BRIDGE STREET NECK PUBLIC MEETING PRESENTATION NOTE - JULY 28, 2009
Salem Bridge Street Neck Neighborhood Revitalization Plan Appendix D
The Cecil Group • GLC Development Resources • Peter Smith Associates • Tetra Tech Rizzo Page D13
MEETING NOTES
Meeting Date: July 28, 2009
Meeting Topic: Final Presentation
Meeting Location: Carlton School, Salem, MA
Project: Salem Bridge Neck Neighborhood Planning Study
Attendees: Community members, The City of Salem Department of
Planning and Community Development, The Cecil Group
Prepared by: Margarita Iglesia and Meghan Grafton
Copies: Danielle McKnight, Department of Planning and Community
Development
Project File
On July 28, the final public meeting for the Salem Bridge Neck neighborhood planning
study was held at the Carlton School. The meeting attracted around 30 participants
from the community.
The Cecil Group presented a slide show summarizing the study’s key findings and
recommendations. The presentation was followed by an active discussion among all the
participants, covering a variety of topics of shared interest and concern.
The following points relate the key questions and comments discussed:
• The importance of maintaining an adequate balance between homeownership
and rental housing in the neighborhood has been emphasized since the first
public meeting for this process. When the Jefferson Station apartments were
developed, substantial changes happened to the neighborhood all of a sudden.
What is the plan recommending regarding balance?
The consultant team has found that a good “balance” between owner-occupied
and rental housing already exists in the neighborhood, and significant risks of
alteration to the existing balance in the near future were not perceived. Even if
changes may occur, especially if some potentially developable sites are
redeveloped, the estimated amount of new development would not be big
enough to significantly disrupt the existing balance. However, explicit mention
of this subject and recommendations to maintain the current balance of owner-
occupied versus rental housing will be added to the final plan document. It will
be important to make sure that future new development gets thoroughly
reviewed at each incremental step prior to approval.
• The development feasibility tests conducted as part of this study indicate that
up to 60 residential units could possibly be accommodated in the Brake &
Clutch site. These appeared to be too many units and too many cars for some
of the residents attending the meeting.
The analysis of potential development concepts looked into building types and
densities with a similar character to the ones that already exist in the
Salem Bridge Street Neck Neighborhood Revitalization Plan Appendix D
The Cecil Group • GLC Development Resources • Peter Smith Associates • Tetra Tech Rizzo Page D14
neighborhood (for example, the buildings that were considered along the side
streets where adjacent single- and two-family homes currently exist were two-
family homes). In looking ahead, if development proposals were made for the
site, the character of future development would need to be determined and
controlled through zoning and possibly design guidelines.
It would be up to the neighborhood to decide what type and extent of
guidelines they would like to have. Design guidelines would need to be
reviewed by the community through a public process. One potential
mechanism for the preparation and application of design guidelines could be
the establishment of a Neighborhood Preservation District. However, this has
been attempted before without success because the corresponding guidelines
were perceived as being restrictive. There are other alternatives – for example,
projects in the North River Canal district get advisory input from the existing
Salem Design Review committee. This type of review and input could be
particularly useful if new projects are proposed, in order to make them be
compatible in design with the rest of the neighborhood.
• It should be noted that this is a National Historic District and repairs can be
very expensive when they need to be made.
That is true in a way. However, Historic Tax Credits may also be available
under certain circumstances if repairs are made conforming to historic
preservation guidelines.
Placing design restrictions on new construction is good. However, there should
not be restrictions on building repairs or anybody else. A balancing point in
terms of requirements needs to be established somewhere in between.
• How will the proposed waterfront walk and beach access be accomplished?
The study also talks about a different type of restaurants. What is the incentive
for the owners?
A neighborhood plan does not have the capacity to compel redevelopment.
However, if restaurant owners would propose changes or improvements in the
future, the creation of waterfront access may be one of the conditions required
for approval. The state waterways regulations (Chapter 91) would likely require
the provision of public access along the water, for example. On a
complementary note, this kind of improvements could result in and enhanced
district image, better restaurant services and more business opportunities.
• The Tracy walkway is being incorporated into the bicycle and pedestrian path
system by connecting the Bypass bike path to Collins Cove. This new
pedestrian and bike way connection is being designed and will be built as part
of the ongoing Bridge Street reconstruction project.
• Through all these ideas and planning process, the City has always had a clear
intention of working together with the existing property owners to bring about
positive change. There has never been any intention of eminent domain.
• Many neighbors are financially incapable of making any improvements to their
properties. This plan is not about compelling neighbors to spend, but rather
about discussing and generating ideas for the future so that the City receives
guidance from the community to move and allocate public funds in the right
direction when change comes.
Salem Bridge Street Neck Neighborhood Revitalization Plan Appendix D
The Cecil Group • GLC Development Resources • Peter Smith Associates • Tetra Tech Rizzo Page D15
• The Bypass Road has been built for a relatively short period of time. However,
some of the noise wall foundations are already cracked. Requests for repairs
have gotten no response so far.
The purpose of this planning process is to set a basis in moving forward in
planning for the future. However, a record will be made with these notes that
the noise walls need to be reviewed and repaired.
• The proposed PUD zoning mechanism for future redevelopment is not
applicable to all the parcels that need change along Bridge Street. In particular,
PUD does not apply to parcels smaller than 60,000 sf. A different zoning
mechanism is needed for the smaller parcels.
• A small group of local businesses has been active through the Chamber of
Commerce for about three years. The members of the Working Group that
was established to oversee the preparation of this study could continue
working with the Chamber of Commerce, and with other interested neighbors,
in advancing the key ideas and recommendations of this plan.
• One of the important concepts discussed at the last Working Group meeting
involved the possibility to work in collaboration with non-profit developer
corporations to rehabilitate vacant buildings. Affordable housing, well priced,
could be one of the very few options available to recover and repair these
properties.
• Affordable housing could also be the mechanism that would allow some of the
existing residents, and their children, to remain in the neighborhood if housing
prices go back up again in the future.
• An important call for caution: If there is a desire to improve derelict properties
and clean up the neighborhood, the proposals of small developers and local
business owners that are trying with great effort to improve their properties
against significant odds should not be dismissed. There is a need to reconcile
the development pressures caused by the rising costs of construction with the
general desire to keep densities low in the neighborhood.
• An important benefit provided by this planning process, which could be
extended through the continuous interaction of a neighborhood group or local
business association, is the opportunity to review and discuss important issues
of general concern with other neighbors in a public forum.