Loading...
10 FAIRMOUNT STREET - APPROVAL LETTER EV �ii► ENGINEERING 2/10/2022 Subject: Post Installation Approval Letter Job Name:TIM FONTANA Address: 10 Fairmount Street,Salem, MA 01970 Attn:To Whom It May Concern On the above referenced project, I reviewed the PV installation that was specified in the plan. The purpose of the review was to verify the installation to be in conformance with the specification and that the modifications were acceptable. After reviewing the installation, I certify that the PV panels were installed in conformance with the plans and specifications for this project, and the installation complies with the provisions of the 2015 International Building Code, ASCE 7-10. Our conclusions were based on review of the photos prepared by the installer.This letter does not waive the installer of any responsibility for improper installation. If you have any further questions on the above for mentioned, please do not hesitate to call. sTRUC Sincerely, ONL LSHOFMgS ay�F9' s'yC VINCENT yG� c MWUMVANEZA CIVIL ` Vincent Mwumvaneza, PE EV Engineering, LLC ONALEN Proiects 'even ineersnet.com http://evengineersnet.com/ 276-220-0064