Loading...
CERTIFICATE OF NON - 78 Federal Street - temporary trim repairs Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 FAX (978) 740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed:  Construction  Moving  Reconstruction  Alteration  Demolition  Painting  Signage ✓ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 78 Federal Street Name of Record Owner: Victoria R. Alla Description of Work Proposed: Per review of mockup by Commission Member Pattison, the Commission approves the following temporary repair work: ▪ Repair rotting window trim and sills on building’s east elevation with composite repairs to match existing dimensions, detail and outward appearance as closely as possible. NOTE: This work is considered a temporary measure ONLY due to advanced deterioration of trim and is to be replaced with wood trim when window sash work is completed in the future. Any future work on window sash and trim requires review by the Commission. ▪ Replace rotting window trim and sills on building’s Federal Street (south) elevation. Sills to be replaced with mahogany and trim to be replaced in wood to match existing dimensions, design and outward appearance. There will be no changes in color, design, location or outward appearance. Non-applicable due to being temporary and in-kind repairs. Upon completion of above work, please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans. Dated: May 19, 2020 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work.