Loading...
7-13 North Pine Street CofNA application 10/12/21,2:45 PM �P4�'k.CONDITg9O 6 9� 2; R P P 9�MINF DO'P Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 Application for: CERTIFICATE OF NON-APPLICABILITY - HCNA-21-75 Date of October 12, 2021 Owner at Submission ELLIS, STEPHANIE Submission: (from Assessor) Applicant name: Stephanie Ellis Owner (from Applicant) Applicant phone: 6175297434 Owner Phone 617-529-7434 Applicant email: aelisabeth1827@gmail.com Owner Email aelisabeth1827@gmail.com Applicant is: Address of Property: Units 7-13 North Pine Street Declared District: McIntire Year Built (From Assessor) 1900 Occupancy (from Zoning (From Assessor) NULL Assessor) Building Type (from Property Use (From Assessor) Assessor) Type of Work: Reroofing Is work visible from Proposed Work is visible from Public Way Public Way? Applicant's Description Dear members of the Salem Historical Commission: of Work: The North Pine Condo Association (7, 9, 11 & 13 North Pine Street, Units 1 & 2) request a Certificate of Non-Applicability from the Salem Historical Commission for the following repair(s) to be made to: Areas of the front- facing, exterior Mansard roof; repairs to the flat Bay and Entry-way roofs of each unit on the front-facing exterior of the dwelling. The Condo Association has met with J.B. Kidney & Co., Inc., a 4th Generation family owned and operated business based out of Salem, Mass. They have a level of 1/2 10/12/21,2:45 PM expertise and knowledge of the historic slate work seen throughout the City's historic neighborhood's and have come highly recommended. With this, we are assured that the repairs and/or replacement made to the historic Mansard slate roof will be done using in kind materials that retain the architectural detailing, integrity of style, color, dimension and texture of the original slate roof tiles. Based on the assessment of the scope of work required on the Mansard roof by J.B. Kidney & Co., Inc. approximately 70 slate roof tiles will need to be repaired and/or replaced. The work done on the Bay and Entry-way roofs require correctly installing flashing at the edges of the roofline that abut the exterior front-facing facade of the dwelling. This process will require the temporary removal of two courses of clapboard. If the existing clapboard has retained its integrity it will simply be put back in its original place. If the clapboard needs to be replaced this too will be done using in kind materials that retain the architectural detailing, integrity of style, color, dimension and texture of the current cedar clapboards. The edge of these roof will terminate with a custom copper edge cleat. 2/2