Loading...
Illustration of Project Limits and Scope Items - Bridge/Boston - 2016North River Apartments (constructed) City of Peabody Ledge Hill/ Mack Park 114 107 107 City of Salem, Massachusetts Kimberley Driscoll, Mayor City of Salem Department of Planning & Community Development Harmony Grove Cemetery Proposed 2016 MassWorks Application Construction Elements Riverview Place Apartments (approved) River Rock Apts. & Retail (approval Pending) City of Salem, Massachusetts Kimberley Driscoll, Mayor City of Salem Department of Planning & Community Development NRCC Redevelopment Site MassWorks Application Construction Elements MassWorks Grove Street Project completed LEGEND Grove Street Apartments (approved) 1 2 3 4 Goodhue Street – “Complete Streets” enhancements tied to MassWorks Grove Street Project south boundary including separated bike lanes on Bridge Street Bridge Street – “Complete Streets” repaving plus separated bike lanes and pedestrian sidewalk enhancements between Flint and Boston Streets Bridge /Boston Street and Bridge/Flint Streets signal upgrades w/ ”Complete Streets” sidewalk, lighting, and pavement markings Widen westbound Boston Street approach to Bridge Street to provide exclusive through/left, shallow right, and sharp right lanes 8 7 6 5 Complete missing link of shared use path between Bridge and Grove Streets with lighting Install rectangular rapid flashing beacon (RRFB) at possible Bridge Street crossing with a median refuge area Provide new separated facility bike connection between the Bridge/Flint Streets intersection and the Leslie’s Retreat shared use path Evaluate and improve public utilities. Relocate 36” drain line easement to Boston and Bridge Streets layout. PROSPECTIVE MASSWORKS PROJECT CONSTRUCTION ELEMENTS 2 5 7 107 8 6 3 3 4 1 City of Salem City of Salem City of Peabody Ledge Hill/ Mack Park 114 107 107 City of Salem, Massachusetts Kimberley Driscoll, Mayor City of Salem Department of Planning & Community Development Harmony Grove Cemetery Multi-modal Connection Enhancements with MassWorks Project City of Salem, Massachusetts Kimberley Driscoll, Mayor City of Salem Department of Planning & Community Development NRCC Redevelopment Site MassWorks Application Construction Elements MassWorks Grove Street Project completed LEGEND Goodhue Street – “Complete Streets” enhancements tied to MassWorks Grove Street Project south boundary including separated bike lanes on Bridge Street Bridge Street – “Complete Streets” repaving plus separated bike lanes and pedestrian sidewalk enhancements between Flint and Boston Streets Bridge /Boston Street and Bridge/Flint Streets signal upgrades w/ ”Complete Streets” sidewalk, lighting, and pavement markings Widen westbound Boston Street approach to Bridge Street to provide exclusive through/left, shallow right, and sharp right lanes Complete missing link of shared use path between Bridge and Grove Streets with lighting Install rectangular rapid flashing beacon (RRFB) at possible Bridge Street crossing with a median refuge area Provide new separated facility bike connection between the Bridge/Flint Streets intersection and the Leslie’s Retreat shared use path PROSPECTIVE BIKE/PEDSTRIAN RELATED MASSWORKS PROJECT CONSTRUCTION ELEMENTS 3 Improved bike/ped connection Improved 1-way Bike/ped connection Improved ped connection 107 1 2 3 4 7 6 5 2 5 7 6 3 3 1 4