Loading...
32 CLIFTON STREET - DRAWING AND AFFIDAVITS BARGMANN HENDRIE + ARC[-IETVPE, INC. Architecture I Planning Interior Design 9 Channel Center Street 617 350 0450 Suite 300 bha@bhplus.com Boston,MA 02210 www.bhplus.com transmittal to: Mike McKeown Project Manager Colantonio 16 Everett Street Holliston, MA 01746 508,429.8666 X225 from: Clara Castro date: January 4,2021 Project name and number: 3374-Forest River Outdoor Recreation and Nature Center subject: Permit Set-drawings and affidavits cc: insert copied parties enclosures: Full size set of drawings and one copy of each affidavit comments: ROM Forest River Pool,Bathhouse&Associated FacilitiesldoclmiscVransmittal i Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional 1, for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Forest River Park Recreation&Nature Center Date: December 22, 2020 Property Address: 32 Clifton Street,Salem,MA Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site and utility work. I Thomas A Scarlata MA Registration Number: 6632 Expiration date: August 31,2021,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': X Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. 4. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Cons tr of Document'. Enter in the space to the right a"wet" or electronic signature and seal: r Phone number: 617-456-2222 Email:tascarlata@bhplus.com UA Building Official Use Only 17f Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description. Version 01 01 2018 i i Initial Construction Control Document To be submitted with the building permit application by a d Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Forest River Park Recreation&Nature Center Date: December 22, 2020 Property Address:32 Clifton Street, Salem,MA Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site and utility work. I MA Registration Number: Expiration date: ���� �m a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Control.;Document'. GHUS"6c Enter in the space to the right a"wet" or S. electronic signature and seal: _ Phone number: r'D�7'IV 10/r Email: N1 �: Building Official Use Only Q \y, Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description. Version 01 01 2018 ` r Initial Construction Control Document u To be submitted with the building permit application by a off Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Forest River Park Recreation&Nature Center Date: December 22, 2020 Property Address:32 Clifton Street,Salem,MA Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site and utility work. I,Anthony Donato MA Registration Number:40706 Expiration date: 6/2022,am a registered design professional,and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning : Architectural Structural Mechanical Fire Protection Electrical X Other:Civil for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final Construction Con of Doc ent'. of Enter in the space to the right a"wet" or electronic signature and seal: paNATO CIVIL c No.aaro� Phone number: 617-357-8145 Email:adonato@hancockassociates.com 12-�t,,-2 �IS TE Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description. Version 01 01 2018 J Initial Construction Control Document �z To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Forest River Park Recreation&Nature Center Date: December 22,2020 Property Address: 32 Clifton Street,Salem,MA Project: Check(x)one or both as applicable:X New construction X Existing Construction Project description:Renovation and expansion of the.bath house,.two new swimming pools,a support building,related site and utility work. I, Benjamin M. Kelchlin, MA Registration Number: 55010 Expiration date: June 30, 2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical X Other:Plumbing for the above named project and that to the best of my knowledge,information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final ��N OF Mq,� Construction Control Document'. NJAMIN Enter in the space to the right a"wet"or y electronic signature and seal: 0.55010 NORIAN/SIANI ENGINEERING,INC. ���lsze��� �Q7 FSSIONAL�G Phone number: (781)398-2250 Email:BenK@NS-Engineering.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description. Version 01 01 2018 i .,- . �. . ��;} M. �� ? ...� `. r� ti �� x' i � Initial Construction Control Document f To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Forest River Park Recreation&Nature Center Date: December 22,2020 Property Address: 32 Clifton Street,Salem,MA Project: Check(x)one or both as applicable:X New construction X Existing Construction Project description:Renovation and expansion of the bath house,two new swimming pools,a support building,related site and utility work. I, Benjamin M. Kelchlin, MA Registration Number: 55010 Expiration date: June 30, 2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerninW: Architectural Structural X Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge,information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments,in a form acceptable to the building official. tNOFMA Upon completion of the work,I shall submit to the building official a'Final Construction Control Document'. 02 i E m Enter in the space to the right a"wet" or y electronic signature and seal: NO.5501 NORIAN/SIANI ENGINEERING,INC. , c�s �� w F-/ONA- fr Phone number: (781)398-2250 Email:BenKQNS-Engineering.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description. Version 01 01 2018 I . I ' lr.. r i y �� + } �� .'. y � 4 Initial Construction Control Document u x To be submitted with the building permit application by a fee Registered Design Professional for work per the ninth edition of the s Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Forest River Park Recreation&Nature Center Date: December 22,2020 Property Address: 32 Clifton Street,Salem,MA Project: Check(x)one or both as applicable:X New construction X Existing Construction Project description:Renovation and expansion of the bathhouse,two new swimming pools,a support building,related site and utility work. I, Benjamin M. Kelchlin, MA Registration Number: 55010 Expiration date: June 30, 2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project and that to the best of my knowledge,information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being perfc xmed 4n a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a'Final I"OF M q Ssy Construction Control Document'. o ENJAMW G KELG a Enter in the space to the right a"wet" or electronic signature and seal: N0. .5010 NORIAN/SIANI ENGINEERING,INC. G FSS/ONAL rTT Phone number:(781)398-2250 Email:BenK@NS-Engineering.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other'is chosen,provide a description- Version 01 01 2018 i r Initial Construction Control Document tr To be submitted with the building permit application by a _ 5 Registered Design Professional for work per the 9th edition of the C �5 ey Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Forest River Park Recreation&Nature Center Date: December 22,2020 Property Address: 32 Clifton Avenue, Salem, MA Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description: Renovation and expansion of the bath house and a support building for two new swimming pools (pool design not included in structural scope). I, Gregory M.Nowak,MA Registration Number: 55046 Expiration date: 6/30/2022,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a`Final Construction Contro ocument'. Or Enter in the space to the right a"wet"or ��10H OF kgS`�9 electronic signature and seal: GREGORY M. �yG NOWAK v UCTUR 46 SbNAI� '\ Phone number: 978-745-6817 Email: gmnowak@structures-north.corn Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 01 01 2018 i � �'� - �� � �' _ � I �� Statement of Special Inspections Project: Forest River Recreation&Nature Center Location: Salem, MA Owner: City of Salem Design Professional in Responsible Charge: Gregory M. Nowak(MA PE#55046) This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the Special Inspection and Structural Testing requirements of the Building Code. It includes a schedule of Special Inspection services applicable to this project as well as the name of the Special Inspection Coordinator and the identity of other approved agencies to be retained for conducting these inspections and tests. This Statement of Special Inspections encom ass the following disciplines: ® Structural Mechanical/Electrical/Plumbing ❑ Architectural ❑ Other: The Special Inspection Coordinator shall keep records of all inspections and shall furnish inspection reports to the Building Official and the Registered Design Professional in Responsible Charge. Discovered discrepancies shall be brought to the immediate attention of the Contractor for correction. If such discrepancies are not corrected, the discrepancies shall be brought to the attention of the Building Official and the Registered Design Professional in Responsible Charge. The Special Inspection program does not relieve the Contractor of his or her responsibilities. Interim reports shall be submitted to the Building Official and the Registered Design Professional in Responsible Charge. A Final Report of Special Inspections documenting completion of all required Special Inspections, testing and correction of any discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy. Job site safety and means and methods of construction are solely the responsibility of the Contractor. Interim Report Frequency: as needed(as determined by Design or❑ per attached schedule. Professional in Responsible Charge) Prepared by: )�OF�ASsq Gregory M. Nowak � GREGORY M. c9G (type or print name) NOWAK o STRUCTURAL —' No. 55046 `n 12/22/2020 N`Al��� Signature Date Design Professional Sea! Owner's Authorization: Building Official's Acceptance: Signature Date Signature Date Forest River Recreation&Nature Center Structural Testing& Inspections Page 1 of 8 Schedule of Inspection and Testing Agencies This Statement of Special Inspections/Quality Assurance Plan includes the following building systems: ® Soils and Foundations—as needed, as determined by GC evaluation of soils after excavations ❑ Spray Fire Resistant Material ® Cast-in-Place Concrete ® Wood Construction ❑ Precast Concrete ❑ Exterior Insulation and Finish System ® Masonry ❑ Mechanical & Electrical Systems ® Structural Steel ❑ Architectural Systems ❑ Cold-Formed Steel Framing ❑ Special Cases Special Inspection Agencies I Firm t Address, Telephone, e-mail 1. Special Inspection Coordinator 2. Inspector 3. Inspector 4. Testing Agency 5. Testing Agency 6. Other Note: The inspectors and testing agencies shall be engaged by the Owner or the Owner's Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official, prior to commencing work. Forest River Recreation&Nature Center Structural Testing& Inspections Page 2 of 8 Qualifications of Inspectors and Testing Technicians The qualifications of all personnel performing Special Inspection and testing activities are subject to the approval of the Building Official. The credentials of all Inspectors and testing technicians shall be provided if requested. Key for Minimum Qualifications of Inspection Agents: When the Registered Design Professional in Responsible Charge deems it appropriate that the individual performing a stipulated test or inspection have a specific certification or license as indicated below, such designation shall appear below the Agency Number on the Schedule. SER Structural Engineer of Record for Project PE/SE Structural Engineer—a licensed SE or PE specializing in the design of building structures PE/GE Geotechnical Engineer—a licensed PE specializing in soil mechanics and foundations EIT Engineer-In-Training—a graduate engineer who has passed the Fundamentals of Engineering examination American Concrete Institute (ACI) Certification ACI-CFTT Concrete Field Testing Technician —Grade 1 ACI-CCI Concrete Construction Inspector ACI-LTT Laboratory Testing Technician—Grade 1&2 ACI-STT Strength Testing Technician American Welding Society (AWS) Certification AWS-CWI Certified Welding Inspector AWS/AISC-SSI Certified Structural Steel Inspector American Society of Non-Destructive Testing (ASNT) Certification ASNT Non-Destructive Testing Technician—Level II or III International Code Council (ICC) Certification ICC-SMSI Structural Masonry Special Inspector ICC-SWSI Structural Steel and Welding Special Inspector ICC-SFSI Spray-Applied Fireproofing Special Inspector ICC-PCSI Prestressed Concrete Special Inspector ICC-RCSI Reinforced Concrete Special Inspector ICC-SSI Soils Special Inspector ICC-SSBSI Structural Steel and Bolting Special Inspector National Institute for Certification in Engineering Technologies (NICET) NICET-CT Concrete Technician— Levels I, II, III & IV NICET-ST Soils Technician - Levels I, II, III & IV NICET-GET Geotechnical Engineering Technician - Levels I, II, III & IV Exterior Design Institute (EDI)Certification EDI-EIFS EIFS Third Party Inspector Other soils testing agency approved to perform ASTM soils tests. Forest River Recreation&Nature Center Structural Testing& Inspections Page 3 of 8 Soils and Foundations Item Agency# Scope (Qualif.) 1. Shallow Inspect soils below footings for adequate bearing capacity. Verb Foundations soils testing excavations are to proper depth. agency or Inspect removal of unsuitable material and preparation of subgrade prior Geotechnical to placement of controlled fill Engineer (GE) All soil supporting new footings to be inspected prior to placing forms 2. Controlled Perform sieve tests(ASTMD422&D1140) and modified Proctor tests Structural Fill soils testing (ASTMD1557) of each source offill material. agency or Inspect placement, lift thickness and compaction of controlled fill. Geotechnical Engineer Test density of each lift offill by nuclear methods (ASTMD2922) (GE) Verify extent and slope offill placement. Forest River Recreation&Nature Center Structural Testing& Inspections Page 4 of 8 Cast-in-Place Concrete Item Agency# Scope (Qualif.) 1. Mix Design ACI-CCI Review concrete batch tickets and verify compliance with approved mix ICC-RCSI design. Verb that water added at the site does not exceed that allowed by the mix design. Refer to ACI 318: 3.5, 7.1-7.7&IBC 1913.4 2. Material ACI-CCI Review mill certificates for conformance with project requirements. Certification 3. ACI-CCI Before each concrete placement:Inspect size, spacing, cover,positioning Reinforcement ICC-RCSI and grade of reinforcing steel. Verb that reinforcing bars are free of Installation form oil or other deleterious materials. Inspect bar laps and mechanical splices. Verb that bars are adequately tied and supported on chairs or bolsters Refer to ACI 318: 3.5, 7.1-7.7&IBC 1913.4 4. Anchor Rods ACC-CCI Inspect size,positioning and embedment of anchor rods.Inspect concrete placement and consolidation around anchors. Refer to ACI318:8.1.3, 21.2.8, 3.8.6, 8.1.3, 21.2.8&IBC 1911.5, 1912.1 5. Concrete ACI-CCI per pour:Inspectplacement of concrete. Verify that concrete conveyance Placement ICC-RCSI and depositing avoids segregation or contamination. Verify that concrete is properly consolidated. Refer to ACI 318: 5.9, 5.10&IBC 1913.6, 1913.7, 1913.8 6. Sampling and ACI-CFTT Test concrete compressive strength(ASTMC31& C39), slump(ASTM Testing of ACI-STT C143), air-content(ASTMC231 or C173) and temperature(ASTM Concrete C1064).Refer to ASTMC 172, C 31 AC1318: 5.6, 5.8&IBC1913.10 Frequency:minimum 4 test cylinders per each pour, or 50 cu yds, whichever is more frequent. 7. Curing and ACI-CCI Inspect curing, cold weather protection and hot weather protection Protection ICC-RCSI procedures.Refer to ACI318:5.11-5.13&IBC 1913.9 8. Other: ACI-CCI Inspect formwork for shape, location and dimensions of the concrete member being formed.Refer to ACI 318: 6.1.1 Forest River Recreation&Nature Center Structural Testing& Inspections Page 5 of 8 Masonry Required Inspection Level: ® 1 ❑ 2 Item Agency# Scope (Qualif.) 1. Material SER Review test reports and materials documentation for Certification conformance to construction documents. 2. Mixing of ICC-SMSI Inspectproportioning, mixing and retempering of mortar and grout. Mortar and Grout 3. Installation ICC-SMSI, Inspect size, layout, bonding and placement of masonry units. of Masonry SER 4. Mortar Joints ICC-SMSI, Inspect construction of mortar joints including tooling andfilling of head SER joints. 5. Existing SER Review condition of the existing masonry to remain at brick and stone Masonry excavations and removals. Evaluation at Excavations 6. Reinforcement ICC-SMSI Inspect placement,positioning and lapping of reinforcing steel. Installation AWS-CWI Inspect welding of reinforcing steel. 7. Grouting ICC-SMSI, Inspect placement and consolidation ofgrout. Inspect masonry clean-outs Operations SER for high-lift grouting. 8. Weather ICC-SMSI Inspect cold weather protection and hot weather protection procedures. Protection Verify that wall cavities are protected against precipitation. 9. Evaluation of ICC-SMSI Test compressive strength of mortar and grout cube samples(ASTM Masonry C780). Strength Test compressive strength of masonry prisms(ASTM C1314). 10. Anchors ICC-SMSI Inspect size, location, spacing and embedment of dowels, anchors and and Ties ties. 11. Other- EIT Provide continuous and/or periodic inspections during all operations per Table 1704.5.1 (Level 1) of the International Building Code(IBC) Forest River Recreation&Nature Center Structural Testing& Inspections Page 6 of 8 A Structural Steel Item Agency# Scope (Qualif.) 1. Fabricator Prior to fabrication:Review shop fabrication and quality control Certification/ AWS/AISC-SSI procedures. Quality ICC-SWSI OR Control Confirm AISC certified fabricator Procedures 2. Material Review certified mill test reports and identification markings on wide- Certification AWS/AISC-SSI flange shapes, high-strength bolts, nuts and welding electrodes ICC-SWSI Review material identification and manufacturer certificates for conformance of weld filler material with AWS Standards and AISC Manual of Steel Construction,LRFDIASD, 13th ed., Section A3.5. Inspector shall have minimum of 5 years experience in the inspection of steel structures. 3. Bolting Inspect installation and tightening of high-strength bolts. Verify that AWS/AISC-SSI splines have separated from tension control bolts. Verb proper tightening ICC-SWSI sequence. Continuous inspection of bolts in slip-critical connections. Inspector shall have minimum of 5 years experience in the inspection of steel structures. 4. Welding Continuous, exceptperiodic for single pass welds <5116"- AWS-CWI Visually inspect all field welds and 25%of shop welds, except all full penetration welds to be 100%inspected. Inspect pre-heat,post-heat and ASNT surface preparation between passes. Verb size and length of fillet welds. Ultrasonic testing of all full penetration welds. Base metal exceeding 1.5 inches in thick and subject to through-thickness weld shrinkage shall be ultrasonically tested for discontinuities behind and adjacent to the welds after joint welding. Inspector shall have minimum of 5 years of experience in the inspection of steel structures. 5. Structural PE/SE Inspect steel frame for compliance with structural drawings, including Details bracing, member configuration and connection details. 6. Shear AWS/AISC-SSI Inspect size, number,positioning and welding of shear connectors. Inspect Connectors: ICC-SWSI suds for full 360 degree flash.Ring test all shear connectors with a 3 lb hammer. Bend test all questionable studs to 15 degrees. 7. Other: PE/SE Inspection of steel frame joint details for compliance: Details such as bracing and stiffening;Member locations;Application of joint details at each connection Forest River Recreation&Nature Center Structural Testing& Inspections Page 7 of 8 Wood Construction Item Agency# Scope (Qualif.) 1. Material SER General conformance with construction documents. Grading 2. Connections SER General conformance with construction documents 3. Framing and SER General conformance with construction documents Details Forest River Recreation&Nature Center Structural Testing& Inspections Page 8 of 8 Initial Construction Control Document To be submitted with the building permit application b a g p pp � Y _ d Registered Design Professional for work per the 91h edition of the v Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Forest River Park Recreation&Nature Center Date: December 22, 2020 Property Address: 32 Clifton Avenue, Salem,MA Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description: Renovation and expansion of the bath house and a support building for two new swimming pools (pool design not included in structural scope). I, Gregory M.Nowak,MA Registration Number: 55046 Expiration date: 6/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet"or electronic signature and seal: Phone number: 978-745-6817 Email: gmnowak@structures-north.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 01 01 2018