65 WASHINGTON STREET - FIRE STOPPING INSPECTION GEOTECHNICAL CONSULTANTS, INC.
201 Boston Post Road West
Marlborough, MA 01752
Telephone: 508 229-0900
Project: 65 Washington Street Date: October 1, 2021
Location: Salem,Massachusetts Job#• 2194730
Contractor: Groom Construction Weather: Cloudy, 70's
FIRE STOPPING INSPECTION
Arrived Onsite @ 11:00 PM Page#1 of 1
As scheduled, a GCI Engineer arrived on-site to perform a final inspection of the Fire
Stoppings at walls penetrations made for electrical wires,plumbing pipes, fire suppression pipes,
HVAC and Vents installed at all floors electrical closets.
GC provided for Inspector the Groom Construction Submittal#220000-4.0 for 3M Products
dated 12.06.2020 To Tise Associates to be used by plumber and Hilti Firestop Submittal Package
Submitted by; Dussault Mechanical Services dated 12.23.2020, Sprinkler Firestop Submittal Package
Materials—without official approval.
The above provided documents were used as basis for inspection.
Observations:
1. 1st Floor Electrical Closet: DONE
2. 2nd Floor Electrical Closet: DONE
3. 3rd Floor Electrical Closet: DONE
4. 4th Floor Electrical Closet: DONE
5. 5th Floor Electrical Closet: DONE
6. 6th Floor Electrical Closet: DONE
Inspection findings were passed to GC's Superintended before leaving site
Left Site @ 1:00 PM Total Travel Time: 2.50 hours
Reviewed By: VAS Engineer: KG