Loading...
158 Federal Street - Certificate of Appropriateness - replace windows on chapel building 1 Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ✓ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property' 158 Federal Street Name of Record Owner: Roman Catholic Archdiocese of Boston Description of Approval of Work: ■ Replace existing aluminum windows on fagade (Federal Street)elevation with Harvey Classic 1/1 double- glazed vinyl windows in bronze color in configuration per attached drawings; ■ Replace five (5)existing 1/1 windows on rear(Bridge Street) elevation with Harvey Classic 1/1 double-glazed vinyl windows in bronze color; ■ Paint first story windows on rear elevation in bronze to match color of new second story windows; ■ Paint four(4)door units on fagade in bronze to match color o new windows; ■ Paint lintel above windows/doors on faVade in tan;and &/j ��'�/�"7� ■ Alter/replace one (1)door on faVade to be consistent with the glazing/panel dimensions of other three doors on fagade. This item can be accomplished during future phases of project. —i'r ktoa f 6914z y Upon completion of above work,please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate. Dated: June 7. 2018 SALEM HI O ICAL COMMIS I 9 By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work.' v" ow If - - rt,C