Loading...
B-17-787 - 0072-0082 BOSTON STREET - Building Permit The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling W �— %',(Thi`s Section For Official Use Only) Building Permit Number: Date,Applied: Building Official:` SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for,which a street address is not available) 72-82 Boston Street Salem,' MA . 01970' " '° _River Rock Residences No.and Street City/Town ' Zip Code Name of Building(if applicable) SECTION 2.PROPOSED WORK" �w .... 1 Edition of MA State Code used 8th If New Construction check here M or check all that apply in the two rows below_ Existing Building❑ Repair IJ I Alteration ❑ Addition❑ Demolition`❑ (Please fill out and submit Appendix_1), CD Change of Use ❑ Change of Occupancy `❑ Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes ® No ❑ 'Is an Independent Structural Engineering Peer Review required? Yes,❑ No Sl Brief Description of Proposed Work: New construction of one three(3)story Mufit-Famify dwelling with basement level private garage and associated site improvements TC�t�N� oVSL U N IT- • ... SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR" CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and.Evaluation is enclosed(See 780 CMR 34) ❑ Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA 6 ry Existing ,: ,., Proposed No.of Floors/Stories(include basement levels)&Area Per Floor,(sq.ft.) ; ' 4 4,300 Total Area(sq.ft.)and Total Height(ft.) `' - f' 17,000 42'-6" SECTION 5:USE GROUP(Check'as applicable) A. Assembly A-1❑ A-2❑` Nightclub ❑ A-3 ❑ A-4❑ A-5❑. B: Business ❑' E: Educational ❑ F: Facto F-1❑ F2❑ H: High Hazard- H-1❑ H-2❑ H-3 ❑_ H-4❑ H-5❑ - I: Institutional 1-1❑ 1-2❑ 1-3❑ .1-4❑ M: Mercantile❑ R: Residential R-10 R-2 M R-3❑ R4❑ t S: Storage S-1❑ S-2❑ U. Utility 10 Special Use❑and please describe below: Special Use: SECTION 6.CONSTRUCTION TYPE.(Check as applicable) ------------------ IA ❑ IB ❑ II A.❑ IIB ❑. IIIA 0 II1B'13 IV ❑ VA ❑ VB SECTION 7:SITE-INFORMATION(refer to 790 CMR'111fffor details:on each item) Trench Permit: Debris Removal: Water Supply Flood Zone Information: Sewage Disposal: Licensed Disposal Site q i A trench will not be t . s: Public® Check if outside Flood Zone® Indicate'municipal Ixl required M or trench or specify: a.Private❑ a or indentify Zone: - or on site system❑ z - permit is enclosed❑ a Railroad right-of way: Hazards to Air Navigation:. MA Historic Commission-Review Process:; Not Applicable[i *"` Is Structure within airport approach area? —. Is their review completed? or Consent to Build enclosed❑ Yes❑ or No 91, Yes❑ No ❑ SECTION 8::CONTENT OF CERTIFICATE.OF OCCUPANCY :. Edition of Code: 8th Use Group(s): U, R-2 Type:of Construction: VB Occupant Load per Floor.. 'Does the building contain an Sprinkler System?: Yes Special Stipulations: - 1 M t SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner LAR Properties, Inc. 282 Bennington Street East Boston, MA 02128 Name(Print) «: ' No.and Street s''f._0- City/Town' , Zip Property Owner Contact Information: Anthonyoberto 617 _ 293. 1215 y • _ ,,,. anthony@spinellis.com - Title General Manager Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes - Jeffrey Alley 672 Suffolk Street, Suite 200 Lowell MA 01854 Name t _ Street Address City/Town ` .'State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. .. SECTION 10-CONSTRUCTION CONTROL Mease.fill out Appendix 2) fbuildin is less than 35,000 cu.ft.of enclosed ace and/or.not under Construction Control then check here O and skipSection 10:1 10.1Re •sfered Professional Responsible for Construction Control` Jai Singh Khalsa 617_ 591 :8682 jkhaisa@tkgeast.com 604'2 Name(Registrant) Telephone No! ^° e-mail address Registration Number 17 Ivaloo Street, Suite 400 Somerville " MA 02143 Architectural 8.30.2017 Street Address City/Town- - State Zip Discipline Expiration Date 102`General Contractor Aberthaw.Construction Company, lnc: Company Name John J Klerm CS 90248 u Type U Name of Person Responsible for Construction License No. and Type if Applicable 161 Cotuit Street Andover," MA 01845 Street Address City/Town` _ State Zip 978. 654 4500 = 978 735.9617 John.Klem @@Aberthawcc.com Telephone No. business Telephone No. cell e-mail address SECTION 11:w0RKERS'`COMPENSATION INSURANCE AFFIDAVIT M.G L.c.152.§25C 6 A Workers Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes M No 0 SECTION 12 CONSTRUCTION COSTS AND PER FEE ; Item w4. Estimated Costs:(Labor , and Materials) Total Construction Cost(from Item 6)_$ 2,577,172 ' 1.Building $ 1,947,472 Building Permit Fee=Total Construction Cost x 11 (Insert here 2.Electrical - $ 176,535- appropriate municipal factor)=$ 28,349. 3.Plumbing • • $ 237,531 - 4.Mechanical (HVAC) $ 171,699 Note:Minimum fee=$ (contact municipality) 5.Mechanical Other $ 43 962 Enclose check payable to City of Salem 6.Total Cost $ . 2,577,172 (contact municipality)and write check number here SECTION 13 SIGNATURE;OF BUILDING PERMIT APPLICANT - - 'By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding,, A Jeffre -Alley Vice President 978-654 A500 x108 Ple prinj( d sign nain Title Telephone No. Date 672 Suffolk treet, Su�IteVQQ Lowell MA 01854 Street Address City/Town State. Zip Municipal Inspector to fill-out this section upon application approval. o ' ' Name Date f Initial Construction Control Document T y To be submitted with the building permit application by a dRegistered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: River Rock Townhouses Date: 6-8-2017 Property Address: 72-82 Boston Street, Salem, MA Project: Check one or both as applicable: Vi New construction ❑ Existing Construction Project description: New Construction of 19,997 sf, 3-story multi-family dwelling (R-2) of type VB Construction containing 6 townhouse style dwelling units over 1 basement level of private garage (U) of type VB Construction containing 6 parking spaces. I Jai Sinnh Khalsa MA Registration Number: FO42 Expiration date: os/31/17 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to official a `Final Construction Control Document'. E.0 A Enter in the space to the right a"wet"Ar- UGH K C� electronic signature and seal: N y� 140. A G w t � CpaA SAP v Phone number: _ - y�P mail: ikhalsalc�i tkaeast.com n icial Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 i - J Initial Construction.Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8 h edition of the Massachusetts State Building Code, 780 CMR, Section.107.6.2 Project Title: Riverrock Residences-Townhouses Date: 6-1-17 Property Address: 70 Boston St&13 Goodhue St.,Salem, MA Project: Check one or,both as applicable:xW4ew construction C Existing Construction Project description: new residential building i i I Brent R. Goldstein MA Registration;Number.: 36782 Expiration date: 6-30-18 ,am a registered design professional, and hereby certify that I have prepared or directly supervised.the preparation of all design plans,computations and specifications concerning: ] Entire Project [ ] Architectural [ c Structural [ } Mechanical [ } Fire Protection [ ], Electrical " [: } Other for the above named project and that such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept.shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter.]7,as applicable.. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building.official, I shall submit field/progress reports(see item:3.)together.with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a!`Final Construction Coo. Doc , Enter in the space to the right a."wet"or electronic signature and seal` Cs Phone number: 781-670-9990 brg@gm-se.com Email; 4 F Building Official Use Only Building Official Name: Permit No.: Date: Trial Version 10 09 2012 Initial Construction Control Document To be submitted with the building permit application by a W Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2 A Project Title: River Rock Townhouses Date: June 5,2017 Property Address: 72-82 Boston Street, Salem,MA Project: Check(x)one or both as applicable: [x] New construction [ ] Existing Construction Project description: New construction of 6 Townhouses on site. I, Zbigniew M. WoM, MA Registration Number: 34029 Expiration date: June 30, 2018, am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': [ ] Entire Project [ ] Architectural [ ] Structural [x] Mechanical [ ] Fire Protection [ ] Electrical [x] Other: Plumbing for the above-named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care, and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or relieve the Contractor of its submittal and other responsibilities. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The Contractor shall be responsible for performing the work in accordance. with the contract documents and shall be exclusively•responsible for its construction means, methods, sequences and procedures, and for construction safety. 4. The performance of the services shall not require any special testing or inspections unless specifically stated in the Code. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'; �N OF Atq t x Enter in the space to the right a"wet"or electronic signature and seal: �o`� ZBIGNIEWM. 0 WOZNY O MECHANICAL No.34029 za I I R FIDAA E. BARBAR Phone number: 781-826-4144 ASS/0 NOTARY PUBLIC COMMONWIXTH OF MASSACHUSMS Email: zwozny@wbaengineers.com My Comm.Expires Oct.27,2017 Building Official Use Only Building Official Name: Permit No.: Date: JA16148 River Rock Residential Salem\Affidavits\Initial Constr Ctrl M-P Townhouses 06-05-17.doc i I Initial Construction Control Document y To be submitted with the building permit application by a d Registered Design Professional o- for work per the 8th edition of the �e,W Massachusetts State Building Code, 780 CMR, Section 107.6.2 sv Project Title: River Rock Townhouses Date: June 5, 2017 Property Address: 72-82 Boston Street, Salem,MA Project: Check(x)one or both as applicable: [x]New construction [ ] Existing Construction Project description: New construction of 6 Townhouses on site. I, M. Salim Afsar, MA Registration Number: 39083 Expiration date: June 30, 2018, am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': [ ] Entire Project [ ] Architectural [ ] Structural [] Mechanical [ ] Fire Protection [x] Electrical [x] Other: Fire Alarm for the above-named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care, and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or relieve the Contractor of its submittal and other responsibilities. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The Contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures, and for construction safety. 4. The performance of the services shall not require any special testing or inspections unless specifically stated in the Code. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'..~: :. �a U OF�.gr s Enter in the space to the right a"wet"or electronic signature and seal: M.SALI;�i A1=SA4 o ELEC'miCAl .; No.3flQ83 Phone number: 781-826-4144 tdAt- ��\� FIDAA E. BARBAR NOTARY PUBLIC Email: safsar@wbaengineers.com COMMONWEALTH OF MASSACHUSETfS My Comm.Expires Oct.27,2017 Building Official Use Only Building Official Name: Permit No.: Date: JAI6148 River Rock Residential Salem\Affidavits\Initial Constr Ctrl Elec Townhouses 06-05-17.doc IL I Initial Construction Control Document z To be submitted with the building permit application by a d Registered Design Professional f ` for work per the 81h edition of the 0W ° Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: River Rock Townhouses Date: June 5,2017 Property Address: 72-82 Boston Street, Salem,MA Project: Check(x)one or both as applicable: [x] New construction [ ] Existing Construction Project description: New construction of 6 Townhouses on site. I, Grzegorz B. WoznX, MA Registration Number: 39170 Expiration date: June 30, 2018, am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': [ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [x] Fire Protection [ ] Electrical Other: for the above-named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care, and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or relieve the Contractor of its submittal and other responsibilities. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The Contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures, and for construction safety. 4. The performance of the services shall not require any special testing or inspections unless specifically stated in the Code. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'.=:,Cy` ° Enter in the space to the right a"wet"or electronic signature and seal: p GRZEGOkZ p WOZNY V FIRE PROTECTION No.39170 }'�O Phone number: 781-826-4144 'Ql� (� Email: gwozny@wbaengineers.com �` FIDAA E. BARBAR NOTARY PUBLIC COMMONWEALTH OF MARWWSETTS My Comm.E�tpires Oct.27,2017 Building Official Use Only Building Official Name: Permit No.: Date: JA16148 River Rock Residential Salem\Affidavits\lnitial Constr Ctrl FP Townhouses 06-05-17.doc OF WB&A :WoznyBarbar& Associates, Inc. K CONSULTLNG: ENGINEERS - y - O CTI • FIRE PROTECTION NARRATIVE v f LRI PROPERTIES.LLC - 70 BOSTON STREET:& 13 GOODHUE STREET - .. . .... SALEM,MA. �E FEBRUARY 16,20.17. BASIS(METHODOLOGY)OF DESIGN �= OF Section 1 -Residential Building Description ��� M.SAL!? AFSAR a) 1 Building"Use"Group: R=2(residential), S-2(garage) ® LECTR(CAL . -`4 2. Total square footage of Building: 169;993 sq.ft. No. 83 ~ 3. Building height: - 42'-31/z'' 4. Number of floors above:grade: 4 5. Number of floors below grade: 0 S1OF1t_��� 6. Square footage per floor: :. Garage— 17,231 sq.ft. " First Floor-17,772 sq..ft, Second Floor- 17,598sq.ft. Third.Fl.00r-17,392 sq.ft, 7. Type(s)of occupancies(hazards): Light Hazard residential,:Ordinary Hazard I— garage;storage,mechanical rooms 81. Type(s)of construction: IB &VB 9. Hazardous material usage and storage: Non . 10. Height storage of commodities within a building stored over 12,ft. N/A_ 11. Site access arrangement See civil drawings Section 2—Applicable Laws and Governing Codes 1. Building Code.:.Massachusetts State Building Code,780 CMR,8th Edition 2. :Referenced Standards::NFPA.13-2013,NFPA 14-2013,NFPA 25-2011,NFPA.72=2010, 3. Applicable Sections of M.G.L.,Chapter 148, "Fire Protection." 4.. . .. _ .Applicable Sections.of 527 CMR"Fire.Prevention Regulations." .. . 5. Applicable Specialized Codes(plumbing,electrical and architectural access.) 6. Applicable Federal Laws such as OSHA,ADA,etc. Section 3-Design.Responsibility_ 1. WoznyBarbar and Associates(WB&A)is providing a design and design criteria including specifications. Hydraulic calculations are required and have been provided.The design has been . based on Fire Protection Systems,Chapter 9,Guidelines for the Preparation of Narrative Reports. 2. Fire Protection drawings will indicate:sprinklers in the most remote areas only,as per"guidelines for the Preparation of the Narrative Reports 780 CMR-903.LI WB&A Associates is providing a partial design and the design criteria which will be used.by the installing contractor who will finalizes the system layout,as per Guidelines for the preparation of Fire Protection System Narrative Reports.WB&A will review sprinkler contractor shop drawings for conformance with the design documents and NFPA requirements.In addition,WB&A will provide.periodic inspection during construction. 3. The Professional Fire Protection Engineer of record responsible for the fire suppression will be Grzegorz B.Wozny,PE,Massachusetts No.39170,and the electrical engineer of record responsible for fire alarm system will:be'Salim Afsar,PE,Massachusetts No.39083: Section 4—Fire Protection System to be Installed 1076 Washington Street,Hanover,MA 0233.9•Tel 781.826.4144•Fax 781.924.5792•www.wbaengineers.com 161 Exchange Street,31 Floor,Pawtucket,RI 02860 Page'2 1. Sprinkler System a. The building will be provided with a 6"fire service and 6"double check valve assembly. b. The fire service will be located in the garage in the sprinkler room. C. Fire department inlet connection will be installed within 100 feet from a fire hydrant. d. Two(2)combination standpipe/sprinkler riser will be located in each staircase. e. Each floor will be a dedicated sprinkler zone.Floor control valve assemblies will be located in the staircases. f. Parking garage,located in the basement,will be a dedicated dry pipe sprinkler zone with upright sprinklers.Dry pipe valve will be located at the garage level in the sprinkler room. g. The sprinkler and standpipe system design will be based on NFPA 1302-13and NFPA 14-2013requirements. h. Spaces above ceiling will be provided with listed sprinklers.The spacing of those sprinklers will be 12'x12' maximum. i. Residential sprinklers will be provided inside apartments and quick response sprinklers outside apartments. j. The hydrant flow test was performed on December 7,2016 by Williams Sparage,the results are as follow: • Static pressure - 72 psi • Residual pressure- 70 psi • Flow - 1106 gpm 2. Fire Alarm System a. The building shall include a complete independent addressable fire detection and alarm system with complete audio/visual evacuation signaling. Equipment shall be UL listed and shall meet the requirements of the local fire department and State Fire Marshal. 1) Alarm notification shall be via ADA-compliant audio and visual signaling devices,located in common spaces,corridors and public toilets.Low frequency 520HZ mini horns shall be installed in bedrooms and the living rooms of the dwelling units. 2) Smoke detectors spaced approximately 30' apart or per manufacturers recommended distances. Smoke detectors shall be located in all common areas, electric rooms and storage rooms.Remote indicators shall be installed above all locked doors with detectors inside the room. 3) Pull stations shall be located at the egress to each floor and at all exits from the building. 4) Audible alarm signals shall sound at march time cadence(120 ppm).The system shall also be capable of temporal(NFPA 72-2.2.2.2). 5) Flash an alarm LED and sound an audible signal at the FACP. Upon acknowledgment,the alarm LED shall light steadily and the audible shall silence. Subsequent alarms shall re-initiate this sequence. 6) Visually indicate the alarm initiating device,type and location via the alpha- numeric display located at the FACP. 7) Flow,tamper and pressure switches will be wired to the building fire alarm control panel. 8) A knox/key box shall be installed at all entrances to the building. 9) The fire control panel annunciator will be located at the entry door.A rotating beacon shall be located on the exterior of the building. The FACP shall be connected to a Master Box and listed Central Station for transmission of alarms to the Fire Department 10) 120 volt smoke detectors shall be provided in bedrooms and outside each bedroom. Detectors shall be equipped with battery backup. 11) 120 volt carbon monoxide detectors shall be provided in outside each bedroom. Detectors shall be equipped with battery backup. 12) An auto dialer will be provided. -2- . Page 3 Section 5—Sequence of Operation 1. Sprinkler System a. Wet System—When a single heat activated sprinkler fuses and discharges water,flow switch at a floor control valve assembly is actuated and sends an alarm signal to the main fire alarm control panel. a. Dry System—When a single heat activated sprinkler fuses and discharges water,pressure switch at a dry pipe valve is actuated and sends an alarm signal to the main fire alarm control panel. 2. Fire Alarm System a. The operation of a dual action(lift and pull)manual station or activation of any automatic alarm initiating device(system smoke,heat,waterflow,and pressure switch)shall automatically: 1) Initiate the transmission of an alarm to the Municipal Fire Station and a listed Central Station for transmission of alarms to the Fire Department. 2) Audible alarm signals shall sound at march time cadence(120 ppm),The system shall also be capable of temporal(NFPA 72-2.2.2.2). 3) Flash all visual signals throughout the building in a synchronized manner.Turn on the exterior beacon at the primary entrance. 4) Flash an alarm LED and sound an audible signal at the FACP.Upon acknowledgment,the alarm LED shall light steadily and the audible shall silence. Subsequent alarms shall re-initiate this sequence. 5) Visually indicate the alarm initiating device,type and location via the alpha- numeric display located at the FACP and at the remote control annunciator. 6) Tampering with any of the supervised control valves shall flash a supervised signal at the Fire Alarm Control Panel. Section 6—Testing Criteria 1. Sprinkler System, a. Notify the authority having jurisdiction and Owner's representative of the time and date of the test. b. Perform all required acceptance test as required by NFPA 13 and NFPA 25. C. Complete and sign the appropriate Contractor's material and test Certificate(s). 2. Fire Alarm System a. The system shall be fully tested by a UL certified testing company in accordance with UL guidelines and NFPA standards.Each and every device shall be tested.A copy of NFPA Record of Completion documentation to Fire Marshall prior to the fire department walk- through.At a minimum perform the following tests: 1) Before energizing the cables and wires,check for correct connections and test for short circuits,ground faults,continuity,and insulation. 2) Close each sprinkler system flow valve and verify proper supervisory alarm at the FACP. 3) Verify activation of all waterflow and pressure switches. 4) Open initiating device circuits and verify that the trouble signal actuates. 5) Open and short signaling line circuits and verify that the trouble signal actuates. 6) Open and short notification appliance circuits and verify that trouble signal actuates. 7) Ground all circuits and verify response of trouble signals. 8) Check presence and audibility of tone at all alarm notification devices. 9) Check installation,supervision,and operation of all intelligent smoke detectors using the walk test. 10) Each of the alarm conditions that the system is required to detect should be introduced on the system.Verify the proper receipt and the proper processing of the signal at the FACP and the correct activation of the control points. -3- Page 4 11) When the system is equipped with optional features,the manufacturer's manual shall be consulted to determine the proper testing procedures.This is intended to address such items as verifying controls performed by individually addressed or T grouped devices,sensitivity monitoring,verification functionality and similar. b. A copy of the final test report and UL certification shall be submitted indicating proper functioning of the system and conformance to the specifications.The test shall be performed by UL certified and factory-trained qualified technicians.Each and every device shall be tested,and standalone operation of remote panels shall be verified.UL certification shall be performed by the same company that will hold and execute the Test and Inspection contract. Equipment and Tools During the pre- and final acceptance testing of the systems, the installing contractor will provide the following equipment at the site. 1. Sprinkler system testing notification announcements to the occupants of the building; 2. All devices within limits of construction shall be tested in strict accordance with manufacturer's instructions: (i.e. all manual pull stations will be activated and reset with key; all smoke detectors will be tested with magnets; all AN units will be activated and monitored for audible and visual notification;etc.); 3. Construction Documents and approved Shop Drawings or As-Built Drawings; 4. Approved narrative description(sequence of operation); Approval Requirements The following approvals are necessary prior to the start of work: 1. Salem Fire Department, Permit for Fire Protection System. This permit is for installation of the fire alarm system and automatic sprinkler system. 2. A verbal approval at time of testing followed by a written documentation shall be issued indicating all Code requirements have been satisfied. 3. The contractor, in conjunction with the alarm manufacturer, shall rectify all portions of the system that fail acceptance testing. 4. The contractor and the alarm manufacturer will issue final inspection reports along with Certificate of Completion verifying all systems affected by construction are in compliance. 5. All documentation for personnel contact regarding emergency notification shall be submitted by the owner's representative. JA16148 River Rock\Narrative\FP Narrative 13 Goodhue Street 02-17-17.doc -4- I RIVER ROCK RESIDENTIAL TOWNHOUSES Fire Sprinkler Reports for i Khalsa Design`Iric 17fi1valoo_St Suite 400} "SOmerviile, MA 02143 t P �' r� x {-a . ., 41 '` WoznyBarbar&Associates,Inc. CONSULTING ENGINEERS 1.076 Washington Street,Hanover;MA 02339' TEL 781.826.4144 • FAX 781.924.5792 www.wbaengineers,com ,TH OF Prepared By: z y / G Wozny/Barbar&Associates P}7 �C 1 Wozny/Barbar&Associates .5a�� Mo �N 1076 Washington St. 'cG� p i Hanover,MA 02339 LE 781-826-4144 1/30/2017 F�re�Fire,Spcinkler Hydraubcs Calculation Pro ram �` "'",�; ���` `" ���`���������� �` `'��' ��flElte Software Develo meat inc": r .c��1-^ ';�3,�ct,�`��`. .,?rr� ,r x.� .r T";. �� . �,g ,� y ��'.# sr;,�.' s c. '„` '�.r' '..,�°` ,z^ �-. `�.. •�x�.: fir`.,'�',m�.�%f,.�,.. �„n-:^',.a e z; Wozny/Ba"rbar�&Associates,-��- ,� � ��� ���� � ���, ';� ��� ��� •� � `��� ���� �Ri�er Rock Residential Townhouses<: General Project Data Reporf Project Title: River Rock Residential Townhouses Project File Name: #1..fiw Designed By: Wozny/Barbar&Associates Date: 1/30/2017 Code Reference: NFPA 1-2013, NFPA 13-2013, Approving Agency: Salem Fire Department NFPA 14-2013 Client Name: Khalsa Design Inc. Phone: 617-591-8682 Address: 17 Ivaloo St Suite 400 City, State Zip Code: SOmerville, MA 02143 Company Name: Wozny/Barbar&Associates Representative: Tom Hamwey Company Address: 1076 Washington St. City And State: Hanover, MA 02339 Phone: 781-826-4144 Building Name: River Rock Residences Building Owner: Townhouses Contact at Building: Phone at Building: Address Of Building: 70-92 1/2 Boston St City, State Zip Code: Salem, MA �l� eV4Datay,. Ms�, `d s :.,' 'x`r' tu-`#'4 ININ, I ,.�,, m ,.r. ✓ ,. Description Of Hazard: Light Hazard Sprinkler System Type: Wet Design Area Of Water Application: 430 ft2 Maximum Area Per Sprinkler: 256 ft2 Default Sprinkler K-Factor: 4.90 K Default Pipe Material: BLAZEMASTER CPVC Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 100.00 gpm In Rack Sprinkler Allowance: 0.00 gpm Sprinkler Specifications Make: Tyco Model: LFII Size: 1/2 Temperature Rating: 155 F #1, Residential Sprinklers 1afe1 Su t TestQataz: Fz ram. f Y Source Of Information: Williams Sparages Test Hydrant ID: Date Of Test: 12-7-2016 Hydrant Elevation: 0 ft Static Pressure: 72.00 psi Test Flow Rate: 1106.00 gpm Test Residual Pressure: 70.00 psi Calculated System Flow Rate: 200.60 gpm Calculated Inflow Residual Pressure: 61.44 psi Available Residual Pressure At System Flow: 71.92 psi >Ca Cu NY"07Pro}ect t ,. Rv-+r'.� .w..,=-� r+m.x�w. �",.rz_ Calculation Mode: Demand HMD Minimum Residual Pressure: 7.00 psi Minimum Desired Flow Density: 0.10 gpm/ft2 Number Of Active Nodes: 25 Number Of Active Pipes: 24 Number Of Inactive Pipes: 0 Number Of Active Sprinklers: 4 Number Of Inactive Sprinklers: 0 J:\...\#1.fiw .' Monday, June 05, 2017, 2:31 PM