULATED COPPER I I I CAINST RO O F`7 IKIM PND IMPORTANT, VELCRO STRAPS /6 INSULATED ONLY MAY BE USED ON FIBER. EXIST. 2001 WITH 2 HOLE LUG CABLE TIES OR TIE WRAP MAN BREAKER (MCB) MUST NOT BE USED ON FIBER INSTALL CABLE EXIST_ TOOA-2P BREAKER IN GROUNDING KN `X2 SOLID TINNED BCW COPPER E%IST. PPC, VERIFY BREAKER MISTING ANTENNA �6-//-/J REQUIREMENTS W/EQUIPMENT GROUND BAR (AGB) EXIST. FIBER MANUFACTURER AND SPRINT DISTRIBUTION PANEL EXIST. EQUIPMENT 1 01/29/14 ISSUED FOR CONSTRUCTIONEXIST. ELECTRICAL PANEL GROUND BAR IF B) EXIST. 0 01/27/14 hSUEO FOR RENEW EXIST. 20OA-2P MAIN EXIST. GROUND FIBER NRNISH AND INSIAII (2) 1.5' LIQUID MTE EXIST. IOM-2P MMBTS CIRCUIT BREAKER (MCB CONDUCTOR TO EXIST. ISR. BO CONDUIT FOR FIBER JUMPERS AND/OR W _ CIRCUIT BREAKER REV. B DATE DESCRIPTION TOWER GROUND RING CONDUCTORS. SUPPORT CONDUrt AT 29' O.C. AND AT VERTICAL-TO-HORIZONTAL BENDS. m&E n x& oL9DIEo ICO. Rrt OJE EXIST. SPRINT METER INSTALL LIE BBU IN EXIST. METER BANK INTERCONNECT CONDUITAC��aOWEMS AS 510"1 FROM POWER LOAD EXISTING SOURCE CENTER _EXIPSTING AC EOU PEMENT EXISTING I PREM CABINET EMU FROM TELCO EXISTING CABINET BS23XC362 J- DEMARCATION TELCO PANEL INSTALL RECTIFIER ret SOLID TINNED EASTERN BANK COPPER TO E%IST. dCOPPER EXIST- GROUNDRIGROUND RING NG E%IST. MASTER 217 ESSEX STASES GROUND BAR (MGB) SALEM,MA019M EXIST. GROUNDING CONNECTION Mglry THF e I ONHINE DIAGRAM& EXIST- BURIED PPC DETAILS GROUND RING TYPICAL POWER & GROUNDING ONE-LINE @ EXIST. PPC BREAKER PANEL E-1 SCALE:NTS E-1 Stec F.NTS E-1 PROTECTIVE GROUNDING SYSTEMS GENERAL NOTES: • 1. GROUNDING SHALL BE IN ACCORDANCE WITH NEC ARTICLE 13.EXOTHERMIC WELDING IS RECOMMENDED WHFOR GROUNDING `/print' 250-GROUNDING AND BONDING. CONNECTION ERE PRACTICAL OTHERWISE. THE CONNECTION C SHALL BE MADE USING COMPRESSION TYPE-2 HOLES. LONG VISION 2. GROUNDING SHALL BE IN ACCORDANCE WITH SPRINT SSED BARREL LUGS OR DOUBLE CRIMP 'C' CLAMP. THE COPPER DOCUMENTS 3.010.02.004 BONDING, GROUNDING AND TRANSIENT CABLES SHALL BE COATED WITH AN MTD-OXIDANT (THOMAS BETTS 1 INTERNATIONAL BLVD, SUITE 600 PROTECTION FOR CELL SITES'AND 3.018.10.002 'SITE KOPR-SHILD) BEFORE MAKING THE CRIMP CONNECTIONS THE RESISTANCE TO EARTH TESTING. CONTRACTOR SHALL FOLLOW MANUFACTURER'S RECOMMENDED MAHWAH. NJ 0749$ 3. PROTIDE GROUND CONNECTIONS FOR ALL METALLIC STRUCTURES, TORQUES ON THE BOLT ASSEMBLY TO SECURE CONNECTIONS. (201) 684-4000 ENCLOSURES, RACEWAYS AND OTHER CONDUCTNE ITEMS 14.AT ALL TERMINATIONS AT EQUIPMENT ENCLOSURES, PANEL, AND ASSOCIATED WITH THE INSTALLATION OF CARRIER'S EQUIPMENT. FRAMES OF EQUIPMENT AND WHERE EXPOSED FOR GROUNDING. CONDUCTOR TERMINATION SHALL IO PERFORMED UTILIZING TWO UNLESS NOTED OTHERWISE, RLL TRM 4. GROUND CONNECTIONS: CLEAN SURFACES THOROUGHLY BEFORE HCLE BOLTED TONGUE COMPRESSION ME LUGS WITH STAINLESS BONDING CONDUCTORS ARE 28 REPLYING GROUND LUGS OR CLAMPS. IF SURFACE IS COATED, STEEL SELF-TAPPING SCREWS. REMOVE THE COATING, APPLY A NON-CORROSIVEINETLU APPROVED SOLID TINNED BCW. COMPOUND TO CLEAN SURFACE AND M META LUGS HA CAPE 15.THE MASCO GROUND BAR (OOR) SHALL BE MAGE OF BNtE WHERE GOR TOUCH IS REMOVED FROM METAL R SHALL BE TINNED COPPER (FOR LARGE ER APPLICATIONS R SHALL BE PAINTED OR TOUCHED UP WITH 'CMVANO% OR EQUAL. TINNED COPPER) AND LARGE ENDUGH TO ACCOMMODATE THE EXISTING GROUND CONNECTION 16 CHESTNUT GREET, SUITE 220 5. ALL GROUNDING WIRES SHALL PROVIDE A STRAIGHT. DOWNWARD RECURRED NUMBER OF GROUND CONNECTIONS. THE HARDWARE FOXB774) 21, MA 02035 21 PATH TO GROUND WITH GRADUAL BENDS AS REQUIRED. GROUND SECURING THE MGB SHAH ELECTRICAL INSULATE THE MGB FROM EXISTING MASTER GROUND BAR (MOB) (774) 215-5421 WIRES SHALL NOT BE LOOPED OR SHARPLY BEM. ANY STRUCTURE TO WHICH R R FASTENED. WWW.UmCOm.Oom 6. P11 CLAMPS AND SUPPORTS USED TO SUPPORT THE GROUNDING 16.ALL BOLTS, WASHERS, AND NUTS USED ON GROUNDING EXISTING EQUIPMENT GROUND BAR (EGB) SYSTEM CONDUCTORS AND PJC CONCURS SHALL BE PVC TYPE CONNECTIONS SHALL BE STAINLESS STEEL. BBU EXPANSION (REFER TO RMI (NON CONDUCTIVE). DO NOT USE METAL BRACKETS OR SUPPORTS 17.ALL GROUNDING CONNECTIONS SHALL BE COATED WITH A COPPER EQUIPMENT REDS) 7 CHAPPELL WHICH WOULD FORM A COMPLETE RING AROUND PLAY GROUNDING SHIELD ANTI-CORROSIVE AGENT SUCH AS T&B KORB SHIELD. ISTING b2 STRANDED, CONDUCTOR. VERIFY PRODUCT WITH SPRINT CONSTRUCTION MANAGER. INSULATECOPPER NEED. ENGINEERING 7. ALL GROUND WIRES SHAUL BE A2 SOLID TINNED BCW UNLESS 18.TOR NEW OR REPAIRED GROUNDING EQUIPMENT. REFER MI ® ASSOCIATES,LLC NOTED OTHERWISE. SPRINT GROUNDING STANDARDS AND FOLLOWING (SUPPLEMENTS): -AND-THEFT UPDATE TO SPRINT GROUNDING DATED 08-24-12 (itVil Sftuclur8!,L81TC!SUrv'ByiRCf & PROVIDE DEDICATED B2 AWG COPPER GROUND WIRE FROM EACH -SPRINT ENGINEERING LETTER EL-0504 DATED 04-20-12 INSD11 INTERNAL GROUND KIT AND ANTENNA MOUNTING PIPE TO ASSOCIATED CIGBE. /6 INSULATED WITH 2-HOLE LUG 1 R.K. OST ROAD CENTRE 9. GROUND ANTENNA BASES, FRAMES. CABLE TACKS, AND OTHER EXISTING 201 BOSTON POG ROAD WEST, SURE 101 INSTALL HYBRIFLIX AND MARLBOROUGH, 044 01752 COPPER COMPONENTS WITH g2 INSULATED TINNED STRANDED CABLE GROUNDING KIT BBU EXISTING EQUIPMENT COPPER GROUNDING CONDUCTORS AND CONNECT TO INSULATED _ - dEEH GROUNDING BATE (ECB) (508) 481-7400 SURFACE MOUNTED RER'SGROUND BARS. CONNECTION DETAILS SHALL wwW.ChOpp61160gi0eeriny.tOm FOLLOW MANUFACTURER'S SPECIFICATIONS FOR GROUNDING. 1 INSTALL INTERNM GROUND KR AND EXISTING FIBER DISTRIBUTION 80X 10.EACH EQUIPMENT CABINET SHALL BE CONNECTED TO THE MASTER /6 INSULATED WITH 2-HOLE LUG ISOLATION GROUND BAR (NOB) WITH /2 SOLID TINNED BCW FURNISH AND INSTALL (2) 1.5' INSTALL HYBRIFLEX (FIBER ONLY) EQUIPMENT CABINETS WALL HAVE (2) CONNECTIONS. UOUID YTE CONDUIT FOR FIBER - AND CABLE GROUNDING KIT * JUMPERS AND DC CONDUCTORS, \�OF 11.GROUND HYBRIREX SHIELD AT TOP, BOTTOM AND AT TRANSITION SUPPORT CONDUR AT 24' O.L. AND _ _ TO HTBRIFLIX JUMPER CARIES AT EQUIPMENT CABINET ENTRANCE AT VERTICAL-TO-HORIZONTAL BENDS RM DA,I� USING MANUFACTURER'S GUIDELINES. WHEN HYBRIFLEX CABLE EXCEEDS 200'. GROUND AT INTERVALS NOT EXCEEDING 100'. 12.ME CONTRACTOR SHALL VERIFY THAT THE EXISTING GROUND FURNISH AND INSTALL (1) 1.5" UOUID BARS HAVE ENOUGH SPACE/HOLES FOR ADDITIONAL TWO HOLE WE CONDUIT FOR FIBER JUMPERS. --1 LUGS. SUPPORT CONDUIT AT 24' O.C.AND Go AT VERTICAL-TO-HORIZONTAL BENDS. 06 EXISTING BURIED GROUND RING ' OP HAT OR cRo uSION �G��`( (REFER TO RPN EQUIPMENT REDS) AL NOTE: HYBRIFLEX (FIBER & POWER) AMD ENGINEER/LAND SURVEYOR DATE HYBRIFLER (FIBER-ONLY SHOWN. REFER TO RAN EQUIPMENT REDS FOR SRS-SPECIFIC SLENPRIO. R ISA M TKH a AW FGR Axr RNTtEOH. UNMIS THEY MS ACING UZ.BE 61ELTION M A LIQD PROi®WVL p TIER, To IlWR THS omnwl. REVISIONS 2.5 RAN EQUIPMENT GROUNDING SCHEMATIC SCALE N.T.S. E-2 IIS AM FROM ANTENNAk 5 GROUND KIT LL 4 2 1 01/29/14 ISSUES FOR CONSTRUCTION ° 01/27/14 ISSUED FOR FDABN 3/4' 0 GROUND BM REV. B DATE DESCRIPTION 7/16' 0 0 ON WNL OR AR 2 0 ° 0 0 ON SMOKE HEAT SHRINK PER FRu1 xu [fN'®RY: M YUE 0 0 0 0 0 0 STS SPRINT SPECIFICATIONS 121&019 AS SHOWN 0 0 0 0 °(0 0 ° � auaro Nn m 3 00 �-0 PRaMtT gTmwlv1 0 ° O oQ o O oQ o 0 0 0 o O Qo BS23XC362 LEGEND O O EASTERN BANK 1- TINNED COPPER GRDUND BAR, 49!44'%20, NEWTON INSTRUMENT L0.GT. NO. 217 ESSEX STREET B-6142. HOLE CENTERS TO MATCH NEMA DOUBLE WG CONFIGURATION SALEM,MA 01970 2- WSUWTORS, NEWTON INSTRUMENT GT. LA0.3061-4 TWO HOLE LUG,TO BE USED WITH 3- 5/8'LOCKWASHERS,NEWTON INSTRUMENT CO.GT. W.3015-8 12 AWG BCM TO Ntuec nnF 1- WALL MOUNTING BRACKET, NEWTON INSTRUMENT CO.GAT LA0.A-6056 eUILDING OR RING GROUND GROUNDING DETAILS 5- 5/8-11 X 1"H.H.C.S.BOLTS,NEWTON WSIRIIMENT W.GT NO. 3012-1 $NOTES GROUND BAR 2 INSTALLATION OF GROUND WIRE TO GROUND BAR rT'� MMWW NABS' SCALE:N.T.S. E-2 SOLE NTS E-2 E-" S/lLe / 1 The Commonwealth of Massachusetts I Department of Public Safety �1 ( � Massachusetts State Building Code(780 CMR) L II Building Permit Application for any Building other than a One-or Two-Family Dwelling (This Section For Official Use Only) Building Permit Number: Date Applied: Building Official: SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is not available) 21�- 221 Lsssex S� �� SA L'l✓) 01170 No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2 PROPOSED WORK Edition of MA State Code used_ If New Construction check here❑or check all that apply in the two rows below Existing Building❑ Repair❑ 1 Alteration K I Addition❑ I Demolition ❑ (Please fill out and submit Appendix 1) Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No ❑ Is an Independent Structural Engineering Peer Review required? \\ Yes ❑ No IL Brief Description of Proposed Work: /NePLAce Mert o F C3J e7Cr $></ N9 fiV Ae 1VA.,4- lNi�"/1 ,Srm,Lad A. NA G4ce /)7 .- f of A RcAoi n F� _tiiz"Nr-,u Y!e SP6i i,✓f J�/2aC 1 e�tK�r u9 SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑ Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2❑ Nightclub ❑ A-3 ❑ A-4❑ A-5❑ 1 B: Business ❑ E: Educational ❑ F: Facto F-1 ❑ F2❑ I H: Hi h Hazard H-1❑ H-2❑ H-3 ❑ H-4❑ H-5❑ 1: Institutional 1-1 ❑ 1-2❑ I-3❑ I-4❑ M: Mercantile❑ R: Residential R-10 R-2❑ R-3❑ R4❑ S: Storage S-1❑ S-2❑ U: Utility❑ Special Use❑and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA ❑ IB ❑ IIA ❑ IIB ❑ HIA ❑ 111B ❑ IV ❑ VA ❑ VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal: Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licensed Disposal Site❑ Private❑ or indentify Zone: or on site system❑ required❑or trench or specify: permit is enclosed❑ Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable❑ Is Structure within airport approach area? Is their review completed? - or Consent to Build enclosed❑ Yes❑ or No❑ Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: -� &eemV )le �� ©) C"4 Co"s�lfi�t�� See le,4e2 crFAattica ;z SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner cn PARK To Wea5I V� LLe J� (/r/>t5/fiyy/0N s� �dj57`� 5ALeAi,A+ Name(Print) No.and Street City/Town Zip Property Owner Contact Information: W -7103 Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property o r hereby authorizes c.k4sa.� Fcele,�� e�t�uaK�,� w Po,-S-,-f' Name Stree Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) building is less than 35,000 cu.ft.of enclosed space and or not under Construction Control then check here❑and skip Section 10.1 10.1 Registered Professional Res onsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Ce#- teP- L.'Ne, Cornmva�'C-A,o+-s LZC Company Name R-kc_6. 6yrr;dge. C 5 a-7sls Name of Person Responsible for Construction License No. and Type if Applicable q6o Iurpo L<e- Sk Sv,�c�g CAr,.ozUtJ i 0202-1 Street Address City/Town State Zip 721-L3 1725- 6l7_ k59 P-Feeley e N6C LLB, COM Telephone No.(business) Telephone No. cell e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT M.G.L.c.152.§25C 6 A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes❑ No ❑ SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)_$151 Ud O 1.Building $ dl O Building Permit Fee=Total Construction Cast x_(Insert here 2.Electrical $ appropriate municipal factor)_$ 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee=$ (contact municipality) 5.Mechanical Other $ Enclose check payable to LP'tyOF 5t+LeAci 6.Total Cost $ O A (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. ?4AR@uG•Feae, _ /r. . -4,v i vzeo !� ,,i- � ZZS 52�f Please print and si name / t„�y )C t�„�{.. CoVjf Telephto ail Street Address City Town •0242 tate ip �1 =YvHn,S} � �iQeen,t��l�c ._ �{ Municipal Inspector to fill out this section upon application approval: Name Date PROPOSED MULTIMODAL ANTENNA HOTSWAP (1 PER SECTOR, TOTAL OF 3) EXISTING CLEAWIRE ANTENNA (1 PER SECTOR, TOTAL OF 3) 45't EXISTING PENTHOUSE EXISTING SKYLIGHT r - - -1 EXISTING ROOF PEAK I I I I I I EXISTING SKYLIGHT EXISTING ROOF L — — J ACCESS HATCH L - - J EXISTING PENTHOUSE EXISTING SPRINT EQUIPMENT AREA (APPROX. LOCATION IN BASEMENT) PROPOSED MULTIMODAL CABLE RUN PREPARED BY: Hudson REVISION OATS DRAWN BY Design GroupucOD V1 04/06/11 SF ROOF PLAN NX0o5G000MEe SCALE: N.T.S. BUXIING20NOMSUIITE2-101 ML: 078I557-5553 APPROX. N.ANWVER,MA61US FAX: p28I 3365586 TRUE NORTH Sprint NNISITE NO: BS23XC362 SITE TYPE: ROOFTOP To ft.H;m NBzr¢ SITE NAME EASTERN BANK nNrERNAnoNAB Bivo,score eoo ADDRESS: 217 ESSEX STREET SCALE: LE-1 MAxwnx.w0)°95 SALEM, MA 01970 DRAWN BY: SF N.T.S. PHONE I201168e 4M � i 16'-8"t 6'-1"t EXISTING POWER CABINET EXISTING TELCO n I CABINET ;n EXISTING CABINET PROPOSED RRU PROPOSED 3 iO UNIT LOCATION EQUIPMENT CABINET M EXISTING BATTERY CABINET EXISTING EQUIPMENT EXISTING MOD CELL CABINET EXISTING CLEARWIRE CABINET PREPARED BY: Hudsc)n±*D REMISION D&M DRAWN BY Design Group= � EQUIPMENT LAYOUT v' 04/06/11 SF 160JOS000DSTREEi if SCALE: N.T.S. 9UILNNGAN0RMSU9E2-101 TER (971I 557-55 APPROX. N,ME)OVER,MA 01W F": (97.) 5 5586 TRUE NORTH Sprin \ SITE NO: BS23XC362 t�i SITE TYPE: ROOFTOP TogetheFwlm NVML SITE NAME: EASTERN BANK I IMERNARONAL BtM,,SURE M ADDRESS: 217 ESSEX STREET LE-2 M WAN,N10I495 SALEM, MA 01970 SCALE: PHONE IMI I6 4=S DRAWN BY: SF N.T.S. PROPOSED MULTIMODAL ANTENNA HOT SWAP (1 PER SECTOR, TOTAL OF 3) EXISTING SKYLIGHT (TYP.) EXISTING PENTHOUSE (TYP.) � OF PROPOSED ANTENNA ELEV. 86'-0"t (AGL) i _ _ _ _ _ _ _ _ EXISTING ROOEiOP ELEV. 69'-61 (AGL) I I I I I PROPOSED MULTIMODAL EXISTING BUILDING CABLE RUN I I I I I I I i I GROUND LEVEL ELEV. 0'—C"± (AGL) I EXISTING SPRINT EQUIPMENT ROOM (APPROX. LOCATION IN BASEMENT) PREPARED BY: Hudson4 REVISION DAIE DRAWN Design Groupuc O V1 04/06/11 EF NORTH ELEVATION 16000SG000 STREET SCALE: N.T.S. BUIIDING MNORTH.SURE2-101 TEL: (978)5573553 R ANDOVER,MA818J5 FAX: (97813365W \ SITE NO: B823XC362 Spring% SITE NAME: SITE TYPE: ROOFTOP To thm Wo,NE%TEl EASTERN BANK I WIERNARONAL BLVD,SURE W ADDRESS: 217 ESSEX STREET SCALE: LE-3 MONE MlI 0I495 SALEM, MA 01970 DRAWN BY: 8F N.T.S. PRONE 131116&-�Tti PROPOSED MULTIMODAL ANTENNA HOTSWAP (1 PER SECTOR, TOTAL OF 3) EXISTING CLEAWIRE ANTENNA (1 PER SECTOR, TOTAL OF 3) 45't EXISTING PENTHOUSE EXISTING SKYLIGHT F- — — 1 EXISTING ROOF PEAK i I I I EXISTING SKYLIGHT 00 EXISTING ROOF —LJ— _ J ACCESS HATCH L EXISTING PENTHOUSE EXISTING SPRINT EQUIPMENT AREA (APPROX. LOCATION IN BASEMENT) PROPOSED MULTIMODAL CABLE RUN PREPARED 6Y: Hudson ID � DEL DRAWN BY Design Group= V1 04/06/71 SF ROOF PLAN 60005GOODMEE1 APPROX. SCALE: N.T.S. BUILDING 20 NONIH,BUOE 2-101 TEL: 1918j55J-5553 KANDOVER,MA01815 FAX: (978)n6-5586 TRUE NORTH Sprint'N SITE NO: BS23XC362 SITE TYPE: ROOFTOP Top,t!Iw NDRFt SITE NAME EASTERN BANK 11NrEBNAnoNAI BLVD.su1TE 800 ADDRESS: 217 ESSEX STREET SCALE: �_1 MANI N107495 SALEM, MA 01970 DRAWN BY: SF N.T.S. PHONE i201i 6844M EXISTING POWER CABINET EXISTING TELCO CABINET it) EXISTING CABINET m PROPOSED RRU PROPOSED 30"x30" EQUIPMENT CABINET UNIT LOCATION N] EXISTING BATTERY CABINET EXISTING EQUIPMENT EXISTING MOD CELL CABINET EXISTING CLEARWIRE CABINET PREPARED W: Hudson REVISION DLT.E DRAWN Design GroupucO EQUIPMENT LAYOUT �' D<iOsi„ SF I 0 OSGCODSTREET SCALE: N.T.S. SUIL]NG MNORM,SURE2101 TEL (978)557-555a APPROX. N,ANDOVER,wolw FAX: (9781 a3b5 TRUE NORTH Sprint/ SITE NO: BS23XC362 SITE TYPE: ROOFTOP TURemerwR NDM SITE NAME EASTERN BANK )WIERNA110NALBMSU9f" ADDRESS: 217 ESSEX STREET LE-2 m WAN,Na 07495 SALEM, MA 01970 SCALE: PHONE(WI)d8LJY1a DRAWN BY: SF N.T.S. I PROPOSED MULTIMODAL ANTENNA HOT SWAP (1 PER SECTOR, TOTAL OF 3) EXISTING SKYLIGHT (TYP.) EXISTING PENTHOUSE (TYP.) ZE OF PROPOSED ANTENNA ELEV. 86'-0"t (AGL) EXISTING ROOFTOP ELEV. 69'-6"T (AGL) I I I I I PROPOSED MULTIMODAL EXISTING BUILDING CABLE RUN I I I I I I I I I GROUND LEVEL ELEV. 0'—C"t (AGL) I I L — — EXISTING SPRINT EQUIPMENT ROOM (APPROX. LOCATION IN BASEMENT) PREPARED BY: Hudson REV SIGN PATE DRAWN BY Design CRmp.* V7 04/O6/11 SF NORTH ELEVATION l60DOSGOODSTREEI SCALE: N.T.S. BURDING20NOM,SUUEMl TEL: �998J559-5553 N.ANDOVER.MACHW FAX:(978)8 6-5586 Sprint��% SRE NO: B823XC362 SITE TYPE: ROOFTOP T getherMONEX1El SITE NAME EASTERN BANK i umExNArIONAi BLvD.SURE" ADDRESS: 217 ESSEX STREET SCALE: LE-3 MAHWAH,NJ 07495 SALEM, MA 01970 DRAWN BY: 8F N.T.S. PHONE 1201168A4228 PROPOSED MUL71MODAL ANTENNA HOTSWAP (1 PER SECTOR, TOTAL OF 3) EXISTING CLEAWIRE ANTENNA (1 PER SECTOR, TOTAL OF 3) 45't EXISTING PENTHOUSE EXISTING SKYLIGHT EXISTING ROOF PEAK I I I I i I I `O EXISTING SKYLIGHT � I I EXISTING ROOF L NEXISTING — J ACCESS HATCH L EXISTING PENTHOUSE SPRINT EQUIPMENT AREA (APPROX. LOCATION IN BASEMENT) PROPOSED MULTIMODAL CABLE RUN PREPARED BY: Hudson± REVISION DATE DRAWN BY Design Groupuc ± ROOF PLAN Y, D<iDB/" SF 10)MGOODSTRM ± SCALE: N.T.S. BUILDING M NORM,SU8E 2 101 TEL: 1978)557-5553 APPROX. N.ANDDVER,MA01845 FAX: (978)33 5586 TRUE NORTH S'ffE NO: BS23XC362 Sprint / SITE NAME: EASTERN BANK SITE TYPE: ROOFTOP To tMrw NEXIEL LE-1 I INTERNATIONAL BLVD,SURE M ADDRESS: 217 ESSEX STREET SCALE: m,ulwAe,wo9T95 SALEM, MA 01970 DRAWN BY: SF N.T.S. PRONE 1201i 60<a223 16'-8"t EXISTING POWER CABINET EXISTING TELCO I CABINET n EXISTING CABINET PROPOSED 3 PROPOSED RRU o UNIT LOCATION EQUIPMENT CABINET n EXISTING BATTERY CABINET EXISTING EQUIPMENT EXISTING MOD CELL CABINET EXISTING CLEARWIRE CABINET PREPARED BY: Hudson4 RATS DRAWN BY Design Groupuc EQUIPMENT LAYOUT v' 04iDsi„ SF 1600 osc000smEEr O SCALE: N.T.S. BUILOING 20 NORTN,SURE 2-101 TEL: 19)8155]-5553 APPROX. N,ANDOVER,MA 01845 FAX: (9)8)M"86 TRUE NORTH \ SITE NO: BS23XC362 Sprint SITE TYPE: ROOFTOP Ta flhE wI111NEXIEL SITE NAME: EASTERN BANK INTERNABONALBLVDrSUREB00 ADDRESS: 217 ESSEX STREET SCALE: LE-2 PHONE(201)681-1223 MAHWAH,NJ 0495 SALEM, MA 01970 DRAWN BY: SF N.T.S. PROPOSED MULTIMODAL ANTENNA HOT SWAP (1 PER SECTOR, TOTAL OF 3) EXISTING SKYLIGHT (TYP.) EXISTING PENTHOUSE (TYP.) (i OF PROPOSED ANTENNA ELEV. 86'-0"t (AGL) I _ _ _ _ _ _ _ EXISTING ROOFTOP ELEV. 69"-6"; (AGL) I I I I I PROPOSED MULTIMODAL EXISTING BUILDING CABLE RUN I I I I I I I I I GROUND LEVEL ELEV. 0'-0'"t (AGL) I I EXISTING SPRINT EQUIPMENT ROOM (APPROX. LOCATION IN BASEMENT) PREPARED 9Y: Hudson REVISION Dm DRAWN ITY Design Groupuc± Vt 04/06/11 SF 40 NORTH ELEVATION I G EEf l.DlNGMN0RT,50RE A101 TEL: (9781 557SR SCALE: N.T.S. RANDOVER,MA01845 FAR (9I8)3365586 SITE NO: B823XC362 Sprint SITE NAME: SITE TYPE: ROOFTOP YoReMa wIU NE%n1 EASTERN BANK WIERNAiIDNAI BlVD.3UREWD ADDRESS: 2n EssEx STREET scALE: LE-3 MONE(NJ) o4 SALEM, MA 01970 DRAWN BY: 8F N.T.S. PHONE(301i 68sa123 r � • � ,�_ —`• �, ' o "fit . �V, _ i �. �rf ^" •." v 3f �•-� '�4 � •• I .Y. A�� �,• "s` j Wil Lj SffE •: BS23XC362 SITE TYPE: ROOFTOP 1 WE "NAME: EASTERN BANK • I r - . 4: CONDMONS rt oco p i 4 J 4 e'lyr'AN ��'q� h' � � �• �• r 14 4 awl sa a x • �+..e-' R �� �^��l����„•`M,111 � i a` * �' R • • LOCAMON VIEW NOWHEAST FROM • DATE OF • • • ' SrM NO: • SFrE TYPE: ROOFTOP 1 SprintSffE NAME: EASTERN BANK / v1sm SALEM, MA 01970 PROPOSED" • • PROPOSED RELOCATE EXISTING PROPOSED PANEL ANTENNA MOUNTED TO CLEARWIRE PANEL ANTENNA PROPOSED PIPE MOUNTOF SECTOR, TOTAL OF .F�l 191, ROPOSED RRH TO BE MOUNTED TO BELOW ANTENNA (TYP. OF 3 PER 0 SECTOR, TOTAL OF 9) *t - 4 v V •� 'tip � ,+ �t w+~y"3'c/:,y j iry ';Rr t • � ♦ � n �'4+: i k.. _�-►rPf /- -yjT h� �� 1' .: I 1 EZ. " 1 -- � • • LOCAMON NORTHEASTVIEW - • • DATE OF PHOTO: 08/16/11 SrrE NO: o SITE TYPE: ROOFTOP SrM NAME: EASTERN BANK v1smSprint')f'> ADDRESS: �•. �• CONDITIONS 7-7 1- e 13 i • 7.. M n f 1 l 1n1 r L k" 4°4 if .. t • • LOCATION SOUTHWESTVIEW ' • DATE OF • • 0' PROPOSED CONDITIONS PROPOSED PANEL ANTENNA MOUNTED TO PROPOSED PIPE MOUNT (TYP. OF 2 PER SECTOR, TOTAL OF 6) PROPOSED RELOCATE EXISTING CLEARWIRE PANEL ANTENNA PROPOSED RRH TO BE MOUNTED TO BELOW ANTENNA (TYP. OF 3 PER SECTOR, TOTAL OF 9) • rJ ti•i�,• 1 � MS • e> .y I y 1 I isle . PHOTO LOCATION # 2 VIEW SOUTHWEST FROM ESSEX ST. DATE OF PHOTO: 08/16/it SITE NO- BS23XC362 j SITE TYPE: ROOFTOP DATE: S 23/11 SITE NAME: EASTERN BANK P vI sm ADDRESS: NERMMWAHL BLVD.SU E8W 217 ESSEX STREET MANWAq.NJWl9s DRAWN BY: DB SCALE: NTS SALEM, MA 01970 he(ml)aeR 3