Loading...
Winter Island Master Plan - Public Meeting #1 Meeting Summary - March 7, 2011Salem Winter Island Park Master Plan  1  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  Public Meeting Memorandum #1        March 7, 2011  Meeting Date: February 22, 2011 / 6:30pm    The first Public Meeting was held on February 22, 2011 at 6:30p m. The meeting started with a  general introduction of the consultant team and the master plan ning process.  Following the  introduction, a power point presentation highlighted the existing and historical conditions along  with the many uses on site.  In conclusion to an open discussio n, many valuable questions were  raised from the approximately 60 attendees. The group was then arranged in three separate  discussion groups. The focus for each group was to determine goals and uses that must, may or not  occur on the island. They are summarized as follows:  General Notes/Comments:   federal land rights and existing deeds will impact the future 1.Concerns were expressed for use of the island and funding  2.Road to remain a public way  3.Consider the relocation of the harbor master to the Salem Pier/Wharf   strictions for use on the island?  4.Are traffic studies being conducted?  5.In regards to Article 97, can the city set re 6.Smith Pool shoreline owned by the state  7.Is the Plummer home held in a trust? No!  uld be parked on the city owned land off 8.It was mentioned that approximately 1,000 cars co of Fort Avenue. To be verified with the city.  9. Can some out buildings be removed from the site?  Group Discussions  Note: some goals may overlap, but will be refined during the design process.  Goa : ls 1.Make Salem more friendly    2.Keep the island as a park   use as a park nitiatives  3.Revenue to remain consistent with 4.Incorporate sustainable / low impact i n it  5.Retain the ‘character’  and maintai 6.Improve what is there  7.Minimize and/or lower traffic use  fety 8. Enhance public sa 9. Incorporate safe access for pedestrian and vehicles  andscape and beach)  10.Prevent over use   (invasive, l tmosphere  11.Improve maintenance 12.Create safe camping a 13. Less is more concept  Salem Winter Island Park Master Plan  2  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  14.Serve all age groups  es 15.Celebrate the water and related us  (viewing, accessing, enjoying, learning and history)  16.Expand upon use with no car access    17.Determine best uses for buildings  rk (maximum capacity) not campers  18.Analyze and determine loading? of pa esidents and  19.Make the park a quality place for r 20.Make the park a more cohesive place  g uses  21.Avoid too many overlappin 22.Resolve clear direction for Barracks and Hangar  23.Maintain historic heritage  24. Establish uses that will enhance and establish year round use  Mus Oct cur:  s (kayak, sailing, trailers) 1.Boat access / program  uses  2.Pavilion 3.Beach use / activities  on (location?)  4.Fishing  5.Function hall, dining, concessi tation  6.History and interpre 7.Restoration of Fort Pickering  se, public ice rink)  8. Maintain lighthouse  9. Reuse Hangar (i.e. conference center, multi u in and enhance views  lcoming (relocate guard shack)  10.Mainta 11.Enhance we 12.Paths  )  13.Playground  ncerts, boat ramp fees ebel Shakespeare, etc.)  14.Income generating uses (co  venues (R 15.Performing arts 16.Bathhouse improvements   on both sides)  17.Balance of uses  18.Alternate parking for boat use (Fort Ave ropriate to seaside setting  s / regulate volume   19.Uses app 20.Better traffic acces 21.Theatre    22.Park management 23.Preserve open space  24.Rehab lighthouse  25.Park protection/vandalism  26. Increase open park space at perimeters of parking lot (ocean edge)  May Occur:  1.Satellite parking (at Fort Ave.)  2. Amphitheatre (With traffic management)  Salem Winter Island Park Master Plan  3  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  3.Theatre for Reb el Shakespeare  4.Additional moorings and dinghy’s     (site maybe too small‐link to the Willows?)  5.Trolley access 6.Cross country skiing 7.Wind Energy  t sites  ty at the moat’s steep edges (could be a ‘must’)  8. Maximize ten 9. Increase safe 10.Boat storage  11.Smaller B&B  12. Good seasonal restaurant  Mus Not t Occur:   1.Firing Range  2.Vandalism  ove or rehab)  3.Boat maintenance  on of the buildings (rem icking at Fort Pickering  4.No deteriorati 5.Camping/picn 6. Over building  Building Han r:  Uses:  ga   1.Community Center for Salem   use – ice skating rink  uilding or boat storage  2.Year round 3.Small boat b   4.Aquarium 5.Art Studios  6.Museum  7.Multilevel use  8.Theatre concepts  vilion and function hall 9. Pa Barr cka s  1.Bed n’ Breakfast  2.Sailing program  3.Veterans organization  4. Conference center (or at Hangar)        Salem Winter Island Park Master Plan  4  The Cecil Group / Susan St. Pierre / Bio Engineering Group / FXM Associates / PAL  Oth  Uer ses/Notes:  1.Consider long term lease  2.Lockers needed at beach  3.Tent site – some Salem citizens  stination point  4.RV’s (limit to save views)  5.Note: Boat ramp fee reviewed and potentially use as a de key locations  6.RV’s to be relocated should go….  s at 7.RV’s that don’t expand into large estate 8. Eliminate 10 RV spaces at function hall  d maintained  9. Add dinghy docs for transient boat use  e park – improved an nts  10.Accessible walk/trails around the entir 11.Host competitive regattas and boating, fishing tourname hs with historic paths  ybe at front entrance)  12.Link exercise pat 13.No bike paths, but bike racks (ma 14.X‐County skiing  dents  15.Change market rates for parking  16.otentially have NO fees for Salem resi 17. reate better shore access at Cat Cove  P C   The various consultants and committee members will continue to research and review all related  items that impact the island’s current and long term uses. Ther e will be two more additional public  meetings that will be held in April and May, which will be post ed through the town as soon as  possible. We invite your comments and questions and you may do so by emailing the City or The  ecil Group at C ebednarek@cecilgroup.com.    Thank you for your input and concern toward a valuable part of Salem’s past history and future  utlook. o   The Cecil Group Team