Loading...
CONSTRUCTION OBSERVATION PITMAN & WARDLEY ir _ hit .�rtur: c '2 11 ?? ( hunch tiurcl . lalrm. MA . 97X.7 74.89X2 CONSTRUCTION OBSERVATION#4 August 10,2018 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: RCG 120 Washington Street Re: Construction Observation Dear Tom, The following observations are based on a periotic site visits by Michel Beheshti,of my staff. Observation: • All demolition in general is complete. • The steel stair that is scheduled to be removed is complete at levels 3 &4,the new steel column is in place. • 2nd floor in elevated corridor connector,the ramp/slope(access to new deck)is done.It needs finish flooring. All windows on 3rd and 40'floors are installed. • The lintels for existing filled masonry windows and other windows are installed. • The existing 31d floor north skylight in the old meeting room has been removed,roof infill framing is complete,roof insulation is done. • 31 floor north shower/tubs as well as toilet drains are installed • Third floor membrane roofing is in place,roof edge is not done yet. • The 31 floor stud wall framing is complete and demising walls are placed with insulation. • 31 floor north the insulation is signed off and complete. • 31 floor north sheet rocks are being installed,ceiling framing is done. • The 31d floor south wall framings are mostly done. • 3rd floor south ceiling insulation is complete and G.W.B. ceiling is installed. • The 41 floor interior stud walls are not started yet,exterior furring studs and insulation are done. • The 41h floor roof insulation is about 50%done. Recommendations or Actions: 1-The Structural Engineer will be submitting independent reports. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. SEE)A,9C Respectfu / 5 tii��n� �No 8749 Peter F. Pitman,Architect BOSTT01 Massachusetts Registration No.8749 MA �NOFMR