Loading...
70-92 Boston Street - Phase 1 Initial Site Investigation and Tier Classification - Appendix E - January 2006 APPENDIX E TEST PIT LOGS 7RC Project: Flynntan Date/Time: Sheet 1 of 1 Test Pit Log Project No.: 28367-0110-0000 06/14/05-0920. Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: ;Tire-mounted backhoe/City of Salem TP-1 Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./'/,yard bucket f 1 _3' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F=Rain Top of Pit _ Sample Depth Number Strati ra hic Description REMARKS: 2 Bituminous concrete(asphalt) 1 2%3' yellowish brown,dry,medium to coarse SAND, little gravel, PID=0 ppm trace boulders and brick(fill.material) 2 3 Bottom of Excavation at approximately 3'below existing 4 ground surface. 5 6 7 8 9 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. 7" Cobble 76-203 mm 3-8 in. Trace(TR.) 0-10% C.Gravel 19-76 mm 314-3 in. 5' rrErfr'�ljrfffrffrFf Little(LI.) 10-20% F.Gravel 4.75-19 mm 3/16-3/4 in. Some(SO.). 20-35% C.Sand 2.0-4.75 mm 5/64-3/16 in. ♦ And 35-50% M.Sand 0.4-2.0 mm 1/64-5/64 in. j I F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.=3_9 cu. yd. Clay <0.002 mm g:lwinwordlte plateXt stpit.dot rRC Project:Flynntan Date/Time: Sheet 1 of 1 Test Pit Log Pro ect No.: 28367-0110-0060 06/1.4/05- 1000 Customer-Focused Solutions Contractor Personnel: TRC Personnel:Jeff Hunter Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: 1 Tire-mounted backhoe/City of Salem TP-2 / Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./3K yard bucket 5.' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: -Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Stratigra hic Description REMARKS: 2" Bituminous concrete(asphalt) 1 2"-1.5" yellowish brown,dry, medium to coarse SAND,some PID=0 ppm brick rubble(20%),little ash 1.5'-5'yellowish brown,dry,.medium to coarse SAND,little gravel,trace cobbles and brick fff 2 i 3 4 I i 5 Bottom of Excavation at approximately 5'below existing 6 ground surface. I 7 8 9 10 J TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. I I♦_ 5'_�I Cobble 76-203 mm 3-8 in. ♦ Trace(TR.) 0-10% C.Gravel 19-76 mm 314-3 In. 5 1 r ,��ff r f Little(1-1.) 10-20% F.Gravel 4.75-19 mm 3/16-3/4 in. Some(SO.) 20-35% C.Sand 2.0-4.75 mm 5/64-3/1F ♦ And 35-60% M.Sand 0.4-2.0 mm 1/64-5/f ) I F.Sand 0.075-0.4 mm North Silt 0.002-0.075 min Vol.=4_6 cu.yd. Clay <0.002 mm gAwinwordltemplateUestpit dot 7RC Project: Flynntan. Date/Time: Sheet 1 of 1 Test Pit Log Project No.: 28637-00110-00000 06/14/05 1040 Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: ;Tire-mounted backhoe/City of Salem TP-3 _ Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./3/4 yard bucket —7' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Strati graphic Description REMARKS: 2" Asphalt 1 2"-7' yellowish brown,dry,medium to coarse SAND, little gravel, PID=:0 ppm trace brick 2 3 4 5 Rusted metal lid at approximately 5'below existing ground Surface. 6 . 7 Bottom of Excavation at approximately 7'below existing 8 ground surface. 9 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. I 10, Cobble 76-203 mm 3-8 in._ Trace(TR.) 0-10% C.Gravel 19-76 mm 3/4-3 in.' 5' ;fr ;r' Little(LI.) 10-20.% F..Gravel 4.75-19 mm 3/16-314 in. Some(SO.) 20-35% C.Sand 2.0-4.75 mm 5164-3/16 in. ♦ And 35-50% M.Sand 0.4-2.0 mm 1/64-5/64 in. I F.Sand 0.075-0.4 mm North Vol.= 12.9 cu. yd. Silt 0.002<0.002 mm g:5winword\temp1ateltestpt4dot 7RC Project: Flynntan Date/Time: Sheet 1 of 1 Test Pit Log Project No.: 28367-0110-00000 06/14/05/1200 Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) EquipmentlContractor Used: Test Pit Number: l Tire-mounted backhoe/City of Salem TP-4 Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./%yard.bucket -8.5' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Strati ra hic Description REMARKS: 2" Bituminous concrete(asphalt) 1 2"-8' brown,dry,medium to coarse SAND, little gravel,trace PID=0 ppm brick 2 3 4 5 6 7 8 8'- brown medium to coarse SAND,some gravel, petroleum PID=5 ppm staining noted 9 Bottom of Excavation at approximately 8.5'below existing ground surface. 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. Imo_ 7' Cobble 76-203 mm 3-8 in. _ Trace(TR.) 0-10%. C.Gravel 19-76 mm 3/4-3 in. 5' irriirrlirirrrr fir i1 Little(LI.) 10-20% F.Gravel 4.75-19 mm 3116-3/4 in. liirrrirr�irrri�iflr !!l,r1lr!lrrrl.!! Some(SO.) 20-35% C.Sand 2.0--4.75 mm 5164-3/16 in. ♦ And. 35-50% M.Sand 0.4-2.0 mm 1164-5/F 1 I F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.= 11 cu.yd. Clay <0.002 mm gAwinwordVemplateXtestpit.dot