B-17-787 - 0072-0082 BOSTON STREET - Building Permit The Commonwealth of Massachusetts
Department of Public Safety
Massachusetts State Building Code(780 CMR)
Building Permit Application for any Building other than a One-or Two-Family Dwelling W
�— %',(Thi`s Section For Official Use Only)
Building Permit Number: Date,Applied: Building Official:`
SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for,which a street address is not available)
72-82 Boston Street Salem,' MA . 01970' " '° _River Rock Residences
No.and Street City/Town ' Zip Code Name of Building(if applicable)
SECTION 2.PROPOSED WORK"
�w
....
1 Edition of MA State Code used 8th If New Construction check here M or check all that apply in the two rows below_
Existing Building❑ Repair IJ I Alteration ❑ Addition❑ Demolition`❑ (Please fill out and submit Appendix_1),
CD
Change of Use ❑ Change of Occupancy `❑ Other ❑ Specify:
Are building plans and/or construction documents being supplied as part of this permit application? Yes ® No ❑
'Is an Independent Structural Engineering Peer Review required? Yes,❑ No Sl
Brief Description of Proposed Work:
New construction of one three(3)story Mufit-Famify dwelling with basement level private garage and associated
site improvements
TC�t�N� oVSL U N IT- • ...
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR"
CHANGE IN USE OR OCCUPANCY
Check here if an Existing Building Investigation and.Evaluation is enclosed(See 780 CMR 34) ❑
Existing Use Group(s): Proposed Use Group(s):
SECTION 4:BUILDING HEIGHT AND AREA
6 ry Existing ,: ,., Proposed
No.of Floors/Stories(include basement levels)&Area Per Floor,(sq.ft.) ; ' 4 4,300
Total Area(sq.ft.)and Total Height(ft.) `' - f' 17,000 42'-6"
SECTION 5:USE GROUP(Check'as applicable)
A. Assembly A-1❑ A-2❑` Nightclub ❑ A-3 ❑ A-4❑ A-5❑. B: Business ❑' E: Educational ❑
F: Facto F-1❑ F2❑ H: High Hazard- H-1❑ H-2❑ H-3 ❑_ H-4❑ H-5❑ -
I: Institutional 1-1❑ 1-2❑ 1-3❑ .1-4❑ M: Mercantile❑ R: Residential R-10 R-2 M R-3❑ R4❑ t
S: Storage S-1❑ S-2❑ U. Utility 10 Special Use❑and please describe below:
Special Use:
SECTION 6.CONSTRUCTION TYPE.(Check as applicable)
------------------
IA ❑ IB ❑ II A.❑ IIB ❑. IIIA 0 II1B'13 IV ❑ VA ❑ VB
SECTION 7:SITE-INFORMATION(refer to 790 CMR'111fffor details:on each item)
Trench Permit: Debris Removal:
Water Supply Flood Zone Information: Sewage Disposal: Licensed Disposal Site q
i A trench will not be t .
s: Public® Check if outside Flood Zone® Indicate'municipal Ixl required M or trench or specify:
a.Private❑ a or indentify Zone: - or on site system❑
z - permit is enclosed❑ a
Railroad right-of way: Hazards to Air Navigation:. MA Historic Commission-Review Process:;
Not Applicable[i *"` Is Structure within airport approach area? —. Is their review completed?
or Consent to Build enclosed❑ Yes❑ or No 91, Yes❑ No ❑
SECTION 8::CONTENT OF CERTIFICATE.OF OCCUPANCY
:. Edition of Code: 8th Use Group(s): U, R-2 Type:of Construction: VB Occupant Load per Floor..
'Does the building contain an Sprinkler System?: Yes Special Stipulations:
- 1
M t
SECTION 9: PROPERTY OWNER AUTHORIZATION
Name and Address of Property Owner
LAR Properties, Inc. 282 Bennington Street East Boston, MA 02128
Name(Print) «: ' No.and Street s''f._0- City/Town' , Zip
Property Owner Contact Information:
Anthonyoberto 617 _ 293. 1215 y • _ ,,,. anthony@spinellis.com -
Title General Manager Telephone No.(business) Telephone No. (cell) e-mail address
If applicable,the property owner hereby authorizes -
Jeffrey Alley 672 Suffolk Street, Suite 200 Lowell MA 01854
Name t _ Street Address City/Town ` .'State Zip
to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. ..
SECTION 10-CONSTRUCTION CONTROL Mease.fill out Appendix 2)
fbuildin is less than 35,000 cu.ft.of enclosed ace and/or.not under Construction Control then check here O and skipSection 10:1
10.1Re •sfered Professional Responsible for Construction Control`
Jai Singh Khalsa 617_ 591 :8682 jkhaisa@tkgeast.com 604'2
Name(Registrant) Telephone No! ^° e-mail address Registration Number
17 Ivaloo Street, Suite 400 Somerville " MA 02143 Architectural 8.30.2017
Street Address City/Town- - State Zip Discipline Expiration Date
102`General Contractor
Aberthaw.Construction Company, lnc:
Company Name
John J Klerm CS 90248 u Type U
Name of Person Responsible for Construction License No. and Type if Applicable
161 Cotuit Street Andover," MA 01845
Street Address City/Town` _ State Zip
978. 654 4500 = 978 735.9617 John.Klem @@Aberthawcc.com
Telephone No. business Telephone No. cell e-mail address
SECTION 11:w0RKERS'`COMPENSATION INSURANCE AFFIDAVIT M.G L.c.152.§25C 6
A Workers Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a signed Affidavit submitted with this application? Yes M No 0
SECTION 12 CONSTRUCTION COSTS AND PER FEE ;
Item w4. Estimated Costs:(Labor ,
and Materials) Total Construction Cost(from Item 6)_$ 2,577,172 '
1.Building $ 1,947,472 Building Permit Fee=Total Construction Cost x 11 (Insert here
2.Electrical - $ 176,535- appropriate municipal factor)=$ 28,349.
3.Plumbing • • $ 237,531 -
4.Mechanical (HVAC) $ 171,699 Note:Minimum fee=$ (contact municipality)
5.Mechanical Other $ 43 962
Enclose check payable to City of Salem
6.Total Cost $ . 2,577,172 (contact municipality)and write check number here
SECTION 13 SIGNATURE;OF BUILDING PERMIT APPLICANT -
-
'By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowledge and understanding,, A
Jeffre -Alley Vice President 978-654 A500 x108
Ple prinj( d sign nain Title Telephone No. Date
672 Suffolk treet, Su�IteVQQ Lowell MA 01854
Street Address City/Town State. Zip
Municipal Inspector to fill-out this section upon application approval. o ' '
Name Date
f
Initial Construction Control Document
T y
To be submitted with the building permit application by a
dRegistered Design Professional
for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: River Rock Townhouses Date: 6-8-2017
Property Address: 72-82 Boston Street, Salem, MA
Project: Check one or both as applicable: Vi New construction ❑ Existing Construction
Project description: New Construction of 19,997 sf, 3-story multi-family dwelling (R-2) of type VB
Construction containing 6 townhouse style dwelling units over 1 basement level of private garage (U) of type
VB Construction containing 6 parking spaces.
I Jai Sinnh Khalsa MA Registration Number: FO42 Expiration date: os/31/17 ,am a
registered design professional, and I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other
for the above named project and that to the best of my knowledge, information, and belief such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted
engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary
professional services and be present on the construction site on a regular and periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to official a `Final Construction Control Document'.
E.0 A
Enter in the space to the right a"wet"Ar- UGH K C�
electronic signature and seal:
N
y� 140. A G w t
� CpaA SAP
v
Phone number: _ - y�P mail: ikhalsalc�i tkaeast.com
n
icial Use Only
Building Official Name: Permit No.: Date:
Version 06 11 2013
i
- J
Initial Construction.Control Document
To be submitted with the building permit application by a
Registered Design Professional
for work per the 8 h edition of the
Massachusetts State Building Code, 780 CMR, Section.107.6.2
Project Title: Riverrock Residences-Townhouses Date: 6-1-17
Property Address: 70 Boston St&13 Goodhue St.,Salem, MA
Project: Check one or,both as applicable:xW4ew construction C Existing Construction
Project description: new residential building
i
i
I Brent R. Goldstein MA Registration;Number.: 36782 Expiration date: 6-30-18 ,am a
registered design professional, and hereby certify that I have prepared or directly supervised.the preparation of all design
plans,computations and specifications concerning:
] Entire Project [ ] Architectural [ c Structural [ } Mechanical
[ } Fire Protection [ ], Electrical " [: } Other
for the above named project and that such plans,computations and specifications meet the applicable provisions of the
Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I
understand and agree that I(or my designee)shall perform the necessary professional services and be present on the
construction site on a regular and periodic basis to:
1. Review,for conformance to this code and the design concept.shop drawings,samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter.]7,as applicable..
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.
When required by the building.official, I shall submit field/progress reports(see item:3.)together.with pertinent
comments,in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a!`Final Construction Coo. Doc
,
Enter in the space to the right a."wet"or
electronic signature and seal`
Cs
Phone number: 781-670-9990 brg@gm-se.com
Email;
4
F
Building Official Use Only
Building Official Name: Permit No.: Date:
Trial Version 10 09 2012
Initial Construction Control Document
To be submitted with the building permit application by a
W
Registered Design Professional
for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2
A
Project Title: River Rock Townhouses Date: June 5,2017
Property Address: 72-82 Boston Street, Salem,MA
Project: Check(x)one or both as applicable: [x] New construction [ ] Existing Construction
Project description: New construction of 6 Townhouses on site.
I, Zbigniew M. WoM, MA Registration Number: 34029 Expiration date: June 30, 2018, am a registered design
professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly
supervised the preparation of all design plans, computations and specifications concerning':
[ ] Entire Project [ ] Architectural [ ] Structural [x] Mechanical
[ ] Fire Protection [ ] Electrical [x] Other: Plumbing
for the above-named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance.
with the contract documents and shall be exclusively•responsible for its construction means, methods, sequences
and procedures, and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a `Final Construction Control Document';
�N OF Atq t x
Enter in the space to the right a"wet"or
electronic signature and seal: �o`� ZBIGNIEWM.
0 WOZNY
O MECHANICAL
No.34029
za
I I R FIDAA E. BARBAR
Phone number: 781-826-4144 ASS/0 NOTARY PUBLIC
COMMONWIXTH OF MASSACHUSMS
Email: zwozny@wbaengineers.com My Comm.Expires Oct.27,2017
Building Official Use Only
Building Official Name: Permit No.: Date:
JA16148 River Rock Residential Salem\Affidavits\Initial Constr Ctrl M-P Townhouses 06-05-17.doc
i
I
Initial Construction Control Document
y To be submitted with the building permit application by a
d Registered Design Professional
o- for work per the 8th edition of the
�e,W Massachusetts State Building Code, 780 CMR, Section 107.6.2
sv
Project Title: River Rock Townhouses Date: June 5, 2017
Property Address: 72-82 Boston Street, Salem,MA
Project: Check(x)one or both as applicable: [x]New construction [ ] Existing Construction
Project description: New construction of 6 Townhouses on site.
I, M. Salim Afsar, MA Registration Number: 39083 Expiration date: June 30, 2018, am a registered design professional,
and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the
preparation of all design plans, computations and specifications concerning':
[ ] Entire Project [ ] Architectural [ ] Structural [] Mechanical
[ ] Fire Protection [x] Electrical [x] Other: Fire Alarm
for the above-named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'..~: :.
�a U
OF�.gr s
Enter in the space to the right a"wet"or
electronic signature and seal: M.SALI;�i
A1=SA4
o ELEC'miCAl .;
No.3flQ83
Phone number: 781-826-4144 tdAt- ��\� FIDAA E. BARBAR
NOTARY PUBLIC
Email: safsar@wbaengineers.com COMMONWEALTH OF MASSACHUSETfS
My Comm.Expires Oct.27,2017
Building Official Use Only
Building Official Name: Permit No.: Date:
JAI6148 River Rock Residential Salem\Affidavits\Initial Constr Ctrl Elec Townhouses 06-05-17.doc
IL I
Initial Construction Control Document
z
To be submitted with the building permit application by a
d Registered Design Professional
f ` for work per the 81h edition of the
0W
° Massachusetts State Building Code, 780 CMR, Section 107.6.2
Project Title: River Rock Townhouses Date: June 5,2017
Property Address: 72-82 Boston Street, Salem,MA
Project: Check(x)one or both as applicable: [x] New construction [ ] Existing Construction
Project description: New construction of 6 Townhouses on site.
I, Grzegorz B. WoznX, MA Registration Number: 39170 Expiration date: June 30, 2018, am a registered design
professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly
supervised the preparation of all design plans,computations and specifications concerning':
[ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical
[x] Fire Protection [ ] Electrical Other:
for the above-named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'.=:,Cy` °
Enter in the space to the right a"wet"or
electronic signature and seal:
p GRZEGOkZ
p WOZNY
V FIRE PROTECTION
No.39170 }'�O
Phone number: 781-826-4144 'Ql� (�
Email: gwozny@wbaengineers.com �` FIDAA E. BARBAR
NOTARY PUBLIC
COMMONWEALTH OF MARWWSETTS
My Comm.E�tpires Oct.27,2017
Building Official Use Only
Building Official Name: Permit No.: Date:
JA16148 River Rock Residential Salem\Affidavits\lnitial Constr Ctrl FP Townhouses 06-05-17.doc
OF
WB&A :WoznyBarbar& Associates, Inc.
K CONSULTLNG: ENGINEERS - y
- O CTI
• FIRE PROTECTION NARRATIVE v f
LRI PROPERTIES.LLC -
70 BOSTON STREET:& 13 GOODHUE STREET
- .. . .... SALEM,MA. �E
FEBRUARY 16,20.17.
BASIS(METHODOLOGY)OF DESIGN �= OF
Section 1 -Residential Building Description ��� M.SAL!?
AFSAR a)
1 Building"Use"Group: R=2(residential), S-2(garage) ® LECTR(CAL . -`4
2. Total square footage of Building: 169;993 sq.ft. No. 83 ~
3. Building height: - 42'-31/z''
4. Number of floors above:grade: 4
5. Number of floors below grade: 0 S1OF1t_���
6. Square footage per floor: :. Garage— 17,231 sq.ft. "
First Floor-17,772 sq..ft,
Second Floor- 17,598sq.ft.
Third.Fl.00r-17,392 sq.ft,
7. Type(s)of occupancies(hazards): Light Hazard residential,:Ordinary Hazard I—
garage;storage,mechanical rooms
81. Type(s)of construction: IB &VB
9. Hazardous material usage and storage: Non .
10. Height storage of commodities within a
building stored over 12,ft. N/A_
11. Site access arrangement See civil drawings
Section 2—Applicable Laws and Governing Codes
1. Building Code.:.Massachusetts State Building Code,780 CMR,8th Edition
2. :Referenced Standards::NFPA.13-2013,NFPA 14-2013,NFPA 25-2011,NFPA.72=2010,
3. Applicable Sections of M.G.L.,Chapter 148, "Fire Protection."
4.. . .. _ .Applicable Sections.of 527 CMR"Fire.Prevention Regulations." .. .
5. Applicable Specialized Codes(plumbing,electrical and architectural access.)
6. Applicable Federal Laws such as OSHA,ADA,etc.
Section 3-Design.Responsibility_
1. WoznyBarbar and Associates(WB&A)is providing a design and design criteria including
specifications. Hydraulic calculations are required and have been provided.The design has been .
based on Fire Protection Systems,Chapter 9,Guidelines for the Preparation of Narrative Reports.
2. Fire Protection drawings will indicate:sprinklers in the most remote areas only,as per"guidelines
for the Preparation of the Narrative Reports 780 CMR-903.LI WB&A Associates is providing a
partial design and the design criteria which will be used.by the installing contractor who will
finalizes the system layout,as per Guidelines for the preparation of Fire Protection System
Narrative Reports.WB&A will review sprinkler contractor shop drawings for conformance with
the design documents and NFPA requirements.In addition,WB&A will provide.periodic
inspection during construction.
3. The Professional Fire Protection Engineer of record responsible for the fire suppression will be
Grzegorz B.Wozny,PE,Massachusetts No.39170,and the electrical engineer of record
responsible for fire alarm system will:be'Salim Afsar,PE,Massachusetts No.39083:
Section 4—Fire Protection System to be Installed
1076 Washington Street,Hanover,MA 0233.9•Tel 781.826.4144•Fax 781.924.5792•www.wbaengineers.com
161 Exchange Street,31 Floor,Pawtucket,RI 02860
Page'2
1. Sprinkler System
a. The building will be provided with a 6"fire service and 6"double check valve assembly.
b. The fire service will be located in the garage in the sprinkler room.
C. Fire department inlet connection will be installed within 100 feet from a fire hydrant.
d. Two(2)combination standpipe/sprinkler riser will be located in each staircase.
e. Each floor will be a dedicated sprinkler zone.Floor control valve assemblies will be
located in the staircases.
f. Parking garage,located in the basement,will be a dedicated dry pipe sprinkler zone with
upright sprinklers.Dry pipe valve will be located at the garage level in the sprinkler
room.
g. The sprinkler and standpipe system design will be based on NFPA 1302-13and NFPA
14-2013requirements.
h. Spaces above ceiling will be provided with listed sprinklers.The spacing of those
sprinklers will be 12'x12' maximum.
i. Residential sprinklers will be provided inside apartments and quick response sprinklers
outside apartments.
j. The hydrant flow test was performed on December 7,2016 by Williams Sparage,the
results are as follow:
• Static pressure - 72 psi
• Residual pressure- 70 psi
• Flow - 1106 gpm
2. Fire Alarm System
a. The building shall include a complete independent addressable fire detection and alarm
system with complete audio/visual evacuation signaling. Equipment shall be UL listed
and shall meet the requirements of the local fire department and State Fire Marshal.
1) Alarm notification shall be via ADA-compliant audio and visual signaling
devices,located in common spaces,corridors and public toilets.Low frequency
520HZ mini horns shall be installed in bedrooms and the living rooms of the
dwelling units.
2) Smoke detectors spaced approximately 30' apart or per manufacturers
recommended distances. Smoke detectors shall be located in all common areas,
electric rooms and storage rooms.Remote indicators shall be installed above all
locked doors with detectors inside the room.
3) Pull stations shall be located at the egress to each floor and at all exits from the
building.
4) Audible alarm signals shall sound at march time cadence(120 ppm).The system
shall also be capable of temporal(NFPA 72-2.2.2.2).
5) Flash an alarm LED and sound an audible signal at the FACP. Upon
acknowledgment,the alarm LED shall light steadily and the audible shall
silence. Subsequent alarms shall re-initiate this sequence.
6) Visually indicate the alarm initiating device,type and location via the alpha-
numeric display located at the FACP.
7) Flow,tamper and pressure switches will be wired to the building fire alarm
control panel.
8) A knox/key box shall be installed at all entrances to the building.
9) The fire control panel annunciator will be located at the entry door.A rotating
beacon shall be located on the exterior of the building. The FACP shall be
connected to a Master Box and listed Central Station for transmission of alarms
to the Fire Department
10) 120 volt smoke detectors shall be provided in bedrooms and outside each
bedroom. Detectors shall be equipped with battery backup.
11) 120 volt carbon monoxide detectors shall be provided in outside each bedroom.
Detectors shall be equipped with battery backup.
12) An auto dialer will be provided.
-2-
. Page 3
Section 5—Sequence of Operation
1. Sprinkler System
a. Wet System—When a single heat activated sprinkler fuses and discharges water,flow
switch at a floor control valve assembly is actuated and sends an alarm signal to the main
fire alarm control panel.
a. Dry System—When a single heat activated sprinkler fuses and discharges water,pressure
switch at a dry pipe valve is actuated and sends an alarm signal to the main fire alarm
control panel.
2. Fire Alarm System
a. The operation of a dual action(lift and pull)manual station or activation of any automatic
alarm initiating device(system smoke,heat,waterflow,and pressure switch)shall
automatically:
1) Initiate the transmission of an alarm to the Municipal Fire Station and a listed
Central Station for transmission of alarms to the Fire Department.
2) Audible alarm signals shall sound at march time cadence(120 ppm),The system
shall also be capable of temporal(NFPA 72-2.2.2.2).
3) Flash all visual signals throughout the building in a synchronized manner.Turn
on the exterior beacon at the primary entrance.
4) Flash an alarm LED and sound an audible signal at the FACP.Upon
acknowledgment,the alarm LED shall light steadily and the audible shall
silence. Subsequent alarms shall re-initiate this sequence.
5) Visually indicate the alarm initiating device,type and location via the alpha-
numeric display located at the FACP and at the remote control annunciator.
6) Tampering with any of the supervised control valves shall flash a supervised
signal at the Fire Alarm Control Panel.
Section 6—Testing Criteria
1. Sprinkler System,
a. Notify the authority having jurisdiction and Owner's representative of the time and date
of the test.
b. Perform all required acceptance test as required by NFPA 13 and NFPA 25.
C. Complete and sign the appropriate Contractor's material and test Certificate(s).
2. Fire Alarm System
a. The system shall be fully tested by a UL certified testing company in accordance with UL
guidelines and NFPA standards.Each and every device shall be tested.A copy of NFPA
Record of Completion documentation to Fire Marshall prior to the fire department walk-
through.At a minimum perform the following tests:
1) Before energizing the cables and wires,check for correct connections and test
for short circuits,ground faults,continuity,and insulation.
2) Close each sprinkler system flow valve and verify proper supervisory alarm at
the FACP.
3) Verify activation of all waterflow and pressure switches.
4) Open initiating device circuits and verify that the trouble signal actuates.
5) Open and short signaling line circuits and verify that the trouble signal actuates.
6) Open and short notification appliance circuits and verify that trouble signal
actuates.
7) Ground all circuits and verify response of trouble signals.
8) Check presence and audibility of tone at all alarm notification devices.
9) Check installation,supervision,and operation of all intelligent smoke detectors
using the walk test.
10) Each of the alarm conditions that the system is required to detect should be
introduced on the system.Verify the proper receipt and the proper processing of
the signal at the FACP and the correct activation of the control points.
-3-
Page 4
11) When the system is equipped with optional features,the manufacturer's manual
shall be consulted to determine the proper testing procedures.This is intended to
address such items as verifying controls performed by individually addressed or
T grouped devices,sensitivity monitoring,verification functionality and similar.
b. A copy of the final test report and UL certification shall be submitted indicating proper
functioning of the system and conformance to the specifications.The test shall be
performed by UL certified and factory-trained qualified technicians.Each and every
device shall be tested,and standalone operation of remote panels shall be verified.UL
certification shall be performed by the same company that will hold and execute the Test
and Inspection contract.
Equipment and Tools
During the pre- and final acceptance testing of the systems, the installing contractor will provide the following
equipment at the site.
1. Sprinkler system testing notification announcements to the occupants of the building;
2. All devices within limits of construction shall be tested in strict accordance with manufacturer's
instructions: (i.e. all manual pull stations will be activated and reset with key; all smoke detectors
will be tested with magnets; all AN units will be activated and monitored for audible and visual
notification;etc.);
3. Construction Documents and approved Shop Drawings or As-Built Drawings;
4. Approved narrative description(sequence of operation);
Approval Requirements
The following approvals are necessary prior to the start of work:
1. Salem Fire Department, Permit for Fire Protection System. This permit is for installation of the
fire alarm system and automatic sprinkler system.
2. A verbal approval at time of testing followed by a written documentation shall be issued indicating
all Code requirements have been satisfied.
3. The contractor, in conjunction with the alarm manufacturer, shall rectify all portions of the system
that fail acceptance testing.
4. The contractor and the alarm manufacturer will issue final inspection reports along with
Certificate of Completion verifying all systems affected by construction are in compliance.
5. All documentation for personnel contact regarding emergency notification shall be submitted by
the owner's representative.
JA16148 River Rock\Narrative\FP Narrative 13 Goodhue Street 02-17-17.doc
-4-
I
RIVER ROCK RESIDENTIAL TOWNHOUSES
Fire Sprinkler Reports
for
i Khalsa Design`Iric
17fi1valoo_St Suite 400}
"SOmerviile, MA 02143
t
P �' r� x {-a . ., 41 '`
WoznyBarbar&Associates,Inc.
CONSULTING ENGINEERS
1.076 Washington Street,Hanover;MA 02339'
TEL 781.826.4144 • FAX 781.924.5792
www.wbaengineers,com
,TH OF
Prepared By:
z y
/ G Wozny/Barbar&Associates
P}7 �C 1 Wozny/Barbar&Associates
.5a�� Mo �N 1076 Washington St.
'cG� p i Hanover,MA 02339
LE 781-826-4144
1/30/2017
F�re�Fire,Spcinkler Hydraubcs Calculation Pro ram �` "'",�; ���` `" ���`���������� �` `'��' ��flElte Software Develo meat inc":
r .c��1-^ ';�3,�ct,�`��`. .,?rr� ,r x.� .r T";. �� . �,g ,� y ��'.# sr;,�.' s c. '„` '�.r' '..,�°` ,z^ �-. `�.. •�x�.: fir`.,'�',m�.�%f,.�,.. �„n-:^',.a e z;
Wozny/Ba"rbar�&Associates,-��- ,� � ��� ���� � ���, ';� ��� ��� •� � `��� ���� �Ri�er Rock Residential Townhouses<:
General Project Data Reporf
Project Title: River Rock Residential Townhouses Project File Name: #1..fiw
Designed By: Wozny/Barbar&Associates Date: 1/30/2017
Code Reference: NFPA 1-2013, NFPA 13-2013, Approving Agency: Salem Fire Department
NFPA 14-2013
Client Name: Khalsa Design Inc. Phone: 617-591-8682
Address: 17 Ivaloo St Suite 400 City, State Zip Code: SOmerville, MA 02143
Company Name: Wozny/Barbar&Associates Representative: Tom Hamwey
Company Address: 1076 Washington St. City And State: Hanover, MA 02339
Phone: 781-826-4144
Building Name: River Rock Residences Building Owner:
Townhouses
Contact at Building: Phone at Building:
Address Of Building: 70-92 1/2 Boston St City, State Zip Code: Salem, MA
�l� eV4Datay,. Ms�, `d s :.,' 'x`r' tu-`#'4
ININ, I ,.�,, m ,.r. ✓ ,.
Description Of Hazard: Light Hazard Sprinkler System Type: Wet
Design Area Of Water Application: 430 ft2 Maximum Area Per Sprinkler: 256 ft2
Default Sprinkler K-Factor: 4.90 K Default Pipe Material: BLAZEMASTER CPVC
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 100.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: Tyco Model: LFII
Size: 1/2 Temperature Rating: 155 F
#1, Residential Sprinklers
1afe1 Su t TestQataz: Fz ram. f Y
Source Of Information: Williams Sparages
Test Hydrant ID: Date Of Test: 12-7-2016
Hydrant Elevation: 0 ft Static Pressure: 72.00 psi
Test Flow Rate: 1106.00 gpm Test Residual Pressure: 70.00 psi
Calculated System Flow Rate: 200.60 gpm Calculated Inflow Residual Pressure: 61.44 psi
Available Residual Pressure At
System Flow: 71.92 psi
>Ca Cu NY"07Pro}ect
t
,. Rv-+r'.� .w..,=-� r+m.x�w. �",.rz_
Calculation Mode: Demand
HMD Minimum Residual Pressure: 7.00 psi Minimum Desired Flow Density: 0.10 gpm/ft2
Number Of Active Nodes: 25
Number Of Active Pipes: 24 Number Of Inactive Pipes: 0
Number Of Active Sprinklers: 4 Number Of Inactive Sprinklers: 0
J:\...\#1.fiw .' Monday, June 05, 2017, 2:31 PM