Loading...
Derby Square, 10-window replacement2/23/22, 3:50 PM OpenGov https://salemma.viewpointcloud.io/#/explore/records/295378/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011778%2…1/4 02/23/2022 City of Salem, MA SRA-21-24 SRA-Urban Renewal Area - Small Project Review Additional Applicant Info Project Information Status: Complete Date Created: Oct 15, 2021 Applicant Samuel Clement samuel@jonesarch.com 10 Derby Square Suite 3 Salem, Massachusetts 01970 9787445200 Location 5 HIGGINSON SQUARE Unit US3 Unit US3 SALEM, MA 01970 Owner: HIGGINSON BLOCK TRUST, LLC 10 DERBY SQUARE UNIT S3 SALEM, MA 01970 Owner Higginson Block Trust LLC Who is the point of contact for this application? Samuel Clement, Jones Architecture Owner Email Address rick@jonesarch.com Owner Phone Number 9787445200 Project Name/Title 10 Derby Square Window Replacement Project Description Window Replacement Project for Unit 3 South of 10 Derby Square Existing Structure's Square Footage 2,400 Proposed Structure's Square Footage 2,400 Estimated time schedule for completing project 2/23/22, 3:50 PM OpenGov https://salemma.viewpointcloud.io/#/explore/records/295378/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011778%2…2/4 Signature DRB Recommendation Spring 2022 Does your project propose a change to the building's facade?  The City of Salem encourages the inclusion of Public Art in project proposals. Public Art proposals must be presented to the Public Art Commission for consideration as part of this application's formal approval process. Public Art is loosely defined as any artistic installation on the grounds or exterior spaces of the property. Will your project include a proposal for Public Art? No Do you have a plan in place for Public Art at this location? No If you would like assistance or suggestion for developing public art for this location please contact Julie Barry, Senior Planner of Arts and Culture Planning Email Julie (mailto:jbarry@salem.com?Subject=Contact regarding Public Art) Digital Signature Samuel Clement 10/15/2021 DRB Meeting Date 10/27/2021 DRB members not in attendance David Jaquith, Marc Perras DRB members in Attendance Paul Durand, Glenn Kennedy, Catherine Miller, Helen Sides, J. Michael Sullivan DRB Decision To recommend approval of the project as presented. 2/23/22, 3:50 PM OpenGov https://salemma.viewpointcloud.io/#/explore/records/295378/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011778%2…3/4 SRA Decision Entry Section Referenced Plans and Documents Application Presentation titled, "10 Derby Square Window Replacement" created by Jones Architecture, 10 Derby Square, Salem, MA, submitted on 10/25/21. Conditions of Approval Findings: DRB Findings Entry The Board found the project as presented to be an appropriate way to maintain the building without negatively impacting its architecture and integrity. This application seems to be the first for window replacements on the structure and can serve as a guide for future window replacement applications at 10 Derby Square. The Board found that the replacement window is appropriate for the building. The window will be aluminum clad with wood interior, double hung with identical light patterns as currently exist. The window will be simulated divided light with exterior mullions and will be inserted into the existing wood trim. The replacement windows will blend with the existing windows on this historic façade. SRA Meeting Date 11/10/2021 SRA Members Present Grace Napolitano, David Guarino, Cynthia Nina- Soto, Dean Rubin SRA Members Absent Russ Vickers SRA Decision To approve the project as presented and conditioned herein. SRA - Referenced Plans and Documents Application Presentation titled, "10 Derby Square Window Replacement" created by Jones Architecture, 10 Derby Square, Salem, MA, submitted on 10/25/21. Conditions of Approval SRA - Open section for Conditions entry Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use and/or construction has not commenced except for good cause within this two-year period. Findings: 2/23/22, 3:50 PM OpenGov https://salemma.viewpointcloud.io/#/explore/records/295378/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011778%2…4/4 SRA - Findings Open Entry The Authority found the project as presented acceptable. Restoration of older wood windows is preferred, though replacement windows are evaluated on a case-by-case basis. The Authority approves of the proposed replacements, which are aluminum clad with wood interior, double hung with identical light patterns as currently exist. The window will be simulated divided light with exterior mullions and will be inserted into the existing wood trim. The Authority acknowledges that the replacement windows will have different dimensions with a smaller glass area than the others on the building; the visual impact of the smaller window is decreased due to the third floor location of the project. If these windows were proposed for the lower levels of the building, the Authority would look for either restoration of the windows or a different replacement that dimensionally matches the existing windows. CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 05 1 EXISTING -EAST ELEVATION SCALE:1/8" = 1'-0"MR 05 2 PROPOSED -EAST ELEVATION CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 06 1 EXISTING -SOUTH ELEVATION SCALE:1/8" = 1'-0"MR 06 2 PROPOSED -SOUTH ELEVATION CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 07 1 EXISTING -WEST ELEVATION SCALE:1/8" = 1'-0"MR 07 2 PROPOSED -WEST ELEVATION 10 Derby Square Window Replacement CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SITE PLAN CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 05 1 EXISTING -EAST ELEVATION SCALE:1/8" = 1'-0"MR 05 2 PROPOSED -EAST ELEVATION CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 06 1 EXISTING -SOUTH ELEVATION SCALE:1/8" = 1'-0"MR 06 2 PROPOSED -SOUTH ELEVATION CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:1/8" = 1'-0"MR 07 1 EXISTING -WEST ELEVATION SCALE:1/8" = 1'-0"MR 07 2 PROPOSED -WEST ELEVATION CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE EXISTING WINDOW PROPOSED WINDOW CLIENT NAMEPROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE 1 3/4"2"1 7/8"5/8"3 1/2"1 3/4"7/8"5 1/8"1 1/4" 1 1/2" 3/4" 1" EXTERIOR INTERIOR NEW WINDOW BASIS OF DESIGN: MARVIN DOUBLE HUNG INSERT G2 EXISTING WOOD SUB-FRAME TO REMAIN. COVER WITH NEW ALUMINUM. COLOR TO MATCH EXISTING EXISTING WOOD SUB-FRAME TO REMAIN. REPAINT 15 5/8"4"6 1/8"1 3/4"7/8"5 1/8"1 1/4" CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SCALE:3" = 1'-0"MR 09 1 NEW WINDOW DETAIL @ JAMB CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE SITE PLAN 10 Derby Square Window Replacement CLIENT NAME PROJECT NAME 10 DERBY SQUARE WINDOW REPLACEMENTJONES ARCHITECTURE 10/28/21, 11:39 AM 1/2 Design Review Board Recommendation Small Project Review - SRA-21-24 Address of Project: 5 HIGGINSON SQUARE Meeting Date:October 27, 2021 Members Present:Paul Durand, Glenn Kennedy, Catherine Miller, Helen Sides, J. Michael Sullivan Members Absent:David Jaquith, Marc Perras Decision:To recommend approval of the project as presented. Referenced Plans and Documents: - Application Presentation titled, "10 Derby Square Window Replacement" created by Jones Architecture, 10 Derby Square, Salem, MA, submitted on 10/25/21. Conditions of Approval: - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the DRB to review proposed modifications prior to making any changes in the field. - Findings: - The Board found the project as presented to be an appropriate way to maintain the building without negatively impacting its architecture and integrity. This application seems to be the first for window replacements on the structure and can serve as a guide for future window replacement applications at 10 Derby Square. 10/28/21, 11:39 AM 2/2 The Board found that the replacement window is appropriate for the building. The window will be aluminum clad with wood interior, double hung with identical light patterns as currently exist. The window will be simulated divided light with exterior mullions and will be inserted into the existing wood trim. The replacement windows will blend with the existing windows on this historic façade. Signature of the DRB: By the signature below, I certify that this recommendation accurately reflects the actions of the Design Review Board. Paul Durand, Chair Date Signed: October 22, 2021 2/23/22, 3:49 PM 1/1 Decision Small Project Review - SRA-21-24 Address of Project: 5 HIGGINSON SQUARE Meeting Date:November 10, 2021 Members Present:Grace Napolitano, David Guarino, Cynthia Nina-Soto, Dean Rubin Members Absent:Russ Vickers Decision:To approve the project as presented and conditioned herein. Referenced Plans and Documents: - Application Presentation titled, "10 Derby Square Window Replacement" created by Jones Architecture, 10 Derby Square, Salem, MA, submitted on 10/25/21. Conditions of Approval: - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the SRA to review proposed modifications prior to making any changes in the field. - Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use and/or construction has not commenced except for good cause within this two-year period. Findings: - The Authority found the project as presented acceptable. Restoration of older wood windows is preferred, though replacement windows are evaluated on a case-by-case basis. The Authority approves of the proposed replacements, which are aluminum clad with wood interior, double hung with identical light patterns as currently exist. The window will be simulated divided light with exterior mullions and will be inserted into the existing wood trim. The Authority acknowledges that the replacement windows will have different dimensions with a smaller glass area than the others on the building; the visual impact of the smaller window is decreased due to the third floor location of the project. If these windows were proposed for the lower levels of the building, the Authority would look for either restoration of the windows or a different replacement that dimensionally matches the existing windows. Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of the Salem Redevelopment Authority Board. Tom Daniel, AICP, Executive Director Date Signed: October 22, 2021 SRA-21-24