CONSTRUCTION OBSERVATION PITMAN & WARDLEY
ir _ hit .�rtur: c
'2 11
?? ( hunch tiurcl . lalrm. MA . 97X.7 74.89X2
CONSTRUCTION OBSERVATION#4
August 10,2018
Tom St.Pierre
Inspectional Services Director
City of Salem Inspectional Services
Salem,Massachusetts 01970
Project: RCG 120 Washington Street
Re: Construction Observation
Dear Tom,
The following observations are based on a periotic site visits by Michel Beheshti,of my staff.
Observation:
• All demolition in general is complete.
• The steel stair that is scheduled to be removed is complete at levels 3 &4,the new steel column is in
place.
• 2nd floor in elevated corridor connector,the ramp/slope(access to new deck)is done.It needs finish
flooring.
All windows on 3rd and 40'floors are installed.
• The lintels for existing filled masonry windows and other windows are installed.
• The existing 31d floor north skylight in the old meeting room has been removed,roof infill framing is
complete,roof insulation is done.
• 31 floor north shower/tubs as well as toilet drains are installed
• Third floor membrane roofing is in place,roof edge is not done yet.
• The 31 floor stud wall framing is complete and demising walls are placed with insulation.
• 31 floor north the insulation is signed off and complete.
• 31 floor north sheet rocks are being installed,ceiling framing is done.
• The 31d floor south wall framings are mostly done.
• 3rd floor south ceiling insulation is complete and G.W.B. ceiling is installed.
• The 41 floor interior stud walls are not started yet,exterior furring studs and insulation are done.
• The 41h floor roof insulation is about 50%done.
Recommendations or Actions:
1-The Structural Engineer will be submitting independent reports.
Please do not hesitate to be in touch with this office should you have any further questions and or concerns.
SEE)A,9C
Respectfu / 5 tii��n�
�No 8749
Peter F. Pitman,Architect BOSTT01
Massachusetts Registration No.8749 MA
�NOFMR