89 Federal Street - C of A - New HVAC r
4
,Salem iistorical Commission
98 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970
(978)619-5685
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑x Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements
set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire District
Address of Propert
Name of Record Owner: T. Jane Graham-Dwyer
Description of Approval of Work:
■ Install new HVAC mini-split system with the following conditions:
o Condenser unit to be 35 7/16"wide x 32 11/16"tall and placed on I tall stand;
o Exposed length of exterior conduit cover to be placed in a position that touches rear edge
of chimney;
o Conduit cover to be painted to match color of underlying clapboards; and
o Arborvitae to be planted to screen condenser unit.
Upon completion of work,please notify Historical Commission staff for final review and sign-off of
Certificate.
Dated: June 6, 2019 SALEM HISTORICAL COMMISSION
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise
indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from
the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work.