Decision
City of Salem Board of Appeals
Petition of FRANKLIN and ANGELA QUINTIN requesting a special permit per Sec. 3.3.5 Non-
conforming Single and Two-Family Structures, to allow the petitioner to construct a full third floor on the
existing non-conforming structure at 4 RICE STREET(Map 36 Lot 208)(R-2 Zoning District)
A'public hearing on the above Petition was opened on June 20, 2018 pursuant to M.G.L Ch. 4'6A, 5 11. The
public hearing was continued to the July 18, 2018 meeting and closed on that date with the following Salem
Board of Appeals members present: Peter A. Copelas, Mike Duffy, Jimmy Tsitsinos, Chris Drucas, Jim
Hacker.
The petitioner is seeking a Special Permit per Sec. 3.3.5 Nonconforming Single- and Two Family Residential
Structures,to allow the petitioner to construct a full third floor on the existing non-conforming structure.
Statements of fact:
1. In the petition date-stamped May 10, 2018, the Petitioner requested a Special Permit per Sec. 3.3.5
Nonconforming Single-and Two-Family Residential Structures, to allow the petitioner to construct a full third
floor on the existing non-conforming structure.
2. Franklin and Angela Quintin-Petitioners,present the petition.
3. The property is located in the R-2 Zoning District.
4. The petitioner is proposing to construct a full third floor addition on the existing non-conforming
structure by raising the roof by approximately seven (7) feet. The proposal will create a new non-
conformity as to the maximum number of stories. The maximum number of stories in the R-2
Zoning District is 2.5 stories where the petitioner is proposing to construct a full third story.
5. The existing ridge line height is approximately 24'-9" and the petitioner is proposing to increase the
height of the structure to 33'-8", which is below the 35' maximum allowable height in feet for the
zoning district.
6. The property is currently utilized as a single family home and will continue to remain a single family
home.
7. The requested relief,if granted,would allow the Petitioner Special Permit per 3.3.5 Nonconforming
Single-and Two-Family Residential Structures,to allow the petitioner to construct a full third floor to
expand the existing non-conforming structure.
8. At the public hearing no members of the public spoke in favor or in opposition to the petition.
The Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and
after thorough review of the petition, including the application narrative and plans, and the Petitioner's
presentation and public testimony, makes the following findings that the proposed project meets the
provisions of the City of Salem Zoning Ordinance:
City of Salem Board of Appeals
August 1,2018
Project 4 Rice Street
Page 2 of 2
Findings for Special Permit:
The Board finds that the proposed extension, alteration or change to the non-conforming structure is
not substantially more detrimental that the existing non-conforming structure to the neighborhood.
1. The proposed expansion of a non-conforming structure would not be more substantially detrimental
than the existing non-conforming structure to the impact on the social, economic or community
needs served by the proposal.
2. There are no impacts on traffic flow and safety,including parking and loading.
3. The capacity of the utilities is not affected by the project.
4. There are no impacts on the natural environment,including drainage.
5. The proposal fits with the existing neighborhood character.
6. The potential fiscal impact,including impact on the City tax base is positive.
On the basis of the above statements of facts and findings, the Salem Board of Appeals voted five (Peter A.
Copelas, Mike Duffy,Jimmy Tsitsinos, Chris Drucas,Jim Hacker) in favor and none (0) opposed, to grant a
special permit per Sec. 3.3.5 Non-conforming Single and Two-Family Structures, to allow the petitioner to
construct a full third floor on the existing non-conforming structure subject to the following terms,
conditions and safeguards:
1. The Petitioner shall comply with all city and state statutes, ordinances, codes and regulations.
2. All construction shall be done as per the plans and dimensions submitted to and approved by the
Building Commissioner
3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly
adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of new construction shall be in harmony with the existing structure.
6. A Certificate of Inspection shall be obtained.
7. A Certificate of Occupancy shall be obtained.
8. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including,but
not limited to,the Planning Board.
_-PeT _e' A . jt&f=�o h
Peter A. Copelas (Vice-Chair)
Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK
Appeal fmm thi decision,if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A,and shall be filed within 20
days of filin,g of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the Variance or
Special Permitgranted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South
Registry of Deeds.