B-19-568 - 0025 ANDREW STREET - Building Permit The Commonwealth of Massachusetts
Department of Public Safety
Massachusetts State Building Code(780 CMR)
Building Permit Application for any Building other than a One-or Two-Family Dwelling
(Thus Seciion_For Official Use Ord
y)
g
�n Buildin Permit N_ umber: lied Date App Buildin Official;
�Y S
SECTION 1:LOCATIONLn 2-5-1
.
1 No.and Street . City/Town Zip Code Name of Building(if applicable)
IFS— _
Assessors Maj2# Block#and/or Lot #
SECTION 2:PROPOSED WORK
Edition of MA State Code used If New Construction check here❑or check all that apply in the two rows below
Existing Building V, Repair❑ Alteration ❑ Addition❑ I Demolition ❑ (Please fill out and submit Appendix 2)
Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: J LA
� 1.G@7 S
Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No ❑
Is an Independent Structural Engineering Peer Review required? Yes ❑ No ❑
Brief Description of Proposed Work:_ r--, Q.on S
CLF•VN xbSr-j m^L Nr J 200 S��6 L-r
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY
Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑
Existing Use Group(s): Proposed Use Group(s):
SECTION 4:BUILDING HEIGHT AND AREA.
Existing d;Propose
-T w,
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) ? '
Total Area(sq.ft.)and Total Height(ft.)
SECTION 5:USE GROUP(Check as.applicable)
A: Assembly A-1 ❑ A-2❑ Nightclub ❑ A-3 ❑ A4❑ A-5❑ B: Business ❑ E: Educational' ;
F. Facto F-1 ❑ F2❑ H: High Hazard H-1❑ H-2❑ H-3 ❑ H4❑ - H-
I: Institutional I-1❑ I-2❑ 1-3❑ I4❑ M: Mercantile❑ R: Residential R-10 R-2❑ R-3 R4,0',
S: Storage S-1❑ S-2❑ U: Utility❑ Special Use❑and please describe below:
Special Use Description:
SECTION 6:CONSTRUCTION TYPE(Check as applicable)
IA ❑ IB ❑ IIA ❑ IIB ❑ IIIA ❑ IIIB ❑ IV ❑ 1. VA ❑ VB ❑
SECTION 7.SITE INFORMATION(refer to 780 CMR 105.3 for details on each item)
Water Supply:l Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal:
Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licensed Disposal Site❑
Private❑ or indentify Zone: or on site system❑ required❑or trench or specify:
permit is enclosed❑
Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process.
Not Applicable❑ Is Structure within airport approach area? Is their review completed?
or Consent,to Build enclosed❑ Yes❑ or No❑ Yes❑ No ❑
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
Edition of Code: Use Group(s): Type of Construction:
Does the building contain an Sprinkler System?: Special Stipulations:
Design Occupant Load per Floor and Assembly space:
SECTION 9: PROPERTY OWNER AUTHORIZATION
Name and Address of Property Owner
Name(Print) No:and Street City/Town Zip
Property Owner Contact Information: .
1-7- 7 3
Title Telephone No.(business) Telephone No. (cell) e-mail address
If applicable,the property owner hereby authorizes:
Name Street Address City/Town State Zip
to apply for and act on the property owner's behalf,in all matters relative to work authorized by this building permit application.
SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 1)
If a building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here .
Otherwise provide construction control forms see section 107 in the code as required.
10.1 Re istered Professional Res onsible'for Construction Control(the rofessional coordin.ting document submittals)
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zip Discipline Expiration Date
10.2 General Contractor
Company Name
Name of Person Responsible for Construction License No. and Type if Applicable
Street Address City/Town State Zip
-A/ 454
Telephone No.(business) Telephone No. cell e-mail address
SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT M.G.L.c.152.§25C 6
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a signed Affidavit submitted with this application? Yes 0 No 0
` SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE
Item Estimated Costs:(Labor
and Materials) Total Construction Cost(from Item 6)_$
1.Building $ PO clod Building Permit Fee=Total Construction Cost x_(Insert here
2.Electrical $ appropriate municipal factor)=$
3.Plumbing $
4.Mechanical (HVAC) $ Note:Minimum fee=$ (contact municipality)
5.Mechanical Other $ Enclose check payable to
6.Total Cost $ 10 40 (contact municipality)and write check number here
SECTIO 13:SIGNATURE OF BUILDING PERMIT APPLICANT
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to 7 est of my knowledge and understanding.
Please print and sign name Title Telephone No. Date
Street Address City/Town State Zip Email Address
Municipal Inspector to fill out this section upon application approval: h-3 -,,09
Nam Date