Salem Intermodal Station Public Meeting - June 26, 2012April 9th, 2012SALEM INTERMODAL STATIONPublic MeetingJune 26, 2012SALEM INTERMODAL STATIONPublic MeetingJune 26, 2012
April 9th, 2012JUNE 26, 2012 PUBLIC DESIGN PRESENTATIONPurpose of Feb 16 discussion:input on project function & featuresPurpose of April 9 discussion:input on building design strategiesPurpose of June discussion:input on suggested design proposal
April 9th, 2012JUNE 26, 2012 PUBLIC DESIGN PRESENTATIONAgenda:Project SchedulePublic comment integrationFunding enhancements30% design proposal
April 9th, 2012ScheduleSchedule
April 9th, 2012Project scheduleDESIGN:Fall/Winter 2011: Subsurface investigationsFeb 16, 2012: Initial public meeting - planningApril 9, 2012: Second public meeting – design strategiesoJune 26, 2012: Third public meeting – 30% designoSeptember 2012: Fourth public meeting – 60% designoWinter 2012: Design completePERMITTING:June 15, 2012: MEPA EENF filingoJune 28, 2012: MEPA scoping session (public)oJuly 20, 2012: MEPA comment period closedoFall 2012: Chapter 91 filing & commentoFall 2012: Local/City permitting process
April 9th, 2012Project scheduleCONSTRUCTION:Spring 2012: Limited archeology work on-siteoFall/spring 2012: Detailed archeological surveyoSpring/summer 2013: Primary construction startoFall 2014: Substantial completion, garage/station openoWinter 2014: Final completion, project complete
April 9th, 2012Project / public process overviewProject / public process overview
April 9th, 2012SiteplanEXISTING CONDITIONS
April 9th, 2012SiteplanPRIMARY FUNCTIONAL ELEMENTS
April 9th, 2012SiteplanVEHICULAR CIRCULATION
April 9th, 2012SiteplanPLATFORM ACCESSPEDESTRIAN / BIKE CIRCULATION
April 9th, 2012CONCEPTUAL LANDSCAPE APPROACH5 CAR TRAIN POSITIONLOCOM.
April 9th, 2012COMPACTCOMPACTEnlarged plansGROUND FLOOR PLAN2NDFLOOR PLAN(upper floors sim.)LEVEL CARS TOTALG 109 1092ND 161 2703RD 164 4344TH 164 5985TH 117715CAR COUNT TABLECIRCULATION DIAGRAMESTIMATED TOTAL PARKING SPACES: 700 - 715
April 9th, 2012Enlarged plans -WAITING AREAGROUND FLOOR PLAN 2NDFLOOR PLAN 3RD, 4TH,5THFLOOR PLAN
April 9th, 2012Enlarged plans -WAITING AREAGROUND FLOOR PLAN 2NDFLOOR PLAN 3RD, 4TH,5THFLOOR PLAN
April 9th, 2012strategies1. WEATHER PROTECTIONoCanopiesoEnclosed lobbyoHeatoViews2. CONTEXT SENSITIVE oScaleoColoroMaterialoTextureDESIGN APPROACH: BALANCE OR EMPHASIS
April 9th, 2012A1: Connectivity-ELEVATIONSNORTH ELEVATIONWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATION
April 9th, 2012PUBLIC PROCESS – EXECUTIVE SUMMARYThings that in general are working….General site layout / location of project elementsFunctional aspects of site circulation, movement, safetyEnclosed waiting location and layoutFull height platformPedestrian bridge from Washington streetThings that need work….Architectural expressionWeather protectionNumber of parking spaces
April 9th, 2012Project enhancementsProject enhancements
April 9th, 2012ADDDITIONAL FUNDING PROVIDED FOR:1. Weather protection... Added protection at bus curb and north platform end.2. Stabilization of historic signal tower... Exterior rehabilitation per Secretary of Interior guidelines3. Additional parking level... Increase from 550 to 715 parking spaces.4. Increased architectural treatment... Redesign of portion facing historic Salem.
April 9th, 2012SiteplanENHANCED WEATHER PROTECTIONAdditional sheltered waiting
April 9th, 2012Intent: Exterior stabilization for public safety.Approach:Exterior rehabilitation in compliance with Secretary of the Interior standards.Process:Conditions survey and historical research, followed by MHC consultation & public input.Schedule:Concurrent with station constructionSIGNAL TOWER STABILIZATION
April 9th, 2012Project scheduleDesign GuidelinesScaleMaterialityTexture
April 9th, 2012Urban character – use of mixed materialsARCHITECTURAL EXPRESSION
April 9th, 2012Mixed-material design of garage structuresLOWELL GARAGE + RETAIL
April 9th, 2012Mixed-material design of garage structuresHAVERHILL INTERMODAL CENTER
April 9th, 2012
April 9th, 2012Project schedule
April 9th, 2012Project scheduleARCHITECTURAL TREATMENT
April 9th, 2012
April 9th, 2012
April 9th, 2012
April 9th, 2012SALEM INTERMODAL STATIONPublic MeetingJune 26, 2012SALEM INTERMODAL STATIONPublic MeetingJune 26, 2012