Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
118 WASHINGTON STREET - PROPERTY CARD
DA('T�OF.PERMIT I PERMIT No. OWNER LOCATION 7/8/4''7 I ��410 Naumkeag Amusement "�"� (Sears Roebuck Co. `118'Washington�Street STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No.OF FAMILIES( WARD COST "CROSS RE ERENCE 120 Washington St.,1r�-- 2 .J BUILDER I Pocket 10, Folder l 1/20/71 113 y Bui�4er stgi�wgnd entracne;stairway will service the basement first floor Ian ing an n floor 1/9/79 #12 Remove existing (3) partitions,construct office partitions, new vestibule, stair egress, suspended ceiling. 3/23/79 #69 (Owner-Mr.Lappin) Class A Roofing,tar and gravel. BOARD OF APPEAL: 5/21/86 - GRANTED - Variances to allow 75 condominium units, 12,000 sq. ft. office space. 90 underground parking spaces to be maintained. VARIANCE NOT ACTED ON Uh� u1uC<� wG 4 7z--) UW 8/"22/89,1142"4-89 DEMOLISH BUILDING ONLY,COST $2,000. ' fee $61 .25 k/a"4fBarton " Sq: - 1/ . nU42 1.%$%90 #890 11$--l3$ b5z5hi_ngtd'n St. Tnt2YioY DP�litioi] dhj-y-walls; StAii�ay; I 0 elevator shift, center chimney & existing storefronts J.S. Est. 1,500. fee $53 4/3/90 #126-P0 Steel erection o- fir-* floor only. J.S. Est. 15,000. .fee $95. (118 Washington St. ) 6/12/90 #313-90 Completion of structural sttel work, reinstallation of existing wood frame windows. ( =- h.) . 118-128 Washington St. J.S. Est. 25,000 fee $155. 10/24/91 #489-91 REMOVING FLOOR TO MAKE ONE LEVEL, REMODEL FOR BAKE SHOP, COST $26,000.00 Fee $161.00 (OWNER - AUTUMN REALTY) ++++ ..;..........111 1r ....D,H, 11/25/91 #534-91 EXTERIOR RENOVATIONS, WALL ELEVATIONS ON LAPPIN PARK;# COST $25,000. Fee $155.00 (OWNER AUTUMN REALTY - 407 Mystic Ave.,Medford,MA.) D.H. 12/26/91, #489-91_CERTIFICATE OF OCCUPANCY FOR BAKERY ISSUED BY DAVID_HARRIs 1/14/92 . ,#17-92 INTERIOR DEMOLITION & FRAMING ONLY, COST $24, 000 . fee $149 . D.`11/15/92 #20-92 RENOVATING PART OF THIRD FLOOR FOR LAW OFFICE (PLUNKET & PLUNKET) COST$21;000, fee $131.00 (CONTRACTOR - LAWLOR CORP.) ------------------------D-H. i 2"/_26/926/92 #-2-0-92� . CERTIFICATE OF OCCUPANCY_ISSUED-BY-DAVID-HARRIS 6/11/92. #�5 9gaCONSTRUCT FIRST FLOOR FOR RESTAURANT, COST $90,000. Pee $545.00 d.h. 7/13/92 32 RE2�IODEL FOR SUB SANDWICH SHOP, COST $61,000. fee $37]..00 D.H. 30,6 -9 17/13/92 0"642 RENOVATE FOR-LAW-OFFICES,-COST $18,_000...rfee=$113.. D.H. 71/25/92`#304=92 CERT�IIFCATE OF OCCUPANCYISSUED BY.MAURICE_M.-MARTI_.�N_F_,AU "5%4%9:K#25642 2 CERTIFICATE OF OCCUPANCY ISSUM-BYTLEO'E'-TREMBLAY' Y