Winter Island Master Plan - Public Meeting #3 PresentationSalem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Winter Island Park Public Meeting #3
Salem, Massachusetts
Draft Master Plan
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Progress to Date
Site analysis
Programming
(Must, May, Must Not Occur)
Criteria for choice
Goals for the future
Vision for the future
Review Draft MP
Alternatives
Draft Master Plan
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Site Context
Marblehead
Dominion Power
Station
The Willows
Salem Center
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
The evolution of Winter Island...
Date: 1940
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Current Conditions….
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Current Conditions-Historic Elements
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Goals for the future
Adequate parking for daily use
Adequate bathhouse facilities
Provide space for events
Accommodate boat launch use
Environmentally sensitive approach
Enhance historic buildings
Provide accessibility to all areas
Provide adequate sitting/viewing
areas
Establish an organized park setting
Create a safe park environment
Financially sustainable
Provide year round
interest
Year round management
Provide education
Enhance connection to
water
Flexible open space
Phased approach
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative A
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative B
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Draft Master Plan Concept
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Common Elements
Precedent Images
Enhanced shoreline edge
Visitor drop off
GrassPave
Wind Energy
Interpretive program
Gateway sign
Fort restoration
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Precedent Images
Interpretive program
Formal tree alle’
Pedestrian plaza/storage
Amphitheatre
Performance stage
Relocated Tot lot
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Precedent Images
Defined tent sites
Bio-infiltration
Community gardens
Enhanced edge
Rain Garden/BMP
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Early Steps
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Early Steps
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Early Steps
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Long-term
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Preliminary Costs: Early Steps
Proposed Use Estimated Cost
Community Gardens Volunteer
New parking lot $80,000
Amphitheatre $800,000
Kayak dock $15,000
Tent site improvements $25,000
Hangar Garage parking $20,000
GrassPave on street parking $60,000
Gateway (sign, gatehouse, paving, lighting, plantings)$175,000
Bio-infiltration area at parking lot and infrastructure $50,000
Moat /Rain Garden restoration (BMP)$20,000
Bathhouse relocate / improvements $50,000
Tot lot relocate and site preparation Volunteer
Preliminary Total Costs $1.5M-$2M
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Proposed Improvement Estimated
Initial Cost
Estimated
Long-term
Cost
The Barracks Building $150,000 $1.5M
The USCG Hangar $200,000 $2M
Fort Pickering restoration $15,000 $250,000
Hangar Garage improvements $25,000
USCG Hangar pedestrian plaza $200,000
Wind Turbine (1.5MW-9 yr. payback w/ funding)$2M
Paths and walkways $20,000 $20,000
Park furnishings/amenities
(lighting,benches, trash, bike rack)
$270,000
Infrastructure (sewer,water, electric)$20,000 $30,000
Preliminary Total Costs $600k-$800k $6M-$8M
Preliminary Costs: Long-term
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Case Studies
Rose Island Foundation-Newport, RI
City and private foundation
Fort Sewall-Marblehead, MA
Fort Sewall Oversight Committee (Town
appointed)
Replacement of lighting, fence, utilities,
bathrooms, etc.
Friends of Fort Point Channel
Fort Phoenix-Fairhaven, MA
Town owned park/DCR beach
Castle Hill, Ipswich
B&B / Functions
Shake a Leg-Miami, FL
Over 100 community
organizations involved
City of Miami partnership
Department of Education
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Funding Opportunities
CPA-Conservation Fund
Seed grant funds (convergence of economic prosperity and environment)
Chapter 91 resources
Waterfront Enterprise Fund-Salem (associated with waterside activities)
Utilities, recreation, transportation (consistent with Harbor Plan)
All exclusion fees collected as condition
Trustees of Reservations (The Barracks Building)
Military Groups
Local and state organizations involvement
Public and private
FOWI-Friends of Winter Island
Department of Planning and Community Development
Watersheet Activation Fund-City budgeting (planning, programming, designing,
constructing and maintaining watersheet activation elements, i.e. South River)
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Funding Opportunities
Massachusetts Historical Commission
Emergency stabilization
At secretary’s discretion
MA Preservation Projects Fund Grant Program
For The Barracks and USCG Hangar Buildings
50%reimbursable matching grant for stabilization/code
$5k-$100k
Mass Cultural Fund
Preserve America ($20k-$250k)
Save America’s Treasures ($20k-$700k)
Collaboration with National Park Service
Federal Maritime Installation-Fort Pickering
Beneficial in areas of public education, awareness of services, and visitor
facilities/transportation
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Action Strategies
Initiate structural assessments for determining long term use
Develop partnerships with local organizations
Seek funding opportunities with local and state organization
Implement park management guidelines
Create effective marketing program
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Schedule
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative A
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative A
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Early Steps Alternative A
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative B
Precedent Images
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative A
Precedent Images
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative B
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative B
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Phasing Concepts: Early Steps Alternative B
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Vision for the Future Alternative B
Salem Winter Island Master Plan
The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL
Discussion:
Comments and Ideas for the Future