Loading...
55 Warren Street - Certificate of Appropriateness addition and fence Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ✓ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ✓ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: Warren Name of Record Owner: Richard Jones and Naomi Cottrell Description of Work Proposed: Approval based on drawings prepared by Jones Architecture dated May 12,2017. Work includes: ■ Removal of rear mudroom,basement bulkhead and back stair; ■ Installation of one Marvin Ultimate all wood true-divided 6/1 window in location of removed rear vestibule ■ Removal of single window on east elevation ■ Construction of 10'-6"x 12'-8"single-story addition on east elevation.Windows to be Marvin Ultimate wood true-divided windows in size and mullion pattern to match existing windows on house. New door and granite stair to be added to rear of addition.Door to be wood full-light Marvin Contemporary Door. ■ Installation of new Bilco steel bulkhead at rear of house. ■ Installation of new wood capped flatboard cedar fencing at rear property line and across driveway. Fence at driveway to be T tall with gate and painted or stained to match color of house trim.Fence at rear property line to include gate with a height range of approximately 4'tall to T tall. This fence to remain unpainted. NOTE. The height of the fence may require a zoning variance. Upon completion of work,please notify Historical Commission staff for final review and sign-off of Certificate. Dated: June 22 2017 SALEM HISTORICAL COMMISSION The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work.