Loading...
DERBY STREET ENVISION PROJECT 2020- SEPTEMBER 13, 2017Derby Street Project Updates September 13, 2017 Salem, Massachusetts Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets off Derby Street 3. Improve shared use path connections Derby Street Meeting June 26, 2017 Comments/Concerns ➢Sidewalk surface materials –cement concrete vs. brick ➢Parking ➢Sidestreet vehicle access ➢Roadway Dimensions ➢Raised Crosswalks/Speed Tables ➢Bump Outs ➢Signage ➢Landscaping/ streetscape ➢Utilities Site Walk July 2017 ▪Clear signage ▪Bump outs ▪Sidewalk materials ▪Sense of place ▪Traffic table at Customs House ▪Sidestreet vehicle access ▪Proper sightlines ▪Illegal parking ▪Pedestrian ramps Stakeholders meeting August 8, 2017 ▪Brick versus concrete –Maintenance –Historic character –Existing brick on side streets ▪Bump outs and possible plantings –Who is responsible for maintenance ▪Bikes on one-way Derby Street –Possible treatments for wrong way riders ▪Historic Recognition of Derby Street ▪Resident meetings to talk about work along properties Sitewalk September 2017 ▪City met with residents on Kosciusko St, Daniels St, Hardy St, Turner St and Carlton Street –Feedback on brick header along installed 4 ft sidewalks –Roadway paving this year on K St., Daniels and Hardy St. –Other design details noted and will be addressed by the City Derby Street upgrades Roadway Improvements ➢New pavement and markings •Phase 1: New Derby Street to Orange Street •Phase 2: Orange Street to Fort Avenue ➢Installed interim directional signage ➢Visibility evaluation ➢Remove sign clutter ➢Traffic ➢Wayfinding ➢Increased illegal parking enforcement Derby Street upgrades Sidewalk Improvements ➢Update pedestrian ramps ➢Install tactile warning panels ➢Refresh cross walk locations ➢Repairs •Widen to 4 ft minimum using bump outs and removing select trees/ obstacles •Reduce severe cross slopes to work towards ADA compliance Finger Street Sidewalks Reconstruction Widen to 4 feet, when appropriate ➢Side Streets-on one side only •Kosciuszko Street, Bentley Street, Becket Avenue ➢Remove obstacles in sidewalks ➢Evaluate trees Replace sidewalks in place ➢Cement concrete ➢Install brick headers on sidewalks ➢Keep brick sidewalk locations ➢Adjust curbs, as needed ➢Drainage evaluation ➢Address illegal driveway curb cuts Finger Street Sidewalks Reconstruction Locations/Streets:Adjust Curbs Replace Sidewalk Widen Sidewalk Remove Obstacles Orange Street X X Palfrey Court X X Kosciuszko Street X X X Daniels Street X X X Bentley Street X X X Hardy Street X X Turner Street X X X Carlton Street X X X White Street X X Blaney Street X X Becket Avenue X X X English Street X X X Webb Street X X Sidewalk material options Sidewalk Material Costs ▪Cement Concrete Sidewalks: $9.50/sf ▪Cement Concrete with brick: $15.00/sf ▪Full brick: $30.00/sf ▪Based on bid prices from 2017 City sidewalk contractor ▪Approximate sf areas for comparison purposes only. Sidewalk Bump outs ▪Custom House ▪Daniels Street ▪Hardy Street ▪White Street ▪Blaney Street Locations determined based on Derby Street width, crosswalk locations and vehicles turning onto side streets Custom House Sidewalk bump outs -Daniels and Hardy St Sidewalk bump outs -White St and Blaney St Sidewalk Improvements Sidewalk Improvements Sidewalk Improvements Custom House view Carlton at White Street White Street Historic Recognition of Derby Street ▪Medallions added to sidewalk surface ▪Similar to McIntire District ▪Symbol to be designed in collaboration between NPS/City/Neighborhood Bicycle Accommodations On –Road Improvements ➢Bike lanes will be provided on Derby Street from Washington Street to Orange Street ➢‘Share the lane’ will be proposed from Orange Street to Fort Avenue ➢Enhanced crossings (RRFB) proposed on Derby Street, Fort Ave, and Szetela Lane (2 locations) On-road bike accommodations Contraflow Derby Street minimum width: 25 ft ▪Reduce parking stall width to 7 feet ▪Reduce travel lane to 11 ft ▪Reduce bike lane to 5 ft ▪Clear width for emergency access: 16 ft ▪Contraflow lane flush to travel lane Bicycle Accommodations Off-Road Improvements ➢From Derby Street through David J. Beattie Park connecting to existing Peter Tracy shared use path ➢Off road shared use path along Footprint property frontage ➢Reconstruct Peter Tracy path along Collins Cove from Webb Street to Bentley School Enhanced Roadway Crossing Locations