Loading...
53 CONGRESS STREET-ASBESTOS ABATEMENT-3RD FLOOR HALLWAY DEGTAM RECEIVED ENVIRONMENTAL SERVICES JUN 17 2021 June 11, 2021 CITY OF SALEM BOARD OF HEALTH Board of Health Agent 120 Washington Street 4th FL Salem, MA 10970 Re: Excelitas Technolo ies--53 Congress St-third floor hallway Dear Sir/Madam: Please be advised that Dec-Tam Corporation will be performing an asbestos abatement project at the above referenced location. This work has been scheduled for July 6,2021 to July 9, 2021. All applicable local, state and federal agencies have been notified of this work. Please let me know if you have any questions. Sincerest regards, Craig Starkman Sales Estimator CS/nap Enclosure 50 Concord Street,North Reading,MA01864 o iP:978.470.2860 F:978.470.1017 - wwwdectarnmm Massachusetts Department of Environmental Protection BAT AQ 04 (ANF-001) 1100347734 Asbestos Notification Farm Asbestos Project# r o r- Project Revision r Project Cancellation A. Asbestos Abatement Description 1.Facility Location: EXCELITAS TECHNOLOGIES 35 CONGRESS STREET Instructions 1.All a.Name of Facility b.Street Address sections of this form SALEM MA 01970 9782244100 must be completed in order to comply with c.Cityrrown d.State a Zip Code f.Telephone MassDEP notification SUSAN LYNN MARALLO EH&S MANAGER requirements of 310 CMR 7.15 and g.Facility Contact Person Name h.Facility Contact Person Title Department of Labor Worksite Location: THIRD FLOOR HALLWAY Standards(DLS) notification i.Building Name,Wing,Floor,Room,etc. requirements of 453 2. Is the facility occupied? P_a.Yes T`b.No CMR 6.12 3. Is this a fee exempt notification(city, town,district, municipal housing authority,state facility,or owner-occupied residential property of four units or less)? i— a.Yes W b.No MassDEP Use Only 4.Blanket Permit Project Approval,if applicable: Date Received Approval ID# 5.Non-Traditional Asbestos Abatement Work Practice Approval, if applicable: Approval ID# 6.Asbestos Contractor: DEC-TAM CORPORATION 50 CONCORD ST a.Name b.Address NORTH READING MA 01864 9784702860 c.City/Town d.State e.Zip Code f.Telephone AC000035 h.Contract Type: W I.Written i—2.Verbal g.DLS License# SCOTTAWRIGHT AS032177 7. a.Name of Contractor's On-Site Supervisor/Foreman b.DLS Certification# 8 ENVIRONMENTAL HEALTH INC AA000044 a.Name of Project Monitor b.DLS Certification# 9 ENVIRONMENTAL HEALTH INC AA000044 a.Name of Asbestos Analytical Lab b.DLS Certification# 10. 7/612021 7/9/2021 a.Project Start Date(MM1DD/YYYY) b.End Date(MM/DD/YYYY) 7AM-4PM N/A c.Work Hours-Monday Through Friday d.Work Hours-Saturday&Sunday 11.What type of project is this? r a.Demolition rvo- b.Renovation r- c.Repair r d.Other-Please Specify: Revised: 11/13/2013 Page 1 of 4 Massachusetts Department of Environmental Protection 100347734 BVWP AQ 04 (ANF-001) Asbestos Project# Asbestos Notification Form r Project Revision r' Project Cancellation A.Asbestos Abatement Description:(cont.) 12.Abatement procedures(check all that apply): r a.Glove Bag r- b.Encapsulation r c.Enclosure r- d.Disposal Only r, e.Cleanup r f.Full Containment F g.Other-Please Specify: 13.Job is being conducted: F7 a.Indoors r b.Outdoors 14 a.Total amount of each type of asbestos Containing materials(ACM)to be removed,enclosed,or encapsulated: 0 1000 1.Linear Feet(Lin.Ft.) 2.Square Feet(Sq.Ft.) b.Boiler,Breaching,Duct, c.Transite Pipe Tank Surface Coatings 1.Lin.Ft. 2.Sq.Ft 1.Lin.Ft. 2.Sq.Ft d.Pipe Insulation e.Transite Shingles 1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft 2.Sq.Ft. f.Spray-On Fireproofing g.Transite Panels 1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft 2.Sq.Ft. h.Cloths,Woven Fabrics i.Other-Please Specify: 1.Lin.Ft. 2.Sq.Ft j.Insulating Cement TILE,MASTIC loon 1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft. 2.Sq.Ft. 15.Describe the decontamination system(s)to be used: THREE CHAMBERED 16.Describe the containerization/disposal methods to comply with 310 CMR 7.15 and 453 CMR 6.14(2) (g): 2X 6-MIL POLY BAGS W/ASBESTOS&WASTE GENERATOR LABELS 17.For Emergency Asbestos Operations,the MassDEP and DLS officials who evaluated the emergency: a.Name of MassDEP Official b.Tiffe of MassDEP Official c.Date of Authorization(MM/DD/YYYY) d.Waiver# e.Name of DLS Official f.Title of DLS Official g.Date of Authorization(MM/DD/YYYY) h.Waiver# 18.Do prevailing wage rates as per M.G.L.c. 149,§26,27 or 27A—F apply to this 1— a.Yes r b.No project? Revised: 11/13/2013 Page 2 of 4 Massachusetts Department of Environmental Protection 1100347734 > � BWP AQ 04 (ANF-001) Asbestos Notification Form Asbestos Project# f" Project Revision r Project Cancellation B.Facility Description 1.Current or prior use of facility: INDUSTRIAL 2.Is the facility owner-occupied residential with 4 units or less? r a.Yes W b.No 3 EXCELRASTECHNOLOGIES 35 CONGRESS STREET a.Facility Owner Name b.Address SALEM MA 01970 9782244100 c.Cityrrown d.State e.Zip Code f.Telephone 4 SUSAN LYNN MARALLO 35 CONGRESS STREET a.Name of Facility Owner's On-Site Manager b.Address T SALEM MA 01970 9782244100 c.City/Town d.State e.Zip Code f.Telephone 5.DEC-TAM 50 CONCORD STREET a.Name of General Contractor b.Address NORTH READING MA 01864 9784702860 c.City/Town d.State e.Zip Code f.Telephone STARINSURANCE g.Contractor's Worker's Compensation Insurer WC0871082 12/28/2021 h.Policy# I.Expiration Date(MM/DD/YYYY) 6.What is the size of this facility? 200000 4 a.Square Feet b.#of Floors Note:Temporary storage of Asbestos C. ransp p Asbestos Transportation &Disposal containing waste 1.Transporter of asbestos-containing waste material from site of generation: material is only allowed at the place r- a.Directly to Landfill or Wo b.To Temporary Storage Location/Transfer Station of business of a DLS licensed Asbestos contractor or a transfer DEC-TAM 50 CONCORD STREET station that Is c.Name of Transporter d.Address permitted by MassDEP and NORTH READING MA 01864 9784702860 operated in e.Cityrrown f.State g.Zip Code h.Telephone compliance with Solid Waste Regulations 310 CMR 19.000 2.If a temporary storage location/transfer station is used,list name of transporter of asbestos containing waste material from temporary storage location/transfer station to final disposal site: RED TECHNOLOGIES 173 PICKERING ST a.Name of Transporter b.Address PORTLAND CT 06480 8608944605 c.Cityfrown d.State e.Zip Code f.Telephone Revised: 11/13/2013 Page 3 of 4 Massachusetts Department of Environmental Protection 1003477 34 1 BWP AQ 04 (ANF-001) —J Asbestos Project# Asbestos Notification Form r Project Revision r- Project Cancellation C.Asbestos Transportation&Disposal:(cont.) 3.Name and address of temporary storage location/transfer station for the asbestos containing waste material: DEC-TAM 50 CONCORD STREEF a.Temporary Storage Location Name b.Address NORTH READING MA 01864 9784702860 c.City/Town d.State e.Zip Code f.Telephone 4.Name and location of final disposal site(asbestos landfill): MINERVA LANDFILL BRUCE SULLIVAN a.Final Disposal Site Name b.Final Disposal Site Owner Name 9000 MINERVA ROAD c.Address WAYNESBURG CH 44688 3308663435 d.City/Town e.State f.Zip Code g.Telephone Note:Contractor must sign this form for US notification purposes D. Certification CRAIG STARI4IAAN CRAIG STARKMAN "I certify that I have personally 1.Name 2.Authorized Signature examined the foregoing and am SALES 6/11/2021 familiar with the information contained in this document and 3.Position/Title 4.Date(MM/DD/YYYY) all attachments and that,based 9784702860 DEC-TAM on my inquiry of those 5.Telephone 6.Representing individuals immediately 5000NCORDST NORTH READING responsible for obtaining the 7.Address 8.City/Town information,1 believe that the MA 01864 information is true,accurate,and 9 state 10.Zip Code complete. I am aware that there are significant penalties for submitting false information, including possible fines and imprisonment.The undersigned hereby states that I have read the Commonwealth of Massachusetts regulations governing asbestos abatement (453 CMR 6.00 promulgated by the Department of Labor Standards and 310 CMR 7.15 promulgated by the Department of Environmental Protection), and that I am aware that this permit application or notification shall not be deemed valid unless payment of the applicable fee is made." Revised: 11/13/2013 Page 4 of 4