Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
23 Chestnut Street 19002 ELGH_Historic App Set 190530-OPTION 2
NEW POURED CONCRETETERRACED PATIONEW +/-10'x9' FOLDING GLASSWALL(S) @ GARDEN HOUSE w/ BLACK SASHES & MUNITINSNEW +/-3'x9' FLOOR TO HEADERHEIGHT WINDOWS w/ BLACK SASHES & MUNITINS, TYP. OF (3) NEW COPPER WALLFLASHING & TILE CAPTO MATCH EXISTING @ DEMO'D CHIMNEY LOCATIONNEW DECK MOUNTED SKYLIGHT w/ COPPERFRAME TO MATCH EXISTNEW MASONRY LENTILS TO MATCH EXIST, PTD. WHITE TO MATCH MAIN HOUSENEW +/-10'x9' FOLDING GLASSWALL(S) @ GARDEN HOUSE w/ BLACK SASHES & MUNITINSNEW HALF-ROUND COPPERGUTTER AT BAY ROOFTO MATCH EXISTINGScale:Project #:Date:Drawn by:Checked by:1/8" = 1'-0"5/30/2019 3:28:54 PMA4Proposed Elevations & Materials -OPTION 21900219002 ELGHEdwards-Mistler05-30-19LHDLHD23 Chestnut Street1/8" = 1'-0"1Proposed West Elevation (Side)1/8" = 1'-0"2Proposed South Elevation (Rear)Image 3 -Proposed Half-Round Copper Gutter to Match Exist & Rear Bay of Main HouseImage 4 -Proposed Painted WhiteLentils to Match Exist @ Main House56Image 1 -Proposed Black Folding Glass Doors & Windows3Image 2 -Proposed Poured Concrete Terraced Patio4Image 5 -Proposed Skylight to Match ExistCopper Skylight7 5 1/2"7 13/16"3/8"1 1/4"1 5/8"7/8"EXISTING EXTERIOR BRICK WALLNEW BRICK MOULD TO MATCH EXIST BRICK MOULD PROFILE,PAINTED BLACKNEW ALUMINUM NANAWALL FOLDING GLASS DOOR SYSTEM & WINDOWS w/ BLACK FRAMEEXTERIORNEW BLACK MUNTIN PATTERN TOMATCH EXISTING, TYP. @ INTERIOR & EXTERIORINTERIOR4 3/4"1 3/4"1/2"INTERIOREXTERIORFOLDING GLASS DOOR PLAN -CLOSED POSITIONFOLDING GLASS DOOR PLAN -OPEN POSITIONINTERIOREXTERIORA52A52A52A54Scale:Project #:Date:Drawn by:Checked by:As indicated5/30/2019 3:28:55 PMA5Folding Glass Door & Window Details -OPTION 21900219002 ELGHEdwards-Mistler05-30-19LHDLHD23 Chestnut Street6" = 1'-0"2NanaWall Door Handle12" = 1'-0"4NanaWall Folding Glass Door & Window Jamb Detail1" = 1'-0"1NanaWall Door Plan View1" = 1'-0"3NanaWall Door Elevation - Option 2 Scale:Project #:Date:Drawn by:Checked by:5/30/2019 3:29:15 PMA6Proposed 3D Views -OPTION 21900219002 ELGHEdwards-Mistler05-30-19LHDLHD23 Chestnut Street1Proposed Northwest Perspective View2Proposed Southwest Perspective View3Proposed Northwest Aerial View4Proposed Southwest Aerial View