Salem Port Expansion Environmental Notification Supplemental Information April 2008
June 10, 2008
SALEM PORT EXPANSION
Salem, Massachusetts
Environmental Notification Form
Supplemental Information
Vine Associates, Inc.
372 Merrimac St.
Newburyport, MA 01950
978-465-1428
978-465-2640
Submitted to:
MEPA Office
100 Cambridge Street
Boston, MA
Submitted by:
Vine Associates, Inc.
with Bourne Consulting Engineering
Submitted for:
City of Salem
120 Washington Street
Salem, MA
Salem Port Expansion Project
Supplemental Information
Table of Contents
1. Additional Alternatives Analysis and Potential Mitigation
1. Introduction
2. Rationale for Proposed Site Programming
3. Site Description
4. Purpose and Need for Intertidal Dredging
5. Alternatives Analysis
6. Conceptual Mitigation
2. Summary of Previous Studies
3. Description of Impacts and associated calculations
4. Exhibits
A. Portscape Memorandum of April 11, 2008 – Commercial Fishing/Lobster Vessels
B. Site Development and Building Footprint and Location
C. US. Army Corps of Engineers Memo Dredge Sediment Suitability, February 2008
D. Plans
1. Existing Conditions Plan
2. Revised dredge footprint and volume calculations based on the updated hydrographic
survey
THIS PAGE INTENTIONALLY BLANK
Section 1 Page 1
1 ALTERNATIVE ANALYSIS AND POSSIBLE MITIGATION
1 INTRODUCTION
The following analysis was undertaken to determine if there is a more practical and feasible alternative to
the Salem Port Expansion project described in the April 2008 ENF that would avoid, and if avoidance is
not possible, minimize and mitigate the amount of intertidal dredging and still provide the required
berthing for the intended users of the facility.
2 RATIONALE FOR PROPOSED SITE PROGRAMMING
Maritime commerce has always been an important industry in the City of Salem beginning shortly after its
founding in 1626. The Salem Port Expansion project would enhance this tradition by creating a much
needed multi use water transportation and commercial berthing facility in the City of Salem.
As noted in Section 2 of this Supplemental Information Package, the City of Salem has been planning the
Salem Port Expansion project at this site for the past ten years and there have been numerous public
meetings held on the plan to solicit public input. The original 1998 plan was included in the City’s 2000
Harbor Plan and the current plan was included in the 2008 update to the Harbor Plan. As described in
more detail below, the property on which the Salem Port Expansion is proposed provides a unique
opportunity for the City to develop and realize the economic benefits of this long planned multi use
transportation facility.
2.1 Location in State Designated Port Area
The Project site is located in the Salem Harbor Designated Port Area (DPA), one of only 12 such areas
located in the Commonwealth of Massachusetts (see Figure 1).
This strategic location allows the City to develop the site in a manner that capitalizes on the site’s
proximity to the recently dredged federal channel and to achieve the development of marine industrial
uses at the site that cannot be accomplished elsewhere in the community. The uses programmed for the
site comply with state policy and regulations governing DPAs.
DPAs are special areas that were designated in the late 1970’s by the state Office of Coastal Zone
Management (CZM) to recognize their importance for maritime commerce and to reserve these areas as
the “…primary host areas to meet both the foreseeable and the unanticipated space needs of industrial
uses that depend on proximity to a waterway, either for the transportation of goods/passengers or the
withdrawal/discharge of large volumes of process water.”1
1 Preamble to the 1994 DPA regulations (301 CMR 25.00)
Salem Port Expansion Project Supplemental Information
Source: MDEP Salem Harbor Designated Port Area
Figure1
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 3
DPAs are special areas that were designated in the late 1970’s by the state Office of Coastal Zone
Management (CZM) to recognize their importance for maritime commerce and to reserve these areas as
the “…primary host areas to meet both the foreseeable and the unanticipated space needs of industrial
uses that depend on proximity to a waterway, either for the transportation of goods/passengers or the
withdrawal/discharge of large volumes of process water.”2
State regulations characterize DPAs as “…geographic areas of particular state, regional, and national
significance with respect to the promotion of commercial fishing, shipping and other vessel-related
activities associated with water-borne commerce, and of manufacturing, processing, and production
activities reliant upon marine transportation or the withdrawal or discharge of large volumes of water.”
The regulations further suggest that such areas should be preserved to the maximum extent practical in
order to “…meet the long term, cumulative space needs of the water-dependent industries which these
areas are so well-suited to accommodate”. 3
To support the state policy of reserving DPAs for marine related industrial uses, the performance
standards found in the state wetland and waterways regulations (310 CMR 10.00 and 310 CMR 9.00
respectively) are relaxed for activities proposed in such areas. The wetlands regulations at 310 CMR
10.26, state that coastal beaches, tidal flats and land containing shellfish located in DPAs are “not likely to
be significant to marine fisheries, storm damage prevention or flood control.” The regulations recognize
that DPAs are developed harbors that typically contain “high concentrations of contaminants, from vessel
discharges and point and non-point source discharges.” They also reduce the impact standard for
activities proposed in land under ocean resource areas from avoid to minimize.
2.2 Ownership
The Project site is the only property under the control of the City of Salem where a multi-use water
transportation and commercial berthing facility can be developed. The proposed use has been planned
for this property since 1998 and considerable city and state efforts have been expended on the project.
2.3 Lack of Sites with Deep Water
The City of Salem is a densely developed, relatively small (8.10 square miles) urban area located along
the Massachusetts coast. The City has approximately 14 miles of shoreline containing very limited areas
of deep water and extensive areas of shallow tidal flats.
The deep water locations are already developed with marinas and berthing areas. These areas are
shown on Figure 2 and include Palmers Cove Yacht Club (“1”), Pickering Wharf Marina (“2”), north west
side of Derby Wharf (“3”), Hawthorne Cove Marina (“4”), the berth along Dominion’s property(“5”), Winter
Island Pier and Ramp (“6”), Salem Willows Pier (“7”) and Salem Willows Yacht Club (‘8”).
2 Preamble to the 1994 DPA regulations (301 CMR 25.00)
3 301 CMR 25.00
Salem Port Expansion Project Supplemental Information
Source: NOAA Salem Harbor Coast Chart
Figure 2
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 5
As noted and illustrated on Figure 2, the extent of tidal mud flats along the coastline is extensive. To
demonstrate this fact, a quick calculation of intertidal4 areas within the City of Salem was performed
based on the U.S. Coast Chart of Salem and Lynn Harbors. The results of the calculation show that the
City of Salem contains approximately 346 acres (15,100,000 square feet) of intertidal areas located along
about 74% of its shoreline.
2.4 Economic
As noted in the April 2008 ENF filing, the Salem Port Expansion project is a vital economic development
initiative being undertaken by the City of Salem. The Project will provide several benefits that will
significantly contribute to the local economy including but not limited to the following:
redevelop a brownfields site into a state of the art multi use water transportation and
commercial berthing facility
provide berthing and backland support for a variety of water transportation uses including a
commuter ferry boat (Nathaniel Bowditch), a LNG supply boat, excursion vessels and cruise
ships
provide sorely needed year round protected berthing for the local lobster/commercial fishing
fleet
reduce operating expenses for local lobster fleet
create employment opportunities for local and regional residents
stimulate the local economy including the City’s tourism related industries
3 SITE DESCRIPTION
3.1 Physical Characteristics
The Project site, which is currently used to support the Salem commuter ferry service Nathaniel Bowditch,
is bordered by the Dominion Power Plant to the east, Hawthorne Cove Marina to the west, the Derby
Street neighborhood to the north and Salem Harbor to the south.
The 2.2 acre site is comprised of urban fill and is long, narrow, fairly level and unpaved. The site is
narrowest in the center (approximately +/- 40 feet in width, which constrains the ability to accommodate
necessary, parking and pedestrian and vehicular circulation.
The entire shoreline has been altered over time and is bordered by intertidal areas which vary in lateral
extent. Water depths along the shoreline range from elevation 5 MLW to elevation -20 at the outer edge
of the existing ferry facility. The northern portion of the site includes an embayment which is almost fully
exposed at low tide.
4 Depicted as extending from Mean Low Low Water to Mean High Water on Coast Charts.
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 6
3.2 Wave Climate
Winter coastal storms can generate strong wave action and surges throughout Salem Harbor. These
winter storms are primarily associated with northeast and easterly winds. The predominate winter wind
storm direction is from the northeast, most often originating from an east to southeast direction and then
returning to the northeast, as the storm passes up the coast.
Unlike nearby Marblehead Harbor, which is more open to the northeast, the mouth of Salem Harbor has
greater eastern exposure. This exposure mitigates to some extent the affect of northeast storm surges
due in part to the natural shape of the harbor, especially along the northern edge.
There is, however, a strong secondary or reflective wave generated from waves reflecting off the existing
wharf structures located in Salem’s inner harbor (primarily Derby Wharf). The reflected wave pattern is
primarily felt in the northern edge of Salem Harbor in the area extending from Derby wharf to the
Dominion property, located just east of the Project site (see Figure 3). The reflective wave approaches
the Project site from the west/southwest direction and has almost the same period and height at the
primary northeasterly generated winter wave (see Figure 4).
As a result of this reflected wave surge, most of the berthing areas proposed for the Project site will be
subject to significant winter wave action that would preclude safe use of the docks during winter months.
While not of concern to the uses that will berth at the site during non-winter months such as cruise ships,
the Nathaniel Bowditch, and excursion vessels, this condition is unsuitable for vessels that require year
round berthing such as the local lobster fleet. The only area on the Project site that would be protected
year round from both primary and reflected waves is the existing “cove” located east of the Hawthorne
Cove marina behind the wharf (see Section 5.3 below).
4 PURPOSE AND NEED FOR INTERTIDAL DREDGING
As noted, the entire shoreline of the Project site contains intertidal areas. The “cove” area which is the
most protected portion of the site, is comprised entirely of intertidal areas that are exposed at low tide. As
a result, dredging is required to create a basin with adequate depths to accommodate the lobster vessels
which average 40 feet in length with a draft of four feet. As noted in Section 3 above, this is the only
area on the site that is protected from all directions of wind and wave surge including the reflective waves
and which also can provide protection from storms with gale force winds or higher. This area is the only
berthing proposed on the Project site that the local lobstermen consider suitable for permanent, year
round berthing.
At present, the local lobster fleet changes locations from the summer to the winter which adds to the
operating costs. The need to provide safe, year round berthing protected from winter storms for the local
lobster fleet cannot be understated and was identified as far back as 1998 when the first plan for the site
was created.
Figure 3
Figure 4The "COVE"
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 9
As indicated in the memorandum prepared by Portscape dated April 11, 2008 (see Exhibit A), commercial
lobster fishing is the “most economically significant fishery” in Massachusetts with landings valued at
$52.4 million dollars in 2006. Essex County is first in the state in the number of pounds of lobster landed
and in the number of active fishermen. Yet, despite the importance of this industry, there is a shortage of
year round commercial fishing dockage in the area.
Currently the only year round berthing available for the local lobster fleet is located in the City of Beverly.
The City of Salem does not have any year round berthing dedicated to lobster boats. During the summer,
most of the Salem fleet stays on moorings in Marblehead. Other lobster boats berth either in the cities of
Beverly or Gloucester. During the winter, berthing is available at the Pickering Wharf marina but the
vessels can not load or unload from that location. There are two lobster boats that moor off of Winter
Island but this area is exposed to winter storms.
Based on interviews with local fishermen, Portscape estimated a potential demand for 15 to 20 year
round commercial fishing vessels ranging from 25 to 45 feet in length. More recent discussions with local
lobstermen indicate that if a year round facility is provided, demand for the berths would exceed 20
vessels. For the purpose of this analysis, a demand for 20 berths is assumed. Provision of year round
berthing is expected to improve economic health of lobster fleet resulting from increased revenues. The
memo also reiterates the fact that the issue of weather exposure is significant for the lobster fleet in the
area.
5 ALTERNATIVES ANALYSIS
As requested by MEPA, the following sections describe and analyze alternatives to the intertidal dredging
proposed in the Salem Port Expansion ENF that meet the identified berthing needs of the uses
programmed for the Project site.
5.1 Alternative Sites
There are no alternative sites under the City’s control where a multi-use water transportation facility can
be developed. The City has already expended over $700,000 on berthing facilities and site
improvements at the Project site and will re-use as many of the components of the existing berthing
facility as possible for the new facility.
There are no alternative sites within the City of Salem where a year round protected berthing facility can
be developed for the local lobster/commercial fishing fleet (see Section 1 above).
5.2 Proposed Building Footprint and Location
The program of landside support uses for the site was determined through a process of interviews with
existing and prospective users, as described in the document, Analysis of Existing Port Plans, prepared
by Bourne Consulting Engineering, November 2007. As noted, the 2.2 acre site is long and narrow and
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 10
must accommodate internal roadways, sidewalks, loading areas, passenger pickup/drop off and a water
transportation terminal building. The physical layout of the vehicular turning area limits the area available
for the proposed terminal building which, as a result, must be located along the waters edge. The project
proposes to fill a small area (1580 sf) of the intertidal revetment slope to allow the placement of the
building at grade and not on pilings. Pilings would be especially difficult due to the amount of large stone
present in this area.
A summary of the alternatives analyzed for the design and programming of the upland is provided in
Exhibit B.
5.3 Vessel Berthing Locations and Dredging
Pier Fixed and Floating Docks
The fixed pier and associated floating docks are located at the most seaward end of the existing upland
portion of the site. Such location allows closer access to the recently dredged federal channel; reduces
the amount of required dredging due to the presence of deeper water in this location; and minimizes
interference with the adjacent Dominion berth and Hawthorne Cove Marina.
An initial alternative analysis was performed in association with the development of site layout
alternatives and the proposed water transportation terminal building as described in the April 2008 ENF
(see also Exhibit B). The alternatives presented illustrate the layouts for the pier as well as commercial
floating barges which are utilized by the passenger ferry and the offshore supply vessel and were based
on the program elements identified from a review and investigation of previous project studies and direct
discussion with current and future users of the facility. Some of the specific design requirements included:
- Meeting of ADA and MAAB accessibility requirements for passenger vessel facilities
- Floating barges for commercial vessel berthing (Offshore supply vessel)
o Sufficient berthing for two vessels on each face.
o Suitable for small cruise ships, visiting vessels, excursion vessels
- Fixed pier with direct berthing face to provide:
o Truck access for
Material/supply transfer
Refueling
Crane access for vessel maintenance and material transfer
Trash removal
o Larger Cruise Ship Berthing (greater than 200 feet)
o Commercial marine support
o Visiting vessel berthing space
The ADA Barge docks are existing and are required at the site to meet MAAB regulations for scheduled
passenger vessel services at Salem. The alternatives integrate the existing facility within each layout.
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 11
Lobster/Commercial Fishing Berthing
Bourne Consulting Engineering investigated alternatives for the development of year round berthing for
the commercial fishing/lobster vessels. In performing the alternative analysis, a number of key
design/performance issues were identified by existing and potential site users and local lobstermen and
include the following:
Year round well protected safe berth
Demand for 20+ slips for berthing of lobster vessels
Vessel lengths from 35 to 42 feet (40 foot average assumed)
Support services including close truck access and dockside utilities
Year Round Berth – Storm Protection
The existing wave climate at the site was discussed with current site users and local lobstermen to
determine the optimal berthing configuration for the site. Through these conversations it was learned that
an unusual wave climate exists at the site caused by the length and location of Derby Wharf, a historic
structure which is part of the National Park Service Salem Maritime National Historic Site, located west of
the site (see discussion of wave climate in Section 3.2 above).
While the most significant exposure to storms of the Project site is from the northeast (and east), the
storm related waves from the northeast reflect off Derby Wharf and travel back toward the northeast and
into the Project site (passing under the floats at Hawthorne Cove Marina). While not a concern during
summer months, this wave pattern creates a significant wave climate during winter storm conditions and
would create an unsafe year round berthing facility in that portion of the site where the waves occur. The
affect of this wave condition is shown on Figures 3 and 4 in Section 3 which illustrate the overall harbor
and the specific area of concern with the initial storm wave train and the reflection off Derby Wharf.
To help combat these storm conditions and wave effects, a wave attenuation structure is now proposed
under the fixed pier proposed at the southerly portion of the site. This wave attenuator will lessen wave
impacts for the offshore supply vessel and other similar vessels that are proposed to berth on the leeward
side of the pier. The attenuator will also provide some protection from the northeast to smaller vessels
including lobster boats but not from the winter storm reflected wave conditions. The typical section of the
wave attenuator, which would run the length of the approach pier, is shown on Figure 5.
The possibility of a second water attenuator on the southwest side of the Project site was also
investigated in an effort to develop protection from the reflected wave conditions. A review of the ability to
install this second wave barrier revealed that it would need to be placed at least 60 feet away from the
edge of Hawthorne Cove Marina to allow adequate room for boat access to/from the marina slips. This
results in insufficient room to construction berthing for the lobster/commercial fishing vessels and still
provide for normal vessel movements associated with commercial passenger vessel operations on the
southwest side of the proposed pier.
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 13
The location of the reflected winter storm wave train within the Project site was determined and is shown
on the alternative lobster/commercial fishing berthing layout plans. Two wave boundary conditions are
illustrated that represent the 0.25 and 0.50 fraction of the open water wave height for that portion of the
wave which is transmitted into the “Cove”. Bourne Consulting Engineering believes that once the wave
has reached the ¼ height boundary that vessel berthing inshore of this boundary will be adequately
protected from winter storm conditions. Berthing of vessels outshore of these boundary conditions would
not be protected.
As illustrated on Figure 4, the “cove” area at the Project site is protected from the southwest wave
conditions (reflected Derby Wharf waves) due to the presence of the existing solid bulkhead structure that
projects out into the harbor at Hawthorne Cove Marina. Hence the year round slips, in order to be
protected and meet the needs of the lobster fleet, must be located within this “cove”.
Alternative Lobster/Commercial Fishing Berthing Configurations
Four alternative berthing configurations (in addition to the layout proposed in the ENF filing shown on
Exhibit 1) were identified and evaluated to determine if intertidal dredging could be avoided or minimized
(see Exhibits 2 through 5). Based on the results of the analysis and review by local lobstermen, the City
of Salem, the Salem Port Advisory Committee, and the Salem Partnership, Alternative V shown on exhibit
5 was selected as the preferred alternative to replace the layout included in the ENF (see Exhibit 1). A
discussion of each alternative is provided below which identifies the number of berths provided, including
year round berths, and the associated intertidal dredging required to accommodate the berths.
Alternative I: This alternative, shown on Exhibit 1, was developed from earlier facility layouts and was
included in the original ENF filing. Twenty slips are provided for the lobster/commercial fishing vessels 40
feet in length. The area of intertidal dredging required for this alternative is 44,190 square feet (sf). This
alternative provides safe year round berthing for 7 vessels (slips to the left of the 0.25 line).
It should be noted that had the reflected winter wave condition been identified at the time of the ENF
filing, the configuration included in the ENF would have been modified to increase the number of slips
with year round protection. This alternative does not accommodate the known year round berthing
demand for lobster/commercial fishing vessels (20 slips) and results in more intertidal dredging than the
other alternatives (see Section 4 above).
Alternative II: This alternative, shown on Exhibit 2, attempts to minimize the impact to the intertidal
area and still provide some safe berthing. Twenty slips are provided for the lobster/commercial fishing
vessels. The area of intertidal dredging required for this alternative is reduced to 26,800 sf. However,
this alternative only provides safe year round berthing for up to 7 vessels which is 13 vessels below
the existing need. Furthermore, although this alternative indicates up to seven protected slips, there is
concern that the commercial vessels operators may find these slips to be too exposed and therefore may
not be interested in utilizing them.
Exhibit 2
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 16
Alternative III: In this alternative, shown on Exhibit 3, 17 slips are provided and the impact to the
intertidal area is further reduced to 8,817 sf. However, this alternative provides no year round
protected berthing and was deemed unacceptable by the commercial vessel operators who reviewed
the alternative.
Alternative IV: This alternative, shown on Exhibit 4, presents an option that eliminates intertidal dredging
in this location and provides for seasonal berthing for 14 commercial vessels. However, this alternative
provides no year round protected berthing. This was deemed unacceptable by the commercial vessel
operators who reviewed the alternative.
Alternative V): This alternative, shown on Exhibit V, attempts to maximize the amount of safe, year
round berths for lobster/commercial fishing vessels and to minimize the intertidal impacts proposed in
Alternative 1. The area of intertidal dredging required for this alternative (shown as the shaded area) is
reduced to 41,600 sf which is illustrated as the shaded area. This alternative shows berthing for up to 30
lobster/commercial fishing vessels, with safe, year round berthing for up to 17 vessels.
Summary and Preferred Alternative:
As shown on see Figure 1, there are very few areas along the shoreline that contain deep water and
therefore, opportunities to create new berthing areas are extremely limited. The Project Site occupies
about 2.5% of the City’s entire shoreline and contains just over one acre of intertidal area (44,867 square
feet) which represents about 0.29% of the total intertidal area in the City.
Dredging of the intertidal area is required in order to create a protected embayment that will provide a
year round berthing area for the local commercial fishing fleet. The project identified a definitive need for
year round lobster/commercial fishing vessel berthing for 20 plus vessels. No alternate sites are available
within Salem. Currently the local lobster fleet uses seasonal moorings in Marblehead Harbor and winter
berthing at Pickering Wharf or other recreational boating facilities. Alternative berthing configurations
were analyzed to determine if the year round berthing need for the lobster/commercial fishing fleet could
be accommodate and at the same time reduce the required amount of intertidal dredging.
Based on this analysis, Alternative I was eliminated as it does not provide the required number of berths
and results in the most intertidal dredging. Alternatives III and IV were eliminated as they do not provide
any year round berthing. Alternative II was eliminated as the proposed berthing configuration was not
supported by local lobster mean and only 7 year round berths are provided. The preferred alternative is
Alternative V which provides 17 protected year round berths for the lobster/commercial fishing fleet and
reduces the amount of intertidal dredging by 2,590 sf. The alternatives were reviewed with commercial
vessel operators, the City of Salem, the Salem Partnership and the Salem Port Advisory Committee and
all parties endorsed Alternative V as the preferred alternative as it provides the maximum year round
berthing.
EXHIBIT 4
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 20
6.0 CONCEPTUAL MITIGATION
Bourne Consulting Engineering, in conjunction with the City of Salem Mayor’s Office and the Department
of Planning and Development with input from the Salem Conservation Commission, Salem Sound Coast
Watch, the MA Office of Coastal Zone Management and other State and Federal agencies developed a
conceptual plan that identifies potential mitigation sites in the City of Salem to offset the proposed
intertidal impacts at the Project site.
The conceptual mitigation plan will be used as framework for developing a more refined mitigation
program as part of the Project permitting phase. This mitigation plan has been developed based on the
results of the alternatives analysis which demonstrate that dredging impacts to the intertidal area cannot
be avoided without severely comprising the need to provide safe, year round berthing for the local lobster
fleet. The preferred alternative does minimize environmental impacts to the greatest extent possible
given the unique configuration of the property and the identified berthing needs. Additionally, the
dredging is not proposed in a natural, unaltered site. Rather, the property is located in a state Designated
Port Area that has historically been used for marine industrial purposes.
The City will work closely with local, state and federal agencies specifically the Salem Conservation
Commission, the state Division of Marine Fisheries, and the National Marine Fisheries Service to reach
agreement on the functions and values of the existing intertidal area, to identify the Project impact on
those functions and values, and to create a mitigation program that affectively offsets the impacts to the
functions and values. The intertidal area that will be affected by the project is a 41,600 sf mud flat. The
area has not been officially designated as a Shellfish resource area by the state DMF however at the
MEPA Scoping session a DMF staff member stated that the area should be mapped as such. The
mudflat is also located in the Salem Harbor Designated Port Area and as a result of the site’s existing and
long history of commercial and maritime industrial usage, is not thought to be an area of high
environmental value. Nevertheless the area is a protected state and federal wetland resource area and
because impacts cannot be avoided, mitigation must be provided. The following sites are listed in order of
their perceived suitability and value in relation to the area to be impacted.
Pioneer Village
Pioneer Village is a City-owned historical site
(recreation of a 1630’s Salem Village) located
along Salem Harbor. The site historically
contained a salt marsh system which was altered
as part of the original work associated with
Pioneer Village to create a freshwater pond. This
mitigation effort would restore tidal flushing to the
pond by removing a portion of the existing
concrete retaining wall along the beach and open
Photo 1: Retaining Wall at Pioneer Village
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 21
a channel to Salem Harbor. The restoration effort would return approximately 20,000 sf of lost salt
marsh habitat to an intertidal system with the anticipation of the reestablishment of its previous
environment.
Furlong Park
Furlong Park is an urban riverfront park situated along Franklin Street in the City of Salem. It is a multi
use facility with picnic tables, benches, a playground, sports fields, a basketball court, and a tennis court.
This area has been subject to bank erosion and filling of the intertidal area due to continuing degradation
of the upland edge and material falling into the mudflat. In order to restore this bank and to protect it from
further erosion and to restore the previous area of mud flats, this project would limit the edge of the
existing park lawn, formalizing that edge with rip rap and excavating the filled area to below MHW (see
Figure 6).
This would establish an approximately 12’ -15’ wide
area of intertidal mud flat that would restore
approximately 20,000 sf of habitat that is of the same
type as the area being impacted. There is also the
possibility to extend the park both to the north and south
of the existing park limits and to create a kayak / canoe
beach landing area to further enhance the recreational
value of this area.
Photo 3: Aerial of Furlong Park Shoreline
Photo 2: Edge Degradation at Furlong Park
Figure 6
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 23
Kernwood Golf Club
On the Kernwood Golf Club property there is an
approximately 5,000 sf salt pond that has been cut
of from the tidal flow of the sound. The proposed
restoration would involve restoring a link to the
estuary to allow for tidal flushing of the pond.
Similar to the pond at Pioneer Village it is
anticipated that this salt pond would return to its
native inter tidal cycle and reestablish the historic
environment for this system. The potential
concern with this project is that it is on land that is
privately owned.
Kernwood Park
The proposed project at Kernwood Park is similar to
that at Furlong Park. The edge of the park is being
eroded and causing the intertidal area adjacent to it
to fill. This project area is smaller, at approximately
50 linear feet, but is also a direct in–kind project.
It is proposed that the edge of the area would be
formalized again potentially with rip rap and
excavation to below mean high water would be
completed.
Other Potential Mitigation Sites
Additional sites that are still being investigated for potential mitigation are also included in this proposal.
These include:
Forest River
The Forest River and the adjacent Forest River Park are important recreational and environmental
resources for the City of Salem. While our initial investigation of this area has not yielded any immediate
sites for mitigation, we are continuing to work with local agencies to identify potential opportunities for
preservation and conservation. There may be opportunity to undertake soft shell clam seeding in this
Photo 3: Edge Degradation at Kernwood Park
Photo 5: Aerial of Kernwood GC Salt Pond
Salem Port Expansion Supplemental ENF Filing
Section 1 Page 24
area which, based on the report prepared by the Division of Marine Fisheries published in 2002,5 contains
suitable habitat that does not have presently contain soft shell clams. Additionally, this area would be a
strong candidate should any direct in-kind mitigation opportunities arise.
Smith Pool, Winter Island, Salem State College
This is a potentially large area of salt pond restoration that is located at the Salem State College Cat
Cove Marine Lab. This area could potentially be reconnected to the sound and restored through tidal
flushing. The potential concern with this project is that this is an area that is actively used by the College
and there may be concerns with changing its current use.
Other sites
There is potential for other wetland restoration projects in the Salem Sound area including the support of
fish runs in the Danvers River and the potential for working in conjunction with a flood control project that
is expected to have impacts in the North River area at the Peabody line.
Additionally, Salem Sound has been previously investigated as a potential site for the establishment of an
artificial reef habitat. A site in Boston Harbor was chosen over the Salem Sound site, and has been
successful in the establishment of a healthy reef system. It is thought that a similar project could be equally
successful if completed in Salem Sound although costs must be considered.
Summary
The above proposed areas for potential mitigation would restore approximately 42,000 sf of inter tidal /
mudflat habitat to the Salem area. This mitigation would be in-kind with the potential impacts that are
anticipated with this project. Out of kind mitigation such as seeding the Forest River with soft shell clams
is another mitigation opportunity that will be explored with local, state and federal agencies. Bourne
Consulting Engineering and the City of Salem are anticipating continuing the collaborative efforts with
state and federal agencies that have already been established as we move forward with the permitting
process for the Port Expansion for the City of Salem.
5 The Marine Resources of Salem Sound, 1997. Prepared by Massachusetts Division of Marine Fisheries, Department of
Fisheries, Wildlife and Environmental Law Enforcement, Executive Office of Environmental Affairs in 2002.
Section 2 Page 1
2 SUMMARY OF PREVIOUS STUDIES
As noted in the Salem Port Expansion ENF filed with MEPA on April 15, 2008, several planning and
economic studies have been prepared for the Project over the past ten years. Dredge sediment sampling
and testing has occurred and the U.S. Army Corps of Engineers has determined that the sediments are
suitable for open ocean disposal. There are no mapped shellfish beds in the area however a
representative from the state Division of Marine Fisheries indicated at the MEPA Scoping session held on
May 1, 2008 that the area should be mapped as containing shellfish resources. The City agreed at the
MEPA Scoping Session to undertake a shellfish survey prior to the submittal of permit applications for the
Project. A brief description of the pertinent previous studies is provided below.
1998 New Salem Wharf Study, Salem Harbor Plan (The Cecil Group, et al)
As noted in the Salem Port Expansion ENF, the re-development of the Project Site into a multi use facility
including significant water transportation use was originally proposed in 1998 in preparation and support
of the subsequent Salem Harbor Plan which was subsequently published in 2000.
The Project at that time was conceived as a multi use marine facility capable of berthing large cruise
ships (800 feet long) as well as accommodating excursion/charter vessels, transient vessels and the local
commercial fishing fleet. The landside development included retail and hotel uses as well as support
facilities for the commercial fishing and water transportation operations. The proposed development was
designed to take advantage of the site’s proximity to the federal channel and its location in the Salem
Harbor Designated Port Area. A large solid filled pier was proposed along with a ½ acre area of fill to
accommodate retail uses in two buildings and a hotel was proposed on the existing upland. Dredging of
approximately 550,000 cubic yards of material was proposed including intertidal and subtidal areas.
This study was the foundation for the City of Salem Harbor Plan which was developed in 2000 for this
specific area of the City. The study was scaled down in subsequent development plans to address site
constraints and provided the original market analysis that was utilized in this as well as subsequent study
updates.
2001 The Salem Ferry and New Salem Wharf Project, A Phased Approach to Completion and
Findings Report - New Salem Wharf Project, Salem, Massachusetts (Vine Associates, Inc.)
These studies analyzed the potential to phase development of the 1998 development plan for the site.
2005 Final Site Development Plan, Salem City Pier (Vine Associates et al)
In 2005, the development program was reduced in scope based in part on public input as well as the
results of market studies which demonstrated that smaller cruise ships would be more likely to utilize the
facility than larger ships. The changes included elimination of a large filled pier; elimination of the ½ acre
of fill formerly proposed for the construction of retail uses; a reduction in the size of the fixed pier to
accommodate smaller class cruise vessels; and reduction of the dredge footprint and volumes.
Salem Port Expansion Supplemental ENF Filing
Section 2 Page 2
The changes also removed the hotel and retail uses from the project altogether. The water transportation
terminal and commercial fishing support buildings were retained. Parking was reduced to reflect the
revised program.
2005 Ferry Facility Design and Program (Vine Associates, Inc.)
In 2005, design plans including alternative configuration were developed for the existing ferry facility
located on the site.
2006/2007 Dredge Sediment Sampling and Testing (Vine Associates, Inc.)
In May 2005 a dredge sediment and sampling plan for the proposed dredging was approved by the U.S.
Army Corps of Engineers and the sampling and testing were conducted in 2005 through 2007. The U.S.
Army Crops of Engineers determined in February 2008 that the sediments are suitable for open ocean
disposal in the Mass Bay Disposal Site (see Exhibit C).
2007 Hydrographic Survey (Vine Associates, Inc.)
In 2007, a bathymetric survey of the Project Site was undertaken. Sheet 2 of 2in Exhibit D includes the
results of the survey. The current dredge footprint and dredge volumes were calculated based on that
survey.
2007 Present Review and Analysis of Existing Salem Port Plans (Bourne Consulting Engineering)
The City of Salem retained a waterfront consultant to analysis the existing port plans developed to date as
well as review the current market analysis and to develop a preferred alternative for both upland and
marine development. The task was based on the current City controlled land of Blaney Street. The Project
is currently underway and is incorporating additional market analysis to reflect current economic
conditions and site constraints. Alternatives were developed and utilized as basis for the proposed
development included in the April 2008 ENF filing with MEPA.
2008- Present Market Analysis, Management and Operations Plan and Regulatory Approvals,
(Bourne Consulting Engineering)
As noted in the Salem Port Expansion ENF, the City retained a waterfront consultant to develop perform
a current market analysis for the project taking into consideration, among other factors, existing facility
use by the commuter/visitor passenger ferry Nathaniel Bowditch, potential use by an offshore supply
vessel to support the Northeast Gateway deep water LNG Port and current interest expressed by
commercial fisherman (lobster boats), commercial marine and coastal cruise companies. The market
analysis results have indicated that in addition to the existing usage for passenger vessel service and for
offshore supply vessel operations that there was a strong demand for year round berthing for lobster
boats. A memorandum of the findings is found in Exhibit A. The full study, which is currently underway, is
anticipated to be completed in early July.
Section 3 Page 1
3 DESCRIPTION OF IMPACTS AND ASSOCIATED CALCULATIONS
The calculations provided in the Environmental Notification Form filed for the Salem Port Expansion
Project (EEA 14234) have been revised based on a refinement of the proposed dredge area using up to
date bathymetry and adjustments to the portion of the site located above the 100 year flood level. The
revised calculations result in an overall wetland impact of 9.8 acres which is below the 10 acre threshold
for a categorical EIR requirement pursuant to 301 CMR 11.03(3)(a)(1)(b).
1. SITE AREA CALCULATIONS
Upland (landward of top of bank) = 2.19 acres
Waterside (seaward of top of bank) = 7.95 acres
Total Site Area = 10.14
2. TOTAL DREDGE
Coastal Beach = 1.01 acres
Land Under Ocean = 6.69 acres
Total Dredge = 7.70
3. OVERALL WETLANDS IMPACT (WITH INTERTIDAL DREDGING REDUCED)
Upland (Land Subject to Coastal Storm Flowage) = 1.85 acres
Waterside (Coastal Bank, Coastal Beach and Land Under Ocean) = 7.95 acres
Total Wetland Impact = 9.80 acres
4. IMPACT BY RESOURCE AREA
LSCSF = 1.85 acres
Coastal Bank = 850 lf (0.25 acres)
Coastal Beach = 1.01 acres
Land Under Ocean = 6.69 acres
Detailed Description of Calculations
The impact calculations were performed using AutoCAD drawings and an updated hydrographic
survey/dredge footprint to refine the estimated wetland impacts identified in the ENF. Based on this
information, the proposed impacts to wetland resource areas is 9.80 acres which is below the 10 acre
thresholds for categorical EIR. Please note that this calculation assumes that the Designated Port Area
calculation is not included as such areas are not defined as wetland resource areas per 310 CMR 10.02 (1).
Resource Area Calculations
The upland portion of the site measured from the top of bank to the property line is 2.19+/- acres. The
waterside portion of the site measured from the top of bank to the top of the dredge slope in the proposed
dredged basins is 7.95 acres. A description of the calculation of wetland impacts is provided below.
Salem Port Expansion Supplemental ENF Filing
Section 3 Page 2
1. Land Under Ocean
Impacts to Land Under Ocean (measured from mean low water seaward) were defined by the limit
of dredging. (Note that the proposed piers and floating dock/barge systems are located within the dredge
footprint). The dredge footprint was further analyzed and the boundary of the outer basin was refined as
shown on the attached plan. This refinement results in a dredge footprint in Land Under Ocean of
291,564 square feet (6.69 acres).
2. Coastal Beach
Impacts to Coastal Beach (measured from mean low water to bottom of coastal bank) were defined by
the limits of dredging and total 44,190 square feet (1.01 acres).
3. Coastal Bank
Approximately 850 linear feet of coastal bank is being altered as a result of bank stabilization, installation
of a concrete retaining wall, installation of sheetpile wall, installation of piles to support a harborwalk, and
placement of fill in front of the proposed water transportation terminal building. The total area of coastal
bank covered by the Harborwalk and proposed to be filled is 10,890 square feet (0.25 acres).
4. Land Subject to Coastal Storm Flowage (LSCSF)
The existing site elevations were reviewed in relation to the FEMA flood maps. Approximately 80,586
square feet (1.85 acres) of the landside are within the Zone A4 or Zone V3 flood elevations and
therefore considered Land Subject to Coastal Storm Flowage. These areas were measured from the top
of coastal bank inland to the property line.
Updated ENF Calculations
The calculations included in the ENF are shown below in red and the revised calculations are shown in
blue.
Calculations in Original Filing Revised Calculations
Land Under Ocean 317,000 sf 291,564 sf
Coastal Beach 45,000 sf 44,190 sf
Coastal Bank 850 lf 850 lf (10,890 sf)
LSCSF 88,900 sf 80,586 sf
Total Wetland Impact 450,900 sf 427,323 sf
Designated Port Area 362,000 sf 346,738 sf6
6 A portion of the landside of the site is located outside of the DPA. Furthermore, Designated Port Area is not defined as a
wetland resource under the state wetland regulations at 310 CMR 10.00 and therefore was not included in the calculation of
wetland impacts.
Exhibit A
Portscape Memorandum dated April 11, 2008
M E M O R A N D U M
DATE: APRIL 11, 2008
TO: RON BOURNE
FROM: LAUREL RAFFERTY, PORTSCAPE
RE: SALEM PORT EXPANSION PROJECT – MARINE MARKETS – COMMERCIAL FISHING/LOBSTER;
OTHER COMMERCIAL VESSELS; TRANSIENT VESSELS
MARINE MARKETS – COMMERCIAL FISHING/LOBSTER; OTHER COMMERCIAL VESSELS;
TRANSIENT VESSELS
Commercial Fishing/Lobster
Commercial lobster fishing is Massachusetts’ most economically significant fishery conducted within state
waters.1 Massachusetts’ landings of lobster from all waters, territorial and non-territorial, at 10.9 million
pounds, was valued at $52.4 million dollars in 2006, 11% higher than 2005, making the state the second
leading producer in the country, after Maine. Maine and Massachusetts combined produced 90% of US
landings.2
The two charts below3 show the relative standing in commercial lobster landings in pounds and value
among New England States from 2001-2006. While Maine has had a commanding lead consistently,
Massachusetts has been second consistently.
NE Lobster Landings (lbs) by State
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
2001 2002 2003 2004 2005 2006LBS in MillionsRI
NH
MA
ME
CT
1 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes (TR31-2005), p. 1.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf
2 Source: http://www.st.nmfs.noaa.gov/st1/fus/fus06/01_intro2006.pdf. Statistics compiled by Massachusetts differ, as indicated
below.
3 Source: www.nmfs.gov. See Appendix A for data depicted in the graphs.
2
NE Lobster Landings ($ in millions) by State
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
2001 2002 2003 2004 2005 2006Millions of DollarsRI
NH
MA
ME
CT
Within Massachusetts, Essex county, in which Salem is located, retained its position in 2005 as first in the
state in number of pounds of lobster landed and in number of active fisherman. The statewide ex-vessel
price for Essex County was $4.85 in 2005, less than the statewide average of $5.02.4
The following chart shows the number of active commercial lobstermen, lobster landings, and traps-fished
by homeport for 2005 for Salem, other communities along Salem Sound and on the North Shore, and for
important fishing ports of the state. Rankings in each of these measures are also shown.5 (See Appendix
B for this data on all communities of the state engaged in lobster fishing.) As the chart indicates,
Gloucester is first in all performance measures. Beverly has top ranking in all categories among the
communities along Salem Sound, followed by Marblehead. Salem ranks low in all categories, between
35th and 37th, of the total of 46 communities covered.
Community Fishermen Catch (lbs) Effort
# Rank Territorial Non-Territorial Total % Rank Traps % Rank
Gloucester 194 1 815,170 751,975 1,567,145 14.01 1 61,988 14.58 1
Rockport 64 4 484,158 122,177 606,335 5.42 5 24,154 5.68 4
Beverly 39 8 416,817 148,307 565,124 5.05 7 21,143 4.97 6
Marblehead 31 12 274,153 24,805 298,958 2.67 13 14,619 3.44 9
Manchester 26 15 186,879 6,987 193,865 1.73 19 8,841 2.08 18
Danvers 8 30 51,375 0 51,375 .46 31 3,130 .74 30
Salem 6 37 26,389 0 26,389 0.24 38 2,110 0.50 35
Boston 51 6 292,038 519,024 811,062 7.25 2 18,988 4.47 7
New Bedford 120 2 51,670 423,997 475,666 4.25 9 5,782 1.36 23
Westport-Fall
River 26 15 24,963 744,203 769,166 6.88 4 13,143 3.09 11
State Total 1,222 46 6,462,788 4,721,940 11,184,728 100.00 46 425,020 100.00 46
4 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes (TR31-2005), p. 5.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf. The ex-vessels price referred to is the landings-
weighted average ex-vessel price as taken from the SAFIS dealer reporting database.
5 Ibid., p. 7. Data does not include seasonal permits
3
Opportunity
Factors affecting the level of opportunity there is in developing lobster fishing dockage fall into two
categories:
Those concerning the dockage itself -- its supply, and characteristics of its supply, its price, safety in
terms of weather exposure, and service level provided
Those concerning the lobster resource, its supply -- the status of the stock -- and its sustainability
Dockage
In Salem Sound and the North Shore area, there is a shortage of year-round commercial fishing dockage
space that is of a good price and safe in terms of protection from winter storms.
In Salem, itself, there are two facilities that have permanent berthing space for commercial fishing
vessels, Winter Island, which is public, and Pickering Wharf Marina, which is private. At Winter Island,
there is a pier, but it is unused for permanent berthing because of exposure to winter storms. At Pickering
Wharf Marina, there is space buffered from winter storms; the space includes a 500-F wharf, 10 slips at
39 F each (accommodating boats on two sides), and 3 docks with a total length of 130 F. Slots are
allocated on a 1st-come, 1st -serve basis. Fees for the summer are $150/F/6-months (May –October) and
$51/F for the winter 6-months November through April. With this rate structure, pleasure craft generally
fill the facility in the summer season, though one lobster vessel used the facility this past summer.
Generally six+/- lobster vessels use it in the winter season6; currently there are 11 lobster vessels at the
facility7. The Dock Master believes that demand for commercial lobster dockage is stronger than the
supply, but could not say whether any requests for dockage at his facility in the winter season had not
been met. He said the facility is generally full year-round though in the winter, there are fewer vessels, as
larger pleasure craft tend to use the facility at this time of year; commercial sight-seeing vessels also use
the facility. Other than Hawthorne Cove, which does not accommodate commercial vessels, Winter Island
is the only facility in Salem with available mooring space with good access and depths; however, weather
exposure is an issue in this location; moorings here are a flat $500/yr and services are good. There are
currently two lobster boats moored at Winter Island. With regard to potential new commercial lobster
fishing space, a dredging project is proposed at an existing pier elsewhere in Salem in the vicinity of the
new Beverly-Salem Bridge. The project is for a private facility that would accommodate 4-6 lobster
vessels and would provide protection for these vessels from winter storms. The status of the project is
unknown, but there are significant obstacles to it going forward, including conflict with existing plans for a
park for the neighborhood. The existing park plans represent mitigation for the bridge construction project
and would require City Council approval to change; there is also neighborhood objection to the change.
Nearby Marblehead has no slips; moorings have weather exposure and the wait at 12-15 years is long;
however, commercial vessels of residents may be given preference, and dockage fees are quite low at
$3.50/F/yr, less than those for recreational boats; services include a conveyor for loading and off-loading
lobster catch at the State St. Landing. According to Harbor Master’s office records, dated 12/2007, there
were mooring permits for 29 lobster boats in Marblehead. In the winter, some vessels are taken out of the
water, some relocate to Gloucester, Beverly, and Pickering Wharf in Salem.
Beverly, the leading producer in lobster landings in Salem Sound and among the top ten statewide in all
of the criteria ranked by the Massachusetts Division of Marine Fisheries (DMF; see Tables on p. 2 and in
Appendix B), has what is considered by some the premium public commercial berthing space for the area
at the public Beverly Harbor Center (BHC). Its fees and services reflect those of the Jodrey State Pier in
Gloucester, which the Facilities Manager for the Harbor Center considered the model in the area for
commercial dockage. Gloucester, as previously noted, is the top lobster producer in the state. Dockage
fees for commercial vessels at BHC are $76/F/yr. Dockage is protected from winter storms. Services
include a hoist for loading/unloading, electricity, fuel and bait delivery, but no haul-out or launch. The
facility has 17 commercial slip spaces; while one is currently available; there is a waiting list of 6-10,
demand is said to have been less in the past. 8
6 Source: Tom Moran, Dock Master, Pickering Wharf Marina.
7 Site survey, 4/9/08.
8 Source: Beverly Harbor Center Facilities Manager. The Facilities Manager reported that waiting list application fees might have an
impact on the numbers applying for placement on the list.
4
Manchester also has mooring space only; however, no commercial vessels are allowed; while the
topography offers winter storm-weather protection, there is icing over.
Rockport offers protected mooring space for commercial lobster vessels at $7/F/yr; there are slips, for
which fees are $14/F/yr; however, as the maximum length vessel they will accommodate is 22 F, most
lobster vessels are too large for them. Moorings are ample in number but nonetheless there is a long
waiting list; a very small number of the total 408 currently on the waiting list are for fishing or lobster
vessels. Lobster vessels on moorings are 150-180 in number.
Jodrey State Pier in Gloucester has space for 50 commercial vessels, 45 of which are filled by fishing
boats used for lobstering 60% of the time and fishing of other species 40% of the time. There is a wait list
of 50. Dockage fees are $79.20/F/yr.
The key findings of reports on Gloucester’s Commercial Fishing industry prepared in 2003 and 2005 are
that there is a shortage of berthing space, and further that the shortage is understated in these reports as
they focus on groundfish needs, not those of other species, including especially lobster. According to a
member of a panel involved in the industry review, lobster boats ‘…probably take up more docking space
than the larger boats because there are so many of them . . .”9
The report goes on to cite a number of conditions which put more and more pressure on commercial
fishing dockage space:
Gloucester’s commercial permanent berthing serves not only Gloucester, but communities in driving
proximity, including Beverly
Smaller nearby harbors have been losing their commercial dockage, and their commercial fishing
vessels have looked to Gloucester for space
Limits on days-at-sea for fishing for many species mean vessels are tied up at docks longer
The downturn in fishery landings, has led to deferred dock maintenance, and sometimes, as a result,
docks that can no longer be used.10
Within the past year, the press has reported the migration of Maine fishermen to Gloucester because of
regulations in the Maine which prohibit landing lobster by-catch, which is allowed in Massachusetts (see
article in Appendix C).
Space Available for Commercial Lobster Fishing Boats
Location Current #
Lobster Vessels Availability of Space
Salem
Public: Winter Island
Private: Pickering Wharf
2 Ample mooring space, pier unused for permanent berthing space because of
exposure to winter storms
11 (winter) Berthing space at a 500-F wharf, 10 39-F slips(2 sides), and 130-F dock,
allocated on a1st-come 1st-serve; used mostly by pleasure craft in summer,
1 lobster vessel was said to use dockage this past summer
Marblehead 29 12-15 year wait for mooring
Preference may be given to commercial fishing vessels of residents
Beverly 16 17 spaces, 6-10 on Waiting List
Gloucestera 45b 50 spaces, none available, wait list of 50
Rockport 150-180 Moorings - long wait list for moorings
Slips - Length will not accommodate most lobster vessels
a Jodrey State Pier only. b Vessels fish lobster 60% of time, other species 40% of time.
9 Commercial Fishing Industry Needs on Gloucester Harbor, Now and In the Future, 2005, Supplement to a Study of Gloucester’s
Commercial Fishing Infrastructure: Interim Report October 15, 2003, p. 4.
10 Ibid., pp.14-18.
5
Dockage Fees for Commercial Fishing Boats11
Location Fees
Salem
Public Winter Island
Private Pickering Wharf
$500/yr
$150/F/6-months (May-Oct); $51/F/6-months Nov-
Apr
Marblehead $3.50/F/yr for moorings
Beverly $76/F/yr for slips
Gloucester
Public
Jodrey State Pier
St. Peter’s Marina
Harbor Cove
Private
Marine Railways*
$79.20/F/yr for slips
$3.75/F/month for dockage
$4/F/month for dockage
$4/F/month+ $100/month (covering dumpster and
electric)
Rockport $7/F/yr for moorings; $14/F/yr for slips (see above)
* Must buy fuel and repairs from facility
Storm Protection for Commercial Fishing Boats
Location Storm Protection
Salem
Public: Winter Island
Private: Pickering Wharf
Moorings and pier are exposed to winter storm
weather
Dockage protected from winter storms
Marblehead Moorings exposed to winter storm weather
Beverly Dockage protected from winter storms
Gloucester Dockage protected from winter storms
Rockport
Pigeon Cove
Moorings protected from winter storms
Services Provided for Commercial Fishing Boats
Location Services
Salem
Public: Winter Island
Private Pickering Wharf
Hoist at pier, launch/haul service, seasonal dinghy
rack storage, water, boat ramps, parking
30+50 amp electrical service
Marblehead Loading/unloading conveyor (at State St. Landing),
launch ramps, floats, commercial fishing vessel float
rings
Beverly Hoist for loading/unloading, electricity, fuel and bait
delivery, no haul-out or launch
Status of Lobster Stock
There are short- and long-term threats to the Massachusetts lobster industry. Short-term threats are
being appropriately attended to; long-term threats require more attention.
There has been an expansion of effort in the lobster fishery that has been significant and rapid. From the
late 1940s through the early 1950s, landings were approximately 25 million pounds. More recently, from
1993-2005, lobster landings increased from 57 million to 88 million pounds, 80% of which were caught in
the state’s waters.12 In Massachusetts, concern that expanding lobster fishing was threatening the stock’s
sustainability led to a prohibition as of 1988 on the issuance of any new coastal commercial lobster
fishing permits.13 The number of coastal permits, now at 1,428, has fallen for the past eighteen
consecutive years. Authorizations for permit transfers in 2005, at 46, were few. The MA DMF report
11 Which may cover additional services
12 Species Profile: American Lobster Managers Face the Challenge of Rebuilding Depleted Southern New England Stock, Excerpted
from ASMFC Fisheries Focus, Vol. 16, Issue 5, July 2007, p.2.
13 Permits that allow lobster harvesting anywhere, including, most importantly, the state’s coastal waters.
6
shows that in 2005, 316 offshore permits were issued, continuing a decline over the past three years of
the five years shown. 14
Level of effort is thought to be a function of not only the number of fisherman, but the number of traps. As
a result, in addition to a moratorium on new licenses, trap limits have been set in some areas.15
There are additional controls as well. In the management of most fish species, a total allowable catch
(TAC) is set, that is, a cap is established on the number or weight of animals that can be landed. In
contrast, the lobster fishery is managed through controls to sustain lobster egg production.16
Management controls to meet this egg production objective, control fish mortality, and reduce latent
fishing effort17, set minimum (and in some areas maximum) legal sizes and prohibit the catching of egg
bearing females.
Nonetheless assessments of the stock status indicate that there are problems: in the Southern Gulf of
Maine, in Massachusetts Bay and Stellwagen Bank -- the area which borders the coast of Massachusetts
from its North Shore to Provincetown and the Outer Cape18-- there is a low abundance of lobster, high
lobster mortality, and low recruitment, and in Southern New England, there is overfishing and stock
depletion. In Georges Bank (GBK) and most of the Gulf of Maine (GOM), while there is no overfishing and
stocks are not depleted, in the case of the GOM, the high stock abundance is matched by high effort
levels, making these levels probably unsupportable if abundance returns to historic median levels, and in
the GBK, the high effort levels mean increases in effort are unadvisable.19
If lobster landings fall to the long-term average, they will be reduced by more than 50% of current
landings.20 This return to historical landings will have significant impact on the lobster fishing industry.21
Average catch rates, that is, catch per trap-haul, for coastal lobstermen in 2005 was approximately 10%
lower than in 2004 and 25% lower for offshore lobstermen22. Catch rates increase with amount of trap
soak time up to a week; when this factor is taken into account the term ‘pounds per trap-haul*set-over-
day’ is used. The average catch per trap-haul*set-over-day for offshore lobstermen for 2005 was the
lowest reported catch rate for Offshore Lobstermen on record,19% lower than 2004. While there has
been variability year-to-year between 1994 and 2005, the trend line is one of decreasing catch rates for
both Coastal and Offshore lobstermen. A comparison of catch rates for state territorial waters of Salem
Sound, which fall in Area 3, and those of other coastal areas of the state are shown below.
14 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes (TR31-2005), pp 1-4.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf 15 According to a New England Aquarium report on the lobster fishing industry, “…regulating the number of traps places no limit on
the number of lobsters that can be harvested commercially.”
16 The Sustainability of the Massachusetts Lobster Fishing Industry Dr. Michael Tlusty Research Scientist New England Aquarium
Boston MA 02110-3399 January 2003, p. 7. “The ASMFC is attempting to rebuild lobster populations to a point where egg
production values are 10% that of an unfished population...” (p.19)
17 This refers to “latent traps”, that is, “… traps that are not currently being fished either because the fisherman is not using their full
allotment (a fisherman with 420 traps in the water can still put in an additional 380 for their quota of 800), or because the license is
unfished (The Sustainability of the Massachusetts Lobster Fishing Industry Dr. Michael Tlusty Research Scientist New England
Aquarium Boston MA 02110-3399 January 2003, p. 10).” 18 Area 514, of the North Western Atlantic Ocean National Marine Fisheries Service Statistical Reporting Areas; see Map in
Appendix D.
19 Species Profile: American Lobster Managers Face the Challenge of Rebuilding Depleted Southern New England Stock, Excerpted
from ASMFC Fisheries Focus, Vol. 16, Issue 5, July 2007, Fact Sources: Lobster Institute & RI Sea Grant, NMFS; and ASMFC
Lobster Flyer, web, 2006.
20 COASTAL FISHERY RESEARCH PRIORITIES AMERICAN LOBSTER (Homarus americanus) Prepared by the Gulf of Maine
Aquarium January 10, 2001.
21 Recent record landings led lobstermen to incur great debt. According to a report on the MA lobster industry: “Economics of the
lobster industry are difficult, particularly for fishermen given the recent record landings. This has caused them to incur great debt
that makes the appropriate investment unsustainable if landings return to their historical average. Given that the lobster fishery is
not statically efficient (meaning that the industry could put in less effort to achieve the same yield, Herriges 2001) the appropriate
investment will always be maximized, and any downturn in landings will significantly impact the lobstermen.” The Sustainability of
the Massachusetts Lobster Fishing Industry Dr. Michael Tlusty Research Scientist New England Aquarium Boston MA 02110-3399
January 2003.
22 Source: 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes, pp. 11-12.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf.
7
2005 median catch per unit of effort (CPUE- pounds per trap-haul * set-over-day) for all license
types by area fished (A - territorial areas)23
Catch per unit effort (CPUE) is an index of fishing pressure. The numbers suggest lobsters are becoming
more difficult to catch. Since current catch levels are significantly above the long-term average, there is
reason for concern that lobsters are being overfished, threatening the sustainability of the lobster
industry.24
According to a lobsterman who also does research for the Massachusetts Division of Marine Fisheries,
fishery management is currently being done on a species-by-species basis, creating an eco-imbalance in
which there are expanding predator fish populations that are diminishing the lobster stock.25 Other
researchers have reported that a long-time lobster disease that softens their shells, diminishing their
quality, has been on the rise. Another threat to the lobster supply is a regulatory closure of the fishery
because of the threat that lobster heavy trap gear and buoy lines pose to right whales, an endangered
species.26
The above indicates the status of the Massachusetts lobster industry and some of the multiple factors
affecting the status. These factors and others reportedly constitute short- and long-term threats to its
sustainability. The industry is said to be taking appropriate measures to assure its sustainability in the
short-term; long-term sustainability is at issue. Accurate predictions are difficult because of what is not
known. What is said to be important to its long-term sustainability is the dedication of greater effort to
improved scientific programs to fill the knowledge gap, as well as improved conservation, monitoring, and
enforcement programs.27
Commercial Dockage Facility Needs
Commercial dockage facilities needs are summarized below. They are largely based on interviews of two
lobstermen, who reported on three vessels, in their or their families’ use. Marblehead is homeport for
these vessels. Currently, in the summer season (May –Oct) the three vessels are tied up at moorings in
Marblehead and in the winter season (Nov–Apr) are moved to Pickering Wharf Marina in Salem.
Safety – Weather Protection -- The shift in location for the three vessels for the six-month winter season
is made for safety reasons. Pickering Wharf offers protected winter dockage, while moorings in
Marblehead are exposed to northheasterly storms in winter. A secure location with protection from
23 Source: 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes, p. 13.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf 24 The Sustainability of the Massachusetts Lobster Fishing Industry, Dr. Michael Tlusty, Research Scientist, New England
Aquarium, Boston MA, 02110-3399, January 2003, p.2.
25 Interview with Jay Michaud, Lobster Fisherman, 3/6/08.
26 The Sustainability of the Massachusetts Lobster Fishing Industry, Dr. Michael Tlusty, Research Scientist, New England Aquarium,
Boston MA, 02110-3399, January 2003, p.10-12.
27 The Sustainability of the Massachusetts Lobster Fishing Industry, Dr. Michael Tlusty Research Scientist New England Aquarium
Boston MA 02110-3399, January 2003, p. 22.
8
weather exposure year-round, but particularly in the winter season, is viewed as a key need by the
lobstermen interviewed.
The issue of weather exposure is a critical one, as can be seen from information posted on the web sites
of Harbor Masters of Salem Sound and North Shore communities, as well as those of the communities
themselves. These web sites often indicate whether the communities’ harbors or areas of their harbors,
are protected or exposed to winter storms. The issue is well-recognized in Salem Sound by those
involved in harbor management. The Salem Harbor Master reports the following in red on his Web site28:
All of Salem Waters, with the exception of Area S29, are exposed to a "Northeaster" to some degree. They
occur rarely in summer but are common in early spring and late fall. The two long-time lobster fishermen,
who were interviewed, stressed the problem of the winter weather exposure of moorings in Marblehead,
their homeport, explaining, as noted above, that they move their vessels to in winter to a different location
that provides storm buffering. The Beverly Harbor Center Facilities Manager emphasized the issue of
weather exposure in Salem Sound in an interview and identified some of the areas of particular concern.
The owner of Hawthorne Cove Marina confirmed the problem of strong wave action from winter storms
affecting his marina, a facility which is located in close proximity to the Salem Port Expansion project site.
Importantly, he noted, that just next to his facility within the project site, there is an area protected from
NE and E storms (winter storms), which he identified on a project map (see map in Appendix E).
Berthing Dimensions -- While lobstermen tend to fish in boats less than 35 F in length30, boats range in
size, on average, from 25-45 F. Two lobstermen who were interviewed indicated the dimensions of three
vessels in their or their families’ use: two vessels were 42F in length, and a third was 31 F. Average size
lobster vessels were said to be perhaps a bit smaller in their homeport of Marblehead. Width of their
vessels ranged from 11.5-13.5F and water depth requirements ranged from 3-5 F. For vessels of 42 F,
ideal berth length along a wharf is 50 F, but 46 F would suffice, it was reported; slip lengths could be
shorter -- 40 F.
Fishing Season -- The lobstermen interviewed fished lobster only, year-round, in daily trips, as often as
the weather allowed, one reported; the average number of days they were at sea was between 150 and
200. Average number of crew is two for the 42 F vessels; and this was said to be the average crew size
for commercial lobster fishing vessels moored in Marblehead. Both lobstermen had state and federal
permits allowing fishing in state and non-territorial waters; for the 31 F boat, one permit, a state permit,
was held; one lobsterman fished in Massachusetts Bay, mostly in federal waters (see Map in appendix);
the other fished in Salem Sound and the area of the surrounding islands, within 5 miles of Salem 70% of
the time for him and 100% of the time for his family member with the 31-F boat. All used traps, one
reporting his number of traps to be the limit, 800. All sold their catch to a Salem retailer/wholesaler,
Patriots Seafood, which they would generally have send a truck for pick-up at the dock. Price at the time
of the interview was $8/lb, but the average price during season is $4+/-/lb. Much of the product was said
to be shipped overseas to Europe and it was speculated that the value of the Euro may cause the price to
increase.
Seasonal Harvest, Coastal & Non-Territorial -- The annual pattern in territorial and non-territorial landings
for 2005 is shown below and reflects that of past years.31
28 (http://www.harbormasters.org/salem/moorings.shtml)
29 Area "S" is from the Kernwood Bridge to the Beverly Bridge in the Danvers River is designated Area "S". There is a long waiting
list and very little turnover.
30 The Sustainability of the Massachusetts Lobster Fishing Industry, Dr. Michael Tlusty, Research Scientist, New England Aquarium,
Boston MA 02110-3399 January 2003, p. 4.
31 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes, p. 8. http://www.mass.gov/dfwele/
dmf/publications/tr31_2005_lobster_report.pdf .
9
Table: 2005 Commercial Lobster Landings (lbs) by Season for Territorial and Non-Territorial Areas
Season Territorial Non-Territorial
May – Oct 4,839,001 2,676,934
Nov -- Apr 1,629,653 2,254,305
Total 6,468,654 4,931,239
Among Statistical Reporting Areas (SRA) of state waters, the one including Salem Sound (SRA 3) had
the third highest lobster harvest in territorial waters. The Cape Ann area (SRA 2) had the highest harvest
of lobster (18%) in state waters. (See Figure below.)32
2005 total commercial lobster landings from all permit types by statistical reporting area—(A - territorial areas)
32 Ibid., p.8.
10
The charts below summarize the berthing and additional commercial dockage facility needs, waterside
and landside, (beyond that of protection from weather exposure), and the incentives for their relocation,
reported by the interviewed lobstermen:
Waterside
Berthing
Length 30-40 F slip length; 40-50 F, if along wharf
Duration Year-Round
Navigational Access Clear channel with 3-5 F water depths
Utilities
Electricity 110-120v, 30 amp
Water ¾” Standard hose (nice, but not necessary according to one interviewee)
Landside
Access Access for trucks that may come to site to pick up lobster, deliver fuel
Parking 1 space/vessel, year-round
Storage Views:
1) 2000 SF/vessel for traps, buoys, lines on-site next to vessel, year-round, ideal but could
live without
2) Temporary storage space only, no need for storage on waterfront, but do need storage
space somewhere, ideally on other city-owned property, as yard storage of traps is prohibited
in Salem
Fuel Views:
1) Fuel delivery by truck to site is easiest
2) Not needed, as can obtain off-site, but allowing access to fuel source used by ferry would
be beneficial
Loading/Unloading Conveyor used to load and unload catch in Marblehead is a convenience
Bait storage Small building, as in Saugus, would be ideal, space permitting, unless would increase cost to
that of private marinas
Ice, food, vessel
maintenance, repair
service
Not necessary
Incentives to Relocation
Year-round dockage available at slip, wharf, or float that provides protection from winter storms, as exposure to
winter storms “puts whole business on line”, and moorings are harder to access and less economical, requiring a
second boat to get to the mooring
Dockage fees more competitive than those of a private marina
Electricity, for vessel safety in providing power for pump-out if leaks develop; also for maintenance with power tools
Proximity to home
Market
When the following question was posed to the lobster fishermen who were interviewed, ‘Assuming the
facility were built per your comments on what would be needed, as well as those on price, if you were
asked "If built, would they come?" how would you answer on a scale of 1-10, 10 being the strongest "yes,
they will come? ", they answered, “!0, they would come.” One elaborated: “A weather protected and
affordable facility in Salem would most likely attract at least fifteen year round commercial fishing boats.
The vessel size would be in the 25 to 45 foot range.”33 In a follow-up interview, the second lobsterman
echoed the first on the size of the market; he believed 15-20 vessels would be attracted to the facility.
Revenue Stream
If dockage fees were those of existing public and private facilities in Salem Sound, the revenues
generated by a 35-F vessel for 12 months would range between $2660 and $7037. For a 42-F vessel
they would range between $3192 and $8442.
33 Emails of 3/29/08.
11
Revenues Generated from Commercial Fishing Vessel Dockage Fees for a 35-F Vessel (average size)
Location Fee 6-months
summer
6 months
winter
12 months
Salem - Pickering Wharf Marina $150/F/summer
$ 51/F/winter
$5250 $1785 $7037
Beverly Harbor Center $ 76/F/yr $2660
Revenues Generated from Commercial Fishing Vessel Dockage Fees for a 42-F Vessel
Location Fee 6-months
summer
6 months
winter
12 months
Salem - Pickering Wharf Marina $150/F/summer
$ 51/F/winter
$6300 $2142 $8442
Beverly Harbor Center $ 76/F/yr $3192
The two lobster fishermen who were interviewed and moor their 42-F vessels in Marblehead for the 6-
month summer period, and Pickering Wharf Marina in Salem for the 6-month winter period, pay
approximately $2336/yr34 or $56/F/yr. This amount is less than the fee for Beverly Harbor Center; this
facility, while offering year-round dockage at a slip at a facility with winter storm protection, meeting the
desired criteria, as well as good services, is considered expensive. While Beverly Harbor Center has a
waiting list, this suggests that it may take a fee less than $76/F/yr to attract these and other lobster
fishermen, especially those who use Marblehead, to a new Salem facility for year-round use. The
Pickering Wharf Marina fee of $51/F/six-month winter, is the current benchmark for the winter November
to April season; however, generally it is only 6-8 commercial lobster vessels which use this facility in this
season.
Impact on Lobster Fishermen Economics
Discussions with experienced, full-time commercial lobstermen indicate that establishing dedicated
shoreline slips in Salem, will improve their bottom-line economics significantly. A conservative estimate of
pre-tax earnings improvement for a single boat exceeds $20,000 per annum. In isolated cases, pre-tax
earnings improvement may approach double this figure. As with any owner-operator enterprise,
individual results vary by each individual boat’s current operating circumstances.
The majority of the earnings improvement results from increases in gross revenue. These increases in
gross revenue are not accompanied by proportionate increases in either variable costs or in fixed
overheads. In simplest terms, proper and dedicated Salem shoreside slips allow more time to actively
fish, and require less time to burn time and fuel while traveling. Assuming that each boat saves enough
time to fish for lobster at least one half hour per day, for five days a week, only four weeks per month,
only six months a year, less than $170 per day incremental gross revenue, will generate $20,000 in
annual revenue. Inasmuch as the fixed costs of mooring, ownership of the vessel and equipment and
insurance, and variable costs, such as fuel and crew labor to travel to and from the fishing ground, are
already expended, additional time spent fishing generates revenue that largely flows to the pre-tax
bottom-line.
Furthermore, proper and dedicated shoreside mooring may result in reduced expenses, particularly for
boats currently unable to find economic and efficient moorings. Areas of expense reduction include
disposing of dinghies, fuel, reduction of insurance if shoreside moorings permit better risk-management
practices; and reduction of weather-related casualty losses.
No estimate is made of benefits accruing to the larger community of Salem, although these may be
significant. Benefits include increased tax revenues from lobster boat gross receipts taxes; increased
employment at tourist-related enterprises – especially lodging and restaurant employment that rely on
“authentic New England” themes to attract customers-, and diversification of Salem’s economy.
Similarly, no estimate is made of benefits to the Commonwealth. Benefits to the Commonwealth may
include increased income tax revenue from increased employment, increased income tax revenue from
34 This number includes mooring fees as well as some small additional fees for the summer period.
12
lobster boatmen’s increased earnings, and increased sales tax revenue from retail sales at tourist and
travel enterprises.
Summary
In Salem Sound and the North Shore area, there is a shortage of year-round commercial fishing dockage
space that is of a good price and safe in terms of protection from winter storms. At the same time,
overfishing of the lobster resource is a significant concern. It is important to keep this latter issue in
perspective -- the industry is said to be taking appropriate measures to meet the short-term threat – and
to understand the threat. Recent harvests of lobster have been at record levels and have led to
expansion of fishing effort and an accompanying expansion in investment that this takes. Catch rates,
the index of fishing pressure, are in decline, indicating fishing is harder and overfishing is likely.
Measures to ensure sustainability of the lobster stock include, among others, a moratorium on issuing
new coastal commercial lobster fishing permits and the number of such permits has been declining. The
decline indicates that circumstances have had an impact on the lobster fishing industry; other potential
significant factors could lead to more impact. A return from record to long-term harvest levels will mean a
50% drop in harvests, and economic consequences for the industry, given its level of investment.
In 2005, there were a total of 76 lobster fishermen in Salem, Marblehead, and Beverly. Currently, there
are at least about 49 commercial lobster vessels using facilities in these communities; approximately 17
vessels are using a wharf, slip, or dock on a year-round basis, and 11 vessels are using such dockage for
six months in the winter; I for 6-months in the summer; the remainder are using moorings in the summer
season. Among the factors that would influence a decision to relocate to a new facility, year-round,
protected dockage is considered important. A dockage fee of as much as $60/F/yr, but less than $76/F/yr
would appear to be competitive.
Establishing dedicated shoreline slips in Salem for commercial lobstermen could improve their bottom-line
economics significantly. A conservative estimate of pre-tax earnings improvement for a single boat
exceeds $20,000 per annum. As noted, individual results vary by each individual boat’s current operating
circumstances. Such savings, if demonstrated and accepted by commercial lobstermen, could serve as a
highly compelling argument increasing their willingness to pay higher fees.
The two interviewed lobstermen felt very strongly that there is a market for a weather-protected,
affordable commercial lobster fishing facility in Salem -- that if built, the lobstermen would come. They
estimated the market size to be at least 15-20 vessels.
Evidence of the interest may be suggested by the feedback elicited in the course of interviewing a
number of sources in Salem, including individuals associated with public and private marina facilities; it
was reported that there was excitement about the possibility of a commercial fishing facility.
Lobster fishing would be synergistic with other possible uses of the site. Cruise passengers and other
tourists are said to find fishing vessels and the activities associated with them an attraction and
promotions such as “Days of Wine and Lobster” can be built around this use, such as is done with the
crab industry in Mendocino on the coast of Northern California.
Other Fishing, Yachts, Transient Vessels
There is a shortage of mooring/dockage space, permanent and transient, for the full range of types of
vessels, commercial fishing, as well as pleasure craft such as yachts. With regard to commercial fishing
space, the same pressures that apply to lobster fishing facilities, noted above, apply to all types of
commercial fishing facilities. There are differences in facilities requirements of different types of fishing
vessels, however; berth-size, seasonality of use, storage, service and other needs can vary according to
the species the vessel is used to fish. Given the changes that occur in the status of stocks and
management controls for sustainability of the various fisheries, the flexibility to accommodate multiple
types of fishing vessels can have value. As lobster vessels can be used to fish other species – as they do
in Gloucester currently 40% of the time, providing for these vessels has built-in a certain amount of
flexibility.
13
Providing berthing for permanent or transient use of pleasure craft, especially yachts, while commanding higher
dockage fees -- the figures below indicate these fees --, has the potential to create conflict when space is shared with
commercial fishing vessels. Pleasure craft also have different space and service needs than commercial fishing
vessels. Written common sense rules can mitigate some potential conflicts of shared recreational/fishing vessel
space – rules to ensure proper management of bait to reduce smells is an example --; nonetheless, segregation of
these uses may be best. Some sources of conflict are inherent: commercial lobster fishermen often go out to sea at
very early hours in the morning, producing noise from vessels engines and other activity at a time yacht users may be
asleep onboard.
Recreational Vessel Mooring/Dockage Fees
Location Fees
Salem
Public Winter Island
Moorings
Private Hawthorne Cove
Moorings
Dockage
Private Pickering Wharf
Dockage
$500/yr
Length Fee
up to 25’ $1,335.00
26’ to 30’ $1,450.00
31’ to 35’ $1,575.00
36’ to 45’ $1,650.00
$142/F/season 5/1-10/31
$150/F/6 months summer
$ 50/F/6 months winter
Marblehead
Public Moorings
Main Harbor
West Shore
$6.50/F/yr
$4.50/F/yr
Beverly
Public
Beverly Harbor Center
Slips
Moorings harbor-wide
$141/F/6 months (Summer, May-Oct)
$ 41/F/6 months (Winter, Nov-Apr)
$5.50 /F/yr (for permit)
Transient Vessels
Location Fees
Salem
Private
Pickering Wharf
Hawthorne Cove
(recreational)
Moorings
Dockage
$150/F/month – summer
$50/F/season -- winter
$25/day
$2/F/day + electric
Marblehead
Tucker’s Wharf
Moorings
$3.50/F/day with electric up to 10 days/stay
N/A – Harbor Master’s office refers requests to
yacht clubs
Beverly
Public
Beverly Harbor Center
$2/F/night
14
Appendix A
New England Lobster Landings by State 2001-2005
2006 2005 2004
NE State Pounds $ Pounds $ Pounds $
CT 792,894 4,030,636 713,901 3,821,396 646,994 3,166,060
ME 72,666,935 297,164,762 68,729,813 317,948,122 71,574,344 289,078,847
MA 10,967,296 52,557,255 9,884,340 49,587,035 11,295,474 51,580,647
NH 2,666,344 13,915,298 2,556,187 14,375,191 2,097,396 10,199,038
RI 3,749,541 18,391,519 4,343,900 23,010,314 3,064,128 14,620,742
Total NE 90,843,010 386,059,470 86,228,141 408,742,058 88,678,336 368,645,334
Total All
States 92,614,704 395,175,319 87,813,069 415,437,923 90,073,234 374,303,151
2003 2002 2001
NE State Pounds $ Pounds $ Pounds $
CT 671,119 3,170,088 1,067,121 4,225,522 1,329,707 5,450,283
ME 54,970,948 205,715,329 63,625,745 210,950,030 48,617,693 153,982,266
MA 11,385,049 52,329,426 12,853,380 56,568,700 12,132,807 53,430,128
NH 391 1,511 2,027,725 8,071,915
RI 3,474,508 16,731,441 3,835,050 15,875,101 4,452,358 18,746,772
Total NE 70,501,624 277,946,284 81,381,687 287,620,864 68,560,290 239,681,364
Total All
States 71,682,906 283,515,593 83,087,146 293,893,651 71,192,803 249,509,514
15
Appendix B
Number of active commercial lobstermen, lobster landings and traps-fished by homeport for 2005 (does not
include seasonal permits).
Source: 2005 Massachusetts Lobster Fishery Statistics, Dean, M.J., S.R. Reed, and T.B. Hoopes (TR31-2005), pp 1.
http://www.mass.gov/dfwele/dmf/publications/tr31_2005_lobster_report.pdf
16
Appendix C
2/2008
More Maine fishing boats moving south
By the Associated Press and the Times staff
http://www.newburyportnews.com/punews/local_story_043064534.html
Gloucester's fishing port is emerging as a prime beneficiary from a tide of changes that's being felt hard in
the state of Maine.
Groundfishing boats are abandoning Portland and heading south, cutting the fish supply for seafood
processors and the Portland Fish Exchange and costing businesses that serve the Maine fleet.
More and more of the harbor's medium and large boats are now bringing their catches to Gloucester —
primarily because they can earn extra money by selling lobsters they catch in their nets, a practice
outlawed in Maine.
Maine's city-owned Portland Fish Exchange seafood auction is now staffed by a skeleton crew and has
cut the number of auctions from five a week to just two. It has been selling about 60,000 pounds of fish a
week, just 12 percent of its volume in the early 1990s, and is trying to lease out a portion of its largely
empty refrigerated warehouse.
Fewer boats mean fewer customers for Gowen Marine, which repairs boats and gear and sells supplies,
and Vessel Services, the harbor's lone remaining company selling ice and fuel to commercial boats. Cozy
Harbor Seafood, one of Portland's four larger seafood processors, now imports 95 percent of its
groundfish from Canada or Massachusetts, said President John Norton.
It's hard for Maine processors to compete with companies that have access to local fish, said Angelo
Ciocca of Nova Seafood. He expects his company and other shore businesses to close after their owners
retire.
"We are living the end of the groundfish-harvesting side of the industry in the state of Maine," Ciocca said.
"It's done. It's finished."
That's hardly the sentiment in Gloucester, where the arrival of the Maine boats is good news in what has
otherwise been a difficult era, said Peter Prybot, the longtime Gloucester lobsterman who writes a
commercial fishing column for the Times.
Prybot's column this past Saturday, in fact, noted the growth in such jobs as graders and buyers at the
Gloucester Seafood Auction.
"The port of Gloucester, for God's sake, loves to see the Maine boats," Prybot said. "They are top
fishermen and top producers. Gloucester not only benefits from the fish landings, they benefit from what
is spent on those boats, such as fuel and food."
Statistics show that the New England fishing industry as a whole continues to shrink in the middle of a
long-range plan to rebuild stocks of haddock, cod and yellowtail flounder through regulatory measures
that include reducing the amount of time fishermen can spend at sea. In the past year, 20 percent of
the active boats in New England have quit groundfishing, said Stephen Ouellette, a Maine
maritime lawyer who specializes in fisheries issues.
Portland has been particularly hard hit, with fish volumes going down nearly 50 percent from 2004 to
2007 — but fish catches brought to Gloucester have been stable, helped in part by Maine fishermen.
Allyson Jordan, of Scarborough, Maine, said she mailed her Maine fishing license back to the state after
the Marine Patrol — at the urging of the lobster industry — began enforcing a long-standing but rarely
enforced law that bans Maine-licensed boats from possessing lobsters in state or federal waters. Jordan,
17
whose family has been fishing in Maine for three generations, moved her family's two draggers and shore
operations to Gloucester and found an apartment in nearby Rockport.
"It was our family's way of life, and it kind of stinks we had to leave," she said.
Sam Viola, a Portland-based fisherman who has been working out of Gloucester this winter, said he and
other boat owners believe they have exhausted all options and are now justified in moving to the Bay
State.
"Portland is done," Viola said. "Portland is out of business right now."
1/19/07
http://www.gloucestertimes.com/punews/local_story_019120552
Maine fishermen landing catch in Massachusetts at Maine's expense
By Douglas A. Moser , Staff writer
Gloucester Daily Times
Maine fishermen are landing more of their fish in Massachusetts to take advantage of more lenient lobster
rules here at the expense of Maine's seafood auction.
Massachusetts law allows fishermen to sell lobsters accidentally caught in their nets; Maine law does not.
In the recent past, many Maine fishermen would just bring their lobsters to Gloucester and Boston and
take the fish back to the Portland Fish Exchange. Now, after the prodding of local fishing advocates, they
sell their fish here as well.
"I always thought it was too restrictive for them," said Vito Calomo, executive director of the
Massachusetts Fishery Recovery Commission. "I used to tell them to come to Gloucester."
Calomo said Maine fishermen would stop to sell their lobsters, then steam back to Maine to sell their fish.
Within the last year, they have been landing their entire catch here.
"We pay a higher price in Gloucester for quality fish," he said. "When they're fishing off our area or in the
Georges Bank, it's quicker for them to come to Gloucester to drop the lobsters and get a higher price for
the fish. They buy fuel here, they buy groceries, they get some repairs done. It's better for our economy."
Maine fishing regulations prohibit fishermen from selling the accidental lobsters, called bycatch, when
they are not the fishermen's permitted catch. Massachusetts allows fishermen from any state to sell a
bycatch of 100 lobsters per day and up to 500 lobsters per trip.
At about $4 per pound, which is currently the average price, fishermen can reap an extra $8,000 from 500
lobsters averaging about four pounds apiece. Calomo said the price rises to between $6 and $8 a pound
during the summer.
Maine lobstermen also insist that operators of boats that catch fish in nets come to Massachusetts not
only because they can sell their lobsters here. They say fishermen also get higher prices for their catches
here, while paying out less in fuel costs.
From 2004 to 2005, the number of trips by Maine-based trawlers to Massachusetts to sell fish and
lobsters grew from 76 to 160, and the amount of seafood sold grew from $1.6 million to $3.8 million,
according to a new analysis.
In 2005, Maine fishermen sold 20,000 pounds of lobster in Massachusetts, a tiny fraction of Maine's total
harvest of 67.3 million pounds.
18
"For the sake of these few lobsters, we're losing whole boatloads of fish," said Tom Valleau, president of
the Portland Fish Exchange.
Maine's lobster industry opposes changing the rules, fearing too much effort is already being put on the
lobster population.
Fishermen know the odds are long that Maine, the nation's leading lobster state, will change its landing
law for lobsters. After all, there are more than 6,000 licensed lobstermen in Maine, the industry has a
politically powerful voice, and lobstering by far is the state's No. 1 fishery, worth more than $300 million in
2005.
The new numbers came from fishermen's log books and seafood dealer records that are collected by the
National Oceanic and Atmospheric Administration, the federal agency that regulates commercial fishing.
The numbers were crunched by an economist at NOAA's Northeast Fisheries Science Center at Woods
Hole.
According to the analysis, Maine lost $9.6 million in seafood revenues to Massachusetts from 2000 to
2005 because of the law outlawing lobster landings.
The Portland Fish Exchange last year handled 9.5 million pounds of product, down from 17.1 million
pounds in 2005. In the early 1990s, the auction handled more than 30 million pounds a year.
One of those Maine boats going to Massachusetts, the 70-foot Olympia, is owned by Maggie Raymond,
who's the executive director of the Associated Fisheries of Maine.
Last year, her boat stopped going to Portland. Instead, it brought about 400,000 pounds of fish to
Gloucester and to Boston, she said.
By going to Massachusetts, her boat also brought in about $50,000 from lobster that were caught in her
fishing nets, Raymond said. She also saved nearly $9,000 in sales taxes that Maine charges on diesel
fuel which Massachusetts does not.
Raymond said she would bring her catch to Portland if Maine law allowed her to bring the lobsters there.
"These lobsters are being landed anyway. They're just being landed in other states," Raymond said. "If
there is any hope of preserving what's left of the groundfishing infrastructure in Maine, which is the
Portland Fish Exchange, something has to be done."
The Associated Press contributed to this report
19
Appendix D
Boundary of 1:125,000 scale map of Massachusetts Bay.
Area 514
20
Appendix E
Area protected from storms
from the NE & E (winter
storms)
21
Appendix F
List of Individuals Interviewed
Michael Sosnowski, Lobster Fisherman, 3/5/08
Jay Michaud, Lobster Fisherman, 3/8/08
Peter Gifford, Salem Harbor Master, 3/12/08
Elaine Cook, Salem Harbor Master’s Office
Louis Bochynski, Beverly Harbor Center, Facilities Manager, 3/12-13/08
Ray Shaw, Jodrey State Pier, Gloucester, Facilities Manager, 3/20/08
Shirley Edmunds, Gloucester Harbor Master’s Office, 4/2/08
Joe Pelczerski, Massachusetts Coastal Zone Management, 3/6/08
Rockport Harbor Masters, Rosemary Lesch and Scott Story, 3/18/08
Russ Vickers and Ben Copp, Hawthorne Cove Marina, 3/19/08
Tom Moran, Dock master, Pickering Wharf Marina, 3/19&23/08
Michael Costello, Executive Director, Cape Ann Chamber of Commerce
Scott Cavanaugh, U.S. Navy Commander NE Fleet Support, 4/2/08
Malia Griffen, Public Relations, Dominion Energy, Salem 3/28/08
Kevin Cornacchio, Dominion Energy, Salem, 3/28/08
Marine Railways, Gloucester
Captain Jeffery Monroe, Director, Ports and Transportation Department, Portland, ME
Exhibit B Page 1
Exhibit B
Site Development and Building Footprint and Location
Site Context Description
The proposed Port of Salem project is to be located on a 2.2 acre parcel of property known as the Blaney
Street site and is entirely located with in a Designated Port Area. The City of Salem currently leases the
site from the adjacent Dominion power plant with the intention to purchase the site. The existing site has
an irregular footprint which presents challenges for an efficient layout of upland support needs and the
multi-purpose terminal building proposed for the south end of the site next to the pier and floating
landings. The current site conditions are shown on Sheet 1 of 2 in Exhibit D. The following describes the
two phases of alternative layouts considered and the proposed plan for the upland components of the site
and building as they relate to the existing bulkhead and high water line.
Maritime Use Landside Site Requirements
The program of landside support uses for the site was determined through a process of interviews with
existing and prospective users, as described in the document, Analysis of Existing Port Plans, prepared
by Bourne Consulting Engineering, November 2007. The upland use requirements can be divided into
two categories: upland site layout needs and building program and footprint needs.
Upland Site Needs: Site users include the Salem Ferry, LNG crewboat operations, whale watch and
excursion ferry, fishing fleet, cruise vessel visits, visiting vessels and general commercial vessels. The
user needs identified included clear and easy circulation for vehicles through the site, parking for
employees and patrons, site utilities, pedestrian harborwalk separated from vehicular traffic, and direct
pier access for service vehicles. A summary of the combined needs for these uses includes the following:
100 foot turning radius at terminal area for bus/trolley queuing, service vehicles, auto and
taxi drop-off, and emergency vehicles
Blaney Street as the two way vehicular access road
12 foot public access harborwalk from terminal and pier along cove shoreline to White
Street at the north western corner connecting to Derby Street
Provide curbside for bus/trolley queuing
Provide for clear truck access from the Blaney Street to the new fixed pier
On site parking for 150 cars.
Utility services for water, electrical and sewer form Blaney Street to terminal and new
pier.
Landscaping, benches, lighting, and shade trees to create a park-like setting
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 2
Building Program and Footprint Needs: The multi-purpose terminal building will provide space in
immediate proximity to the pier for some site users including the Salem Ferry, the LNG crewboat, port of
call cruise vessels, and other visiting vessels. The building footprint for a two storey structure was
determined to be approximately 5,000 square feet, and located as close as possible to the landing
locations and gangways for the passengers of the ferries and small cruise vessels.
Ferry Terminal including shared passenger waiting, operators’ office and ticketing and a
workshop and supply storage area
Public visitor information and restroom facilities
LNG supply vessel office, crew waiting, workshop and storage facilities
Allow for flexibility and expansion of the initial structure.
Outdoor waiting area
Separation of perimeter pedestrian circulation and vehicular circulation
Optional Site Layout and Building Footprint Plans
Based on the upland site and terminal building needs a series of optional site plans were developed in
conjunction with pier layout options to determine the preferred site plan. The plans responded to several
important site characteristics which limited the options.
The long tapering site made it difficult to provide an efficient parking and traffic plan,
particularly from the head of Hawthorne Cove to the south end of the site.
The narrow width of the site makes a 100 foot traffic turning radius very difficult even at the
wider southern or outshore end without widening the site with a pile- supported harborwalk.
The narrow width of the site watersheet requires that a double loaded pier be located at or
near the southwest corner of the land area.
The rough rubble rip rap bulkhead from the head of the cove around to the Dominion property
on the south east corner should not be disturbed or altered any more than necessary,
suggesting use of pile supported piers where pedestrian access or widening is needed.
The terminal building needs to be sited to allow a single type foundation which would either
be footings and slab entirely over upland or entirely over pile supported pier to provide a
stable cost-effective foundation. The existing site is stone filled making upland pile driving
extremely difficult.
The site and building analysis options were studied in two sequential steps; 1) a broad set of options
considering different building locations and pier layouts, and 2) a refined set of options around the
preferred building and pier option from the first set.
Concept Options (A through F)
Initially six options concept plans were considered with concept plan layouts of different building
locations, vehicular turnaround plans and different pier and float layouts. The intention was to determine
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 3
the preferred general site layout and then prepare more detailed variations. The six plans labeled
Alternative A through F are shown on the following pages.
Alternative A: The plan includes the building sited parallel to the south face of the Blaney Street site with
a fixed “L” shaped pier and floats extending south from the western face of the site. A pile supported
harborwalk extends 12 feet over the rip rap bulkhead around the perimeter of the site. The building siting
provides the optimum orientation to the pier for ferry passengers, cruise visitors and crew boat users of
the terminal building. The 100 foot wide traffic circle is located immediately north of the building site
leaving a maximum amount of the site open for parking and circulation
Alternative B: The plan includes the building sited parallel to the east property line of the Blaney Street
site with a fixed “L” shaped pier and floats extending south from the western face of the site. as in
Alternative A, a pile supported harborwalk extends 12 feet over the rip rap bulkhead around the perimeter
of the site. The building siting provides a more remote relationship to the pier for ferry passengers, cruise
visitors and crew boat users of the terminal building. The 100 foot wide traffic circle is located immediately
south of the building site at the south edge of the site, requiring all terminal users to walk around the
circle. The building location and pedestrian/vehicular circulation conflicts are problems in this plan. The
site layout reduces the amount of site available for parking and circulation
Alternative C: The plan includes the building sited parallel to the east property line of the Blaney Street
site with a fixed “L” shaped pier and floats extending the middle of the south face of the site. However, in
this case the building is located on the water side of the traffic circle, leaving a large open area on the
southwest corner of the site. As in Alternative A, a pile supported harborwalk extends 12 feet over the rip
rap bulkhead around the perimeter of the site. The building siting provides a more remote relationship to
the pier for ferry passengers, cruise visitors and crew boat users of the terminal building. In Alternative C,
the 100 foot wide traffic circle location works for terminal passengers, but cuts down substantially on
available parking. The traffic circle location and subsequent reduced upland parking and circulation are
problems in this plan. The site layout further reduces the amount of site available for parking and
circulation.
Alternative D: As in Alternative A, the plan includes the building sited parallel to the south face of the
Blaney Street site with a fixed “L” shaped pier and floats extending south from the western face of the
site. A pile supported harborwalk extends 12 feet over the rip rap bulkhead around the perimeter of the
site stopping at the terminal building. While the building siting provides the optimum orientation to the
pier, as in Alternative A, the siting requires that building footprint is half on pile supported pier and half on
exiting upland, making for a poor foundation condition. As in Alternative A, the 100 foot wide traffic circle
is located immediately north of the building site leaving an even greater amount of the site open for
parking and circulation than in A. While the greater parking is and advantage, the primary problem with
this plan is the terminal building straddling the upland and pile supported pier.
Alternative E: Similar in layout to Alternative C, the plan includes the building sited parallel to the east
property line of the Blaney Street site with a fixed “L” shaped pier and floats extending out from the west
edge of the site. As in Alternative A, a pile supported harborwalk extends 12 feet over the rip rap
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 4
bulkhead around the perimeter of the site. In this case, the traffic circle is located west of the building,
requiring a 120 x 25 foot pile supported pier extension into Hawthorne Cove beyond the harborwalk to
accommodate the circle width. The building siting provides a more remote relationship to the pier for ferry
passengers, cruise visitors and crew boat users of the terminal building. In Alternative C, the 100 foot
wide “cantilevered” traffic circle location works for terminal passengers, and gains back some of the
upland parking capacity. The pier extension for the traffic circle and the awkward construction of
combined upland and pile supported traffic circle are problems in this plan, as well as the somewhat less
functional relationship of the terminal building to the pier and floats.
Alternative F: In this plan the terminal building is sited on a pile supported pier extension of
approximately 120 x 50 feet at the southwest corner of the site with the traffic circle immediately to the
east at the south face of the site. The 12 foot harborwalk extends around the perimeter of the site
including around the terminal building. The pier projects form the center of the south face of the site. The
large pile supported area required for the terminal allows for more parking on site, but covers more
watersheet area to allow for the terminal building and substantially impacts navigation and pier layout
options in Hawthorne Cove. In addition the terminal site is more removed from the pier and passenger
circulation than in Alternatives A and D.
Preferred Concept Plan – Alternative A: Plan A appears to provide the best balance between the
functional relationships of the terminal building to the piers and traffic circle, while also allowing enough
upland parking. The linear fixed pier extending south from the west edge of Hawthorne Cove was found
to allow for better navigation, as well as providing more flexibility for berthing northward into Hawthorne
Cove In addition the terminal layout remains on upland and does not require building on an additional
area of pile supported pier. In terms of balancing upland passenger and vehicular circulation needs and
the primary terminal functions and construction, Alternative A was selected for study of more detailed plan
layouts.
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 8
Detailed Options - Phase 2 Evaluations: Five Plans
The five detailed site plans, presented in the April 2008 initial ENF filing (under Project Description),
assumed a preferred location of the fixed pier extending in a line from the current western edge of the site
along Hawthorne Cove. The site layouts and terminal footprint then explored different combinations of
building location with traffic, parking and pedestrian circulation. Each plan impacts the site bulkhead
edge in a different way, with greater or lesser bulkhead alteration. It should be noted that, while all uses
on the site are DPA commercial marine operations and support, all concept plans sought to minimize
watersheet coverage with pile supported deck and the limiting of fill to behind bulkheads inshore of the
High Tide Line.
There are four optional plans presented here labeled A, B, C, and E and shown at the end of this Exhibit.
These more detailed plans tested different combinations of vehicular infrastructure, parking, perimeter
harborwalk, pier and floats, and terminal building siting. (Option D is not shown since the site and building
layouts are duplicates to those shown). The plan characteristics with respect to site and terminal layouts,
as well as advantages and disadvantages of each option, are described as follows.
Site Plan A: The 12 foot pile supported harborwalk extends fully around Hawthorne cove and the south
end of the site, covering most of the rip rap bulkhead between high and low water around the perimeter.
The building is sited on an angle to follow the existing south edge of the site and remain fully in shore of
the top of mean high water line and the existing bulkhead. However, the building shape creates an odd
geometry at the ends in order to achieve the desired footprint square footage of 5,000 square feet (for
cost, construction purposes and interior layout, the building works far better if the ends were square). The
traffic circle can fit within the harborwalk widened end of the site. The parking of 146 vehicles comes
close to meeting the proposed site minimum of 150 spaces. The accessible ferry floats and ADA ramps
are placed on the eastern face of the fixed pier (these floats can be located on either side of each
alternative and are therefore not a significant variable).
Advantages:
Terminal footprint stays within the existing bulkhead and high water line.
No filling required and minimal bulkhead alteration
Parking for 146 cars
Separation of pedestrian and vehicular traffic
Comfortable location for the traffic circle.
Direct access from ferry landings to terminal waiting area.
Disadvantages:
Terminal Building shape is more costly and awkward for interior layout and construction
Ferry terminal landings are exposed to easterly storms and winds.
Site Plan B: As in A, the 12 foot pile supported harborwalk extends fully around Hawthorne cove and the
south end of the site, covering most of the rip rap bulkhead between high and low water around the
perimeter. The end of the site is squared off with a pile supported pier and altered south west corner of
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 9
bulkhead. The terminal building is sited square to the deck and fixed pier, but requires some filling to
allow for the whole footprint to be on upland. However, the building shape is optimum for the desired
footprint square footage of 5,000 square feet, for construction purposes and interior layout. As in Option
A, the traffic circle can fit within the harborwalk widened end of the site. Plan B also provides parking of
146 vehicles and comes close to meeting the proposed site minimum of 150 spaces. The accessible
ferry floats and ADA ramps are placed on the eastern face of the fixed pier.
Advantages:
The building footprint is optimum for interior layout, construction and proximity to the ferry
landings.
Parking for 146 cars
Separation of pedestrian and vehicular traffic.
Comfortable location for the traffic circle
The squared end deck works better with the new pier layout and access ramps.
Direct access from ferry landings to terminal waiting area.
Disadvantages:
Terminal footprint is slightly outside the existing bulkhead and high water line. And requires
bulkhead modification and some filling.
Ferry terminal landings are exposed to easterly storms and winds.
Site Plan C: The 12 foot wide pile supported harborwalk is all located inside the mean low water line and
extends from the head of Hawthorne Cove around the south end of the site, leaving the existing vertical
bulkhead at the end of the Cove. The building is sited perpendicular to the south edge of the site and is
rectilinear in shape. The perpendicular siting allows for expansion of the Terminal at a later date to the
east. However in order to allow for the turning radius and preserve parking capacity, the building projects
out beyond the low water line. The Building footprint is half on the upland and half over tidelands requiring
a new rectangular extension of the bulkhead with filling behind to allow the foundation to be on upland.
The perpendicular alignment also requires a greater amount of pile supported deck beyond the south face
of the site by eliminating the harborwalk extension at the north end of the Cove, the parking is reduced to
136 spaces and does not meet the proposed site minimum of 150 spaces. The accessible ferry floats
and ADA ramps are placed on the more protected western face of the fixed pier.
Advantages:
Separation of pedestrian and vehicular traffic
Terminal building site allows for future addition to the east.
Comfortable location for the traffic circle.
Ferry landing is more protected from easterly storms and wind.
Disadvantages:
Terminal footprint projects beyond the existing bulkhead and low water line and requires greater
alteration and fill below high water line than option B.
South pile supported deck is larger because of perpendicular building.
10 fewer parking spaces than options A or B.
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 10
Ferry access is separated from terminal waiting by width of the pier.
(Plan D omitted due to duplication – See initial ENF filing for copy)
Site Plan E: The narrower 6 foot wide pile supported harborwalk is all located inside the mean high water
line and extends from the head of Hawthorne Cove around the south end of the site, leaving the existing
vertical bulkhead at the end of the Cove. As in option A, the building is sited on an angle to follow the
existing south edge of the site and remain fully in shore of the top of mean high water line and the existing
bulkhead. Like A, the building shape needs to be an odd geometry at the ends in order to achieve the
desired footprint square footage of 5,000 square feet. The traffic circle barely fits within the existing end
of the site. The parking is reduced to 115 vehicles and is far from meeting the proposed site minimum of
150 spaces. The spaces are lost by not building the pile supported harborwalk at the head of the cove,
and by forcing parallel parking along the narrower west edge of the Cove. The accessible ferry floats and
ADA ramps are placed on the eastern face of the fixed pier. A small harborwalk extension is need to the
west of the building to provide ramp access to the western floats.
Advantages:
Terminal footprint and harborwalk stays within the existing bulkhead and high water line and
reduces impact on intertidal area (except for small extensions west and south of the building
footprint).
No filling required and minimal bulkhead alteration
Separation of pedestrian and vehicular traffic
Comfortable location for the traffic circle.
Direct access from ferry landings to terminal waiting area.
Disadvantages:
Terminal Building shape is awkward for interior layout and construction
Parking is reduced to 115 spaces because of narrower site width along the Cove.
Ferry terminal landings are exposed to easterly storms and winds.
Preferred Upland Site and Building Plan
The final proposed plan is a synthesis of preferred features of the 4 detailed options described above,
incorporating the best features to achieve a workable site program for commercial maritime uses, and
moderating the impacts of harborwalk construction and fill on intertidal areas.
Proposed Site Plan: The proposed site plan is similar in layout and building footprint to Option B. The
12 foot pile supported harborwalk extends fully around Hawthorne Cove and the south end of the site,
covering most of the rip rap bulkhead between high and low water around the perimeter. The south end of
the site is squared off with a pile supported pier. A small portion of the inner end of an existing pile
supported access pier is retained as a fish pier and overlook feature of the public harbor walk. The
terminal building is sited square to the deck and fixed pier, but requires some filling and alteration of the
south west corner of bulkhead to allow for the whole building footprint to be on upland. Approximately
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 11
1,580 square feet of the building footprint is in the intertidal zone currently occupied by sloping rip rap
bulkhead. The rectangular building shape parallel to the south face and perpendicular to the fixed pier
and access road is optimum for the desired footprint square footage of 5,000 square feet, for construction
on solid ground and for efficient interior layouts. The traffic circle can fit within the harborwalk-widened
end of the site. Plan B also provides parking of 146 vehicles and comes close to meeting the proposed
site minimum of 150 spaces. This amount of parking is considered to be essential to a workable plan, in
order to minimally accommodate the peak use demands for combined Salem ferry, excursion/whale
watch, and commercial fishing and LNG crewboat operations. Even with this maximum amount of
parking, offsite parking is likely to be needed at peak use periods. The accessible ferry floats and ADA
ramps are placed on the more protected western face of the fixed pier. An open waiting shelter is added
to provide protection for ferry and cruise vessel passengers on the western side of the pier at the
gangway locations.
Building Foundation Considerations: The site is an historic fill with rip rap stone edges. This creates a
significant problem both in terms of cost and actual ability to drive piles for the building foundation. The
foundation proposed is with footings and slab which results in the building foundation extending slightly
beyond the existing Mean High Water line in the southwest corner. The project proposes to extend the
foundation wall to provide the full building support resulting in the filling of 1,580 sf of intertidal area within
the existing rip rap slope.
Advantages:
The building footprint is optimum for interior layout, construction.
Proximity to the new pier which is critical for passenger vessel terminal facilities.
Parking spaces for 146 vehicles
Separation of pedestrian and vehicular traffic.
Comfortable location and adequate size for the traffic circle
The squared end deck works better with the new pier layout and access ramps.
Ferry landing is located on the western side of the new pier, with a shelter at the top of the
gangway.
Disadvantages:
Terminal footprint is slightly outside the existing bulkhead and high water line. And requires
bulkhead modification and some filling of the intertidal zone
Ferry landing shelter and ramp access requires an additional 10 foot wide section of pile
supported Harborwalk opposite the west end of the terminal.
.
Project Team Findings: We believe that for the terminal building to function properly and effectively in
support of the site DPA and water dependant uses, it needs to be close to the activities it supports at the
outer end of the site. Given the restrictions of the site and the need for siting the vehicular turnaround for
fire and safety as well as for operations, we also found that these conditions force the building to the
outshore end. We have presented the range of alternatives investigated for various building locations and
configurations to minimize the buildings impact beyond the MHW limit.
Salem Port Expansion Supplemental ENF Filing
Exhibit B Page 12
In addition, the proposed plan is intended to improve and stabilize the existing rip rap bulkhead slope and
eliminate the erosion of edge conditions into the adjacent resource areas, while at the same time
providing a harborwalk with major improvements to public access and use. Such improvements are
deemed not only necessary but beneficial for a successful project.
THIS PAGE INTENTIONALLY BLANK
Exhibit C
U.S. Army Corps of Engineers Dredge Sediment Disposal Suitability Determination
Memorandum dated 29 February 2008ing and Testing
THIS PAGE INTENTIONALLY BLANK
Exhibit D
Existing Conditions and Proposed Site Plans