ENGINEERING FINAL AFFIDAVIT
Anchor Upgrade
4DE9201A
130201/1-oring Towers
ADDRESS:
1000 Loring Avenue
Salem, MA 01970
DATE:
January 28, 2022
M c
ENGINEERING
ASSOCIATES.LLC
Civil•Structural•Land Surveying
R,K.Executive Centre a 201 Boston Post Road West■Suite 101 ■Marlborough,MA 01752
t.508.481.7400 0 www.chappellengineering.com■f.508.481.7406
r CHAPPELL
ENGINEERING
ASSOCIATES,LLC
Civil•Structural•Land Surveying
January 28,2022
T-Mobile Northeast LLC
15 Commerce Way, Suite B
Norton, MA 02766
Reference: Engineering Field Visit and Completion Affidavit
Site 4DE9201A—B0201/1-oring Towers
1000 Loring Avenue,Salem, MA 01970
CEA Job Number 747.38
Site Description:
The site is located on an existing rooftop in Salem, Massachusetts. The site includes rooftop equipment
cabinets, as well as antennas, RRHs&ancillary equipment mounted to non-penetrating rooftop ballast
frames. (6) New panel antenna, (6) new RRHs, (3) new diplexers&(3) relocated existing antennas
mounted to(3) new non-penetrating rooftop ballast frames, replacing (3)existing antennas&(6)existing
ballast frames. (3) New signal cables ran along existing rooftop cable trays from the equipment area to
the antenna arrays. (2) New equipment cabinets were mounted to the existing steel frame, replacing (1)
existing cabinet. New conduit was installed in the existing equipment area to incorporate the new cabinets
into the existing system. (1) New slack box was installed at the existing equipment area.All the new
equipment was tied into the existing ground system on site. Existing site telco&power were utilized for
the upgrade.
Engineering Field Visit
Based on photographs taken by others during December 2021, Chappell Engineering Associates, LLC
(CEA) has verified the newly installed T-Mobile equipment described above is in general conformance to
the engineering construction documents(Revision#2"Construction Revised"dated 01/07/21). The
following site photos and field visit form documents the installation, and the enclosed Final Construction
Control Document is attached as requested.
Very truly yours,
CHAPPELL ENGINEERING ASSOCIATES, LLC
01Et�lENT J.
US
CK
o.47=
Clement J. Salek, P.E.
R.K.Executive Centre 0 201 Boston Post Road West■suite 101 w Marlborough,MA 01752
t.508.481.7400■www.chappeliengineering.com■f.508.481.7406
Final Construction Control Document
pl To be submitted at completion of construction by a
Registered Design Professional
h
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:4DE9201A—B0201/Loring Towers Date:01/28/2022 Permit No.
Property Address: 1000 Loring Avenue, Salem,MA 01970
Project: Check(x)one or both as applicable: X New construction X Existing Construction
Project description:
Installation of(6)New panel antenna,(6)new RRHs,(3)new diplexers&(3)relocated existing antennas mounted to(3)new non-
penetrating rooftop ballast frames,replacing(3)existing antennas&(6)existing ballast frames.(3)New signal cables ran along
existing rooftop cable trays from the equipment area to the antenna arrays.(2)New equipment cabinets were mounted to the existing
steel frame,replacing(1)existing cabinet.New conduit was installed in the existing equipment area to incorporate the new cabinets
into the existing system.(1)New slack box was installed at the existing equipment area.All the new equipment was tied into the
existing ground system on site.Existing site telco&power were utilized for the upgrade.
I Clement J. Salek MA Registration Number:47382 Expiration date: 6/30/2022 ,am a registered design
professional,and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
Architectural Structural Mechanical
Fire Protection Electrical X Other: Describe Entire Project
for the above named project. 1, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
�t1 OF
Enter in the space to the right a"wet" or OLEMDa J.
electronic signature and seal: SAtEK
GRIN. y,
o.4=
Phone number: (508)481-7400 Email: csalekQchappe XOM
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018
r I
I '
}
I
Li
- I
d
_ I
I
. I
I
• i
I
r
(2)New Equipment Cabinets Mounted To Existing Steel Frame& (1)New Slack Box Installed I Existing Equipment Area
Y 1'
'S
1�
1
Alpha Sector: (2) New Antannas, (2)New RRHs, (1)New Diplexer, (1)Existing Antenna& (1)
Existing TMA Mounted To The New Non-Penetrating Ballast Frame
i
r
l
Beta Sector: (2)New Antannas, (2)New RRfls, (1)New Diplexer, (1)Existing Antenna& (1)
Existing TMA Mounted To The New Non-Penetratin Ballast Frame
V
- .Z
Gamma Sector: (2)New Antannas, (2)New RRHs, (1)New Diplexer, (1)Existing Antenna& (1)
Existins TMA Mounted To The New Non-Penetratina Ballast Frame