Loading...
6 South Pine Street - building renovations fence relocation and shed FINAL Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: √ Construction  Moving  Reconstruction √ Alteration  Demolition  Painting  Signage  Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 6 South Pine Street Name of Record Owner: Matthew Murphy and Sarah Morrill Description of Approval of Work: ▪ Install new shed in southwest corner of property. Shed to be “Chateau” style without a window; oriented gable end to South Pine Street; clad in horizontal cedar tongue-and-groove siding to remain unpainted; with roof to be 3tab asphalt shingle to match main house; and door to be painted black to match doors on main house, locate shed five feet (5’) from side and rear property lines in accordance with zoning requirements. ▪ Relocate fence along sidewalk into lot to correspond with far corner of entrance vestibule. Two (2) fence segments, approximately 4 feet long to remain at corner of house and yard on sidewalk. Fence and sidewalk segments to match existing fence in design, materials and color. ▪ Renovate main house per architectural drawings by Helen Sides dated September 18, 2019 with the following changes: o New dormer on façade (south) slope of roof to include trim to match existing on building; a 2/1 true-divided wood window; and sidewalls clad in wood clapboards; o Two (2) 2’ x 3’ skylights to be added to upper slope of rear roof in place of proposed light tubes; o New first and second story windows on the rear (north) elevation to be located near the street; center new windows between cornerboard and adjoining existing window trim. Upon completion of work, please notify Historical Commission staff for final review and sign-off of Certificate. Dated: September 23, 2019 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work.