Loading...
45 TRADERS WAY BLDG 20 - AFFIDAVITS Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional e for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: October 18,2021 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories,23 units, slab-on-grade foundation,wood-framed, light-commercial construction I, Robert A. Schaefer MA Registration Number: 10791 Expiration date:08/3 1/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other:Describe for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 1.07. S.��AEDARCy Digitally signed Enter in the space to the right a"wet"or d' ti SC E, electronic signature and seal: by Robert ft.10791 Schaefer FIRE Date: 2021 .10.18 Phone number: (603)497-340 Email:rasarch@comcast.net OF1AA�5� 1 0:55:34 —04'00' Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document To be submitted at completion of construction by a b Registered Design Professional for work per the ninth edition of the V Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/12/2021 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x)one or both as applicable: X New construction Existing Construction Project description: 4 Stories,23 units, slab-on-grade foundation,wood-framed, light-commercial construction I, Sarah Desiderio,MA Registration Number: 49548 Expiration date: 6/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other:Describe for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or OFFt electronic signature and seal: �c�P_ 06! 5 NO.' No.4S5^ ag �� 9�F'PFGtS Phone number: 603-433-8639 Email: sarah@jsneng.com �sstO VAL g• Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the J Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/18/21 Permit No.B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories, 23 units, slab-on-grade foundation,wood-framed,light-commercial construction I,Muzaffer Muctehitzade MA Registration Number: 32579 Expiration date: 6/30/2022 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical Fire Protection [X] Electrical Other: for the above named project. 1, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or OF 4{_ electronic signature and seal: ``MJZAFrcR f fn tErt r7ADt EL CTRIC.AL a ;t25i�9Rl,� its Phone number.617-338-4406 Email:zade@zadeengineering.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the 9y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/18/21 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories, 23 units, slab-on-grade foundation, wood-framed,light-commercial construction I,Mohammed Zade,MA Registration Number: 27233 Expiration date: 6/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural X Mechanical (PLUMBING) Fire Protection Electrical Other: for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. 4. Visual/surface inspection has be completed to confirm installation meets original engineered drawings. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: .; . MpHA� Y. qr� k i Phone number:617-338-4406 Email: g zade@zadeen ineerin .com g Building Official Use Only Building Official Name: Permit No.: Date: Version 01_01_2018 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional F for work per the ninth edition of the Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/18/21 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories, 23 units, slab-on-grade foundation,wood-framed, light-commercial construction I,Muzaffer Muctehitzade MA Registration Number: 39362 Expiration date: 6/30/2022 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical [X] Fire Protection Electrical Other: for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: •, ,t .uf.t: 4X Phone number:617-338-4406 Email:zade@zadeengineering.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document l � To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the y � Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/18/21 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories, 23 units, slab-on-grade foundation,wood-framed, light-commercial construction I,Muzaffer Muctehitzade MA Registration Number:32579 Expiration date: 6/30/2022 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical Fire Protection [XI Electrical (FIRE ALARM) Other: for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107, Enter in the space to the right a"wet" or electronic signature and seal: .---- MAKER PAUGTETI riADE ,�PPt.3�579 fj Phone number:617-338-4406 Email:zade@zadeen ineerin .com g g Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document u To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the J Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Traders Way Date: 10/18/21 Permit No. B-20-831 Property Address: 45 Traders's Way—Building 20 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: 4 Stories, 23 units, slab-on-grade foundation,wood-framed, light-commercial construction I,Mohammed Zade,MA Registration Number: 27233 Expiration date: 6/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural X Mechanical (HVAC) Fire Protection Electrical Other: for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: �K Phone number:617-3384406 Email: g• zade@zadeen ineerin com IU g• Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018