Contract-_39_Warren_St_Fri_May_13_2022_09-59-20 INVOICE #9166805
INVOICE DATE May 04, 2022
RBDUE upon receipt
R O D F I N G Co DEPOSIT DUE $4,012•80
SINCE -1 984
RB Farina Roofing & Construction
Bill Healy CONTACT US
39 Warren St 1319 Massachusetts Avenue
Salem, MA 01970 Arlington, MA 02476
(978) 317-5843 (781) 648-5446
billmhealy@gmail.com info@farinaroof.com
INVOICE
As low as$257.77/mo* QUALIFY NOW
Pay over time with Wisetack
Services qty unit price amount
Roof Replacement- EPDM Membrane 1.0 $6,700.00 $6,700.00
We hereby propose to furnish materials and labor for the completion of 3 square(s) of new 60 mil
EPDM Membrane installation on the lower roof on the back of the house. Indicated on the photos
of company Cam
• Remove and dispose of the existing roof membrane;
• Inspect and clean the roof deck surface prior to installation;
• Install new wood board all around the eaves/edge, as necessary,to attach the new 3" copper drip
edge drip edge, and install new copper wall flashing and new copper cap on the door sill
• Install new 1/2" high density Polyiso insulation;
•Mechanically attached insu)ation with fastener plates to ho)d the insulation in place,
• Install new 60 mil EPDM membrane in accordance with manufacturer specification;
• Use a "T"joint cover to overlay all the joints and seams;
• Apply Elastoform flashing on vertical seams as required at angle change of walls, and etc. or to
flash inside/outside corners and other unusually shaped penetrations;
• Flash all roof penetrations in accordance with manufacturer specification;
• Install new .032 aluminum edge flashing at eaves/edges.
• Complete clean-up and removal of all related debris from the project area.
is going to start. If RB Farina Roofing has made purchases for the project,the customer agrees to
pay 80% of the total amount that RB Farina Roofing had paid in all purchases for the project. The
payment is due immediately upon RB Farina Roofing sending the receipts for such purchases.
* If RB Farina Roofing decides to terminate this contract a written notice will be sent to the
customer informing the reason for the breach. Purchasing material, Permit fees will not be
refunded, they will be deducted from the amount already paid and the remaining amount will be
refunded.
* The customer understands and accepts that the work starts anywhere from two to six weeks
after the contract is signed (approved by hitting the green button on the button of the estimate
and a downpayment is provided.
* The customer understands and accepts that if the temperature is too high or too low it would
risk RB Farina Roofing Employees' health and/or safety and given that the job will be rescheduled.
*The customer is agreed to provide electrical power if needed at the time of the work and has the
responsibility to get in touch with the electrical company in order to ensure the wires are wrapped
and will not represent a risk for the employees working at the property
*Any other reason to terminate this contract can be negotiated between the parties.
Gutters-Seamless Aluminium Gutter 1.0 $2,770.00 $2,770.00
Remove existing gutter
Install linear 75 feet of new 5" Seamless Aluminium Gutter (K-Style-.032 gauge) I Color: White
Install Gutter hangers every 16"
Install new downspouts
Install new gutters accessories: end caps,drop outlets,corners, elbows, and straps.
Existing gutter color: brown
This estimate expires 30 days after it was issued.
Carpentry(Trim work) 1.0 $2,690.00 $2,690.00
Strip the existing fascia board and replace it with new WindsorOne 1"x10"x12'
Strip the existing soffit board on the same area to cover hole left by the downspout about 12
On the right side of the house on the back
This estimate expires 30 days after it was issued.
Total $12,160.00
u �
Deposit $4,012.80
* Please, refer to the invoice number attached when filling out the memo section of the check.
*Check(s) should be made payable to RB Farina Roofing and mailed to 1319 Massachusetts Avenue
Arlington, MA 02476
Office Business Hours: Monday to Friday-from 8 am to 4 pm
Thank you for your business.
But-
RB Farina Roofing&Construction http://www.farinaroof.com
In a minority of our roofing projects, damaged sheathing may be identified during the installation
process once the existing roof is removed. When this is the case, additional charges for sheathing
replacement will apply at a rate of $135.00 per sheet (plywood) or $5,50 per linear foot if it is a
wood board.
ATTENTION:
- Dirt and debris will be going into the attic. Precautions such as covering valuables with plastic
sheeting are highly recommended.
-Shrubs and landscaping near the roofline will be protected with a tarp as needed.
- RB Farina Roofing is not responsible for any kind of damage over rotten/damaged siding during
the process of flashing replacement.
- Permit fees are included in this estimate, in case the job requires it.
- In order to be granted a Permit to do the job,the customer authorizes RB Farina Roofing to act on
his/her behalf by printing/signing the customer's name in all documents necessary for the
submission of an application along with the Buiding Department and/or City Hall.
- It is the customer's responsibility to request the Electric Utility Company protect the wires before
RB Farina Roofing starts the work.
-This estimate expires 30 days after it was issued.
WARRANTY
All installations performed by R.B. Farina Roofing Company are guaranteed, from the date of job
completion,for 15 years on all the workmanship.
PAYMENT TERMS
Down Payment of 33%- Due at contract signing. (For permitting process)
2nd Payment of 33%- Due at the start of the project. (Beginning of project)
Final Payment of 34%- Due at the completion of the project. (Final walkthrough)
Considerations:
It is at the discretion of RB Farina Roofing to request the Permit before receiving the
downpayment. However, if the customer requests the cancellation of this contract after a Permit
submission has been made along with the Building Department, the customer agrees to pay all
fees already paid by RB Farina.
If the down payment has already been made, the amount will be deducted from the refund. If RB
Farina Roofing has not yet received a down payment, an invoice will be issued to the customer
with the amount of the fees.
The client agrees that if payment is not made according to the above plan, Farina has the right to
stop all work until such payments have been brought current
RB Farina Roofing may terminate or suspend this contract if the customer did not act accordingly
to this agreement when it comes to:
* Have the payments made according to the terms in this agreement;
* If the customer postponed the work for more than 6 months after RB Farina Roofing had gotten
a Permit. In this case, if RB Farina Roofing, for its own discretion, decides to reconsider moving on
with the project, a new Permit application will be needed and a $150.00 fee for the new
application plus the fee RB Farina Roofing will have to pay to the Building Department in order to
submit a new application,will be automatically applied to the customer invoice.
* If the customer decides to terminate this contract, RB Farina Roofing needs to receive a written
notice from the customer who is named in the contract at least 72 business hours before the job