Loading...
70-92 Boston Street - Supplemental Site Investigation Summary Report - Appendix C - November 2005 APPENDIX C TEST PIT LOGS Supplemental Site investigation Summary Report November 2005 i Project: Flynntan Date/Time: Sheet 1 of 1 TRC Test Pit Log Project No.: 28367-0110-0000 06/14/05-0920. Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: Tire-mounted backhoe/City of Salem TP-1 i Reach/Capacity. Total Depth: Piezometer Installed? 12 ft./%yard bucket -3' 0 Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Stratigra hic Description REMARKS: 2" Bituminous concrete(asphalt) 1 2"-3' yellowish brown,dry,medium to coarse SAND, little gravel, PID=0 ppm trace-boulders and brick(fill material) 2 3 Bottom of Excavation at approximately 3'below existing 4 ground surface. 5 6 7 8 9 i I 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. I I�- 7'0 I Cobble 76-203 mm 3-8 in. �r Trace(TR.) 0-10% C.Gravel 19-76 mm 3/4-3 in. 5' �fF�rIF{�Fflrllllffrl ! Little LI. 10.20%( ) F.Gravel 4.75-19 mm 3/16-3!4 in. Some(SO.) 20-35% C.Sand 2.0,4.75 mm 5/64-3/16 in. 1 And 35-50% M.Sand 0.4-2.0 mm 1/64-5/64 in. F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.=3_9 cu.yd. Clay <0.002 mm I I rAwiuw°rd%te plate\testpiLd°t fProject: Flynntan Date/Time: Sheet 1 of 1 TRC Test Pit Log I Project No.: 28367-0110-0000 06/14/05-1000 Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: Tire-mounted backhoe I City of Salem TP-2 Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./%yard bucket I —5' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Stratigraphic Description REMARKS: 2" Bituminous concrete(asphalt) 1 2"-1.5 yellowish brown,dry, medium to coarse SAND,some PID=0 ppm brick rubble(20%), little ash 1.5'-5'yellowish brown,dry,medium to coarse SAND, little gravel,trace cobbles and brick 2 3 4 5 Bottom of Excavation at approximately 5'below existing 6 ground surface. 7 8 9 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. 51 Cobble 76-203 mm 3-8 in. I♦_ —�I Trace(TR.) 0-10% C.Gravel 19-76 mm 314-3 in. 5° Little(LI.) 10-20% F.Gravel 4.75-19 mm 3116-314 in. Some(SO.) 20-35% C.Sand 2.0-4.75 mm 5164-3/16 in. And 35-50% M.Sand 0.4-2.0 mm 1164-5/64 in. F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.=4_6 cu.yd. Clay <0.002 mm F gAwiuwordkemplate\testpitdot rRC Project: Flynntan Date/Time: Sheet 1 of 1 Test Pit Log Project No.: 28637-00110-00000 06/14/05 1040 Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: Tire-mounted backhoe/City of Salem Tp-3 Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./1%yard bucket -7' ❑ Yes_ ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast, 65 deg F-Rain Top of Pit Sample Depth Number Stratigra hic Description REMARKS: 2" Asphalt 1 2"-7' yellowish brown,dry,medium to coarse SAND, little gravel, PID=0 ppm trace brick 2 3 4 5 Rusted metal lid at approximately 5'below existing ground Surface. - 6 . 7 Bottom of Excavation at approximately 7'below existing 8 ground surface. 9 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE USED Boulder >300 mm >12 in. ♦_ 10, I Cobble 76-203 mm 3-8 in. + Trace(TR.) 0-10% C.Gravel 19-76 mm 3/4-3 in. 5' Little(LI.) 10-20% R.Gravel 4.75-19 mm 3/16-314 in. — Some(SO.) 20-35% C.Sand 2.0-4.75 mm 5164-3/16 in. ♦ And 35-50% M.Sand 0.4-2.0 mm 1/64-5/64 in. I F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.=12.9 cu.yd. Clay <0.002 mm 9Awinword%temp1ateltevtpit.dot rRC Project: Flynntan Date/Time: Sheet 1 of 1 Test Pit Log I_Project No.: 28367-0110-00000 06/14/05/1200 Contractor Personnel: TRC Personnel:Jeff Hunter Customer-Focused Solutions Wayne(City of Salem) Equipment/Contractor Used: Test Pit Number: Tire-mounted backhoe/City of Salem TP4 Reach/Capacity: Total Depth: Piezometer Installed? 12 ft./%yard bucket --8.5' ❑ Yes ® No Depth to Ground Water: Weather: Elevation: Not Encountered Overcast,65 deg F-Rain Top of Pit Sample Depth Number Stratigraphic Description REMARKS: 2" Bituminous concrete(asphalt) 1 2"-8' brown,dry, medium to coarse SAND, little gravel,trace PID=0 ppm brick 2 3 4 5 6 7 8 8'- brown medium to coarse SAND,some gravel, petroleum PID=5 ppm stainino noted 9 Bottom of Excavation at approximately 8.5'below existing ground surface. 10 TEST PIT PLAN PROPORTIONS GRAIN SIZE -USED Boulder >300 mm >12 in. 7' Cobble 76-203 mm 3-8 in. ♦ I~—/ —�I Trace(TR..) 0-10% C.Gravel 19-76 mm 314-3 in. 5' f/tlt�f IflFI�Ffrf�f!! Little(Lt.) 10-20% F.'Gravel 4.75-19 mm 3M6-314 in. 0 ,.,..../..f.Ji. Some(SO.) 20-35/a C.Sand 2.0-4.75 mm 5164-3116 in. And. 35-50% M.Sand 0.4-2.0 mm 1/64-5/64 in. 1 F.Sand 0.075-0.4 mm North Silt 0.002-0.075 mm Vol.=11 cu.yd. Clay <0.002 mm g:\winword\template\testpltdot