Loading...
287-291 Lafayette Street - proposed screening options 3.14.17Salem State University – Roof Top Unit January 24, 2017Pre‐Construction Salem State University – Roof Top Unit January 24, 2017Post‐Construction Salem State University – Roof Top Unit January 24, 2017Proposed Painted RTU Salem State University – Roof Top Unit March 14, 2017Proposed TecPan Panel System & Paint Option  Salem State University – Roof Top Unit March 14, 2017Proposed Square Lattice Panels & Paint Option  Salem State University – Roof Top Unit March 14, 2017Proposed Slatted Panel & Paint Option