42 Broad Street Unit 2 - Certificate of Appropriateness - replace windows
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
✓ Construction Moving
Reconstruction Alteration
Demolition ✓ Painting
Signage Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire District
Address of Property: 42 Broad Street Unit 2
Name of Record Owner: Wolfgang Koch
Description of Approval of Work:
Replace existing first story windows on west elevation in unit 2 with new Harvey Majesty aluminum clad SDL windows to
match existing window configurations with the following conditions:
▪ Exterior of windows to be brush painted in white to match existing trim color;
▪ All trim at brick molding to be preserved intact;
▪ Any gaps at muntins to be filled and painted;
▪ Windows to be installed per attached drawing detail.
▪ Replace existing casement window and slider door on first floor of rear elevation per application (work not
visible from a public way).
NOTE: Previously approved window replacement in this unit has not complied with conditions set forth in Certificate
of Appropriateness issued in 2019. All windows, including both previously replaced and new replacements, must be
brush painted white to match existing trim color within 6 months of this certificate. If this work is not completed, the
project will be deemed in violation and Commission will commence violation proceedings.
Upon completion of work, please notify Historical Commission staff as final sign-off is required to
document compliance with this Certificate.
Dated: March 8, 2022 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.