Loading...
8 Beckford Street application Date Stamp I Salem Histol'zcal Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 For Office Use Only (978i(319-5685 FAX(978)740-0404 APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: ❑ New Construction 0 Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other District: ❑Derby Street ❑Lafayette Street A McIntire ❑Washington Square Address of Property: 8 _ 1,C - �r>� S-t . I ,Y �l { A -)--7 p Name of Record Owner(s): Owner Mailing Address: f ter' c� �y�� , y1 �( AV d1 4�)1 O Description of Work Proposed Please qPe `orprtirtClearly: 4ttacL tror2 Beets, asnecessaof: n - �Icac� ��` C1iJ ��� ha/r�� Si c�a �1CaJSQ Name of Applicant:(21aAC-;-r:-53�6n ire` *wner ❑Contractor ❑Tenant OOther: Signature:�ICLA�Z � Date: _Q icy 46- • 14 2D t(o Tel. #: "D 5--2> 0--a-9 2-0 E-mail Address: G 2rn, (1Z�- Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name /`a zx-� Mailing address: Gt _ City: State:_Zip: ). B. KIDNEY & CO., INC. Roofers Metal Workers 41 OSBORNE STREET • TELEPHONE(978)744-2875 • FAX(978)744-2252 - SALEM,MA 01970 • jbkidney@verizon.net COPPER GUTTER PROPOSAL August 19,2016 Claire Cassella 8 Beckford St. Salem,MA 01970 Dear Mrs. Cassella, As requested we are quoting you on the following work: New 5"custom copper OG gutter: • Erect a pump jack staging,running the entire length of the left side of the house. • Remove the wooden gutter and the split fascia board. • Furnish and install new 1"X12" Primed Pine fascia board,replacing the split fascia board. • New fascia board will be fastened to the rafter tails with stainless steel fasteners. • Fabricate and install new 5" OG copper gutter along the entire 2nd story of the house on the left side,replacing the wooden gutter and fascia board. • The profile of the gutter will be the same size and dimensions as the gutter we installed on the driveway side a few years ago. • Remove and properly dispose of existing wood gutter. • 1"X 1/8" solid copper bar will run along the face of the gutter to give the gutter its strength.The copper bar will be used to make the hangers with a twist. • All seams,end caps and outlets will be thoroughly soldered. • Fabricate and install new 3" copper outlets to drain the water from the gutter. • Debris will be cleaned up at the end of each day. Cost to do this work will be TWELVE THOUSAND THREE HUNDRED SIXTY ($12,360.00) DOLLARS. Clean up debris upon completion of the work and furnish workmen's compensation and public liability insurance to protect the owner in case of an accident while work is in progress. Any rotted roof boards must be replaced on a time and material basis before work can continue.