32 Clifton Street - Final Construction Control Final Construction Control Document
�r
To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:Forest River Park Recreation&Nature Center Date:December 10, 2021 Permit No.B-20-1526
Property Address:32 Clifton Street,Salem,MA
Project: Check(x) one or both as applicable: X New construction X Existing Construction
Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,
related site and utility work.
I Thomas A. Scarlatam MA Registration Number: 6632 Expiration date: August 31,2022,am a registered
design professional,and I have prepared or directly supervised the preparation of all design plans,computations
and specifications concerning:
X Architectural Structural Mechanical
Fire Protection Electrical Other: Describe
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding th isions of 780 CMR 107.
Enter in the space to the right a "wet' or
electronic signature and seal:
1b.l69R
�Or10N
IM
Phone number:617456-2222 Email:tscarlata@bhplus.com
Building Official Use Only
Building Official Name: Permit No.: Date: UU7r
Version Ol 01 2018
Final Construction Control Document
x�
To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:Forest River Park Recreation&Nature Center Date:December 10,2021 Permit No.B-20-1526
Property Address:32 Clifton Street,Salem, MA
Project: Check(x) one or both as applicable: X New construction X Existing Construction
Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site
and utility work.
I,Benjamin M. Kelchlin,MA Registration Number:55010,Expiration date:June 30,2022,am a registered design
professional,and I have prepared or directly supervised the preparation of all design plans,computations and specifications
concerning:
Architectural Structural Mechanical
Fire Protection X Electrical Other.Describe
for the above named project. I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded
in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that
I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility OF
Af1
regarding the provisions of 780 CMR 107. 4
. m
Enter in the space to the right a"wet' or
electronic signature and seal: .55oto
NORIAN/SIANI ENGINEERING,INC. FoiSTEa��
Aorta.
Phone number: (781) 398-2250 Email: BenK@NS-Engineering.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018
Final Construction Control Document
To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:Forest River Park Recreation&Nature Center Date:December 10,2021 Permit No.B-20-1526
Property Address:32 Clifton Street,Salem,MA
Project: Check(x)one or both as applicable: X New construction X Existing Construction
Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,
related site and utility work.
I,Anthony Donato MA Registration Number:40706 Expiration date:06/2022 am a registered design
professional,and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
Architectural Structural Mechanical
Fire Protection Electrical Other:X Civil
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet' or tN
electronic signature and seal:
ANTFpM,
�ft7pp a�
Phone number:617-357-81445 Email:Adonato@hancockassociates.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018
Final Construction Control Document
�r
To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:Forest River Park Recreation&Nature Center Date: December 10,2021 Permit No.B-20-1526
Property Address:32 Clifton Street,Salem,MA
Project: Check(x)one or both as applicable: X New construction X Existing Construction
Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site
and utility work.
I,Benjamin M. Kelchlin,MA Registration Number:55010,Expiration date:June 30,2022,am a registered design
professional,and I have prepared or directly supervised the preparation of all design plans,computations and specifications
concerning:
Architectural Structural X Mechanical
Fire Protection Electrical Other.Describe
for the above named project.I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded
in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that
I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have perforated the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility Ott+of eyts.
regarding the provisions of 780 CMR 107. °s
m
Enter in the space to the right a"wet" or
electronic signature and seal: .550to
NORIAN/SIANI ENGINEERING,INC. Fo/STEa�O
�roNnt.
Phone number: (781) 398-2250 Email: BenK@NS-Engineering.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018
x�
Final Construction Control Document
= To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CAM, Section 107
Project Title:Forest River Park Recreation&Nature Center Date: December 10,2021 Permit No.B-20-1526
Property Address:32 Clifton Street,Salem, MA
Project: Check(x) one or both as applicable: X New construction X Existing Construction
Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site
and utility work.
I,Benjamin M.Kelchlin,MA Registration Number:55010,Expiration date:June 30,2022,am a registered design
professional,and I have prepared or directly supervised the preparation of all design plans,computations and specifications
concerning:
Architectural Structural Mechanical
Fire Protection Electrical X Other.Plumbing
for the above named project.1,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded
in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that
I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility Loyt14 of kq
regarding the provisions of 780 CMR 107. s�
Enter in the space to the right a"wet' or
electronic signature and seal: .55010
NORIAN/SIANI ENGINEERING,INC. /STEa�O
Ssronra
Phone number: (781) 398-2250 Email: BenK@NS-Engineering.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018