Loading...
8 Carpenter St - C of A application - new slate roof Date Stamp JUN 2-1 Salem HistoricalCommission ssion � DEPT. OF PLANNING & CO UNITY E =w' - "zNT ` For Office Use Only APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: ❑ New Construction ❑ Moving E�T 1. Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other District: ❑Derby Street ❑Lafayette Street ✓❑McIntire ❑Washington Square Address of Property: 8 Carpenter Street p rt3'� Name of Record Owner(s): Barbara Ruth Newman Revocable Trust Owner Mailing Address: 8 Carpenter Street Description of Work Proposed Please type or print clearly.Attach additional sheets, as necessary. Re-roof entire 3-story main house 1. Replace existing architectural asphalt shingles with same on upper roof 2. Replace existing architectural asphalt shingles with Vermont black slate on mansard roof sections (front& back) 3. Replace wood gutter(front) & aluminum gutter(back) with copper gutters 4. Replace aluminum downspouts (front& back) with copper downspouts tV ik-A�. Name of Applipw. Barbara New Downer❑Contractor❑Tenant❑Other: 6/23/20 Signature: r.� Date: Tel. #. 978-745-9380 E-mail Address: bnewm@verizon.net Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name Barbara Newman 8 Carpenter Street . Salem Mailing address: City. State: M Zip: 01970 jo B. KIDNEY & CO3 I N C• Roofers Metal Workers 41 OSBORNE STREET • TELEPHONE(978)744-2875 • FAX(978)744-2252 • SALEM,MA 01970 • jbkidney@verizon.net ROOFING CONTRACT Barbara Newman June 23,2020 8 Carpenter St Salem,MA 01970 Dear Ms.Newman, The quoted price,specifications and conditions are satisfactory and are hereby accepted. We are authorized to do the work as outlined below: Replace upper shingle roof on the main house: • Build a ladder stage on Barbara's side of the main roof to replace the entire upper shingle roof • Strip off the existing architectural asphalt shingles from the entire upper main roof • Furnish and install 6' of Ice and water shield to the first six feet of the roof eve and dormer roofs • Synthetic roofing paper will be applied to the remainder of the roof • Fabricate and install new 8"copper drip edge to go along the eves and up the rake boards,including the perimeter of each dormer • Furnish and install new Certainteed architectural asphalt shingles to the entire upper main roof.Replace with in-kind materials • 11h galvanized roofing nail's will be used to fasten asphalt shingles • New custom copper chimney flashings will properly flash the chimney to the new roof • Furnish and install new 8" Copper drip edge to run along the eves and up the rake boards • All debris will be picked up at the end of each day,trucked away and discarded in a dumpster located at JB Kidney &Co.Inc shop.41 Osborne Street Salem, MA 01970 Replace both sides of the mansard roof on the main house with new Vermont Black Slate: • Build a staging tower on both sides of the house. • Strip off the existing asphalt shingles and replace them with new Vermont Black slate • Strip off all the siding on the sides of the dormer walls and the front • 6' of Ice and water shield will be installed to the first six feet of the roof • Synthetic roofing paper will be applied to the remainder of the roof • All new copper flashings will be installed to the 2 chimneys and 3 sides of each dormer • A custom copper flashing will be fabricated and installed to the top of the mansard slate roof to make a transition from the upper roof to the mansard roof • New copper vent stacks will be fabricated in the shop and installed to each vent stack coming through the roof • 1%a" copper nails will be used to fasten the slate to the roof • Slate will over hang the eve and the rake boards by 1",allowing any water to drip free • Replace the clapboards of the sides and front of each dormer.The existing clapboards need to be removed to properly flash the roof to the dormers • All debris will be picked up at the end of each day,trucked away and discarded in a dumpster located at JB Kidney &Co.Inc shop.41 Osborne Street Salem, MA 01970 New OG Copper gutters to the main house: • Working off the staging detailed above to replace the existing wood gutters on the front and aluminum gutter on the back with new copper OG Gutters • Copper gutters will be fabricated in the shop prior to installation • New gutters will have a 5" opening and will pitch to the existing downspout locations • New copper downspouts will be installed to drain the gutters • All seams,endcaps,miters and outlets will be thoroughly soldered ` -Oak ' f +ok •'4 Lti d : - Irb Slk - - ! � WV% • - .� �� _ J Y is ,__ ► �' •. Ok Zb. ilk q, �c • � w l _ a rsacK view nuumm i f --� .-. MOWER -"NIGER.