38 Palmer Street Phase 1 Environ. Site Assessment ASTM-AAI PHASE I ENVIRONMENTAL SITE ASSESSMENT 38 Palmer Street Salem, MA April 8, 2021 Prepared for: North Shore Community Development Coalition, Inc. 102 Lafayette Street Salem, MA 01970 Prepared By: 33 West Central Street Natick, MA 01760 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx i 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx TABLE OF CONTENTS 1. SUMMARY ......................................................................................................................................... 1  2. INTRODUCTION............................................................................................................................... 2  2.1 LOCATION AND LEGAL DESCRIPTION ............................................................................................... 2  2.2 PURPOSE ........................................................................................................................................... 2  2.3 SCOPE-OF-SERVICES ......................................................................................................................... 3  2.4 SIGNIFICANT ASSUMPTIONS .............................................................................................................. 3  2.5 LIMITATIONS AND EXCEPTIONS ........................................................................................................ 3  2.6 SPECIAL CONTRACTUAL TERMS AND CONDITIONS ........................................................................... 4  2.7 USER RELIANCE ................................................................................................................................ 4  3 USER PROVIDED INFORMATION ............................................................................................... 4  3.1 TITLE RECORDS ................................................................................................................................ 5  3.2 ENVIRONMENTAL LIENS OR ACTIVITY AND USE LIMITATIONS ......................................................... 5  3.3 SPECIALIZED KNOWLEDGE ............................................................................................................... 5  3.4 COMMONLY KNOWN OR REASONABLE ASCERTAINABLE INFORMATION .......................................... 5  3.5 VALUATION REDUCTION FOR ENVIRONMENTAL ISSUES ................................................................... 5  3.6 OWNER, PROPERTY MANAGER, AND OCCUPANT INFORMATION ....................................................... 6  3.7 REASON FOR PERFORMING PHASE I .................................................................................................. 6  4 RECORDS REVIEW ......................................................................................................................... 6  4.1 STANDARD ENVIRONMENTAL RECORD SOURCES ............................................................................. 6  Comprehensive Environmental Response Compensation and Liability Information System (SEMS) – 0.5 mile .............................................................................................................................................. 7  Federal RCRA Corrective Action Sites – 1.0 mile .............................................................................. 7  State and Tribal Brownfields – 0.5 mile .............................................................................................. 8  State and Tribal Releases– 1.0 mile reduced to 0.5 mile ..................................................................... 8  Non geocoded Sites ............................................................................................................................. 10  4.2 ADDITIONAL ENVIRONMENTAL RECORD SOURCES ......................................................................... 10  4.3 PHYSICAL SETTING SOURCE(S) ....................................................................................................... 11  4.3.1 Topographical Map ................................................................................................................... 11  4.3.2 Sensitive Receptors .................................................................................................................... 11  4.4 HISTORICAL USE INFORMATION ON THE PROPERTY ........................................................................ 12  4.5 HISTORICAL USE INFORMATION ON ADJOINING PROPERTIES .......................................................... 13  5 SITE RECONNAISSANCE ............................................................................................................. 14  5.1 METHODOLOGY & GENERAL SITE SETTING .................................................................................... 14  5.2 EXTERIOR OBSERVATIONS .............................................................................................................. 14  5.3 INTERIOR OBSERVATIONS ............................................................................................................... 14  5.4 CURRENT USE OF THE PROPERTY.................................................................................................... 14  5.4.1 CURRENT USE ............................................................................................................................. 14  5.4.2 CURRENT USE OF HAZARDOUS SUBSTANCES .............................................................................. 14  5.4.3 WASTE MANAGEMENT AND DISPOSAL PRACTICES ...................................................................... 15  5.4.4 CURRENT CORRECTIVE ACTIONS AND RESPONSE ACTIVITIES ...................................................... 15  5.4.5 ENGINEERING CONTROLS ........................................................................................................... 15  5.4.6 INSTITUTIONAL CONTROLS ......................................................................................................... 15  5.5 CURRENT USES OF THE ADJOINING PROPERTIES ............................................................................. 15  ii 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 6 INTERVIEWS .................................................................................................................................. 15  6.1 INTERVIEW WITH OWNERS .............................................................................................................. 15  6.1.1 Current Owner ........................................................................................................................... 15  6.1.2 Past Owner(s) ............................................................................................................................ 15  6.2 INTERVIEW WITH SITE MANAGER ................................................................................................... 16  6.2.1 Current Site Manager ................................................................................................................ 16  6.2.2 Past Site Manager ...................................................................................................................... 16  6.3 INTERVIEWS WITH OPERATORS AND OCCUPANTS ........................................................................... 16  6.3.1 Current Operators and Occupants ............................................................................................. 16  6.3.2 Past Operators and Occupants .................................................................................................. 16  6.4 INTERVIEWS WITH USER AND OTHERS ............................................................................................ 16  6.5. INTERVIEWS WITH LOCAL GOVERNMENT OFFICIALS ................................................................. 17  6.5.1 Fire Department ......................................................................................................................... 17  6.5.2 Health Department ..................................................................................................................... 17  6.5.3 Building Department .................................................................................................................. 17  7 EVALUATION ................................................................................................................................. 17  7.1 FINDINGS ..................................................................................................................................... 17  7.2 OPINION ....................................................................................................................................... 18  7.2.1  Data Gaps ............................................................................................................................. 18  7.3 CONCLUSIONS ............................................................................................................................ 18  7.4 ENVIRONMENTAL PROFESSIONAL STATEMENT ............................................................... 19  7.5 REFERENCES ............................................................................................................................... 19  8 APPENDICES ................................................................................................................................... 20  8.1 QUALIFICATIONS OF ENVIRONMENTAL PROFESSIONALS AND STAFF ....................... 20  8.2 SITE PHOTOGRAPHS ........................................................................................................................ 21  FIGURE 1 - SITE LOCUS MAP ........................................................................................................................   FIGURE 2 – ASSESSOR’S MAP .......................................................................................................................   APPENDIX A - LIMITATIONS .........................................................................................................................   APPENDIX B - ENVIRONMENTAL DATABASE REPORT ...................................................................................   APPENDIX C – LEGAL DESCRIPTION .............................................................................................................   APPENDIX D – USER LETTER ........................................................................................................................   APPENDIX E – SANBORN MAPS ....................................................................................................................   APPENDIX F – LOCAL RECORDS ...................................................................................................................   1 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 1. SUMMARY David Valecillos, Project Manager for the North Shore Community Development Coalition, Inc. (“Client” or “User”) requested this Phase I ASTM Environmental Site Assessment (“ESA”) of the Site in conjunction with the purchase of the property. The Site is identified as Map 34 Lot 0155 by the Salem City Assessor. A locus map and Assessor’s map are presented in Figure 1 and Figure 2, respectively. The current owner of record is 47 Leavitt Street, LLC. The address of the Site is 38 Palmer Street, Salem, MA 01970. The Site is located central eastern part of the city near Palmer Cove. The area is primarily residential with apartments and multi-family housing. The Site is currently vacant and used for parking. Its previous building, a one story residential building, was demolished in 2012. This ESA was accomplished by (1) researching reasonably ascertainable records from standard sources and additional sources as needed, (2) conducting a Site visit, (3) conducting interviews, (4) and considering information provided by the User. The objective of this process of all appropriate inquiries into previous and current uses of the Site and adjacent area is to identify, to the extent feasible, Recognized Environmental Conditions. [Italicized terms are defined in the ASTM Standard Practice E 1527-13.] Findings: This assessment was conducted for the Site which is currently vacant. Past uses include a multi-family dwelling and a store as well as a pool parlor and a hairdresser. The Site was originally underwater or wetland and was developed between 1890 and 1906 by filling presumably with fill containing coal and coal ash. Sometime after 2002 there was a fire which destroyed the residential building. In 2012 a one story garage was demolished after a 275 gallon heating oil tank was removed from the basement. 100 cubic yards of fill was placed on Site as part of the demolition. The fill may have contained some building materials based on the presence of some bricks visible on the surface. The adjacent property to the east had been a gas station from the 1920s to the 1960s. It was the subject of remedial activities which resulted in a Class A2 Response Action Outcome. Conclusion: We have performed a Phase I Environmental Site Assessment in conformance with the scope and limitations of ASTM Practice E 1527-13 of 38 Palmer Street, Salem MA 2 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 01970. Any exceptions to, or deletions from, this practice are described in Sections 2.4 and 2.5. of this report. This assessment has revealed no evidence of Recognized Environmental Conditions in connection with the property except:  Likely presence of lead in soil from historical lead paint application onto prior on- Site structures that either burned down or have been removed; and  Likely presence of historical fill containing polycyclic aromatic hydrocarbon (PAH) compounds associated with coal or coal ash. 2. INTRODUCTION 2.1 Location and Legal Description The Site is located in the central eastern part of the city of Salem. The Site is identified in the Assessor’s records as Map 34, Lot 0155, and containing 0.073 acres. A locus map and Site plan are presented in Figure 1 and Figure 2, respectively. The current owner of record is Jose Baez. The address of the Site is 38 Palmer Street, Salem, MA 01970. The Site is located in an urban residential neighborhood characterized by apartment buildings and multifamily homes. The area has been developed since at least the late 1800s. The Site is currently vacant. The legal description is attached in Appendix C. 2.2 Purpose This study was conducted by Irwin Engineers, Inc. (IRWIN) with the goal of identifying Recognized Environmental Conditions, defined by ASTM Standard Practice E-1527-13 as “the presence or likely presence of any hazardous substances or petroleum products in, on, or at a property: (1) due to release to the environment; (2) under conditions indicative of a release to the environment; or (3) under conditions that pose a material threat of a future release to the environment. De minimis conditions are not recognized environmental conditions.” This ASTM Practice is intended to constitute All Appropriate Inquiry and permit the User to satisfy one of the requirements to qualify for the innocent landowner, contiguous property owner, or bona fide prospective purchaser limitations on CERCLA liability (collectively, the “landowner liability protections” or “LLPs”). CERCLA is the Comprehensive, Environmental Response, Compensation and Liability Act. While 3 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx petroleum products are not classified as hazardous substances under CERCLA they are included in the ASTM Practice and will, therefore, be included here. The scope of this study does not address requirements other than All Appropriate Inquiry, which may be required for the user to qualify for the LLPs such as ongoing obligations to comply with activity and use limitations, or state or local laws. 2.3 Scope-of-Services IRWIN has reviewed records at the local municipal offices and those maintained by the Department of Environmental Protection concerning the Site (if any) and the surrounding area within applicable ASTM search radii. A search was conducted using a commercial environmental database company to identify known critical environmental resources and sensitive receptors, registered underground storage tanks, hazardous waste generators, state disposal sites, RCRA sites, CERLIS sites, federal sites, listings in tribal databases of equivalent sites, Federal Brownfield sites, and available registries of institutional and engineering controls. A Site reconnaissance visit was conducted by an Environmental Professional or under the supervision of an Environmental Professional to observe the current conditions of the Site and surrounding area for evidence of Recognized Environmental Conditions. Photographs were taken of the Site and of any notable current Site conditions. Interviews were conducted with the current owner and manager (if any) of the Site. Certain local officials were also interviewed to obtain current and historical information regarding the Site and immediate surrounding area. 2.4 Significant Assumptions None. 2.5 Limitations and Exceptions This assessment is designed to satisfy the ASTM standard for the User to qualify for one of the limitations on CERCLA liability, therefore, the following considerations will not be addressed: business environmental risk; non-scope items including but not limited to: asbestos or PCB containing material in buildings; radon; mold; lead-based paint; lead in drinking water, wetlands, regulatory compliance, compliance with applicable institutional and/or engineering controls, cultural and historic resources, industrial hygiene, health and 4 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx safety, ecological resources, endangered species, indoor air quality unrelated to releases of hazardous substances or petroleum products into the environment, and biological agents. The former list is not all-inclusive. A review of land title records or of judicial records for environmental liens is not within the scope of this assessment. That review is the responsibility of the User. As stated in the ASTM standard, “No environmental site assessment can wholly eliminate uncertainty regarding the potential for recognized environmental conditions.” This report is subject to the limitations outlined in Appendix A attached hereto and incorporated herein. The report has been prepared in accordance with the Terms and Conditions set forth in our contract dated March 29, 2021. No other warranty, express or implied, is made. 2.6 Special Contractual Terms and Conditions None. 2.7 User Reliance This study and report have been prepared on behalf of and for the exclusive use of Client solely for use in an environmental evaluation of the Site. This report and the findings contained herein shall not, in whole or in part, be disseminated or conveyed to any other party, nor used or relied upon by any other party in whole or in part, without the prior written consent of Irwin Engineers, Inc. However, Irwin Engineers Inc., acknowledges and agrees that, subject to the Terms and Conditions of our contract, the report may be conveyed to the Client’s attorney, lender, title insurer, or regulatory agencies. In addition to the Limitations contained in Appendix A and in addition to our Standard Provisions for Environmental Services, please note that the ASTM E1527-13 standard provides (1) that this report is valid for 180 days and (2) if within this period the assessment will be used by a user different than the user for whom the assessment was originally prepared, the subsequent user must also satisfy the User’s Responsibilities. 3 USER PROVIDED INFORMATION The Client was asked to provide the information listed below via the User Questionnaire attached as Appendix D. 5 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 3.1 Title Records It is an obligation of the User to arrange for a search of recorded land title records and lien records that are filed under federal, tribal, state or local law to identify environmental liens and Activity and Use Limitations (“AULs”) that are currently recorded against the Site. Where applicable, judicial records must also be searched. The User was asked to provide this information. A title search was conducted on November 17, 2015 by Attorney Jeffrey Miller for Stewart Title Guaranty Company and it showed no environmental liens or AULs. The User also provided a title update dated April 7, 2021 from Keith Hersey, Title Examiner. It found no liens or restrictions. 3.2 Environmental Liens or Activity and Use Limitations In addition to the User’s obligation to conduct a title search, AULs or institutional controls were searched via a commercial database search company, EDR Environmental Data Resources, Inc. The results are discussed in Section 4.1 Further, the Client was asked if he knew of any environmental liens, AULs, intuitional and/or engineering controls on the Site. He responded that he would conduct a title search. 3.3 Specialized Knowledge The Client was asked if he had any information or special knowledge (professional as well as personal experience) concerning the Site and surrounding area. The User responded that “there is urban fill at 47 Leavitt and 106 Congress St.” These are other properties in the immediate vicinity. 3.4 Commonly Known or Reasonable Ascertainable Information The Client was asked if she/he was aware of any commonly known or reasonably ascertainable information about the Site that would help IRWIN identify conditions indicative of release or threatened releases. The User responded that the Site was last used for a two story residential building. 3.5 Valuation Reduction for Environmental Issues The Client was asked if the purchase price being paid for the Site reasonable reflects the fair market value of the Site and, if not, whether any difference is attributable to actual or 6 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx suspected contamination. The User responded that the purchase price does reflect fair market value. 3.6 Owner, Property Manager, and Occupant Information The Client provided the following information with regards to current and past owners, managers, operators and occupants: Current owner: 47 Leavitt St. LLC Past owner: Jose Baez Information was not provided for: Current manager: Current occupant: Past manager: Past occupant: 3.7 Reason for Performing Phase I The Client stated the reason for performing this Phase I assessment is prospective development of the Site. 4 RECORDS REVIEW 4.1 Standard Environmental Record Sources A database search was conducted through Environmental Data Resources, Inc. (“EDR”) on March 30, 2021. The EDR Report is attached hereto as Appendix B. The date that each database was last updated in also listed in Appendix B. Due to the density of the Site area the search radii were reduced in accordance with section 8.1.2.1 of the ASTM Standard 1527-13. A review of the following databases revealed no sites listed within the ASTM reduced search radii:  Federal National Priority List (NPL) (includes delisted sites)- 1.0 mile  Federal CERCLIS No Further Action Planned – 0.5 mile  Federal RCRA Treatment, Storage & Disposal facilities – 0.5 mile  Federal RCRA Generators - property & adjoining 7 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx  Federal institutional control/engineering control registries (Brownfields) – property only  Federal Emergency Response Notification System – property only  Registered Underground Storage Tanks – property & adjoining  Solid Waste Landfills – 0.5 mile  State and Tribal institutional control/engineering control registries (AULs) – property only Institutional controls are legal restrictions on the use of, or access to, to a property to (1) reduce or eliminate potential exposure to hazardous substances or petroleum products in the soil or ground water on the property, or (2) to prevent activities that could interfere with the effectiveness or a response action. ASTM requires searches of state “lists of hazardous waste sites identified for investigation or remediation.” ASTM identifies the appropriate radius for “state- equivalent NPL” as 1.0 mile and for “state equivalent CERCLIS” as 0.5 mile. In Massachusetts the investigation and cleanup of hazardous waste sites has been privatized through the Licensed Site Professional program. All sites are given a Release Tracking number and, therefore, there is only one database to search. However, review of the following database(s) did reveal the listed properties as follows: Comprehensive Environmental Response Compensation and Liability Information System (SEMS) – 0.5 mile This database was renamed in 2015 to the Superfund Enterprise Management System although the ASTM standard has not been updated as of this report. There is one listing in the database within the search radius for 15 Peabody Street which is located 0.212 miles north of the Site. That property was a former Massachusetts Electric facility. The listing indicates that the property was listed due to asbestos removal and not for site assessment. This property is located downgradient from the Site. Due to its location and the reason for its listing in the database, it is not expected to pose a threat of migration of contamination to the Site. Federal RCRA Corrective Action Sites – 1.0 mile There is one listing on this database for New England Power Co located approximately 0.991 miles to the northeast. This location on a peninsula to the northeast of the Site is expected to be downgradient with respect to the Site and not to pose a threat of migration of contamination. 8 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx State and Tribal Brownfields – 0.5 mile There are three listings on this database within the search radius. They are discussed below. 15 Peabody Street This location was discussed above as it is also listed in the SEMS database. Due to its location and the reason for its listing in the database, it is not expected to pose a threat of migration of contamination to the Site. 50 Palmer Street, Former Keefe’s Restaurant This property adjoins the Site to the east. The property was first developed for commercial use in the 1920’s. Between 1920’s and 1958, the property was used exclusively as a gasoline service station. From 1958 to the late 1960’s, the property was used as both a restaurant and a gasoline service station. The property was used as a restaurant from the late 1960’s to 1999. This property is also listed as the location of a release on the state’s database of releases and is discussed further below. 61 Ward Street This location is 0.189 north of the Site. The property is a former gas station, auto repair and taxi stand location. The property is downgradient of the Site and not expected to pose a threat of migration of contamination to the Site. State and Tribal Releases– 1.0 mile reduced to 0.5 mile The ASTM Standard does not provide a definition for this database since it will vary by state. In Massachusetts all releases are tracked through the same database which assigns Release Tracking Notification numbers. Therefore, there are no separate databases for leaking underground storage tanks. There are 63 releases within 0.5 mile of the Site. The database report also lists 5 leaking above ground tanks and 24 leaking underground storage tanks (“LUSTs”). These additional listings are duplicative. Releases which are on adjoining properties or which are still open and expected to have pose a concern for the Site are discussed below. 50 Palmer Street, RTN 3-25097, #3-22894, and #3-25291 This property adjoins the Site to the east. The property was first developed for commercial use in the 1920’s. Between 1920’s and 1958, the property was used exclusively as a gasoline service station. Historical Sanborn Maps show it covered both 48 and 50 Palmer Street. From 1958 to the late 1960’s, the property was used as both a restaurant and a gasoline service station. The property was used as a restaurant from the late 1960’s to 1999. 9 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx In 2003 Simmons Environmental Services, Inc. (“Simmons”) filed a Class A2 Response Action Outcome (“RAO”) report for RTN #3-25097. Simmons stated that according to a previous assessment, three USTs (a 2,000 gallon and a 1,000 gallon gasoline and a 500 gallon heating oil UST) were filled with sand in 1973. Due to issues with the way in which the prior assessment had been conducted, Simmons conducted its own subsurface investigation. Two fractions of VPH (C5-C8 aliphatics and C9-C10 aromatics) exceeded Method 1 S1 GW2/GW3 risk limits. The property had been a beach and coastal wetland which had been filled with coal ash. Therefore, analysis for PAHs other than those associated with gasoline was not conducted. In groundwater, each of three fractions of tested for VPH exceeded applicable Method 1 GW2/GW3 risk limits. Purgeable VOCs were also detected in three wells and xylene exceeded the Method 1 GW2 risk limits. The monitoring well closest to the Site (SB106) showed no headspace screening results above background. The figure showing groundwater flow direction is missing from the report available at the online DEP website. However, the report states that the contamination was limited to that portion of the property where the USTs were. This area is the northwest portion of the property and not immediately adjacent to the Site. Simmons opined that the silty sand would limit movement of the contamination. Simmons also conducted soil gas screening and found no exposure pathway as a result of dissolved VOCs and VPH in groundwater. A Method 3 Risk Characterization was then conducted. A condition of No Significant Risk was found supporting the submission of the Class A2 RAO. In 2005 Simmons issued a Revised RAO Statement for RTN #3-22894which included the other RTNs listed above. As part of planned redevelopment of the property, the filled USTs were to be removed. It was discovered that the 500 gallon heating oil tank had not been cleaned or filled as was previously reported. 150 gallons of oil and tank sludge were removed and placed in drums. Additionally, approximately 20 cubic yards of petroleum contaminated soil was found next to the 1,000 gallon UST. Both the 500 gallon UST and the 1,000 gallon UST were located on the northeast portion of the 50 Palmer Street property and not immediately adjacent to the Site. Due to headspace readings greater than 100 ppmv associated with the gasoline UST, an Immediate Response Action was authorized and undertaken. Additional soil gas measurements were made which confirmed the absence of an indoor air exposure pathway. Shallow soils samples were tested for lead which might have leached from many decades of lead based paint on buildings. Concentration were found to be 150, 550 10 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx and 1200 mg/kg. Simmons opined that these lead levels were from peeling paint and therefore exempt under the Massachusetts Contingency Plan (“MCP.”) Due to the planned residential development, the Method 3 Risk Characterization was redone to include lead, copper and nickel from the 2003 testing. This Characterization also found No Significant Risk thus supporting the Revised RAO. The sources of the releases at this property have been removed. The property is expected to be downgradient/cross-gradient to the Site. The disposal area is limited to the northwestern portion of the property not immediately adjacent to the Site. Soil gas testing has not shown an exposure pathway. Based on this information, the releases at 50 Palmer are not expected to pose a threat of migration of contamination to the Site. Non geocoded Sites A review of “orphan” releases indicates that they have either been closed or are in an expected cross-gradient or down-gradient location relative to the Site. 4.2 Additional Environmental Record Sources Health Department Inquiry was made during the 2015 assessment regarding environmental contamination issues on or surrounding the Site. Mr. Jeffrey Barosy, Sanitarian, reported that there were no “environmental files” for the Site. An inquiry was made for this assessment of Maureen Davis, Principal Clerk. She responded that any information was available online. None was found regarding Board of Health concerns for environmental issues concerning the Site. Fire Department A request was made during the 2015 assessment for all records for USTs located at or removed from the Site and for any licenses for flammables storage for these locations. Review of records made available showed the following. Inspector Dean Larabee reported in voice mail message that there was “nothing there but a 275 aboveground tank from the basement when it was a garage.” The Client has owned the Site since that time and confirms that no tanks have been either installed or removed since 2015. 11 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Permits for Site Permits were not found for storing, generating or handling hazardous substances or petroleum other than a permit dated December 9, 2011 for the removal of a 275 aboveground storage tank (“AST”) of heating oil. The installation date is unknown. Building Department The building department files contained the following relevant information:  Permit to remove 275 AST dated 12/9/11;  Disposal receipt for same AST undated;  Demolition permit for one story brick structure dated 1/12/2012;  Demolition permit for demolishing garage dated 1/12/2012;  Lien request for demolition work and invoice for 100 cubic yards of “clean compactable fill/gravel;”  Gas cutoff order dated 12/20/2011;  2003 letter stating Site was a ‘legal non-conforming four family dwelling.;”  Reroofing permit dated December 1972. 4.3 Physical Setting Source(s) 4.3.1 Topographical Map The USGS 7.5 x15 Minute topographical map for the Salem quadrangle (1985) was reviewed. Based on that review, the inferred direction of groundwater flow is expected to be in a southeasterly-easterly direction. However, local geology and other factors such as utilities can affect localized flow patterns. 4.3.2 Sensitive Receptors The Site is located within a non-potentially productive aquifer. See Appendix B. It is not within ¼ mile of state drinking water wells. Based on a review of the online database maintained by the Massachusetts Division of Fisheries and Wildlife, the Site is not within ¼ mile of either an Estimated Habitat of Rare Wildlife or Priority Habitat of Rare Species. 12 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 4.4 Historical Use Information on the Property Historical sources were reviewed to identify obvious uses of the Site back to 1890 the date of the earliest available Sanborn Fire Insurance Map. The Site appeared as follows on the available maps: 1970: A dwelling covers the eastern part of the Site. Attached to the dwelling and covering the western part of the Site is another unlabeled building that appears to have three sections. Addresses associated with the Site are 33 Prince St., 38 Palmer St. and 40 Palmer St. 1965: Same as 1970 1957: The dwelling is the same as in 1965. The northern section of the western building is a store and the two other parts are auto garages. 1950: The eastern part of the Site is a store. The western part appears the same as 1957. 1906: The Site has one store-house building on its western side. 1890: The Site appears to be underwater as part of Salem Harbor. Palmer and Prince Streets do not exist in the area of the Site. Historical street directories show that the eastern part (#40 Palmer St.) of the Site was pool parlor from 1924 to 1947. The western portion (#33 Prince St.) was a hairdresser in 1926 and a vacant store in 1947 and in 1957. The other listings are for individual names and are presumed residential. The Site is listed as vacant in 1988, 1974, and partially vacant in 1964 and 1961. A phone interview with the Assessor’s office revealed that the multifamily dwelling and garage building was built in 1910. Historical topographical maps available from the University of New Hampshire show that in 1949 the Site and its immediate vicinity had the same topography as today. However, a map from 1893 shows that the Site was likely within a wetland or under the water of Palmer Cove. Past use of hazardous substances Unknown. Uses are expected to be consistent with household quantities of cleaners and home maintenance products. Past Waste management and disposal practices Unknown. 13 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Past corrective actions and response activities None recorded. 4.5 Historical Use Information on Adjoining Properties Sanborn Fire Insurance maps were reviewed for the adjoining properties. Dates of available maps and how the Site appeared are described below: 1970: East: Filling station with 12 car garage South: Dwellings West: Dwellings North: Vacant 1965: Same as 1970 1957: Same as 1965 1950: Same as 1957 except the gas tanks are now shown on the filling station to the east. 1906: East: Tenements and painters storeroom South: Vacant and Palmer Cove West: Tenements North: Store and vacant 1890: East: Vacant South: Salem Harbor West: Vacant North: Wagon and Paint Shops Historical street directories show that the property abutting the Site to the east at #50 Palmer was a gas filling and service station from 1926 to 1969. The property is not listed in later directories except for 1995 when it lists two individuals. 14 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 5 SITE RECONNAISSANCE 5.1 Methodology & General Site Setting The visit was conducted by foot. The perimeter of the Site was walked and the Site was viewed from adjacent public ways. One Site visit took place on April 5, 2021 at 10am. Lana Carlsson-Irwin of IRWIN visited the Site. It was approximately 59 degrees Fahrenheit and cloudy. The area is relatively flat with a gently slope up to the west and north. The area is one of multi-family dwellings and apartments buildings. 5.2 Exterior Observations The Site is a vacant, level dirt and gravel lot. It has frontage on Palmer Street to the north, Prince Street to the west and Naumkeag Street to the east. The southern edge is fenced off by the two adjacent neighbors. Scattered bricks were observed in the surface of the Site. Five cars were parked on the Site. The following were not observed: pits, ponds or lagoons, stained soil or pavement, stressed vegetation, obvious evidence of solid waste fill, stormwater disposal other than to a sewer, wells, septic systems, oil storage tanks, vent or fill pipes, odors, pools/sumps, drums, unidentified substance containers suspected of being hazardous waste, transformers labeled as containing PCBs. There are no water bodies on the Site. Gas was cutoff to the Site in 2011 according to the information obtained for the assessment conducted in 23015. 5.3 Interior Observations Not applicable. Site is vacant. 5.4 Current Use of the Property 5.4.1 Current use Vacant lot is used for parking. 5.4.2 Current use of hazardous substances Not applicable. Drips or minor leaks of automotive fluids may exist from parked cars. 15 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 5.4.3 Waste management and disposal practices Not applicable. 5.4.4 Current corrective actions and response activities None. 5.4.5 Engineering controls None. 5.4.6 Institutional controls None. The following were not observed: oil storage tanks, vent or fill pipes, odors, stains, corrosion, sumps, drums, unidentified substance containers suspected of being hazardous waste, transformers labeled as containing PCBs. 5.5 Current Uses of the Adjoining Properties The property to the north is a park, the Mary Jane Lee Park. The other abutters are multi- family homes or 3 or 4 story apartment buildings. The majority of which appear relatively old with the exception of the apartment building to the east. 6 INTERVIEWS 6.1 Interview with Owners 6.1.1 Current Owner The Owner of record is an entity controlled by the User with the same people involved so no separate interview was conducted. 6.1.2 Past Owner(s) ASTM requires that past owners likely to have material information not duplicative of information collected elsewhere be interviewed. For the 2015 assessment, Jose Baez, was asked if he had any knowledge of pending, threatened or past litigation, administrative proceedings, or notices of proceedings or violations of environmental laws regarding the 16 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Site or relevant to hazardous substances or petroleum in on or from the property. He responded, “not known.” In response to questions about the Site, he answered “no” or “not known” to every question regarding those topics. Mr. Baez stated that he purchased the property in 2002, that it had contained a multi-family dwelling which was destroyed in a fire. 6.2 Interview with Site Manager 6.2.1 Current Site Manager None. 6.2.2 Past Site Manager None. 6.3 Interviews with Operators and Occupants 6.3.1 Current Operators and Occupants None identified. 6.3.2 Past Operators and Occupants None identified. 6.4 Interviews with User and Others An interview was conducted with the user of this assessment, the Client. As required by the ASTM standard, the User, David Valecillos, was asked if he had any knowledge of pending, threatened or past litigation, administrative proceedings, or notices of proceedings or violations of environmental laws regarding the Site or relevant to hazardous substances or petroleum in on or from the property. He answered “no.” The user was asked the questions contained in Appendix D regarding the Site and any relevant documentation. 17 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 6.5. Interviews with Local Government Officials 6.5.1 Fire Department Inspector Dean Larabee responded by voice mail on December 2, 2015 to an inquiry for records on USTs and permits for flammables at the Site. An additional inquiry was not made as the Client has owned the Site since the 2015 assessment. 6.5.2 Health Department Jeffrey Barosy, Sanitarian for the City of Salem stated that there were no environmental files for the Site on Nov. 23, 2015. Ms. Maureen Davis responded on April 6, 2021 that any information was available online. 6.5.3 Building Department A clerk provided files on Nov. 23, 2015 containing the information detailed in Section 4.2 above. 7 EVALUATION 7.1 FINDINGS This assessment was conducted for the Site which is currently vacant. Past uses include a multi-family dwelling and a store as well as a pool parlor and a hairdresser. The Site was originally underwater or wetland and was developed between 1890 and 1906 by filling presumably with fill containing coal and coal ash. Sometime after 2002 there was a fire which destroyed the residential building. In 2012 a one story garage was demolished after a 275 gallon heating oil tank was removed from the basement. 100 cubic yards of fill was placed on Site as part of the demolition. The fill may have contained some building materials based on the presence of some bricks visible on the surface. The adjacent property to the east had been a gas station from the 1920s to the 1960s. It was the subject of remedial activities which resulted in a Class A2 Response Action Outcome. 18 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 7.2 OPINION The Site had been developed since approximately 1900 and it is likely that the soil on Site may contain lead from lead paint historically applied to on-Site structures. Concentrations of lead were found on the adjacent property at 50 Palmer Street at up to 1200 mg/kg. The presence of lead in soil associated with lead paint at the site of original application is not a release that is reportable under the Massachusetts Contingency Plan (MCP) at 310 CMR 40.0000; however, the concentrations of lead on the Site are not known to make the evaluation of whether those concentrations pose a risk, nor was there information beyond supposition to confirm that the lead residues tested on the adjacent property were specifically associated with lead paint. As such the likely presence of lead in soils at the Site cannot be concluded to be a de minimis condition and therefore is considered in our opinion to be a Recognized Environmental Condition. Based on historical Sanborn maps, it appears likely that the Site was filled harbor and/or wetlands. The adjacent property at 50 Palmer Street, and no further from the current shore line, was found to have been filled with soils reportedly containing observable coal ash when it was investigated for environmental assessment with closure of underground gasoline tanks from the former gas station. On that basis it is likely that the Site was also filled with soil containing coal ash. Coal ash is commonly known to contain lead, arsenic and polycyclic aromatic hydrocarbon (PAH) compounds; however the presence of coal or coal ash is not a release that is reportable under the Massachusetts Contingency Plan (MCP) at 310 CMR 40.0000. There was no information beyond supposition to confirm that the materials observed on the adjacent property were specifically coal or coal ash and while there was testing that detected lead there was no testing for PAH compounds to make an evaluation of whether concentrations pose a risk. As such the likely presence of lead, arsenic and polycyclic aromatic hydrocarbon (PAH) compounds within fill historical placed at the Site in soils at the Site cannot be concluded to be a de minimis condition and therefore is considered in our opinion to be a Recognized Environmental Condition. 7.2.1 Data Gaps Significant data gaps were not found. 7.3 CONCLUSIONS We have performed a Phase I Environmental Site Assessment in conformance with the scope and limitations of ASTM Practice E 1527-13 of 38 Palmer Street, Salem MA 01970. Any exceptions to, or deletions from, this practice are described in Sections 2.4 and 2.5. of this report. This assessment has revealed no evidence of Recognized Environmental Conditions in connection with the property except: 20 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 8 APPENDICES 8.1 QUALIFICATIONS OF ENVIRONMENTAL PROFESSIONALS AND STAFF J. ANDREW IRWIN, P.E., LSP, TURP, is responsible for projects involving environmental site assessment, risk assessment, engineering feasibility studies, remediation design, permits and compliance auditing programs. Mr. Irwin holds Bachelor of Science (1981) and Master of Engineering (1982) degrees in Chemical Engineering from Cornell University. He is a Member of the American Institute for Chemical Engineers and belongs to the Licensed Site Professional Association. He is a registered Professional Engineer in the State of New York, Massachusetts, Connecticut, Rhode Island and New Hampshire. He has been actively practicing in environmental engineering since 1982. LANA CARLSSON-IRWIN, ESQ. is responsible for environmental site assessment projects. Ms. Carlsson-Irwin holds a Bachelor of Arts in Biology from Cornell University (1981) and a Juris Doctor summa cum laude from Syracuse Law School (1985). She has been actively conducting site assessments since 1996. She has completed the Phase I Site Assessment & Transaction Screen Assessment Modules for Environmental Site Assessments for Commercial Real Estate Course, 2003 and attending on-going training seminars. 21 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx 8.2 Site Photographs SITE VIEWED FROM PALMER STREET 22 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx SOUTHERN EDGE OF SITE TYPICAL BRICKS EMBEDDED INTO SITE SURFACE 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Figure 1 - Site Locus Map Figure 2 – Assessor’s Map NOTE: LOCUS CIRCLES FOR 500 FT AND 0.5 MILE RADIUS North Shore Community Development Coalition, Inc 102 Lafayette Street Salem, MA 01970 31MAR21 673-09C NSCDC 38 Palmer St Salem Site Locus 0B 1 OF 1 FIGURE 1 SITE LOCUS 38 Palmer Street, Salem, MA 33 West Central Street Natick, MA 01760 (508) 653-8007 DRAWING BY: CHECKED BY: APPROVED BY:SCALE CLIENT TITLE SIZE DWG NO SHEETNTS ICL JAI JAI Appendix A - Limitations 1 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Appendix A - Limitations 1.The observations described in this report were made under the conditions stated therein. The conclusions presented in the report were based solely upon the services described therein, and not on scientific tasks or procedures beyond the scope of described services or the time and budgetary constraints imposed by Client. The work described in this report was carried out in accordance with the Standard Provisions for Environmental Services in our contract. 2. In preparing this report, IRWIN has relied on certain information provided by other parties referenced therein. IRWIN did not attempt to independently verify the accuracy or completeness of all information reviewed or received during the course of this site assessment. 3.Observations were made of the Site and of structures on the Site as indicated within the report. Where access to portions of the Site or to structures on the Site was unavailable or limited, IRWIN renders no opinion as to the presence of hazardous materials or oil, or to the presence of indirect evidence relating to hazardous material or oil, in that portion of the Site or structure. In addition, Irwin Engineers renders no opinion as to the presence of hazardous material or oil, or the presence of indirect evidence relating to hazardous material or oil, where direct observation of the interior walls, floor, or ceiling of a structure on a Site was obstructed by objects or coverings on or over these surfaces. 4.It is IRWIN’s understanding that the purpose of this report is to identify Recognized Environmental Conditions as defined by ASTM Practice E1527-13. This stated purpose has been a significant factor in determining the scope and level of services provided for in the Agreement. Should the purpose for which the Report is to be used or the proposed use of the site(s) change, this Report is no longer valid and use of this Report without IRWIN’s review and written authorization shall be at the sole risk or the party using it. Should IRWIN be required to review the Report after its date of submission, IRWIN shall be entitled to additional compensation at then existing rates or such other terms as agreed between IRWIN and the Client. 5. The conclusions and recommendations contained in this report may be based in part, where noted, upon the data obtained from a limited number of soil samples obtained from widely spaced subsurface explorations. The nature and extent of variations between these explorations may not become evident until further exploration. If variations or other latent conditions then appear evident, it will be necessary to reevaluate the conclusions and recommendations of this report. 6.Any water level readings made in test pits, borings, and/or observation wells were made at the times and under the conditions stated on the report. However, it must be noted that fluctuations in the level of groundwater may occur due to variations in rainfall and other factors different from those prevailing at the time measurements were made. 7. Except as noted within the text of the report, no quantitative laboratory testing was performed as part of the site assessment. Where an outside laboratory has conducted such analyses, IRWIN has relied upon the data provided and has not conducted an independent evaluation of the reliability of these data. IRWIN did not perform testing or analyses to determine the presence or concentration of asbestos at the Site or in the environment at the Site. 8.The conclusions and recommendations contained in this report are based in part, where noted, upon various types of chemical data and are contingent upon their validity. These data have been reviewed and interpretations made in the report. As indicated within the report, some of these data may be preliminary “screening” level data and should be confirmed with quantitative analyses if more 2 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx specific information is necessary. Moreover, it should be noted that variations in the types and concentrations of contaminants and variations in their flow paths may occur due to seasonal water table fluctuations, past disposal practices, the passage of time, and other factors. Should additional chemical data become available in the future, these data should be reviewed, and the conclusions and recommendations presented herein modified accordingly. 9.Chemical analyses may have been performed for specific constituents during the course of this site assessment, as described in the text. However, it should be noted that additional chemical constituents not searched for during the current study may be present in soil and/or groundwater at the Site. 10.This Report was prepared for the exclusive use of the Client. No other party is entitled to rely on the conclusions, observations, specifications, or data contained therein without the express written consent of IRWIN. 11. The observations and conclusions described in this Report are based solely on the Scope of Services provided pursuant to the Agreement. IRWIN has not performed any additional observations, investigations, studies, or testing not specifically stated therein. IRWIN shall not be liable for the existence of any condition, the discovery of which required the performance of services not authorized under the Agreement. 12. The passage of time may result in significant changes in technology, economic conditions, or site variations that would render the Report inaccurate. Accordingly, neither the Client, nor any other party, shall rely on the information or conclusions contained in this Report after six months from its date of submission without the express written consent of IRWIN. Reliance on the Report after such period of time shall be at the User's sole risk. Should IRWIN be required to review the Report after six months from its date of submission, IRWIN shall be entitled to additional compensation at then existing rates or such other terms as may be agreed upon between IRWIN and the Client. 13.No environmental site assessment can wholly eliminate uncertainty regarding the potential for recognized environmental conditions in connection with a property. Performance of this assessment is intended to reduce, but not eliminate, uncertainty regarding the potential for recognized environmental conditions in connection with a property. 14. IRWIN has endeavored to perform its services based upon engineering practices accepted at the time they were performed. IRWIN makes no other representations, express or implied, regarding the information, data, analysis, calculations, and conclusions contained herein. 673-09C R01 North Shore CDC Palmer Salem ASTM Phase I 2021.docx Appendix B - Environmental Database Report