8 Carpenter St - C of A application - new slate roof Date Stamp
JUN 2-1
Salem HistoricalCommission ssion � DEPT. OF PLANNING &
CO UNITY E =w' - "zNT
` For Office Use Only
APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,
application is hereby made for issuance of a Certificate of Appropriateness for:
❑ New Construction ❑ Moving E�T 1. Reconstruction ❑ Alteration
❑ Demolition ❑ Painting ❑ Sign ❑ Other
District: ❑Derby Street ❑Lafayette Street ✓❑McIntire ❑Washington Square
Address of Property: 8 Carpenter Street
p rt3'�
Name of Record Owner(s): Barbara Ruth Newman Revocable Trust
Owner Mailing Address: 8 Carpenter Street
Description of Work Proposed
Please type or print clearly.Attach additional sheets, as necessary.
Re-roof entire 3-story main house
1. Replace existing architectural asphalt shingles with same on upper roof
2. Replace existing architectural asphalt shingles with Vermont black slate on mansard roof sections (front&
back)
3. Replace wood gutter(front) & aluminum gutter(back) with copper gutters
4. Replace aluminum downspouts (front& back) with copper downspouts
tV ik-A�.
Name of Applipw. Barbara New Downer❑Contractor❑Tenant❑Other:
6/23/20
Signature: r.� Date:
Tel. #. 978-745-9380 E-mail Address: bnewm@verizon.net
Certificate will be mailed to the owner unless otherwise indicated here:
Certificate should be mailed to: Name Barbara Newman
8 Carpenter Street . Salem
Mailing address: City. State: M Zip: 01970
jo B. KIDNEY & CO3 I N C• Roofers Metal Workers
41 OSBORNE STREET • TELEPHONE(978)744-2875 • FAX(978)744-2252 • SALEM,MA 01970 • jbkidney@verizon.net
ROOFING CONTRACT
Barbara Newman June 23,2020
8 Carpenter St
Salem,MA 01970
Dear Ms.Newman,
The quoted price,specifications and conditions are satisfactory and are hereby accepted.
We are authorized to do the work as outlined below:
Replace upper shingle roof on the main house:
• Build a ladder stage on Barbara's side of the main roof to replace the entire
upper shingle roof
• Strip off the existing architectural asphalt shingles from the entire upper main
roof
• Furnish and install 6' of Ice and water shield to the first six feet of the roof eve
and dormer roofs
• Synthetic roofing paper will be applied to the remainder of the roof
• Fabricate and install new 8"copper drip edge to go along the eves and up the
rake boards,including the perimeter of each dormer
• Furnish and install new Certainteed architectural asphalt shingles to the entire
upper main roof.Replace with in-kind materials
• 11h galvanized roofing nail's will be used to fasten asphalt shingles
• New custom copper chimney flashings will properly flash the chimney to the
new roof
• Furnish and install new 8" Copper drip edge to run along the eves and up the
rake boards
• All debris will be picked up at the end of each day,trucked away and discarded
in a dumpster located at JB Kidney &Co.Inc shop.41 Osborne Street Salem,
MA 01970
Replace both sides of the mansard roof on the main house with new Vermont Black Slate:
• Build a staging tower on both sides of the house.
• Strip off the existing asphalt shingles and replace them with new Vermont
Black slate
• Strip off all the siding on the sides of the dormer walls and the front
• 6' of Ice and water shield will be installed to the first six feet of the roof
• Synthetic roofing paper will be applied to the remainder of the roof
• All new copper flashings will be installed to the 2 chimneys and 3 sides of each
dormer
• A custom copper flashing will be fabricated and installed to the top of the
mansard slate roof to make a transition from the upper roof to the mansard roof
• New copper vent stacks will be fabricated in the shop and installed to each vent
stack coming through the roof
• 1%a" copper nails will be used to fasten the slate to the roof
• Slate will over hang the eve and the rake boards by 1",allowing any water to
drip free
• Replace the clapboards of the sides and front of each dormer.The existing
clapboards need to be removed to properly flash the roof to the dormers
• All debris will be picked up at the end of each day,trucked away and discarded
in a dumpster located at JB Kidney &Co.Inc shop.41 Osborne Street Salem,
MA 01970
New OG Copper gutters to the main house:
• Working off the staging detailed above to replace the existing wood gutters on
the front and aluminum gutter on the back with new copper OG Gutters
• Copper gutters will be fabricated in the shop prior to installation
• New gutters will have a 5" opening and will pitch to the existing downspout
locations
• New copper downspouts will be installed to drain the gutters
• All seams,endcaps,miters and outlets will be thoroughly soldered
` -Oak '
f +ok •'4 Lti d
: -
Irb
Slk
- -
! � WV%
• - .� �� _ J Y is ,__ ► �' •.
Ok
Zb. ilk
q,
�c
• � w
l
_ a
rsacK view
nuumm
i
f
--� .-. MOWER
-"NIGER.