39 Washington Square North - CofNA - repointing
Salem Historical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685 FAX (978) 740-0404
CERTIFICATE OF NON-APPLICABILITY – MASONRY REPOINTING
It is hereby certified that the Salem Historical Commission has determined that the proposed:
Construction Moving
✓ Reconstruction Alteration
Demolition Painting
Signage Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or
limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: Washington Square
Address of Property: 39 Washington Square North
Name of Record Owner: Sarah Herr
Description of Work Proposed:
▪ Repoint masonry building. Remove existing mortar to a minimum depth of 2 to 2½ width of joint to ensure adequate
bond. Mortar should be removed by hand or with small pneumatically-powered chisels to avoid damage to masonry.
Mechanical tools shall not be used on vertical joints.
▪ Mortar should match the following:
☒ Type N (1 part cement/1 part lime/6 parts sand) for hard-cored brick and most exterior above-grade walls
exposed to severe weather including chimneys.
▪ Mortar to match existing color, grain size, texture, and tooling/pointing style.
▪ Cleaning of masonry surfaces to be by gentlest means possible, such as washing with lower pressure water and soft
natural bristle brushes. High pressure washing and sandblasting is not allowed.
▪ Waterproof coatings and sealants should be avoided.
☒ Mason to provide test sample of mortar application before commencing project
There will be no changes in color, material, design, location or outward appearance. Non-applicable due to being in-
kind repair. Upon completion of above work, please notify Historical Commission staff as final sign-off is
required to document compliance with this Certificate and approved plans.
Dated: March 28, 2022 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All
work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Building s
(or any other necessary permits or approvals) prior to commencing work.