Winter Island Trail and Fort Pickering Restoration 2009RV Sites
42-54 (Safari
Field)
Tent
Field
35-40
Tent
Site 41
Tent Sites
28-34
(Igloo)
Tent
Sites
25-27
Pavilion Tent Sites
11, 17, 18
Bath
House
RV Site 1
Function
Hall RV Site
16A
RV Site 16
RV Site
16C
RV Site 12
RV Site 13
RV Site 14
Fort
Pickering
Stage
Waikiki
Beach
RV Site 10
RV Site
10A
Hangar
Office
/ Store
Harbormaster
Office
Garage
Boat
Ramp
Barracks
Open
Space
Parking Area
(Grassy)
Boat Trailer
Parking
(Overflow)
Designated
Boat Trailer
Parking
South Beach
Pebble
BeachDesignated
Parking
(Vehicle)
RV Site 4
RV Site 3
RV Site 2
RV Site 5
Designated
Parking
(Vehicle)
RV Site 55
Tent
Sites
56, 57
Harbormaster
Seasonal
Patrol Office
Gazebo
Moat
Fort
Pickering
Light
Picnic
Area
Playground Walki ng Trail
Walk
ing Trail
Walking T r a il
Winter Island Park
2009 Aerial Photo
Map No. 14-005
Mayor
Kimberley Driscoll
City Of Salem
Massachusetts
180 0 18090
Scale in Feet
kzla
Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the
GIS User Community
0 100 20050
Feet ¸upper trail possibilitylo
w
e
r
trail possibility
dense sumac and bittersweet to clear
Wood chips, utility poles, and other vegetation to clear
Potential loop to make
Consider relocating boats
Consider open area for off-trail use, such as picknicking and terrace seating
Potential loop to make
replace multi-leader maple
fill in gap Allee: 9 maples coastside, 7 maples inland
Consider removing some of the 5 grills
Potential grander trail entrance / exit requires relocation of boats, removal of part of fence, and some earthwork
Nice views, potential for dam interpretation here
Could remove some vegetation to open views
narrow lower bank here
Could remove some vegetation to open views
views to maintain
grade issue
close social trail
dense vegetation
to clear
vegetation to
clear
spur to add
existing spur
WINTER ISLAND TRAIL
Things to Consider
kzla
Slope stability issues along this edge of parking
All parking lot drainage flows here. Must capture and treat.
FORT PICKERING
FORT PICKERINGNORTHWEST BASTION
BRUSH TO CLEAR
HARBORMASTER OFFICE AREA SUMAC GROVE
PROPERTY LINE FENCE
Parade
Magazines
A & C
Magazine B
North
Wet Ditch
West
Wet Ditch
Lighthouse
Rifle Gallery
SOUTH RAMPART
Rifle
Gallery
NORTH RAMPART
EAST
RAMPART
Northwest
Bastion
1a
1b
1b
1c
1c
1e
1d
1f
2e
2d
SIGNAGE
Spreading across work priority
levels I & II, consider where
interpretive signage is appropriate
and signage aesthetics. Install new
interpretive plaques where plaques
were removed as appropriate.
1g
WORK PRIORITY I
IMPROVE FIRST IMPRESSION
WORK PRIORITY II
ADDRESS MORE EASILY
DEFINED ISSUES AND
OCEAN VIEWING AREA
1930s Fort pickering
Magazines
A & C
Magazine B
North
Wet Ditch
West
Wet Ditch
Lighthouse
Rifle Gallery
SOUTH RAMPART
Rifle
Gallery
NORTH RAMPART
EAST
RAMPART
Northwest
Bastion
3a
3a
3b
3c
3d
3d
3d
3d
4a
4b
WORK PRIORITY III
MANAGE LONG-TERM
WORK PRIORITY IV
ADDRESS THE NW BASTION
Parade
close path
maintain soft path
add soft path
maintain hard path surface
add hard path surface
add accessible path