Winter Island Master Plan - Public Meeting #2 Meeting Summary - April 12, 2011Salem Winter Island Park Master Plan  1  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  Public Meeting Memorandum #2       April 12, 2011  Meeting Date: April 5, 2011 / 6:30pm  The second Public Meeting was held on April 5, 2011 at 6:30pm. The meeting started with an  overview of the master planning process to date.  Following the introductions and over view, a  power point presentation highlighted two master plan alternatives Scheme A and Scheme B.  In  conclusion to an open discussion, the approximately 60 attendees were again arranged into three  separate discussion groups. The focus for each group was to determine the preferred Scheme or  select specific concepts within each scheme. The major items included:   Alternative A  1. Amphitheatre and stage (for approximately 200 people)  2. Car parking relocated to the top of the hill away from the Hangar area (Just for trailers  and cars along water’s edge  3. New pedestrian plaza at the Hangar  4. Community gardens relocated to the NW open lawn area  5. Tent sites to be concentrated at NE corner at current location (approx. 22 sites)  6. Tot lot relocated to a long beach pedestrian walk  7. Relocated Bathhouse to accommodate the relocated tot lot  8. Parking and walkway improvements at the harbor master’s office  9. Access road at Hangar Garage remains but potentially as a one way  Alternative B  1. Tot lot to remain in its current location  2. Community gardens are located at the potential amphitheatre location, but as a terraced  gardens (or located to the potential RV site‐labeled as open field)  3. Space in front of Hangar is used for park space and/or potentially bio cell area  4. Majority of parking remains the Hangar, but reorganized and landscape strips utilized  for bio cells  5. RV’s are secluded to a smaller well buffered space on the east isde of the entrance  (approximately 12 spaces)  6. Theatrical venue to remain at the current locations of pavilion and sunken fort area  7. Tent sites to be expanded to the NW open lawn area and enhanced with new plants  8. Harbor master parking to remain in its current state  9. Access road at Hangar Garage is removed and used for pedestrian park space    Reoccurring proposed items in both schemes:  1. Restore Fort Pickering  2. Road side parking with reinforced turf  3. Continuous internal walkway  4. Continuous perimeter path system  5. Boat launch parking (approx. 32 spaces)  Salem Winter Island Park Master Plan  2  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  6. Enhanced  gateway entrance  7. Wind turbine located near the harbor master’s office  8. Relocation of camp store into Hangar Garage or other building  9. Restoration of Barracks Building  10. Restoration of Hangar  11. Introduction of sustainable initiatives (Bio cells, porous paving, rainwater harvesting,  etc.)  12. New parking at Hangar Garage  13. Maintain access road at Hangar Garage  14. Shift edge of parking lot back on east side to accommodate more greenspace and wider  pedestrian walkway  15. Vehicle access around Hangar  16. Ramp and dock to remain in its current state  17. Light house to be restored  18. Interpretive program developed for the park  19. Limited access into Fort Pickering with guided tours and formalized interpretive trail  20. Manager/caretaker to manage all uses on the island  21. Pavilion to remain in its current location  Other uses and items to be determined:  1. Dinghy storage  2. Kayak storage and rental  3. Extent of RV’s short and long term  4. Barracks and Hangar uses  Group discussion comments:  1. Some hesitation to remove ‘all’ of the RV’s from the park, but potentially remove all RV’s if  the island can be financially sustainable over time. Some still favor the use  2. Roads should be widened  3. The island should not become a very formal park with formal edges. It should maintain its  rustic and natural character to some degree  4. Preferred parking in Scheme A  5. Like amphitheatre for many reasons, but some concern for amount of traffic it will produce  within the park  6. The pavilion should remain, very popular and a good revenue generator  7. Potential introduction of Cycle Rickshaws to the park  8. Enhanced gateway was preferred with multiple lanes for convenient access for visitors and  member  9. Restoring the moat should be a last priority. Safety was a concern being located near the  beach use with children activity  10. Tot lot relocation near the beach walk and on street parking was preferred  11. Keep parking for Salem residents and for/near water use (viewing)  12. Value to locating parking in one place so visitors are not circling park  Salem Winter Island Park Master Plan  3  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  13. Open views to water should be maintained and not views under trees  14. Like community gardens and should remain  15. Keep park for Salem  16. Need a back up plan  17. Set goals for building but do not set a deadline  18. Terraces for community gardens not a good idea  19. Rahab Barracks building, but it not, do not use for RV use  20. Like wide spread open feeling  21. Phase out RV’s especially along waterfront  22. Like thought of heavily buffering and secluding RV’s  23. Expand and improve restrooms  24. Petition state to raise boat ramp fees, but keep McCabe Marina?  25. Restore old Coast Guard building in condition they once were  26. Do immediate low cost moth balling of Barracks  27. Widen greenspace along parking lot for pedestrian use (benches, etc.)  28. Make sure there is overflow parking for trailers  29. Make sure park does not compete with The Willows  30. Obtain an agreement with Plummer Home about satellite lot?  31. Doug? Will do labor for renovations if Salem pays for materials  32. Prioritize  parking for Salemites and senior citizens  33. Keep boat trailers parking further away from the ramp  34. Turn current trailer parking into new use‐location?  35. Performance center desirable  36. Paths should be gravel or shells  37. Hangar should have more windows if it becomes a used facility/function room  38. Turbines can generate significant $$. No opposition at this time  39. Gardens are more important than RV’s  40. 100 garden spaces are sold out in 1st season  41. Add fire pits on the island  42. Entrance should have turnaround space  43. Amphitheatre should have multi use purpose  44. Restaurant should be considered or ice cream parlor   45. Parking lots are full every summer