Loading...
B-19-39 - 0009 BARNES CIRCLE - Building Permit DocaSign Envelope ID:287A11EC-664A-489B-99C8-F35C4BF3244A � CK 9 q r • The Commonwealth of Massachusetts Board of Building Regulations and Standards CITY OF ?t I F�1. r'D SALEM Massachusetts State Building Code,780 CMR `t,=,' AN I i_l t , Revised Mar 20/1 Building Permit Application To Construct,Repair,Renovate Or Demolish a One-or Two-Family Dwelling fh This Section For Official Use Only �^ Building Permit Number: Date Applied: Building Official(Print Name) Signature Date SECTION l:SITE INFORMATION /1 1.1 Prop rty Tess: ^ 1.2 Assessors Map&Parcel Numbers I V 1 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 11 Opwnrrr f Record: ladimir Cagan ���� Name(Print) r City,State,ZIP No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s))S( Addition ❑ Demolition ❑ Accessory Bldg.❑ Number_of.Units Other ❑ Specify:. Brief Description of Proposed Work':• /V r SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Item Official.Use Only (Labor and Materials). 1. Building $ L Building Permit Fee:$ _Indicate how fee is determined: 2. Electrical $ - )❑Standard City/Town Application Fee ��'——'! #❑Total Project Cost(Item 6)x multiplier x 3. Plumbing S i{_ 2, Other Fees: $ p f 4. Mechanical (HVAC) $ List; f� ~ 5.Mechanical (Fire Suppression) $ Total All Fees:$ Check No. . Check Amount: Cash Amount: 6.Total Project Cost: $ 2 ❑Paid in Full 0 Outstanding Balance Due: 7 f DocuSign Envelope ID:287A11 EC-664A-4896-99C8-F35C4l3F3244A SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) -, Y��e 1eo�o� License Number Expiration Date Name of CSL Holder v List CSL Type(see below) 2--3o Pam.:f-k l C K6\/C t'P I- No.and Street Type Description U Unrestricted(Buildings u to 35,000 cu.ft. MI �� y'4 R Restricted 1&2 Family Dwelling City/Town,State, M Masonry i RC Roofing.Covering I WS Window and Siding j 78 1305jtiOS SF Solid Fuel Burning Appliances I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 91 HIC Registration Number Expiration Date, HIC Company Name or H C Rcgisiont Name No.and Street C Email address W t►Pyl tf 1C�-` -�1 /�r 1 .S 30t0 City/Town,SIP- . Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes...,.. No ,.,.:._...❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize: V I V l ✓1 S6 A-YL— to act on my behalf,in all matters relative to work authorized by this building permit application. 7si a er 4 Pr nt OWner,'s Name(ElectroniaSignature) " Date SECTION 7b;OWNERt OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Print Owner's or Authorized Agent's Name(Electronic Signature) _ Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www:mass:=ol, y/oca Information on the Construction Supervisor License can be found at www.mass.gov/dRs 2. When substantial work is planned,provide the information below:.` ``� . Total floor area(sq.ft.) (including garage,fmished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of'fireplaces Number of bedrooms Number of bathrooms . Number of half/baths Type of heating system Yp g 'Y Number of decks/porches �' Type of cooling system Enclosed.. Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost"'' (�J owo nt. solar 1800 W Ashton Blvd. VV ��lJSttulructural Group Lehi, UT 84043 J. Matthew Walsh, SE, PE Samuel Brown, PE Senior Structural Engineering Manager Structural Engineer james.walsh@a vivin Molar.com sam.brown0vivintsolar.com January 10, 2019 Re: Structural Engineering Services Kagan Residence 9 Barnes Cir, Salem, MA S-6037425; MA-01 To Whom It May Concern: We have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit by a representative from our office under my supervision identifying specific interior and exterior site information including the condition of the existing roof system and the size, spacing, and condition of existing structural framing members. Information gathered during the site visit includes photographs, sketches, and verification forms. 2. Design drawings of the proposed PV System layout, including details to mount the new solar panels to the existing roof. Based on the above information, we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: A. Description of Residence: The existing residence is typical wood framing construction with a maximum of two layers of composite shingle roofing. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components and consists of the following: • Roof Section 1: Prefabricated trusses at 24" on center. Survey photos indicate that there was free access to verify the framing size and spacing. B. Loading Criteria 8.49 PSF= Dead Load (roofing/framing) 2.59 PSF= Dead Load (solar panels/mounting hardware) 11.08 PSF=Total Dead Load 20 PSF= Roof Live Load 50 PSF =Ground Snow Load (based on local requirements) Wind speed of 127 mph (based on Exposure Category B-the total area subject to wind uplift is calculated for the Interior, Edge, and Corner Zones of the dwelling.) C. Solar Panel Anchorage 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below. If, during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. • Unirac, Inc. Installation Manual, which can be found on the Unirac, Inc.website (www.unirac.com). 2. The solar panels are 11/2' thick and mounted 41/2" off the roof for a total height off the existing roof of 6". At no time will the panels be mounted higher than 6"above the existing plane of the roof. Page l of 2 v solar Page 2 of 2 3. The following mounting types shall be used. Please refer to the mounting details for the associated required penetration depth. Based on our evaluation, the pullout demand is less than the maximum allowable per connection and therefore is adequate. • Unirac, Inc.: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications (NDS) of timber construction specifications for Spruce-Pine-Fir is 235 Ibs/inch penetration. 4. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind load uplift procedures of ASCE 7-10 and is specified below. These spacing requirements apply to all mount types indicated above. The following values have been verified by in-house testing and the mounting hardware manufacturers'data, which are available upon request. Panel support connections should be staggered, where possible, to distribute load to adjacent members. Modules in Landscape Modules in Portrait Roof Zone Interior Ede Corner Interior Ede Corner Max Vertical Spacing in 40 40 40 66 66 66 Max Horizontal Spacing in 72 72 72 48 48 48 Max Uplift Load Ibs 174 141 133 293 239 224 D.Summary Based on the above evaluation,with appropriate panel anchors being utilized the roof system designed on will adequately support the additional loading imposed by the solar panels, if installed correctly. This evaluation has been performed for the structural elements only and verifies that they are in conformance with the 2015 International Residential Code with Massachusetts Amendments, current industry standards and practice, and the information supplied to us at the time of this report. If there are any questions regarding'the above, or if more information is required, please contact me. i N OF M,gss�� Regards, \se J. J. Matthew Walsh, SE, PE MA License No. 54057 - F .p Nio. 540.7 Q. L r T 01/10/2019 o s wnrint. sol e WRMCTKM GOVERNING CODES ALL WORK SHALL CONFORM TO THE FOLLOWING CODES a. 2015INTERNATIONAL RESIDENTIAL CODE b. 2017 NATIONAL ELECTRICAL CODE C. ANY OTHER LOCAL AMENDMENTS SHEET INDEX: COVER SHEET PV 1.0-SITE PLAN S 1.0-MOUNT DETAILS u E 1.0-ELECTRICAL DIAGRAM E 2.0-ELECTRICAL NOTES E 3.0-WARNING LABELS E 4.0-WARNING LABEL LOCATIONS GENERAL ELECTRICAL NOTES: GENERAL STRUCTURAL NOTES: ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL a. THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING MEANS DESIGNED AND LISTED FOR SUCH USE.FOR ROOF-MOUNTED THE SFM SYSTEM BY UNIRAC.THE MOUNTING FEET ARE TO BE SPACED AS SYSTEMS,WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF SHOWN IN THE DETAILS,AND MUST BE STAGGERED TO ADJACENT FRAMING THE ROOF SURFACE. MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD. ANY CODE VIOLATIONS EVIDENT IN THE INTERCONNECTION PANEL WILL BE b. UNLESS NOTED OTHERWISE,MOUNTING ANCHORS SHALL BE%fi LAG CORRECTED ON INSTALLATION. SCREWS WITH A MINIMUM OF 2Y2"PENETRATION INTO ROOF FRAMING. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL RELEVANT CODE C. THE PROPOSED PV SYSTEM ADDS 2.6 psf TO THE ROOF FRAMING SYSTEM. RAPID SHUTDOWN INITIATION TAKES PLACE WITHIN THE FIRMWARE OF THE d. ROOF LIVE LOAD=20 psf TYPICAL,0 psf UNDER NEW PV SYSTEM. INVERTER.RAPID SHUTDOWN COMMENCES UPON LOSS OF UTILITY SOURCE e. GROUND SNOW LOAD=50 psf VOLTAGE. I. WIND SPEED=127 mph SEE`E 1.0 AND*E 2.0 FOR DIAGRAMS,CALCULATIONS,SCHEDULE AND g. EXPOSURE CATEGORY=B "'"� }. ®I SPECIFICATIONS. Y Y 6 ar 1800 ASHTON BLVD.LEHI,UT,84043 1.877.404.4129 +i MA LICENSE: HIC-170848, ME-15688A,SS-002342 PHOTOVOLTAIC SYSTEM SPECIFICATIONS: KAGAN RESIDENCE CIR SYSTEM SIZE-3.1 OOkW DC 3.8OOkW AC 9 y� � $ALEM,M,M MA,A,01970 MODULE TYPE&AMOUNT-(10)Jinko Solar JKM31 OM-60BL WITH 10 SolarEdge P320 OPTIMIZERS UTILITY ACCOUNT u:00833-85013 MODULE DIMENSIONS-(L/W/H)65.55"/39.45"/1.38" — INVERTER-(1)SolarEdge Technologies SE380OH-USOOONNC2 SERVICEM s-6037425 INTERCONNECTION METHOD-LOAD TAP REGIONAL ccENrER MA41 COVER ' DATE:1/10/2019 yt, � DRAWN BY:DIN SHEET PV STRING(S): SYSTEM LEGEND ® 1 SLOPE-23 #1)10MODULES AZIMUTH-310 PV SYSTEM SIZE: MATERIAL- ' NEW 3.100kW DC I 3.800kW AC J BARNES CIR COMPOSITION SHINGLE EXISTING 6.120kW DC I 5.160kW AC FRONT OF HOUSE. - EXISTING INTERIOR MAIN SERVICE PANEL 8 Fml POINT OF INTERCONNECTION.TIED TO UTILITY METER#25063490. NEW SMART PRODUCTION METER.LOCATED F WITHIN 10'OF MSP. ® NEW PV SYSTEM AC DISCONNECT. LOCATED WITHIN 10'OF MSP. 1 NEW PV SYSTEM INVERTER:SolarEdge Technologie SE380OH-USOOONNC2(RSD EQUIPPED) 10 NEW JINKO SOLAR JKM31OM-608L MODULES. NEW SOLAR EDGE P320 OPTIMIZERS,MOUNTED O - - ON THE BACK OF EACH MODULE. 1 © NEW DEDICATED PV SYSTEM COMBINER PANEL 24 EXISTING TRINA SOLAR TSM-255 PA05 ®MODULES. 24 EXISTING ENPHASE M215-60-21-L-S2X-ZC INVERTER(S). NEW PV CONDUIT RUN.'SEE EEI.O CONDUIT SCHEDULE -EXTERIOR RUN—————=ATTIC RUN E/' I ----�W M O NEW JUNCTION BOX.(MOUNTED TO PV MODULE) JA © EXISTING DEDICATED PV SYSTEM COMBINER W/ PANEL EXISTING PV SYSTEM AC DISCONNECT. EXISTING SMART PRODUCTION METER.LOCATED WITHIN 10'OF MSP. 4- EXISTING UTILITY METER: O A 25063490 El ❑ I vivint.Solar 1.877.404.4129 KAGAN RESIDENCE 9 BARNES CIR SALEM,MA,01970 UTILITY ACCOUNT#:00833-85013 SITE PLAN SERVICE REGIONAL OPERATINGSE037425 CENTER:MA-01 PV 1.0 DATE:1110/2019 SCALE:3116"=V-O" DRAWN BY:DIN MOUNTING LEGEND M R. THING M o ^ SFM—9"ATTACHED SPLICE NOT TO SCALE SFM-TRIMRAIL WITH 1 SFM-ROOF ATTACHMENT 2 SECTION VIEW 3 ROOF ATTACHMENT $ SFM-3"RAIL $1.0 NOT TO SCALE $1 D NOT-1-1 $1.D NOT TO SCALE $1.0 NOT TO SCALE SFM 9-ATTACHED SPLICE t CLAMP.ATTACHMENT � CLAMP• HMENT " COUPLING COUPLING SFM 9'SPLICE MODULE - SFM 3' ILSCO SGB-4 GROUNDING LUGS RAFTER sI NOT TO MODULE �� RAFTER / 9 \MODULES IN PORTRAIT/LANDSPACE TRIMRAIL SPLICE 510 NOT TO SCALE TRIMRAIL ROOF ATTACHMENT.SEE TABLE 6 SFM LAYOUT TRIMRAIL B SFM—9"SPLICE $1.0 NOT TO SCALE $1.0 NOT TO SCALE N y/ryy CANTILEVER I/3OR LE. i�/`,Int•Sola IOSCAPE=MAX 72"(6') `' PORTRAIT=MAX 48'(4') Pu"c cuMP Z 1.877.404.4129 1 MODULE 3fimm PROFILE , KAGAN RESIDENCE RAFTER 9 BARNES CIR T SALEM,MA,01970 PV SYSTEM MOUNTING DETAIL 11 SFM-TRIMRAIL 1 UTILITY ACCOUNT*00833-B5013 10 $1.0 NOT TO`,PALE $1.0 NOT TO SCALE 40mm PROFILE SERVICE p:5-6037425OPER 1 REGIONAL MOUNT DETAILS DATE:1IN/2019CENTER:MA-01 S 1•0 DATE:1/102019 SCALE:NOT TO SCALE DRAWN BY:DIN Photovoltaic System Conduit Conductor Schedule(ALL CONDUCTORS MUST BE COPPER) DC System Size(Watts) 3100 Tag# Description Wire Gauge #of conductors/Color Conduit Type Conduit Size M t 2 AC System Size(Watts) 3800 1 PV Wire 10 AWG 2(V+,V-) N/A-Free Air N/A-Free Air N Total Module Count SO 1 Bare Copper Ground-EGC 6 AWG 1 BARE N/A-free Air N/A-Free Air 0 00 t 2 /yam 2 THWN-2 12AWG 211V+,SV-)B/R EMT 1/2" `q, N v o 2THWN-2-EGC 12AWG 1(GRN) EMT 1/2" a 3 THWN-2 12 AWG 3(11.111.21N)B/R/W EMT 1/2" a w ` �p�/Q 3THWN-2-EGC 12AWG 1(GRN) EMT 1/2" m� o 2/h 4 THWN-2 8 AWG 3(1I-11L2 1N)B/R/W EMT 3/4" Y Existing Module Information: EMTType:Trina Solar TSM-255PD05.08 count:24 Both AC Disconnects will be labelled 1 of 2 and 2 of 2 and a placard will be at the revenue meter stating there are two disconnects for the PV. Existing PVCombiner Panel Existing Inverter Information: Type:Enphase M215-60-2LL-S22-ZC • count:24 _ICU 4 VISIBLE LOCKABLE ' SREC/ANSI METER DISCONNECT � MILBANK SODA OR Siemens GF221NR • XLNT NEMA3 OR EQUIVAL-BLG 5934- 30AI240V FUSED EQUIVALENT v V 30A M on r v Interior Panel Main disconnect derated to 175A from 200A V ¢ n Point of Interconnection,lead Side 705.12(B)(2)(1&2) z N Solar Edge H m SE380OH-US m 'Conforms to ANSI Lf t2 N > o C12.1-2008 Existing 240V/200A Z N M Service Panel,Single w w w N Phase,with200AMain u ry Rapid Shutdown Disconnect FQ- Disconnect,SquareD Combined Solar Z Z a mo • DU221R8240V/30A Disconnect Square u, PV System SMART Meter Unfused,NEMA3,or New Sol a r Combiner DU222RB,240V/60A, 200 SHEET's- equivalent with 75•C Panel240V/125A Unfused,NEMA3,Or NAME: terminations Square DSub Panel equivalent LOAD o0 NEW c STRING 1:30 PV 2 10 \ J2A 175 C 3. J A MODULES NEMA4 Junction Box 3 LINE It A 50A Existing 240V/200A M p W/OPTIMIZERS ••• 3 MVO Bryant sub Panel with 3 3 4 4 new B121ker SHEET breaker NUMBER: 10PV MODULES PER INVERTER=3100 WATTS STC Visible/Lockable'Knife' Visible Lockable'Knife'AC Minimum GECsize4 AC Disconnect Disconnect AWG copper W