Loading...
Gallows Hill Park - Baseball Field Construction Plans - August 7, 2019Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAL-0AS SHOWNGALLOWS HILL PARK RENOVATION - BASEBALL FIELDSALEM, MASSACHUSETTSD R A W I N G L I S TLANDSCAPE :COVER SHEETSD-1SITE PREPARATION PLANL-1LD-1SITE IMPROVEMENT PLANLANDSCAPE DETAILSKyle Zick Landscape Architecture, Inc.36 Bromfield Street, Suite 202Boston, MA 02108617-451-1018 Telwww. kylezick.comAUGUST 1, 2019LOCUS MAPPROJECT SITEPREPARED BY:CONSTRUCTION DOCUMENTSCOVERL-0MANSELL PARKWAYWITCH HILL R O A D L-2SITE IMPROVEMENT PLAN - ENLARGEMENTSL-3GRADING AND DRAINAGE PLANLD-2LANDSCAPE DETAILSLD-3LANDSCAPE DETAILSLD-4LANDSCAPE DETAILSLD-5LANDSCAPE DETAILSLD-6LANDSCAPE DETAILSSLB Group, LLC14 Thompson CourtStoughton, MA 02072781-686-2489 TelAction Sports Design, LLC1801 E 51st Street, Suite 365-500Austin, TX 78723512-221-8036 TelJoseph Sarkisian & Associates, Inc.6 Hosmer StreetWatertown, MA 02472508-790-4525 TelNOTESL-0AIRRIGATION :IR-1IRRIGATION LAYOUT PLANSITEGALLOWS HILL PARKL-4PLANTING PLANL-5PLANTING PLAN - ENLARGEMENTSIR-2IRRIGATION LAYOUT PLANIR-3IRRIGATION DETAILSMeridian Associates500 Cummings CenterBeverly, MA 01915978-229-0447 TelLD-7LANDSCAPE DETAILSEXEXISTING CONDITION PLAN Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAL-0AAS SHOWNNOTES Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAEXISTING CONDITIONS PLANEX1"=40'-0"0402080 FT.· Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MASITE PREPARATION PLANSD-11"=30'-0"0301560 FT. Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MASITE IMPROVEMENT PLANL-11"=30'-0"0301560 FT. Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MASITE IMPROVEMENT PLAN - ENLARGEMENTSL-21"=10'-0"2ENLARGEMENT PLAN1ENLARGEMENT PLAN3ENLARGEMENT PLAN Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAGRADING PLANL-31"=30'-0"0301560 FT. Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAPLANTING PLANL-41"=30'-0"0301560 FT. Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAPLANTING PLAN-ENLARGEMENTSL-51"=10'-0"010520 FT. Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-1AS SHOWNSILT SACK2CONCRETE PAVEMENT6BIT. CONCRETE - PEDESTRIAN PATH3DETECTABLE WARNING PAVER8EROSION CONTROL1BIT. CONC.PAVEMENT - OVERLAY5BIT. CONC.PAVEMENT - VEHICULAR4CONCRETE CURB STOP7PERVIOUS PAVER9 Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-2AS SHOWNCHAIN LINK FENCE1BIKE RACK4CHAIN LINK FENCE FOOTING2MOW STRIP - ADD ALT #13GATE6CHAIN LINK FENCE - DOUBLE GATE5 Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-3AS SHOWNRESET- GRANITE BLOCK1GRANITE BLOCK IN SLOPE25SALEM PARK SIGNTRAILHEAD SIGN4INTERPRETIVE SIGN3 Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-4AS SHOWNBACK STOP FOOTING7BASEBALL FIELD LAYOUT8PORTABLE FENCE10PLAYER BENCH11FOUL POLE6RUBBER BASE PLATES5PITCHER'S MOUND1HOMEPLATE2SKINNED INFIELD4FOUL POLE ENLARGEMENT9BACK STOP3 GALLOWSHILLPARKKyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-5AS SHOWNFOUL POLE ART - ADD ALT #25ACCESSIBLE PARKING SIGN4ACCESSIBLE PAVEMENT MARKING2DRINKING FOUNTAIN1TRASH RECEPTACLE3 Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-6AS SHOWNLOAM AND SEED2TREE PLANTING ON SLOPE6RAINGARDEN MIX3DECIDUOUS TREE7BASE FOR MEMORIAL STONE1PERENNIAL PLANTING4SHRUB PLANTING5 Kyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108AUGUST 7, 2019RBKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MALANDSCAPE DETAILSLD-7AS SHOWNWATERTIGHT JOINTDUCTILE IRONDOME GRATE4" (MIN.)3/4" CRUSHED STONEDPERFORATED NYLOPLASTDRAIN BASINAREA DRAIN DETAIL(N.T.S.)ENGINEERED RAIN GARDEN SOIL40% SAND (PER ASTM D422)20-30% TOP SOIL (EXISTING SOIL)30-40% COMPOST (PER MASS DEP GUIDELINES)PERFORATED NYLOPLASTAREA DRAIN (W/ DOME GRATE)ENGINEERED BIO-RETENTION SOIL(2' DEEP MINIMUM)W/ 3" PEA STONE AT BOTTOMBOTTOM OF BIO-RETENTION AREANOTES:EXISTING TOP SOIL AND FILL SAND MATERIAL LOCATED WITHIN THE PROJECT LIMITSSHALL BE UTILIZED IN THE ENGINEERED RAIN GARDEN SOIL, IF FEASIBLERAIN GARDENSIDE SLOPES(2:1 MAX, 3:1 AVG.)BIO-RETENTION AREA DETAIL(N.T.S.)TOP OF PONDTOP OF BIO-RETENTION AREADETENTIONFLOODELEVATIONRETENTIONFLOODELEVATIONBIO-RETENTION AREA A1BOTTOM OFBIO-RETENTION BASIN50.00TOP OF BIO-RETENTIONBASIN & GRATE51.25TOP OF POND52.00STORM EVENTFLOODELEVATION2-YEAR51.9610-YEAR52.57100-YEAR53.10BIO-RETENTION AREA A2BOTTOM OFBIO-RETENTION BASIN49.50TOP OF BIO-RETENTIONBASIN & GRATE50.50TOP OF POND51.00STORM EVENTFLOODELEVATION2-YEAR50.8510-YEAR51.89100-YEAR52.82BIO-RETENTION AREA A3BOTTOM OFBIO-RETENTION BASIN49.50TOP OF BIO-RETENTIONBASIN & GRATE50.25TOP OF POND51.00STORM EVENTFLOODELEVATION2-YEAR50.1710-YEAR50.39100-YEAR51.38BIO-RETENTION AREA A4BOTTOM OFBIO-RETENTION BASIN49.50TOP OF BIO-RETENTIONBASIN & GRATE50.25TOP OF POND51.00STORM EVENTFLOODELEVATION2-YEAR50.4510-YEAR50.74100-YEAR50.94BIO-RETENTION AREA B2BOTTOM OFBIO-RETENTION BASIN47.50TOP OF BIO-RETENTIONBASIN & GRATE48.00TOP OF POND49.00STORM EVENTFLOODELEVATION2-YEAR48.2110-YEAR48.37100-YEAR48.96LEACHING MANHOLE DETAIL(N.T.S.)34" CRUSHEDSTONEVARIES4'24"INLET PIPE4'5" THICK WALLDRAIN HOLES8" THICK TOPELEVATIONPLANFRAME AND SOLID COVERFILTER FABRICOUTLET PIPE6'6'6"(TYP.)D(SEE NOTES)D 12"5' MAXIMUMVARIES 1:1CLEAN FILL OREXCAVATEDMATERIALNO STONES >3"BEDDING MATERIAL(SEE NOTES)SURFACE TREATMENTPIPEPIPE TRENCH DETAIL(N.T.S.)TRENCH WIDTH(4' MAX)4'-6" MINIMUMNOTES:·BEDDING MATERIAL:··FOR HDPE OR PVC NO STONES SHALL BE GREATER THAN34", NO STONES WITHIN 4" OF PIPE AND MATERIAL SHALL BETHOROUGHLY COMPACTED··6" OF BEDDING MATERIAL BELOW PIPE IF PLACED IN ROCK··4" OF BEDDING MATERIAL BELOW PIPE IF PLACED IN EARTH·IF EXISTING MATERIAL WITHIN TRENCH CONTAINS ORGANICS,MUCK, CONTAMINATION OR UNSUITABLE, CONTRACTOR SHALLCONTACT ENGINEER PRIOR TO PROCEEDING.MAGNETIC TAPE(FOR ELECTRICAL CONDUIT)112" OR 2" TYPE KCOPPER(N.T.S.)CORPORATION STOPDIRECT TAPCURB STONESTREET SURFACESIDEWALKMAIN TUBESHOETEE HEADSTREET BASEMAIN TUBECORP STOP & WATER CONNECTIONMAINROADWAY COVERSTRUCTURE SIZE “D” SHALL BE AT LEAST THE SAME DIAMETER AS PIPESENTERING THE STRUCTURE OR THE GRATE SIZE, WHICHEVER IS GREATER ADCBBBBBAAAAAAAAAAAAAABBBBBBAAAAAAAAAAADDDDDDDBBBBBBBBBBCCCCCCC2"1½"2½"2½"2½"2½"2½"2½"2½"2½"2½"2½"2½"2"1½"1½"2"2"1½"1½"1½"1½"2"2"1½"1½"2"1½"1½"2"2"1½"1½"1½"1½"1½"1½"1½"2"2"2"2"1½"1½"1½"1½"1½"2"2"2"1½"1½"1½"2½"2½"2½"2"2"2"2"2"1½"1½"1½"1½"1½"1½"1½"1½"2"1½"1½"1½"1½"1½"1½"1½"2½"2"1½"1½"1½"1½"2"1½"1½"1½"1½"1½"1½"1½"1"2½"ControllerEnclosureAproximateLocation of2 1/2" Tap2 1/2" HDPEFrom City Main toControllerEnclosure2 1/2" PCVSleeve for wiresonlyLEGENDHunter I-25-ADS-10 Adjustable Part Circle Rotary SprinklerHunter I-25-36S-10 Full Circle Rotary SprinklerHunter I-25-ADS-4 Adjustable Part Circle Rotary SprinklerHunter I-25-ADSHS-8 High Speed Adjustable Part Circle Rotary SprinklerHunter HQ-5-RC Manual Quick Coupler Valve, 1" with Rubber Cover.Hunter ICV-151G, Automatic Control Valve2" SDR 21 Mainline and Lateral Line PVC Pipe1½" SDR 21 Mainline and Lateral Line PVC Pipe6" Schedule 40 Sleeving Material as specifiedPlan Notes:1.The irrigation system design is diagrammatic and shall be field verified bythe Irrigation System Contractor and Designer prior to construction.2.The Irrigation System Contractor shall contact “Dig Safe” prior to thecommencement of any of his work on this project. The Irrigation SystemContractor shall request his own “Dig Safe” inspection and have his own“Dig Safe” permit number. The irrigation System Contractor shall not usemarkings and permits issued to others working on this project.3.The Irrigation System design shall be coordinated with other drawings forthis project.4.Irrigation work on this project to include: city mainline water tap, piping fromwater tap to backflow cabinet, RP backflow preventer, controller, valves,sprinkler heads, install City of Salem provided water meter, and relateditems.5.The contractor shall install a 2" RP Backflow Preventer in the cabinet asdescribed in the written specifications and as shown on the detail drawings.6.All mainline and lateral pipe downstream of the Backflow Preventer in sizes2½", 2", or 1½" to be SDR 21 PVC Pipe with swedged ends.7.All pipe in 1" size to be Sch 40 PVC Pipe with swedged ends.2½" SDR 21 PVC Pipe from the discharge side of BF enclosureMainline Isolation Ball Valve2½" HDPE Mainline Pipe from the City Mainline Tap to the BF Enclosure2½" Schedule 40 Sleeving Material for wires as specified1"1" Schedule 40 Lateral Line PVC PipeIrrigation contractor responsible for1" PVC pipe connection to existing1" PVC from plaza area installed byothers.1"DrinkingFountainkzlaKyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108JUNE 14, 2019JSAKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAIRRIGATION LAYOUT PLANIR-11"=30'-0"0301560 FT.Joseph Sarkisian & Assoc., Inc.Joseph Sarkisian & Assoc., Inc.6 Hosmer StreetWatertown, MA 02472Tel: 508-737-2178Email: jsarkis@comcast.net Existing 1" PVC installedby others1"Contractor responsible for providinghose bibb valve in valve boxConnect to existing 1" PVCADCB2"1½"2½"2½"LEGENDHunter I-25-ADS-10 Adjustable Part Circle Rotary SprinklerHunter I-25-36S-10 Full Circle Rotary SprinklerHunter I-25-ADS-4 Adjustable Part Circle Rotary SprinklerHunter I-25-ADSHS-8 High Speed Adjustable Part Circle Rotary SprinklerHunter HQ-5-RC Manual Quick Coupler Valve, 1" with Rubber Cover.Hunter ICV-151G, Automatic Control Valve2" SDR 21 Mainline and Lateral Line PVC Pipe1½" SDR 21 Mainline and Lateral Line PVC Pipe6" Schedule 40 Sleeving Material as specified2½" SDR 21 PVC Pipe from the discharge side of BF enclosureMainline Isolation Ball Valve2½" HDPE Mainline Pipe from the City Mainline Tap to the BF EnclosurePlan Notes:1.The irrigation system design is diagrammatic and shall be field verified bythe Irrigation System Contractor and Designer prior to construction.2.The Irrigation System Contractor shall contact “Dig Safe” prior to thecommencement of any of his work on this project. The Irrigation SystemContractor shall request his own “Dig Safe” inspection and have his own“Dig Safe” permit number. The irrigation System Contractor shall not usemarkings and permits issued to others working on this project.3.The Irrigation System design shall be coordinated with other drawings forthis project.4.Irrigation work on this project to include: city mainline water tap, piping fromwater tap to backflow cabinet, RP backflow preventer, controller, valves,sprinkler heads, install City of Salem provided water meter, and relateditems.5.The contractor shall install a 2" RP Backflow Preventer in the cabinet asdescribed in the written specifications and as shown on the detail drawings.6.All mainline and lateral pipe downstream of the Backflow Preventer in sizes2½", 2", or 1½" to be SDR 21 PVC Pipe with swedged ends.7.All pipe in 1" size to be Sch 40 PVC Pipe with swedged ends.2½" Schedule 40 Sleeving Material for wires as specified1"1" Schedule 40 Lateral Line PVC PipekzlaKyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108JUNE 14, 2019JSAKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAIRRIGATION LAYOUT PLANIR-21"=10'-0"010520 FT.Joseph Sarkisian & Assoc., Inc.Joseph Sarkisian & Assoc., Inc.6 Hosmer StreetWatertown, MA 02472Tel: 508-737-2178Email: jsarkis@comcast.net 1" PREFABRICATEDLATERAL PIPESWING JOINTHUNTER I-25RUBBER COVERMODEL I-25 / I-20GEARED ROTORTO ICSD OR GROUNDING COMPONENT.COPPER GROUND PLATE INSTALLATIONHARD TRENCH BOTTOMGROUND PLATE4" x 96" COPPER#6 BARE COPPER WIRE11" to 18"GEM MATERIAL4" DRAINAGE PIPE 18" LONGWITH DRAINAGE PIPE CENTERED OVERFILLED WITH ¾" STONEGROUND PLATECONTROL WIREWIRE CONNECTORSEXPANSION COILLATERAL WITH ELECTRIC VALVE12" RECTANGULAR VALVE BOXCONCRETE SUPPORT BLOCKGRAVELWATERPROOFHUNTER AUTOMATIC CONTROL VALVEQUICK COUPLER VALVE10" ROUND BOXHQ-5-RCMANUFACTUREDSWING JOINTCONCRETE SUPPORT BLOCKHUNTER ICC2-M WALL MOUNT CONTROLLERHONEYCOMB STYLESTABLIZER WITH WIRE TIESWITH PRESSURE REGULATION(if required)PIPE TRENCH DETAILMINIMUM15" DEPTHCONTROL WIRE IN ELECTRICALCONDUIT. SIZE AND TYPEPER LOCAL CODE*NOTE*SPECIFY 20 STATION MODEL CONTROLLER. MOUNT CONTROLLER WITHLCD SCREEN AT EYE LEVEL. CONTROLLER SHALL BE HARD-WIRED TOGROUNDED 110 VAC SOURCE.3" CLEAN FILLAROUND PIPEINTERIOR OR EXTERIOR WALL1'-3.5"MODEL ICC2-M 20 STATION1/2" POWER SUPPLY CONDUITJ BOX INSIDE CONTROLLERCONNECT PER LOCAL CODEMINIMUMDEPTH 24"FINISHED GRADEMAINLINE PIPELATERAL PIPEMAINLINE PIPEFINISHED GRADEFINISHED GRADEFINISHED GRADEFINISHED GRADEMAINLINE WITH WIRESMINIMUM3" BELOWPIPECONTROLL WIRESROUTED BESIDEMAINLINE3/16" Gauge SteelHinges Cont. Weld AllSides3/16" Gauge SteelEnclosure3/16" Gauge Steel DoorRound And Smooth AllEdges And CornersDoor Latch And CoverFront Cabinet OpeningThree 1/4" Drain HolesEach Side (Typ.)Finish Grade4000 PSI Conc. PadFRONT ELEVATIONGFI Duplex OutletWaterMeterSteel Cabinet2" Ball Valve (Typ.)FEBCO 825Y 2" BackflowPreventer, Typ.Locking Access DoorHose Bib4000 PSI Conc. Pad w/ 6x6Welded Wire Mesh2" PVC Sleeve w/ 2" Type KCopper ServiceGalv. Steel Supports, Typ.2" PVC Sleeve Filled w/ Gravelfor DrainIrrigationCtrl Box8" MinimunCompactedGravelSECTION2 1/2" HDPEFrom StreetThrust Block2 1/2" PVC ToIrrigationGround Fault InterrupterDuplex ReceptacleSteel Water Cabinet2" Continuous BaseFlangeSix 3/8" Galv. SteelAnchor BoltsWater Out: 2" / 4" SleeveDrainage Pipe WithStoneWater In: 2" / 4" SleeveLatch and CoverFront Door and HingePLAN VIEWEdge of CabinetEdge of DoorOpening in Door1/4" Lock Rail1/4" x 1 1/2" x 1 1/2"Steel Plate Welded ToCabinetHole To Accomodate Cityof Salem Standard LockAnd Be Located So LockWill Hold Door Tightly1/8" Steel CoverSIDE VIEWFRONT VIEWTOP VIEW OF DOOR EDGELATCH AND COVEROutside Of CabinetEdge Of DoorContinuous WeldDouble GaugeThickness AlongEntire EdgeNOTES1. City of Salem to Provide Water Meter and Contractor is to install Meter in Cabinet as indicated.2. Contractor to provide Lock which meets City of Salem Standard (Combination Padlock).3. Irrigation Controller/Clock to be located in Water Cabinet.4. SHOP DRAWINGS REQUIRED.24V. In / 4" Sleeve4" PVC Sleeve for 24V Wiresfrom fieldWATER CABINET WITH GFI ON CONCRETE PADTransition from2 1/2" HDPE to2" CopperTransition from2" Copper to 21/2" PVCHOSE BIBB IN VALVE BOX12" RECTANGULAR VALVE BOXCONCRETE SUPPORT BLOCKGRAVELHOSE BIBB VALVE1" PVC LATERAL PIPEFINISHED GRADEPVC ELBOWSCHEDULE80 NIPPLEHUNTER MINI-CLIK RAIN SENSORBACKSTOP POLEHUNTER MINI-CLIK RAIN SENSORRUN LEAD WIRES TO CONTROLLERNOTE:MOUNT SENSOR ON SURFACEWHERE IT WILL BE EXPOSEDTO UNOBSTRUCTED RAINFALL.IN ½" METAL CONDUIT OUTSIDECONTROLLER ELECTRICAL BOX PIPE TRENCH DETAIL3" CLEAN FILLAROUND PIPEMINIMUMDEPTH 15"for 1"LATERALSFINISHED GRADEMAINLINES AND LATERALSMINIMUM3" BELOWPIPEMINIMUMDEPTH 20"for 1 1/2"and 2"LATERALSMINIMUMDEPTH 24"MAINLINESkzlaKyle Zick Landscape Architecture, Inc.36 Bromfield Street Suite 202 617 451-1018 TelBoston, MA 02108JUNE 14, 2019JSAKZSALEM, MASSACHUSETTSGALLOWS HILLPARKGALLOWS HILL PARK IMPROVEMENTSCITY OF SALEM, MAIRRIGATION DETAILSIR-3N.T.S.Joseph Sarkisian & Assoc., Inc.Joseph Sarkisian & Assoc., Inc.6 Hosmer StreetWatertown, MA 02472Tel: 508-737-2178Email: jsarkis@comcast.net