Loading...
266_Lafayette_Street_Gutter_and_Eave_Proposed_Work street View of 266 - 268 Lafayette Street ILI 1- 1 • � 7 1 � � 4 4 1 *Point of discussion — Hove to integrate aluminum gutter 1 . Inspect all upper trim on 6 Mansard dormers and upper roof eave. Repair as necessary. Restore details as they become known. 2. Replace fascia w/PVC 1 10" or 12", repair soffit y with like for like wood, 3, Leader pipes will be reused or replaced as necessary, using 3" galvanized, painted to match -- background. 4. Rebuild this roof and gutter detail, using copper 16 oz, with soldered joints, 1� 5, Porch restoration T•• •* — = - Lov er parch and replace existing decking with nevi 1 3 112" Azec decking, - replace any freaming that has expired, - Address any skirting issues; posts, footing, lattice work, facing boards as needed using PJC flat stock & red cedar lattice work. Access panel to be installed on driveway side. - rail to match 263 Lafayette Street y 1 . Replace lover roof fascia and kick with new PVC fascia and fiberglass 45" _ gutter, corregated down �y spouts and leader pipe, ti - _ 2. Check windows mantles, drops and sills, AIM- r f 3 and maintain lower gutter leafs, mabch • i L. r. i ' x � i