Loading...
94 WASHINGTON SQUARE SOUTH - AFFIDAVITS Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:The Breakaway at Washington Square Date: AUGUST 31,2021 Permit No. Property Address: 94 Washington Square South Salem,Ma. 01970 Project: Check(x)one or both as applicable:XX New construction XX Existing Construction Project description:The scope of work for this project was the restoration of a historic mansion and to construct a new two story addition to the existing one story structure that was added to the mansions.The property was returned to residential use with a total of 18 dwelling units in the original mansion and new addition.The associated improvements were made to the parking lot,site access,utilities and landscaping I Peter Pitman MA Registration Number:8749 Expiration date:Aug 2021 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: XX Architectural Structural Mechanical Fire Protection Electrical Other:Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: - r.�'. f BOSTON TkOF- ti�e Phone number:978-744-8982 Email:pfpitman@juno.com •w�„� Building Official Use Only Building Official Name: Permit No.: Date: P`tN OFiygs Final Construction Control Document To be submitted at completion of construction by a u ARE Registered Design Professionals g o,, r for work per the ninth edition of the �s"SI rvnt Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: The Breakaway at Salem Common Date:08.18.2021 Permit No. Property Address: 94 Washington Square, Salem, MA 01970 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: Multi-family redevelopment. This project was installed in accordance with NFPA-13. 1 Michael Denommee MA Registration Number: 49888 Expiration date: 06/30/22 am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: Subject to the Completion of the Punch List Report 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: Phone number:(978) 486-4301 Email:info@blwengineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 & N OFMgs9 Final Construction Control DocumentQ� scyG To be submitted at completion of construction by a :i ' Registered Design Professional 'F Q. for work per the ninth edition of the wnt Massachusetts State Building Code, 780 CMR, Section 107 Project Title: _The Breakaway_ at Salem Common _ Date:08.18.2021 Permit No. Property Address: 94 Washington Square, Salem, MA 01970 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: Multi-family redevelopment. I Michael Denommee MA Registration Number: 49888 Expiration date: 06/30/22 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: Subject to the Completion of the Punch List Report 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: Phone number:(978) 486-4301 Email:info@blwengineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 O1 2018 � w oF�s�o Final Construction Control Document �� Jo'IN C. ti PIER.A To be submitted at completion of construction by aca ELL 0° 1 ' Registered Design Professional a T w� for work per the ninth edition of the o J Massachusetts State Building Code, 780 CMR, Section 107 Project Title: The Breakaway at Salem Common Date: 08.18.2021 Permit No. Property Address: _ 94 Washington Square, Salem, MA 01970 Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: Multi-family redevelopment. This project was installed in accordance with NFPA-72. I John C. Pierga MA Registration Number: 48291 Expiration date: 06/30/22 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical X Other: Fire Alarm for the above named project. 1, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: Subject to the Completion of the Punch List Report 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or electronic signature and seal: Phone number: 978 486-4301 Email:info@blwengineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 012019 Df Massachusetts "The Construction Testing People' -Page 1 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438-6216(Fax) IFC FIRESTOPPING INSPECTION Report Date 11-16-2020 Report No. 3 Distribution Copy Job Number 23029 Project 94 Washington Square East, Salem, MA The Breakaway of Salem Commons Contractor T. Berube Contracting Co., Inc. WEATHER: TIME: 3: 00 AM CONTACT:Mike SUMMARY: Attached is the IFC firestopping inspection report prepared by UTS inspector Eric McFadden for the above project. GENERAL REMARKS: IFC Firestopping Inspection. Inspector Premium Travel Name Time I Hours Time Eric McFadden No 4.00 1 Hr(s) REVIEWED BY: William P_ Crabtree "RC-1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc: T. Berube Contracting Co., Inc Mike Pydynkowski Mcbrie Laura Bates Mcbrie Mike Perham T. Berube, Inc Mike Pydynkowski UTS of Massachusetts, Inc. Page 3 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438-6216(Fax) Report Date 11-16-2020 Report No. 3 Job Number 23029 Project 94 Washington Square East, Salem, MA Attachment The Breakaway of Salem Commons Page 2 of 5 Basement Level:Units 001&002 The following previous de icieneies were now found to be properly tmis LOW& Basement Level is now COMPLETE Basement: Unit 1: No Deficient Items Unit 002: %"CPVC @ Bath(seal fell out) '/2"Copper Tubing @ Bath-top plate Level 1: Level I is now COMPLETE Unit 103: 2"PVC(2)@ CMU wall(penetrates to Level 2) %11 CPVCv(2)@ CMU wall(penetrates to Level 2) Unit 104: 2"PVC(2)@ Entrance-right to Corridor Unit 105: MC(1)@ Entrance Closet-right-floor 2"PVC @ Living Closet-floor Unit 1 Romex(2)@ Top of Stair Closet-floor Hole @ Bath to Corridor-Repair 2"PVC @ Bath(outside comer)-floor Unit 107: 2"PVC @ Top of Stair Closet-top plate/floor 2"PVC @ Kitchen Demising-floor 2"PVC @ Bath-floor %"CPVC(2)@ Bath-floor UTS of Massachusetts, Inc. Page 5 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438-6216(Fax) Report Date 11-16-2020 Report No. 3 Job Number 23029 Project 94 Washington Square East, Salem, MA Attachment The Breakaway of Salem Commons Page 4 of 5 Level The following deft iencies were found and witnessed being properlyfreStopped Level 3 is now COMPLETE Unit 301 MC(1)@ Bath to Corridor 1"Sprinkler @ Bath to Corridor 1"PVC @ Bath to Corridor Unit 303 No Deficient Items Unit 304 No Deficient Items Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional M for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:The Breakaway at Salem Common Date:September 18,2020 Permit No. Property Address: 94 Washington Square,Salem,MA Project: Check (x) one or both as applicable: I X New construction X Existing Construction Project description: I, Michael Perham, MA Registration Number: 41143 Expiration date: 06/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or IN OF Mqs electronic signature and seal: ���`'P s9�y �o MICHAEL L GN PERHAM STRUCTURAL No.41143 -off 9 Phone number:978-646-0097 Email:mperham@mcbrie.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018