Loading...
44 Chestnut Street - DRAFT - CofNA - in-kind repairs REVISED Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 CERTIFICATE OF NON-APPLICABILITY – Continuation of Certificate originally issued July 22, 2021 It is hereby certified that the Salem Historical Commission has determined that the proposed:  Construction  Moving ✓ Reconstruction  Alteration  Demolition ✓ Painting  Signage  Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 44 Chestnut Street Name of Record Owner: Jeffrey Casiglia Description of Work Proposed: Maintenance of outside structures • In-kind repairs and/or replacement of exterior siding (flushboard and clapboard), trim and roofing as needed. Repaint in-kind. All work to replicate existing materials, dimensions, design, location, color, and outward appearance (see attached photographs of existing conditions). *NOTE: Historic materials and details to be retained and repaired except where material is not salvageable and must be replaced. If replacement is necessary, new elements must replicate existing details, dimensions, and materials. Should any changes to materials, design, dimensions or outward appearance be determined necessary, Applicant must submit a new application for review. Non-applicable due to being in-kind repair/replacement and painting. Upon completion of above work, please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans. Dated: April 27, 2022 SALEM HISTORICAL COMMISSION: By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work.