266_Lafayette_Street_Gutter_and_Eave_Proposed_Work street View of 266 - 268 Lafayette Street
ILI
1- 1
• � 7 1
� � 4
4 1
*Point of discussion — Hove to integrate aluminum gutter
1 . Inspect all upper trim on 6 Mansard dormers and upper roof eave.
Repair as necessary. Restore details as they become known.
2. Replace fascia w/PVC 1 10" or 12", repair soffit
y with like for like wood,
3, Leader pipes will be reused or replaced as
necessary, using 3" galvanized, painted to match
-- background.
4. Rebuild this roof and gutter detail, using
copper 16 oz, with soldered joints,
1�
5, Porch restoration
T•• •* — = - Lov er parch and replace existing decking with nevi
1 3 112" Azec decking,
- replace any freaming that has expired,
- Address any skirting issues; posts, footing, lattice
work, facing boards as needed using PJC flat stock
& red cedar lattice work. Access panel to be
installed on driveway side.
- rail to match 263 Lafayette Street
y 1 . Replace lover roof fascia
and kick with new PVC
fascia and fiberglass 45"
_ gutter, corregated down
�y spouts and leader pipe,
ti
- _ 2. Check windows mantles,
drops and sills,
AIM-
r f
3 and maintain lower gutter leafs,
mabch • i L.
r.
i
' x �
i